This solicitation is for the Install Car Charging Stations Project #539-21-203 at the Cincinnati VAMC in Cincinnati, Ohio. The contractor shall install thirty-eight Level 2 car charging stations and one DC fast charger at two locations, the Cincinnati VAMC and Fort Thomas campus. The work includes preparing sites, demolishing existing structures, installing equipment, and ensuring functionality. The period of performance is 180 calendar days from receipt of the notice to proceed. The project value is estimated between $5-10 million. The solicitation is 100% set aside for verified service-disabled veteran-owned small businesses. Bids are due at the date and time specified in block 13A at the Network Contracting Office in Cincinnati, Ohio. An organized pre-bid site visit was scheduled for February 24, 2021.

View the file

Other files

File Type Posted
36C25021B0013 0005.docx DOCX document
36C25021B0013 0004.docx DOCX document
SD321216-02.pdf PDF
SD321216-01.pdf PDF
36C25021B0013 0003.docx DOCX document
539-21-203_ ADDENDUM_1-write up -2021.0304.pdf PDF
539-21-203 drawings -addendum1 2021.03.pdf PDF
36C25021B0013 0001.docx DOCX document
Site Visit 2.24.2021.pdf PDF
36C25021B0013_1.docx DOCX document
Attachment 2- SPECIFICATONS.pdf PDF
Attachment 3 -Contractor EMR Certification Form.pdf PDF
Attachment 1 - DRAWINGS.pdf PDF
Attachment 5-DBA-WD-OH020210082.pdf PDF
Attachmetn 4- RFI Form.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

539-21-2-6905-0012

539-21-203

Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219

Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219 To all Offerors/Bidders

36C25021B0013 03-10-2021

X x x

The purpose of this amendment is to:

-Post the Government's responses to RFIs

- Post addendum explanation (see attachment)

- Post Addendum to the drawings (see attachment)

This information can be found on the continuation page of the amendment

“INSTALL CAR CHARGING STATIONS” PROJECT FOR THE

VETERANS AFFAIRS MEDICAL CENTER (VAMC)—CINCINNATI, OH

PROJECT NUMBER: 539-21-203

QUESTIONS AND ANSWERS (RFIs)

QUESTIONS AND ANSWERS

1. RFI #1 Question: Base bid states “Installation of (38) Level 2 car charging stations and (1) fast car charging station at each location as indicated on the drawings. The drawings show (11) 26.01 Level 2 car charging stations at the Cincy VA, (8) Level 2 car charging stations on Ft. Thomas VA, and )1_ 26.02 fast car charging station on the Ft. Thomas VA for a total of 21. Please confirm quantities and which is correct.

Answer: Electrical drawings indicate either a single or dual charger stations. Provide L2 chargers with 38 car plug locations as indicated on the drawings.

· 10 stations at CVAMC Building 1

· 3 stations at CVAMC Building 3

· 9 stations at CVAMC parking garage B01

· 16 stations at Fort Thomas

· One fast charging station at Ft Thomas VA

2. RFI #2 Question: Reference Drawing E101

Note 1: “New Dual Level 2 Charger” Can we get a make and specific model that we should include in our price?

Note 2: “New Single Level 2 Charger” Can we get a make and specific model that we should include in our price?

Answer: Car charging stations are not sole sourced. Refer to project specifications for characteristics.

Note 10: “Remove Existing Level 2 Charger” What are we to do with the existing charging stations after they have been removed?

Answer: Turn over existing charging stations to VA Note 12: “Exposed conduit shall be run in IMC” While onsite we seen many different types of Conduit, such as GRC, EMT and PVC. Can any of these be used inside or outside for exposed conduit in place of IMC?

Answer: GRC or IMC shall be used within the garage. EMT and PVC are not permitted.

3. RFI #3 Question: Reference Specification 26 27 29

(PG. 166) 1.3 Certified Installers A. Installers must be certified by EVSE manufacturer or a recognized certified training agency. (Is all manufacture’s or training agency’s training accepted? Does the Contractor and employee both need a certification, and can the certification be from different manufacture’s or training agency’s?)

Answer: Certification from manufacturers meeting the specifications is acceptable. Contracting agency certification only is acceptable as employees will be operating under the contracting agency responsibility (PG. 167) 1.7 Quality Control D. 1. Submit documentation certifying that pertinent personnel are qualified for EVSE installation. The documentation must include installation experience on two projects of comparable size and scope of work. (What kind of documentation are you requesting?)

Answer: Documentation of qualification per 1.3 above. Documentation of prior experience shall be completed projects including (2) projects with DC fast charger(s) and (2) projects with a minimum of (8) L2 charging stations.

4. RFI #4 Question: Reference Drawing E102

How do we go about saw cutting and excavating to cross the road from Building 64 to the pull box area? Will we be required to install a road plate to get this road reopened or will we have time to get that excavated and raceways across the road before backfilling?

As an alternative plan would it be acceptable to bore under this road and excavate on each end?

Answer: Directional boring would be acceptable as well. If saw cutting is done, roadway plates are required.

