Attachment II - Drawings.pdf

PDF 9 MB Posted

Attached to
Z1DA--Update Utilities, Building 49 610-21-214 **THIS IS A SOLICITATION**
Solicitation number
36C25023B0031
Issued by

About this file

This federal contract opportunity notice solicits bids to upgrade utilities at the VA Northern Indiana Health Care System campus in Marion, Indiana. The scope of work includes replacing the temporary mechanical system with new condensing units and fan coil units, installing new exhaust fans throughout, replacing the existing water heater, upgrading light fixtures to LED on the first and second floors, adding new receptacles and data outlets, installing a new electrical panel in the lower level, and renovating restrooms on the lower, first, and second floors including new plumbing fixtures and finishes. The fire protection system will be replaced or upgraded on the lower level, first floor, and second floor. The project also includes replacing the existing fire protection system compressor. The work must be completed within 270 calendar days of the notice to proceed at a cost of $1.5M-$3M. An organized pre-bid site visit will be held on May 2, 2023 at the specified location and time. Bids for this project are due by June 15, 2023.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design, Inc. and shall not be used for any purpose without prior expressed written consent.

The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

NORTH

REFERENCE

PROJECT # SIGNATURE DATE

Director Associate Director Chief of Staff Associate Director for Patient Services Associcate C.O.S. for Mental Health Chief, FMS Chief, Engineering Section Chief, Environmental Management Section Infectious Control Officer Patient Safety Manager GEMS Coordinator Safety Specialist Chief, Police Service Chief, Fire Station Union Safety Representative Contracting Officer Contracting Officer Representative

VA NORTHERN INDIANA HEALTH CARE SYSTEM: MARION, INDIANA

VA NORTHERN INDIANA HEALTH CARE SYSTEM

1700 E 38th Street

MARION, INDIANA 46953

VA PROJECT NO.:

01 54OF

S LINCO

LN BLVD

S HOME AVE

GR

AY

R

OA

D

M C

M

AR

IO

N

AV

E

38TH STREET

S LINCO

LN BLVD

38TH STREET

S HOM

E AVE

LOCATION

OF PROJECT

LOCATION MAP VICINITY MAP

100% CONSTRUCTION DRAWING BID SET SUBMISSION

FINAL BID

DOCUMENTS

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 1-

4_

C

EN

TR

AL

_R

_j oh nm ic ha el

.rv t

3/ 5/

2:

