36C25023B0003 Amendment 0001.pdf
PDF 249 KB Posted
- Solicitation number
- 36C25023B0003
About this file
This document is an amendment to a solicitation for the addition of emergency power to a central chiller plant at a Veterans Affairs medical center. The contractor will construct a new generator building addition and tie it into existing fuel and electrical systems. Work includes installing automatic transfer switches to back up chilled water systems during outages and integrating direct digital controls with the facility's Siemens building management system. Bidders must acknowledge receipt of this amendment by the specified date and time. The amendment provides responses to bidder questions for clarification, including confirming the construction type, identifying existing electrical equipment, and noting that variable frequency drives and branch feeders are new.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 36C2523B0003 Add Emergency Power to Chiller 506-21-110 Amendment 0001
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
506-21-110
36C250
Department of Veterans Affairs Network Contracting Office (NCO) 10 5500 Armstrong Rd.
Bldg 9 Rm. 105 Mail Code 515/90VC Battle Creek MI 49037
36C250
Department of Veterans Affairs Network Contracting Office (NCO) 10 6150 Oak Tree Blvd., Suite 300
Independence OH 44131
To all Offerors/Bidders
36C25023B0003
02-01-2023
X
X X
X 1
The purpose of this amendment is to provide response to submitted RFI's, see continuation pages below.
Scott D. Brennan Contracting Officer
Question: Can a comparable alternative from Dur-A-Flex be substituted for the materials specified on the finish legend? Please advise when possible.
Response: Dur-A-Flex is NOT sole sourced. Thus, a product which meets the VA specifications and requirements would be an equal and acceptable. This would include all salient characteristics related to the basis of design for the identified product.
Question: Spec section 26 24 13 - Distribution Switchboards Part 2-2.9, A references Section 25 10 10 Advanced Utility Metering (Page 838). There is no division 25 within the project specifications. Can section 25 10 10 Advanced Utility Metering be issued?
Response: Updated Specs that include missing Section 25 10 10 to be uploaded to Solicitation via Amendment.
Question: What is the Construction Type of this Building?
Response: The addition was designed as a Type II (222) per NFPA 220. Interior steel columns of the addition have 2-hr rated CMU surrounding the columns up to 8ft, then spray-applied fireproofing above to the roof.
Question: Which Substation in Main Electrical Room #113 is Energy Center Substation #1 and which is Energy Center Substation #2?
Response: The four substations are identified as follows:
North to south o Energy Center Substation #2 o Energy Center Substation #1 o Chiller Substation #2 o Chiller Substation #1
Question: Are Distribution Panels DB-EMCC EC-1 & DB-EMCC EC-02 New or Existing Panels? Should the Branch Feeders coming off DB-EMCC EC-1 be Dark lined (New/Relocated)?
Response: DB-EMCC EC-1 & DB-EMCC EC2 are new panels. Feeders for these panels are new.
Question: Who is the Manufacturer of the Existing Switchboard EMCC EC-3 we are to Re- Label and add Breakers to? Is a picture of the switchboard available?
Response: EMCC EC-3 is motor control center and is manufactured by Siemens.
Question: What is the existing Security / Access Control System is in place at the VA?
Response: Hersch.
Question: There is no VFD Schedule and Drawing Note #1 on EP102 only states to Install, not Furnish & Install. Please confirm contractor is to furnish VFDs. A VFD Schedule for Physical Size Information is needed to show what each VFD is feeding, please.
Response: VFD’s are to be furnished and installed by Div 26 contractor. Each is to be sized to the HP rating of the motor it controls. See Spec 26 29 11 Motor Controllers for details.
Question: Which Substation in Main Electrical Room #113 is Energy Center Substation #1 and which is Energy Center Substation #2?
Response: Unit substation #2 is the most northern one. Unit substation #1 is the next one just south of #2. This is shown on sheet EP101.
Question: Are Distribution Panels DB-EMCC EC-1 & DB-EMCC EC-02 New or Existing Panels (they are light lined as if existing)? Should the Branch Feeders coming off DB-EMCC EC-1 be Dark Lined (New/Relocated)?
Response: DB- EMCC EC-1 AND DB-EMCC EC-2 are new panels. All feeders attached are new.
File details come from the government source that posted it. Updated .