Will there be a waste dumpster or something to dispose of the cut-up asphalt or do we need to provide one?

Answer: Contractor to provide all dumpsters needed for project.

5. RFI #5 Question: Reference Drawings E102

Note 2: Shows 3-500 KCMIL, 1-#3 GRD in a 4-inch conduit. This note is for the Line side of the transformer and should be revised on the drawing as its own note.

Answer: Note 2 sheet E201 serving panel GP6 shall be changed to 2A. 2A shall read "4-500kcmil, 1-#3 grd. in 4" c.”

Note 2: Again 3-500 KCMIL, 1-#3 GRD in a 4-inch conduit. This Note is missing an additional 500 KCMIL conductor. The physical location of L2A panel is at a distance where what is shown in NOTE 2 will not be code compliant?

Answer: Note 2 serving panel L2A shall be changed to 2B. 2B shall read "2 sets of 4-400kcmil, 1-#2/0 grd. in 4" c.”

Note 7: Shows 4-3/0, 1-#4 GRD in a 2-inch conduit. The physical location of the PANEL DC FAST is at a distance where what is shown in NOTE 2 will not be code compliant?

Looking at E4 location on Drawing E201. Where does this 200A disconnect need to be located? At or near the PANEL DC FAST or in the Switching room where the Transformer will be located?

Answer: DC fast charger calculations show under 2% expected voltage drop at 400' at a design load of 120A and a service voltage of 480V-3PH. L2A voltage drop calculations with revised feeder above showed under 3% voltage drop at a max connected load of 311A at a service voltage of 208V-3PH to panel (total voltage drop from service to chargers less than 5%).

200A breaker in Nema 1 enclosure shown on the single line after the 112.5KVA transformer on Ft Thomas single line diagram is secondary-side disconnect and OCP adjacent to transformer. Refer to sheet E1-2 Note 3.

6. RFI #6 Questions: Reference Word Document 36C5021B0013 page 14-15

2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT - CONSTRUCTION MATERIALS (MAY 2014) Regarding (a) (b) (c)(1)(2) (d)(1)(2)(3)(i)(ii) Does this requirement apply to the purchase of the EV charging stations?

Answer: All Clauses sited in this solicitation are applicable to ALL materials for this project.

7. RFI #7 Questions:

Section 2.5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) Paragraph: B; Page Number: 16 of 58

Banning Contracting Services respectfully requests on behalf of the Banning CS/Siemens Team an additional site visit as our team was unable to attend the original site visit dated 2/24/2021 due to inclement weather at our home office that has since been determined a State of Emergency in Oklahoma.

Additionally, the Banning CS/Siemens Team requests a list of attendees for the original site visit dated 2/24/2021.

Answer: There will not be another site visit scheduled for this effort at this time.

8. RFI #8 Questions: Reference 36 C 25021B0013

"We see that the SOW states 'The project will install thirty-eight level 2 car changing stations and one fast car charging station at each location with associated electrical connections in electrical closets, in multiple locations at the Cincinnati and Fort Thomas campuses.'

We are seeing some discrepancies in the drawings compared to the SOW regarding quantities of station.

Can you verify a few items:

1. How many Level 2 stations are planned to be installed?

Answer: 38 Level 2 chargers (refer to addendum for location).

2. Are these Level 2 stations all dual port stations? Or are some single ports?

Answer: This is total number of chargers. Some are single on pedestal, some are 2 chargers per pedestal.

3. How many level 2 stations are wall/surface mounted? And how many are pedestal mounted?

Answer: Refer to plan notes on drawing for locations to determine quantities.

4. We see that one DC Fast Charger was deleted, but one is still required, correct?"

Answer: One DC fast charger to be located at the Ft Thomas location.

In Person Questions

Cincinnati

1. Will the garage in building #3 be empty?

a. No. Immediate area for work to be coordinated with COR.

2. Will the building #3 garage need to be brought up to code?

a. No

3. In building #3 garage, will holes need to be drilled, or can they use the current openings?

a. You can use the current openings if they are within 2 feet of the designed path.

4. In building #3, which direction will the construction be going?

a. Vertically from sub-basement into basement Room 002 and horizontally to the electrical room.

5. Is part of the requirement removing the ceiling grid?

a. Ceiling grid intended to remain in place.

6. What is the construction infection control requirement?

a. IRCA Class 2

7. Are underground utility site plans of the parking lot available?

a. Individual areas involved in the project have been provided below. Please note that these are the best site plans available, but a utility locating service shall be utilized prior to excavation.

b. Building 1

c. Building 3

d. Parking Garage

e. Fort Thomas

Fort Thomas

1. Will the exercise equipment be moved out?

a. No, immediate area in path of work to be coordinated with COR. Work in patient care areas requires coordination of construction activities with COR.

See attached document: 539-21-203_ ADDENDUM_1-write up -2021.0304.

See attached document: 539-21-203 drawings -addendum1 2021.03.

image4.png image1.png image2.png image3.png