:0

PM

GI001

COVER SHEET UPGRADE UTILITIES BUILDING 49 610-21-214

BUILDING 49

03/09/2021 TWT HER

UPGRADE UTILITIES BUILDING 49

610-21-214

610-21-214

MARION VAMC

VA INDEX OF WORKING DRAWINGS

SHEET NO DRAWING TITLE DRAWING N0

PD102 DEMOLITION - SECOND FLOOR PLUMBING PLAN 28

PL100 PLUMBING - LOWER LEVEL FLOOR PLAN 29

PL101 PLUMBING - FIRST FLOOR PLAN 30

PL102 PLUMBING - SECOND FLOOR PLAN 31

MECHANICAL

MG001 MECHANICAL GENERAL INFORMATION 32

MG002 MECHANICAL DETAILS AND SCHEDULES 33

MG003 MECHANICAL DETAILS AND SCHEDULES 34

MG004 MECHANICAL DETAILS 35

MD100 DEMOLITION - LOWER LEVEL MECHANICAL PLAN 36

MD101 DEMOLITION - FIRST FLOOR MECHANICAL PLAN 37

MD102 DEMOLITION - SECOND FLOOR MECHANICAL PLAN 38

MH100 MECHANICAL - LOWER LEVEL FLOOR PLAN 39

MH101 MECHANICAL - FIRST FLOOR PLAN 40

MH102 MECHANICAL - SECOND FLOOR PLAN 41

ELECTRICAL

EG100 ELECTRICAL ABBREVIATIONS & SYMBOLS 42

ED100 ELECTRICAL DEMOLITION PLAN - LOWER LEVEL 43

ED101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR 44

ED102 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR 45

EL100 ELECTRICAL - LOWER LEVEL LIGHTING PLAN 46

EL101 ELECTRICAL - FIRST FLOOR LIGHTING PLAN 47

EL102 ELECTRICAL - SECOND FLOOR LIGHTING PLAN 48

EP100 ELECTRICAL - LOWER LEVEL POWER PLAN 49

EP101 ELECTRICAL - FIRST FLOOR POWER PLAN 50

EP102 ELECTRICAL - SECOND FLOOR POWER PLAN 51

FIRE PROTECTION

FX100 FIRE PROTECTION PLAN - LOWER LEVEL 52

FX101 FIRE PROTECTION PLAN - FIRST FLOOR 53

FX102 FIRE PROTECTION PLAN - SECOND FLOOR 54

VA INDEX OF WORKING DRAWINGS

SHEET NO DRAWING TITLE DRAWING N0

GENERAL

GI001 COVER SHEET 01

GI002 ICRA DETAILS 02

GI003 INFECTION CONTROL PLANS 03

GI004 ARCHITECTURAL - ABBREVATIONS AND SYMBOLS 04

CIVIL

LD100 DEMOLITION - LANDSCAPING SITE PLAN 05

LP101 LANDSCAPING SITE PLAN 06

DEMOLITION

AD100 DEMOLITION - LOWER LEVEL FLOOR PLAN 07

AD101 DEMOLITION - FIRST FLOOR PLAN 08

AD102 DEMOLITION - SECOND FLOOR PLAN 09

AD900 DEMOLITION - LOWER LEVEL REFLECTED CEILING PLAN 10

AD901 DEMOLITION - FIRST FLOOR REFLECTED CEILING PLAN 11

AD902 DEMOLITION - SECOND FLOOR REFLECTED CEILING PLAN 12

ARCHITECTURAL

AS100 ARCHITECTURAL - LOWER LEVEL FLOOR PLAN 13

AS101 ARCHITECTURAL - FIRST FLOOR PLAN 14

AS102 ARCHITECTURAL - SECOND FLOOR PLAN 15

AS300 ARCHITECTURAL - ENLARGED TOILET PLANS AND ELEVATIONS 16

AS900 ARCHITECTURAL - LOWER LEVEL REFLECTED CEILING PLAN 17

AS901 ARCHITECTURAL - FIRST FLOOR REFLECTED CEILING PLAN 18

AS902 ARCHITECTURAL - SECOND FLOOR REFLECTED CEILING PLAN 19

AS1100 ARCHITECTURAL - LOWER LEVEL FINISH FLOOR PLAN 20

AS1101 ARCHITECTURAL - FIRST FLOOR FINISH PLAN 21

AS1102 ARCHITECTURAL - SECOND FLOOR FINISH PLAN 22

AS1201 ARCHITECTURAL - FIRST FLOOR FURNITURE PLAN 23

AS1202 ARCHITECTURAL - SECOND FLOOR FURNITURE PLAN 24

PLUMBING

PG001 PLUMBING DETAILS AND SCHEDULES 25

PD100 DEMOLITION - LOWER LEVEL PLUMBING PLAN 26

PD101 DEMOLITION - FIRST FLOOR PLUMBING PLAN 27

Revisions: Date:

FLEX DUCT

PLASTIC WINDOW

(ON ALL SIDES)

HEPA NEGATIVE AIR UNIT

MOBILE CONTAINMENT

CART WITH CANVAS /

1-1/4" SQUARE STEEL

TUBULAR FRAME

FLEX DUCT

SWIVEL CASTERS

ZIPPER SIDE ENTRY

AD

JU

ST

AB

LE

HE

IG

HT

UNIT SHALL BE VENTED

TO OUTSIDE

AD

JU

ST

AB

LE

HE

IG

HT

TYPE A TYPE B

4" RUBBER COVE TO MATCH EXISTING

AREA BASE AT BOTH SIDES. 4" RUBBER COVE

TO MATCH EXISTING AREA

BASE AT BOTH SIDES.

SUSPENDED

ACOUSTICAL CEILING

AS SCHEDULED

ON FLOOR PLAN.

ALL TEMPORARY CONSTRUCTION BARRIER -

INFECTION/ DUST CONTROL PARTITION(S)

SHALL BE SEALED TO EXISTING FLOOR,

CEILING, WALL, & DOOR/ WINDOW FRAME

CONSTRUCTION AS APPLICABLE, PER

INFECTION CONTROL REQUIREMENTS PRIOR

TO DEMOLITION & FOR DURATION OF

CONSTRUCTION. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

TEMPORARY CONSTRUCTION "SMOKE

TIGHT" BARRIER - INFECTION/ DUST CONTROL

PARTITION: 4" , 20 GA. METAL STUDS @ 16"

O.C., SECURED TO FLOOR, CEILING, WALL, &

DOOR/WINDOW FRAME INTERSECTIONS FOR

STRUCTURAL STABILITY, W/ 1/2" GYP. BD. EA.

SIDE, W/ ALL JOINTS TAPED AND SEALED FOR

INFECTION/DUST CONTROL (NOT MUDDED).

SUSPENDED ACOUSTICAL CEILING AS

SCHEDULED ON FLOOR PLAN.

ALL TEMPORARY CONSTRUCTION

BARRIER - INFECTION/ DUST CONTROL

PARTITION(S) SHALL BE SEALED TO

EXISTING FLOOR, CEILING, WALL, &

DOOR/ WINDOW FRAME CONSTRUCTION

AS APPLICABLE, PER INFECTION CONTROL

REQUIREMENTS PRIOR TO DEMOLITION &

FOR DURATION OF CONSTRUCTION. SEE

SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

4 7/8"

W

AL

L H

EI

GH

T

VE

RI

ES

F

IEL

D

VE

RI

FY

CE

ILI

NG

H

EI

GH

T 8'

-0

" 3 5/8" 16 GA. METAL

STUDS AT 16" O.C.

WITH 5/8" GYPSUM

BOARD EACH SIDE.

4 7/8"

CE

ILI

NG

H

EI

GH

T 8'

-0

W

AL

L H

EI

GH

T

VE

RI

ES

F

IE

LD

V

ER

IFY

XXXXX

XXXXX

XXXXX

XXXXX

INDICATOR MUST MAINTAIN -0.01 INCHES OF WATER

GAUGE (VERIFY DAILY) AIR PRESSURE, IF NOT VERIFY

ALL OPENING SUCH AS DOORS ARE CLOSED AND/OR

CHANGE OUT NEGATIVE AIR PRE-FILTER.

INDICATOR

(REFER TO

PLAN &

ELEVATION)

POST ICRA, ILSM,

FIRE INSPECTION

SHEETS VISIBLE

TO PUBLIC

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

COMING SOON!!!

ICRA, ILSM

FIRE WATCH

MISC. FORMS

PAPER

CADDY

PERSONNEL ENTERING MUST HAVE: HARD HAT,

SAFETY GLASSES AND PROPER I.D.

-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY-

THIS IS A

RESTRICTED AREA

AREA UNDER CONSTRUCTION

CONST. SUPERVISOR

NAME AND

CELL PHONE

CONTACT PHONE #####

FIRE EMERGENCY DIAL 911

XXXXXX

XXXX

FRAMED

PICTURE

OF

C.O.R.

WITH CONTACT

INFORMATION

AP

PR

OX

. 4

8" A

.F .F

ICRA

REQUIREMENTS

NO ENTRY

DUST BARRIER

PROVIDE AND DISPLAY ICRA REQUIREMENT

DOCUMENTATION. COORDINATE WITH COR.

5-PLY SOLID CORE FLUSH DOORS SHALL BE

SECURED, AND HAVE LIMITED, ZIPPERED ACCESS,

& MASKED OFF / SEALED & PROTECTED PER

INFECTION CONTROL REQUIREMENTS PRIOR TO

DEMOLITION & FOR DURATION OF CONSTRUCTION.

COORDINATE EGRESS REQUIREMENTS WITH COR.

SEE SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

EXIT

CLOSED FOR

CONSTRUCTION

PROVIDE AND DISPLAY ICRA REQUIREMENT

DOCUMENTATION. COORDINATE WITH COR.

5-PLY SOLID CORE FLUSH DOORS SHALL BE

SECURED, AND HAVE LIMITED, ZIPPERED ACCESS,

& MASKED OFF / SEALED & PROTECTED PER

INFECTION CONTROL REQUIREMENTS PRIOR TO

DEMOLITION & FOR DURATION OF

CONSTRUCTION. COORDINATE EGRESS

REQUIREMENTS WITH COR. SEE SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

USE ALTERNATIVE

EXITS

CAUTION

THIS AREA CLOSED

OFF

A

O

V

E

PROVIDE STICKY MATS

(CHANGED END OF SHIFT OR

MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

INDICATOR MUST BE AT -.01 OR GREATER

(VERIFY DAILY), IF NOT VERIFY ALL OPENINGS

SUCH AS DOORS ARE CLOSED AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC.

FIRE EXTINGUISHER

ON PORTABLE FLOOR

BRACKET (ISLM MAY

REQUIRE MORE THAN

ONE).

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION.

COVER ALL RETURNS AT

THE GRATE / DIFFUSERS

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN RUNNING

TO KEEP DUST OUT.

OUTSIDE OF BUILDING

SUSPENDED PLASTIC ZIPPER

WALL CURTAIN BARRIER

OPTIONAL EXHAUST

DUCTS (COVER THE

GRATES AND THE

DIFFUSERS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

OF02 54

100% CONSTRUCTION DRAWING BID SET SUBMISSION

FINAL BID

DOCUMENTS

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 1-

4_

C

EN

TR

AL

_R

_j oh nm ic ha el

.rv t

3/ 5/

2:

:4

PM

GI002

ICRA DETAILS UPGRADE UTILITIES BUILDING 49

MARION VAMC

610-21-214

BUILDING 49

03/09/2021 TWT JMP

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

• OFFICE AREAS • CARDIOLOGY

• ECHOCARDIOGRAPHY

• ENDOSCROPY

• NUCLEAR MEDICINE

• PHYSICAL THERAPY

• RADIOLOGY / MRI

• RESPIRATORY THERAPY

• CCU

• EMERGENCY ROOM

• LABOR AND DELIVERY

• LABORATORY (SPECIMEN)

• NEWBORN NURSEY

• OUTPATIENT SURGERY

• PEDIATRICS

• PHARMACY

• POST ANESTHESIA CARE UNIT

• SURGICAL UNITS

• ANY AREA CARING FOR

IMMUNOCOMPROMISED PATIENTS

• BURN UNIT

• CARDIAC CATH LAB

• CENTRAL STERILE SUPPLY

• INTENSIVE CARE UNITS

• MEDICAL UNIT

• NEGATIVE PRESSURE ISOLATION ROOMS

• ONCOLOGY

• OPERATING ROOMS INCLUDING

C-SECTION ROOMS

PATIENT RISK GROUPS

APPLICABILITY OF GENERAL CONSTRUCTION NOTES:

THESE NOTES APPLY TO ALL WORK DESCRIBED IN THESE DRAWINGS AND SPECIFICATIONS AND TO ALL CONTRACTORS AND / OR SUBCONTRACTORS THAT WORK IN, ON, OR AROUND THIS BUILDING OR THE ADJACENT SITE. FOR ADDITIONAL SCOPE OF WORK DESCRIBED IN DETAIL, SEE THE RESPECTIVE DISCIPLINE DRAWINGS AND

SPECIFICATIONS.

1. EXISTING BUILDING UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY / ALL WORK, VERIFY THE LOCATION AND INSURE THE OBVIOUS MARKING OF ALL EXISTING UTILITIES (PRIVATE / PUBLIC) AND RELATED EQUIPMENT ON, ABOVE, OR BENEATH THE ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN, TO BE MODIFIED, OR TO BE REMOVED. COORDINATE ALL VERIFICATION AND MARKING WORK WITH THE COR.

2. BUILDING DUST AND INFECTION CONTROL: THE BUILDING WILL REMAIN FULLY UNOCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL MEASURES OUTLINED. SEE INFECTION CONTROL PLAN AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE SPECIFIC INFORMATION WITH THE COR.

3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL REMAIN FULLY UNOCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION

OF THE CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH THE COR. SEE

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

4. EXISTING WORK AREA AND BUILDING CONDITION: PROVIDE, INSTALL, AND MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO THE WORK AREA AND PATH OF DEMOLITION

TRAVEL FROM CONSTRUCTION DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING

BUILDING OR ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK, AT NO

ADDITIONAL COST TO THE VA. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. EXITS TO BE MAINTAINED: MAINTAIN A MINIMUM OF 3' OF MAIN WARD ACCESS / EXIT THROUGHOUT THE

CONSTRUCTION PERIOD.

6. GENERAL DEMOLITION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR

GENERAL DEMOLITION NOTES AND INFORMATION INCLUDING DISPOSAL AND / OR SALVAGE OF

DEMOLISHED MATERIALS. COORDINATE SPECIFIC INFORMATION WITH THE COR.

7. GENERAL CONSTRUCTION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS

FOR GENERAL CONSTRUCTION NOTES AND INFORMATION INCLUDING STORAGE AND STAGING OF

CONSTRUCTION MATERIALS. COORDINATE SPECIFIC INFORMATION WITH THE COR.

8. EXISTING PLUMBING SUPPLY AND DWV SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY UNOCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING, MODIFICATIONS TO, REROUTING OF, AND RECONNECTING OF EXISTING PLUMBING SUPPLY AND DRAIN WASTE VENT SYSTEMS (DWV) AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. EXISTING MECHANICAL SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY UNOCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING MECHANICAL SYSTEMS, STEAM PIPING AND EQUIPMENT WITH THE

COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

10. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY UNOCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING POWER SUPPLIES AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

11. FIRE-PROTECTION SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY UNOCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL NEW ROUTING OF FIRE-PROTECTION SYSTEMS AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

GENERAL CONSTRUCTION AND PHASING NOTES

COORDINATE WITH NORTHERN INDIANA VAMC CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO COMPLETE AN INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN INFECTION CONTROL CONSTRUCTION PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE DOCUMENTS PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT. SEE ITEMS LISTED BELOW AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK ASSESSMENT MATRIX OF

PRECAUTIONS FOR CONSTRUCTION & RENOVATION" FOR INFECTION CONTROL INFORMATION AND

REQUIREMENTS.

2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION &

RENOVATION" COORDINATE WITH COR TO DETERMINE THE FOLLOWING PROJECT CONDITIONS:

· PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)

· TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)

· CLASS OF PRECAUTION/ LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (CLASS II REQUIRED)

3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED WITH DEMOLITION AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN AUTHORIZED BY THE COR. ONCE THE PERMIT

IS AUTHORIZED, POST THE PERMIT AS DIRECTED BY THE COR.

4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS" AS OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT AND APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS. PRECAUTIONS LISTED BELOW ARE TO BE

CONFIRMED WITH THE COR:

1.1. DURING CONSTRUCTION PROJECT PHASE:

1.1.1. ISOLATE THE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

1.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK AREA BEFORE

DEMOLITION OR CONSTRUCTION BEGINS.

1.1.3. MAINTAIN NEGATIVE AIR PRESSURE OF -0.1" W.C. WITHIN WORK SITE UTILIZING HEPA EQUIPPED

AIR FILTRATION UNITS. CONTRACTOR SHALL PROVIDE MAGNOMETER TO MEASURE AIR

PRESSURE.

1.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

1.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM

SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR

THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE

WORK SITE.

1.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS

MUST BE EXCHANGED EACH TIME WORKER EXITS THE WORK AREA.

1.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE

SAFETY OFFICE AND INFECTION CONTROL AND THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT SERVICE.

1.2. UPON COMPLETION OF PROJECT PHASE:

1.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

1.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

1.2.3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

1.2.4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

1.2.5. WET MOP AREA WITH DISINFECTANT.

1.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK HAS BEEN PERFORMED.

5. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, & MAINTAIN THE SPECIFIC INFECTION

CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.

6. UPON COMPLETION OF THE CONSTRUCTION PROJECT PHASE, REMOVE THE SPECIFIC INFECTION

CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.

7. IAQ (INDOOR AIR QUALITY) CONTROL MEASURES DURING CONSTRUCTION NOTES:

INFECTION CONTROL PLAN GENERAL NOTES

RISK RELATED GROUP

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

TYPE A

I

I

I

II

TYPE B

II

II

II

III / IV

TYPE C

II

III

III / IV

III / IV

TYPE D

III / IV

IV

IV

IV

NOTE:

INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACITIVITY AND RISK LEVEL INDICATE THAT CLASS II CONTROL

PROCEDURES ARE NECESSARY.

IC MATRIX - CLASS OF PRECAUTIONS:

CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

SCALE: 3/8" = 1'-0"

GI002

ICRA MOBILE CART

SCALE: 3/8" = 1'-0"

GI002

ICRA - WALL CONSTRUCTION TYPES

SCALE: 1/2" = 1'-0"

GI002

ICRA - ROOM ELEVATION

SCALE: 1/2" = 1'-0"

GI002

ICRA - INFECTION / DUST CONTROL DOOR

SCALE: 1/2" = 1'-0"

GI002

ICRA - EXIT CLOSED FOR CONSTRUCTION

SCALE: 3/8" = 1'-0"

GI002

ICRA - CONSTRUCTION LAYOUT

TYPE A

INCLUDES, BUT IS NOT LIMITED TO:

• REMOVABLE OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET.

• PAINTING (BUT NOT SANDING).

• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR

REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

MATRIX OF PRECAUTIONS FOR

CONSTRUCTION & RENOVATION

INSPECTION AND NON-INVASIVE ACTIVITIES

TYPE B

INCLUDES, BUT IS NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

• ACCESS TO CHASE SPACES.

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

SMALL SCALE, SHORT DURATION ACTIVITIES

WHICH CREATES MINIMAL DUST

TYPE C INCLUDES, BUT IS NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING.

• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.

• NEW WALL CONSTRUCTION.

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.

• MAJOR CABLING ACTIVITIES.

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.

WORK THAT GENERATES A MODERATE TO HIGH LEVEL

OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF

ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

TYPE D INCLUDES, BUT IS NOT LIMITED TO:

• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.

• REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM.

• NEW CONSTRUCTION.

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

CL

AS

S

II

CLASS II WORK ITEMS NOTES:

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT WORK AREAS.

6. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

PRIOR TO ANY CONSTRUCTION:

1. WIPE WORK SURFACES TO CONTROL DUST WHILE CUTTING.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP AND / OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

POST CONSTRUCTION:

4 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

OF03 54

100% CONSTRUCTION DRAWING BID SET SUBMISSION

FINAL BID

DOCUMENTS

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 1-

4_

C

EN

TR

AL

_R

_j oh nm ic ha el

.rv t

3/ 5/

2:

:3

PM

GI003

INFECTION CONTROL PLANS UPGRADE UTILITIES BUILDING 49

MARION VAMC

610-21-214

BUILDING 49

03/09/2021 TWT JMP

SCALE: 3/16" = 1'-0"

GI003

LOWER LEVEL - ICRA PLAN

SCALE: 3/16" = 1'-0"

GI003

FIRST FLOOR - ICRA PLAN

SCALE: 3/16" = 1'-0"

GI003

SECOND FLOOR - ICRA PLAN

NOT TO SCALE

LOWER LEVEL

BUILDING 49 KEY PLAN

N

RENOVATION

AREA

NOT TO SCALE

FIRST FLOOR

BUILDING 49 KEY PLAN

N

RENOVATION

AREA

NOT TO SCALE

SECOND FLOOR

BUILDING 49 KEY PLAN

N

RENOVATION

AREA

INFECTION CONTROL PLAN NOTES

1 INFECTION / DUST CONTROL PARTITION. PARTITION SHALL BE SECURED, SEALED, &

PROTECTED FOR THE DURATION OF CONSTRUCTION. COORDINATE INFECTION CONTROL

RISK ASSESSMENT AND EGRESS REQUIREMENTS WITH COR. COORDINATE ADDITIONAL

REQUIREMENTS WITH COR.

2 INFECTION / DUST CONTROL PARTITION EGRESS DOOR. EGRESS DOOR SHALL BE

SECURED, SEALED, AND PROTECTED FOR THE DURATION OF CONSTRUCTION.

COORDINATE INFECTION CONTROL RISK ASSESSMENT (ICRA) AND EGRESS REQUIREMENTS

WITH COR. COORDINATE ADDITIONAL REQUIREMENTS WITH COR.

3 CONTRACTOR TO PROVIDE "STICKY" MAT FLOOR PADS IMMEDIATELY OUTSIDE ALL

INFECTION / DUST CONTROL PARTITIONS TO ENSURE THE FLOOR CLEANLINESS IS

MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION.

4 PATH OF DEMOLITION / TRASH REMOVAL TRAVEL FROM RENOVATED AREA. ALL

CONSTRUCTION DEBRIS AS PART OF DEMOLITION SHALL BE REMOVED IN ENCLOSED /

SEALED CONTAINERS AND FOLLOW THE INFECTION CONTROL RISK ASSESSMENT (ICRA)

REQUIREMENTS AS COORDINATED WITH THE COR.

NORTHNORTH

NORTH

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CERTIFICATE OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM,

OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD OR FLAT HEAD SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR

FIBERGLASS REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FV FIELD VERIFY

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE DIMENSION

OD OUTSIDE DIMENSION OUTSIDE DIAMETER

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND CEMENT

PCA PORTLAND CEMENT ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR, OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL TEMPERATURE CONTROL PANEL;

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

YD YARD

YR YEAR

ARCHITECTURAL ABBREVIATIONS GENERAL NOTES

1. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE

OF THE DRAWINGS TO BE THE FOLLOWING: THE DOCUMENTS (DRAWINGS,

SPECIFICATIONS, ADDENDUM, ETC.) INDICATE THE GENERAL SCOPE OF THE

PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSION OF

THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, THE MAJOR STRUCTURAL,

MECHANICAL, AND ELECTRICAL SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT

INTENDED TO INDICATE OR DESCRIBE ALL THE WORK REQUIRED FOR FULL

PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT.

ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE

TRADE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER

EXECUTION AND COMPLETION OF THE WORK.

2. GENERAL CONTRACTOR IS TO FOLLOW AND OBEY THE LATEST VERSION OF ALL

FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND

HAZARDOUS WASTE LAWS, ETC. INCLUDING OSHA 101 LIFE SAFETY CODE AND

NEC.

3. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

4. ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF MASONRY, FACE OF

METAL STUDS, OR COLUMN CENTERLINE, UNLESS NOTED OTHERWISE.

5. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH BUILDING

COMPONENT LOCATION. BRING ANY DISCREPANCIES TO THE CONTRACTING

OFFICER REPRESENTATIVE'S (COR) ATTENTION IN WRITING IMMEDIATELY.

REFERENCE SYMBOLOGY

DETAIL IDENTIFICATION NUMBER

AREA OF DETAIL

NUMBER OF SHEET ON WHICH

SECITON IS DRAWN

SYMBOL WHERE SECTION IS TAKEN

SCALE AT WHICH SECTION

IS DRAWN

SECTION IDENTIFICATION

NUMBER

SUBTITLE FOR SECTION DRAWNG

SYMBOL WHERE DETAIL IS TAKEN

A101

SIM

SUBTITLE FOR DETAIL DRAWNG

A001

SHEET REFERENCE NUMBER

SHEET SEQUENCE NUMBER

DISCIPLINE CODE NORTH

NORTH ARROW

P5-3

PARTITION TYPE DOOR NUMBER

DOOR REFERENCE NUMBER

ROOM NAME & NUMBER

PARTITION TYPE

NUMBER

ROOM NUMBER

SHEET NOTE

NOTE REFERENCE NUMBER

SYMBOL WHERE ELEVATION IS TAKEN ELEVATION TAG

A101 Name

Elevation

ELEVATION IDENTIFICATION

ELEVATION HEIGHT

1 Ref

R ef

1 Ref

R ef

NUMBER OF SHEET ON

WHICH ELEVATION IS DRAWN

ELEVATION IDENTIFICATION

NUMBER

DETAIL IDENTIFICATION NUMBER

NUMBER OF SHEET ON WHICH DETAIL IS DRAWN

VESTIBULE

ROOM NAME

A001

A001

SECTION

SCALE 1/2" = 1'-0"

NUMBER OF SHEET ON

WHICH SECTION IS DRAWN

A001

DETAIL

SCALE 1/2" = 1'-0"

SCALE AT WHICH DETAIL IS

DRAWN

NUMBER OF SHEET ON

WHICH DETAIL IS DRAWN

A001

WOOD (ROUGH)

PLYWOOD

STEEL OR METAL

ALUMINUM

FIRE SAFING INSULATION

BLANKET, BATT OR LOOSE FILL INSULATION

GRANULAR/GRAVEL FILL

BRICK

CMU

EARTH

CONCRETE

GROUT/GYPSUM BOARD

RIGID/FOAM INSULATION

MATERIAL LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

OF04 54

100% CONSTRUCTION DRAWING BID SET SUBMISSION

FINAL BID

DOCUMENTS

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 1-

4_

C

EN

TR

AL

_R

_j oh nm ic ha el

.rv t

3/ 5/

2:

:0

PM

GI004

ARCHITECTURAL - ABBREVATIONS AND

SYMBOLS

UPGRADE UTILITIES BUILDING 49

MARION VAMC

610-21-214

BUILDING 49

03/09/2021 TWT JMP

LANDSCAPING LIMITS

EXISTING SHRUB

REMOVE SHRUB

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

OF05 54

100% CONSTRUCTION DRAWING BID SET SUBMISSION

FINAL BID

DOCUMENTS

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 1-

4_

C

EN

TR

AL

_R

_j oh nm ic ha el

.rv t

3/ 5/

2:

:3

PM

LD100

DEMOLITION - LANDSCAPING SITE

PLAN

UPGRADE UTILITIES BUILDING 49

MARION VAMC

610-21-214

BUILDING 49

03/09/2021 TWT ANL

GENERAL DEMOLITION NOTES

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR

SUBCONTRACTORS THAT WORK WITHIN THE BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED SCOPE. CONTRACTOR TO COORDINATE

ALL ASSOCIATED WORK BETWEEN ALL TRADES.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE CONTRACTOR IN THE EVALUATION OF

THE EXTENT OF DEMOLITION: BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER

IMMEDIATELY.

4. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY THE CONTRACTOR –

DAILY.

5. PROTECT FROM DEMOLITION DEBRIS AND EQUIPMENT, ALL EXISTING TREES.

6. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE (WOODS, DRIVEWAY, OR COUNTY

ROADS) PRIOR TO COMPLETING ALL DEMOLITION WORK.

7. CONTRACTOR TO PATCH / REPAIR / REGRADE EXISTING DRIVEWAY AS NEEDED TO ELIMINATE ANY RUTS OR

LOW AREAS CREATED DURING DEMOLITION.

SCALE: 1/4" = 1'-0"

LD100

DEMOLITION - LANDSCAPING SITE PLAN

NOTE:

NOT ALL KEYNOTES ARE USED ON EVERY SHEET. NOTES NOT

USED ON THIS SHEET MAY OCCUR ON OTHER SHEETS.

NOT TO SCALE

FIRST FLOOR

BUILDING 49 KEY PLAN

N

RENOVATION

AREA

NOTE:

1. ALL DISTURBED AREAS OF GRADE TO RECEIVE PERMANENT

SEEDING. REFER TO SPECIFICATION FOR ADDITIONAL

INFORMATION.

2. ALL GRADING ELEVATIONS ARE TO MATCH EXISTING TOP

OF SURFACE UNLESS NOTED OTHERWISE.

NORTH

SITE PLAN DEMOLITION NOTES

1 CONTRACTOR TO REMOVE SHRUB AND / OR PERENNIALS INCLUDING ROOT BALL. ALL DISTURBED AREAS

OF GRADE TO RECEIVE PERMANENT SEEDING. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2 CONTRACTOR TO REMOVE EXISTING EQUIPMENT PAD. ALL DISTURBED AREAS OF GRADE TO RECEIVE

PERMANENT SEEDING. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

LANDSCAPING LIMITS

EXISTING SHRUB

REMOVE SHRUB

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

OF06 54

100% CONSTRUCTION DRAWING BID SET SUBMISSION

FINAL BID

DOCUMENTS

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 1-

4_

C

EN

TR

AL

_R

_j oh nm ic ha el

.rv t

3/ 5/

2:

:0

PM

LP101

LANDSCAPING SITE PLAN UPGRADE UTILITIES BUILDING 49

MARION VAMC

610-21-214

BUILDING 49

03/09/2021 TWT ANL

NOTE:

NOT ALL KEYNOTES ARE USED ON EVERY SHEET. NOTES NOT

USED ON THIS SHEET MAY OCCUR ON OTHER SHEETS.

NOT TO SCALE

FIRST FLOOR

BUILDING 49 KEY PLAN

N

RENOVATION

AREA

SCALE: 1/4" = 1'-0"

LP101

LANDSCAPING SITE PLAN

GENERAL CONSTRUCTION NOTES

1. DIMENSIONS ARE FROM CORNER TO CORNER OF OPENING, OR TO FACE OF WALL UNLESS

NOTED OTHERWISE.

2. CONTRACTOR TO COORDINATE ALL WORK BETWEEN TRADES, INCLUDING BETWEEN FINISH

CONTRACTOR AND ELECTRICAL, ON ALL LIGHT FIXTURES, WIRING, AND FINISHES.

3. CONTRACTOR TO PROVIDE ALL RELATED FASTENERS, TRIM AND ACCESSORIES FOR INSTALL

PRODUCTS PER MANUFACTURER’S WRITTEN INSTRUCTIONS.

4. ALL CONTRACTORS ARE RESPONSIBLE FOR CLEANING SITE TO THE BEST OF THEIR ABILITIES

AT THE END OF EACH WORK DAY.

5. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE

CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS TO CONTACT

THE OWNER IMMEDIATELY PRIOR TO THE END OF THE DAY OF CONSTRUCTION.

NORTH

SITE PLAN CONSTRUCTION NOTES

1 CONTRACTOR TO PROVIDE AND INSTALL NEW EQUIPMENT PAD. SEE MECHANICAL SHEETS

FOR ADDITIONAL INFORMATION.

2 ALL DISTURBED AREAS OF GRADE TO RECEIVE PERMANENT SEEDING. REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

NOTE:

1. ALL DISTURBED AREAS OF GRADE TO RECEIVE PERMANENT

SEEDING. REFER TO SPECIFICATION FOR ADDITIONAL

INFORMATION.

2. ALL GRADING ELEVATIONS ARE TO MATCH EXISTING TOP

OF SURFACE UNLESS NOTED OTHERWISE.

RESTROOM

CLOSET

ELEVATOR

OIT CLOSET

MECH

UTILITY

008 CLOSET

MECHANICAL

LOWER LEVEL

SPRINKLER

ROOM

CORRIDOR

C001

STAIR

S001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY

SPRINKLED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

OF07 54

100% CONSTRUCTION DRAWING BID SET SUBMISSION

FINAL BID

DOCUMENTS

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\6

-2 1-

4_

C

EN

TR

AL

_R

_j oh nm ic ha el

.rv t

3/ 5/

2:

:4

PM

AD100

DEMOLITION - LOWER LEVEL FLOOR

PLAN

UPGRADE UTILITIES BUILDING 49

MARION VAMC

610-21-214

BUILDING 49

03/09/2021 TWT JMP

SCALE: 1/4" = 1'-0"

AD100

DEMOLITION - LOWER LEVEL FLOOR PLAN

GENERAL DEMOLITION NOTES

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR

SUBCONTRACTORS THAT WORK WITHIN THE BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED SCOPE. CONTRACTOR TO COORDINATE

ALL ASSOCIATED WORK BETWEEN ALL TRADES.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE CONTRACTOR IN THE EVALUATION OF

THE EXTENT OF DEMOLITION: BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY MAY BE COMPROMISED, NOTIFY THE ARCHITECT / ENGINEER

IMMEDIATELY.

4. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY THE CONTRACTOR –

DAILY.

5. PROTECT FROM DEMOLITION DEBRIS AND EQUIPMENT, ALL EXISTING TREES.

6. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE (WOODS, DRIVEWAY, OR COUNTY

ROADS) PRIOR TO COMPLETING ALL DEMOLITION WORK.

7. CONTRACTOR TO PATCH / REPAIR / REGRADE EXISTING DRIVEWAY AS NEEDED TO ELIMINATE ANY RUTS OR

LOW AREAS CREATED DURING DEMOLITION.

DEMOLITION PLAN CONSTRUCTION NOTES

1 CONTRACTOR TO REMOVE EXISTING PLUMBING FIXTURES IN THEIR ENTIRETY. SEE PLUMBING SHEETS FOR

ADDITIONAL INFORMATION.

2 CONTRACTOR TO REMOVE ALL EXISTING TOILET ACCESSORIES IN THEIR ENTIRETY.

3 CONTRACTOR TO REMOVE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .