515-18-109 Bid Drawings - Signed_Part1 - reissue.pdf

PDF 15 MB Posted

Attached to
Z1DA--Renovate Outpatient Pharmacy & Urgent Care 515-18-109
Solicitation number
36C25020B0058
Issued by

About this file

This document outlines a federal contract opportunity for renovation services. The solicitation seeks bids to furnish all labor, materials, supervision, equipment, tools, and other necessary resources to renovate the outpatient pharmacy and urgent care areas at the Battle Creek Healthcare System located in Battle Creek, Michigan. Key details include a solicitation number of 36C25020B0058, NAICS code 236220 with a $39.5 million small business size standard, and a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. An organized site visit is scheduled and sealed bids must be delivered to the Network 10 Contracting Office by 2:00PM on September 10, 2020. The place of performance is 5500 Armstrong Road in Battle Creek. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is the contracting agency.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF.REF.

REF.

REF.

UP

UP

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2019

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2019 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2019 EDITION.

NFPA 54 NATOINAL FUEL GAS CODE, 2018 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2017 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2019 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA

PROCESSING EQUIPMENT, 2017 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2019 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2019 EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS, 2018 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2018 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2018 EDITION

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2018 EDITION

NFPA 101, LIFE SAFETY CODE, 2018 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2018 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017

EDITION

NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA

5000 AND NFPA 900

ASHRAE 90.1-2016 HVAC SYSTEMS

ASHRAE 62.1 - 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

ASHRAE 170 - 2013 VENTILATION OF HEALTH CARE FACILITES

ANSI A117.1-2017 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2015

ENERGY SUSTAINABILITY, MAY 2014

EQUIPMENT, JANUARY 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR

PROJECTS SEPTEMBER 30, 2010

EPA GUIDELINES CHECKLIST

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38 & AMBULATORY HEALTH CARE OCCUPANCY CHAPTER 20

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD

PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

THE PROJECT SCOPE INCLUDES RENOVATION

THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE IB/TYPE II(222) CONSTRUCTION AS FOLLOWS:

OCCUPANCY TYPE: B-BUSINESS, IBC CHAPTER 3/LSC CHAPTER 38 & AMBULATORY HEALTH CARE, LSC CHAPTER 20

CONSTRUCTION TYPE: IB (IBC CHAPTER 5)

3. FIRE RESISTIVE RATINGS TYPE IB CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 2 -HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

FIREPROOFING NOTE: CONTRACTOR IS REQUIRED TO PROVIDE NEW FIREPROOFING ON NEW STEEL AND ASSEMBLIES, AND ON EXISTING CONSTRUCTION WHERE REQUIRED BY DEMOLITION AND NEW WORK TO MAINTAIN FIRE RATINGS PER THE CODE ANALYSIS GI101. PRIMARY STRUCTURAL FRAME 2 HRS, ROOF 1 HR, AND FLOOR 2

HRS.

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT: UNLIMITED FT (IBC, TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 11 (IBC, TABLE 504.4)

7. ALLOWABLE AREA: BASED UPON UNLIMITED OCCUPANCY, IB CONSTRUCTION TYPE

8. OCCUPANCY SEPARATION: A ONE HOUR OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE AMBULATORY HEALTH CARE OCCUPANCY (LSC CHAPTER 20) AND THE

BUSINESS SUITE OCCUPANCY (LCS CHAPTER 38). (LSC 18.1.3.4)

9. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 150 FEET (LSC 20.2.6.2)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)

• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)

• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)

• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3 STORIES. (LSC 38.2.9.1)

• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)

10. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED WITH AN AUTOMATIC EXTINGUISHING SYSTEMS THE SPACE SHALL ALSO BE ENCLOSED WITH SMOKE

PARTITIONS IN ACCORDANCE WITH SECTION 8.4.

• 1-HOUR FIRE RESISTANCE RATING AND AUTOMATIC SPRINKLER SYSTEM IS REQUIRED FOR THE FOLLOWING: SOILED HOLDING AND HIGH HAZARD CONTENT

AREAS PER LSC 38.2.2.

11. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL

AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• · CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.

• · CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS

SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD

METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA

260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

12. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10. (38.3.5)

13. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC 38.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM. (LSC 38.3.4.4)

14. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2019 EDITION OF NFPA 13 AND THE SEVENTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.

16. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED AND

MAINTAINED PER NFPA 241.

PROCEDURE

0111A

STOR.

0110B

ISO EXAM

TRIAGE

RECEPTION

0103A

TRIAGE

VAULT

0103B585 SF

A

EQUIP. STORAGE

MH EXAM

M.H. TLT

EXAM / FLEX M.H.

EXAM / FLEX M.H.

0120 EXAM

SOILED

STAFF TLT

STAFF TLT

CONSULT

772 SF

A

CONSULT

CONSULT

CONSULT

VAULT

CONFERENCE RM

UC BREAK RM AND

LOCKERS

HAC

RECEIVING

DISPENSING

WINDOWS

BREAK RM

STAFF TLT

OFFICE

GENERAL WAITING

PROCEDURE ROOM

GAS - FULL

2084 SF

10022

B

EXAM SOUND

BOOTH

SECURITY OFFICE

MECHANICAL

EXIST. IT CLOSET

OFFICE

OFFICE

TEMP PHARMACY

CONSULT

AGENT CASHIER

0051A

HAC

MECH

MECH

ON-CALL

0097A

GAS - EMPTY AND

IN-USE

ON-CALL TLT /

SHOWER

0097B

VEST. / BOX BREAK

DOWN

HVAC

021E

HOUSE KEEPING

OFFICE

OFFICE

FILLING

WORK STATIONS

PHARM. STORAGE

MH EXAM

AUDIOLOGY EXAM

SHOWER

0106A

ISO / PATIENT

TOILET

NURSE MANAGER

LINEN

AUDIOLOGY CLEAN

NF AND PENDING

016 STORAGE

NURSE

0135A

NURSE / DICTATION

EXAM

EXAM

PATIENT TLT

CLEAN

EXAM

MED

0130 PROCEDURE

0110A

MAIL-OUT

B

5,512 SF

CONSULT /

DISPENSING

B

3,540 SF

URGENT CARE SUITE

FEC

FEC

FEC

FEC

FEC

FEC

FEC

FEC

FEC

PHARMACY WAITING

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

TRAVEL DISTANCE: 198'-7"

T R

A V

E L

D

IS

T A

N C

E

'-1

0"

TRAVEL DISTANCE: 95'

TRAVEL DISTANCE: 148'-11"

10035

PHARMACY WORK

RM

ELECTRICAL

CLOSET

ELECTRICAL

CLOSET

WALK-IN ENTRANCE

MECH

CORRIDOR

C08

CORRIDOR

C05

CORRIDOR

C01

CORRIDOR

C02

CORRIDOR

C011

STORAGE

CORRIDOR

C03

EXIT PASSAGEWAY

01228

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

STAFF LOUNGE/

LOCKER ROOM

OFFICE

STOR.

OFFICE

CUSTOMER SERVICE

OFFICE

OFFICE

0074A

HSK

ELEC.

OFFICE

I.T.

OFFICE

SUB WAITING

TOILET

0078A

FEMALE

ELEV.

E3

MALE

OFFICE

FEMALE

MALE

STAIR

S1

STOR.

016A

HVAC

0017E

ELEV. MACH.

0018E

ELEV.

E1

ELEV.

E2

HVAC

0020E

STAIR

S2

STOR.

PROSTHETICS

TREATMENT

WAITING

HVAC

0042E

CHIEF

EXAM SOUND

BOOTH

SECRETARY

STAIR

S5

STAIR

S3

CORRIDOR

C04

CORRIDOR

C015

STAIR

S6

TEMP VAULT

PRESCRIPTION

PICK-UP

BREAK RM

PHOTO

STOR.

EXAM SOUND

BOOTH

CORRIDOR

C06

CORRIDOR

C014

CLOSET

0111B

CORRIDOR

C010

CORRIDOR

C012

VAULT

0051B

HALL

CALL ROOM

CLOSET

0107A

MECH

0112A

OPEN OFFICE AND

AUDIOLOGY AND

TEMPORARY PHARMACY,

BUSINESS OCCUPANCY

URGENT CARE,

AMBULATORY HEALTH

CARE OCCUPANCY

PHARMACY, BUSINESS

OCCUPANCY

SHADE INDICATES AREA

NOT IN SCOPE

SHADE INDICATES AREA

NOT IN SCOPE

CROSSHATCH INDICATES AREA OF

SPRINKLER SYSTEM, SEE FIRE

PROTECTION DRAWINGS

CROSSHATCH INDICATES AREA OF

SPRINKLER SYSTEM, SEE FIRE

PROTECTION DRAWINGS

48'-8"

TEMPORARY

PHARMACY

(PHASE 1) OPEN

OFFICE AND

AUDIOLOGY

(PHASE 3)

PHARMACY

(PHASE 2)

URGENT CARE

(PHASE 4)

SHADE

INDICATES

APPROXIMATE

AREA OUT OF

SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI 48126

313.441.3000 | WWW.GHAFARI.COM

FRED VOLLMERHAUSEN

CHIEF, ENGINEERING PROJECTS

100% DESIGN SUBMISSION 03/13/2020

95% DESIGN SUBMISSION 9/13/2019

65% DESIGN SUBMISSION 12/05/2018

35% DESIGN SUBMISSION 10/12/2018

100% BID DOCUMENTS 05/20/2020

C U s e rs

\t s a n d e rs \D o c u m e n ts \1

.1

.0

V

A B

C P

H A

R U

C A ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:5

A

M

GI101

LIFE SAFETY PLAN RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

May 20, 2020 JDF JDJ

100% BID DOCUMENTS

PART. SPRINKLERED

100% BID DOCUMENTS

SCALE: 3/32" = 1'-0"GI101

2 GROUND FLOOR LIFE SAFETY PLAN

N

SCALE: 1" = 80'-0"

KEY PLAN - GROUND FLOOR

Revisions: Date:

UPUP

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION BATT.

5/8" TYPE X GYPSUM BOARD, BOTH

SIDES

3 5/8" METAL STUD @ 16" O.C.

WITH RUNNER CHANNELS ALONG

TOP AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY

ADHERE TO THE STRUCTURAL DECK

ABOVE AND TO THE FLOOR BELOW

WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

COORDINATE WITH EXISTING

CEILING

CONTRACTOR SHALL

FINISH, INCLUDING

PAINTING, PUBLIC SIDE

OF TEMPORARY WALLS

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

5/8" TYPE X GYP BD

3 5/8" STEEL STUDS @ 16"

O.C.

BEAD OF CONT. SEALANT

6-MIL FIRE RETARDENT POLY

INTERIOR SIDE

CEILING

2" DEEP LEG 3 5/8" STEEL SLIP TRACK

3 5/8" STEEL STUD TRACK

6" M

IN

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDENT

POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

PUBLIC SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER,

HARDWARE AND CLOSER

NEGATIVE AIR MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE

FOR REQUIRED CONDITION TO

STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

PHASE 1

CONSTRUCTION

ACCESS. NEW

WINDOWS OPENINGS

WILL BE INSTALLED IN

PHASE 1

PHASE 1

AREA C

PHASE 1

AREA ACONSTRUCTION

BARRIER

AND ACCESS

CONSTRUCTION

BARRIER AND

ACCESS

PHASE 1

AREA B

PHASE 1 CONSTRUCTION OPENING. WINDOWS

OPENING BE INSTALLED IN PHASE 1

PHASE 1 – TEMPORARY PHARMACY SHELL SPACE SCOPE AND PORTION OF NEW

PHARMACY RENOVATION SCOPE

ESTIMATED DURATION: 18 WEEKS

PHASE 1 AREA A – TEMPORARY PHARMACY BUILD OUT AND STAFF /

EQUIPMENT MOVE TO SHELL 0G-001

• DEMOLITION AND NEW WORK IN SHELL OG-001, EXIT PASSAGEWAY, AND

EXISTING VENDING EXCEPT FOR THE AREA OF PHASE 1 AREA B. REFER

TO PHASING PLANS AND ALL CONTRACT DOCUMENTS FOR ADDITIONAL

INFORMATION.

• PROVIDE (4) NEW WINDOWS IN EXISTING EXTERIOR WALLS. WINDOW

OPENING CAN BE USED FOR CONSTRUCTION ACCESS TO EXISTING SHELL

SPACE.

• THIS IS THE CRITICAL PATH OF CONSTRUCTION FOR PHASE 1. WHEN THIS

PORTION OF WORK IS COMPLETED, THE VA WILL MOVE PHARMACY INTO

ITS TEMPORARY LOCATION.

PHASE 1 AREA B – UC BREAK RM AND ON-CALL TLT / SHOWER 0097

• DEMOLITION AND NEW WORK OF THE REMAINDER OF THE SHELL OG-001,

EXIT PASSAGEWAY, AND EXISTING VENDING. REFER TO PHASING PLANS

AND ALL CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION.

• WHEN THIS PORTION OF WORK IS COMPLETED, THE TEMPORARY

PHARMACY STAFF WILL USE THIS SPACE.

PHASE 1 AREA C – WEST SHELL SPACE

• DEMOLITION AND NEW WORK IN WEST SHELL SPACE.

• THIS AREA DOES NOT NEED TO BE COMPLETED UNTIL THE COMPLETION

OF PHASE 2 FOR PERMANENT PHARMACY LOCATION.

CONSTRUCTION PHASING SEQUENCE - PHASE 1

CONSTRUCTION PHASING GENERAL NOTES

1. GENERAL CONTRACTOR SHALL PROVIDE APPROPRIATE TEMPORARY

BARRIER THAT WILL ALLOW CONTINUING OPERATIONS OF THE FACILITY

DURING CONSTRUCTION AS DETERMINED BY COR. THE GENERAL

CONTRACTOR SHALL NOTIFY THE OWNER, AT LEAST 48 HOURS IN

ADVANCE, OF ANY ACTIVITY THAT WILL PRODUCE DISRUPTIONS TO THE

FACILITY OR OPERATIONS.

2. BASED ON THE PROXIMITY TO THE EXISTING AUDIOLOGY DEPARTMENT,

G.C. SHALL COORDINATE WITH THE OWNER CONSTRUCTION ACTIVITIES,

GENERATION OF NOISE AND / OR VIBRATION TRANSMISSION AT TIME OF

CONSTRUCTION, WHICH WILL IMPACT THE AUDIOLOGY DEPARTMENT

OPERATION. ASSUME THAT CONSTRUCTION OPERATIONS SHALL ONLY

OCCUR DURING OFF HOURS OF OPERATION (NIGHTS AND WEEKENDS)

UNLESS DETERMINED OTHERWISE.

3. THE GENERAL CONTRACTOR SHALL INCLUDE 3 WEEKS BETWEEN

COMPLETION OF EACH CONSTRUCTION PHASE FOR VA STAFF TO OCCUPY

THE COMPLETED CONSTRUCTION AREA, PRIOR TO BEGINNING WORK ON

THE SUBSEQUENT AREA OF WORK. GENERAL CONTRACTOR SHALL

SCHEDULE / COORDINATE WITH THE OWNER ALL ASPECTS OF TRANSITION

BETWEEN CONSTRUCTION PHASES.

4. THE FOLLOWING PHASES ARE INDENTED TO PROVIDE A GUIDELINE

SEQUENCE OF CONSTRUCTION. THESE SHALL INCLUDE ALL ACTIVITIES,

METHODS, CONSTRUCTION SCHEDULING AND / OR COORDINATION, WHICH

WILL ENSURE THE UNINTERRUPTED OPERATIONS IN THE FACILITY. IF

THERE IS A NEED TO VARY AND / OR REVISE THESE PHASES, THE

GENERAL CONTRACTOR SHALL INFORM BOTH THE OWNER AND THE

ARCHITECT PRIOR TO ANY VARIATION / REVISION OF THE PHASES AND

THEIR EXECUTION.

PHASE 1

PHASE 2

PHASE 3

AREA 1A - EXISTING VENDING AREA, EXIT

PASSAGEWAY, AND EAST SHELL SPACE.

AREA 1B - BREAK ROOM AND ON CALL TLT.

COMPLETE ASAP FOR TEMP. PHARM USE

PHASE 1 IS COMPLETED UPON TEMPORARY PHARMACY

AREA READY FOR OCCUPANCY

AREA 1C - WEST SHELL SPACE

PHASE 2 IS COMPLETED UPON

PERMANENT PHARMACY AREA READY

FOR OCCUPANCY

AREA 2 - EXISTING PHARMACY AREA

VA MOVES

PHARMACY TO

TEMPORARY

AREA

VA MOVES

PHARMACY TO

PERMANENT

LOCATION

PHASE 3 IS COMPLETED UPON AUDIOLOGY OFFICE

AREAS, PATIENT FUNDS, AND AGENT CASHIER READY

FOR OCCUPANCY

AREA 3A - NEW AUDIOLOGY OFFICE AREA AND

PASSAGE INTO EXISTING AUDIOLOGY

AREA 4A - EXISTING URGENT CARE

AREA 3B - NEW PATIENT FUNDS AND AGENT CASHER VA OCCUPIES

COMPLETED

SPACES

PHASE 4

PHASE 4 IS COMPLETED UPON URGENT CARE AND ALL REMAINING WORK IS READY FOR

OCCUPANCY

VA OCCUPIES

COMPLETED

SPACES

AREA 3B - NEW BOX BREAKDOWN

AND NF AND PENDING

SUB-PHASE 3C

PHASE 3C IS COMPLETED UPON BOX

BREAKDOWN, AND NF AND PENDING

READY FOR OCCUPANCY VA OCCUPIES

COMPLETED

SPACES

AREA 4B - EAST VESTIBULE

AREA 4C - ENTRY AREA TO

AUDIOLOGY WAITING, FINISH ASAP

AREA 4E - AREA OF

NEW PUBLIC

HALLWAY THROUGH

URGENT CARE,

FINISH ASAP

AREA 4D - AREA OF EXISTING

PUBLIC HALLWAY NOT BEING USED

FOR NEW HALLWAY, FINISH ASAP

AREA 4F - NEW MAIN SOUTH

VESTIBULE

AREA 4G - CORRIDOR NIGHT AND

WEEKEND WORK

INFECTION CONTROL NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 1/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GI102.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO FULL SET OF CONTRACT DOCUMENTS FOR ALL PHASING

INFORMATION.

PROJECT SHALL BE COMPLETED IN 4 PHASES AS OUTLINED IN THESE

DOCUMENTS.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR.

TEMPORARY IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS

ARE APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR ONCE

ICRA PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM WEEKDAYS OR ON THE WEEKENDS.

EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A

MINIMUM.

PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH

TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS

DETERMINED BY COR.

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-

PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS

UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH

A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

PHASING LEGEND AND NOTES

# HATCH AND NUMBER INDICATE CURRENT

PHASE - SEE PHASING PLANS

TEMPORARY WALLS AND DOORS

AREA NOT IN SCOPE OF

WORK

PHASE 2

PHASE 1

AREA C

CONSTRUCTION BARRIER

AND CONSTRUCTION

ACCESS DOOR

FOR WORK ON PHASE 1C

PHASE 2 – PERMANENT PHARMACY RENOVATION

ESTIMATED DURATION: 22 WEEKS

• DEMOLITION AND NEW WORK FOR PERMANENT PHARMACY.

• THIS IS THE CRITICAL PATH OF CONSTRUCTION FOR PHASE 2. WHEN THIS

PORTION OF WORK IS COMPLETED, THE VA WILL MOVE PHARMACY INTO

ITS PERMANENT LOCATION.

CONSTRUCTION PHASING SEQUENCE - PHASE 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI 48126

313.441.3000 | WWW.GHAFARI.COM

FRED VOLLMERHAUSEN

CHIEF, ENGINEERING PROJECTS

100% DESIGN SUBMISSION 03/13/2020

95% DESIGN SUBMISSION 9/13/2019

65% DESIGN SUBMISSION 12/05/2018

35% DESIGN SUBMISSION 10/12/2018

100% BID DOCUMENTS 05/20/2020

C U s e rs

\t s a n d e rs \D o c u m e n ts \1

.1

.0

V

A B

C P

H A

R U

C A ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:0

A

M

GI102

CONSTRUCTION PHASES 1 & 2 /

INFECTION CONTROL PLAN

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

May 20, 2020 JDF JDJ

100% BID DOCUMENTS

PART. SPRINKLERED

100% BID DOCUMENTS

SCALE: 1 1/2" = 1'-0"GI102

1 TEMP 1 HR RATED BARRIER WALL - NFPA 241

SCALE: 1 1/2" = 1'-0"GI102

2 TEMP INFECTION CONTROL BARRIER WALL

SCALE: 1/4" = 1'-0"GI102

3 TEMP WALL CONSTRUCTION ELEVATION

N

SCALE: 1" = 20'-0"GI102

5 PHASE 1 PLAN KEY PLAN

SCALE: 12" = 1'-0"

PHASING TIMELINE LEGEND

SCALE: 1" = 20'-0"GI102

6 PHASE 2 PLAN

UPUP

UP

PHASE 3

AREA A

PHASE 3

AREA B

PHASE 3

AREA C

MODIFIED PHASE 3C

BARRIER

AND ACCESS

CONSTRUCTION BARRIER

AND ACCESS

CONSTRUCTION

BARRIER AND

ACCESS

PHASE 3 – AUDIOLOGY RENOVATION SCOPE

THE FOLLOWING DESCRIBES THE SEQUENCE OF CONSTRUCTION FOR

THE AUDIOLOGY RENOVATION WORK.

ESTIMATED DURATION: 10 WEEKS

PHASE 3 AREA A - AUDIOLOGY OFFICE AREA BUILD OUT AND STAFF

/EQUIPMENT MOVE

• DEMOLITION AND NEW WORK TO CREATE FINAL OFFICE SPACE AND TO

CREATE THE CONNECTION TO EXISTING AUDIOLOGY. RENOVATE

EXISTING SPACES AS NOTED.

• WHEN THIS IS COMPLETED, VA WILL MOVE INTO AND OCCUPY THIS AREA.

PHASE 3 AREA B - PATIENT FUNDS AND AGENT CASHER RNOVATION

• NEW RENOVATION IN PATIENT FUNDS 0024. PROVISION FOR CUTTING OF

NEW OPENINGS IN EXISTING WALL, ALONG WITH THE WORK INDICATED IN

THE PLANS.

• THIS IS THE CRITICAL PATH FOR PHASE 3. WHEN THIS AREA IS

COMPLETED, THE VA WILL OCCUPY THIS SPACE AND PHASES 3C AND 4

MAY BEGIN.

PHASE 3C – RENOVATE EXISTING PATIENT FUNDS AND AGENT CASHIER

• DEMOLITION AND NEW WORK TO RENOVATE EXISTING PATIENT FUNDS

AND AGENT CASHIER.

• THIS AREA SHOULD BE COMPLETED AS SOON AS POSSIBLE BUT DOES

NOT NEED TO BE COMPLETED PRIOR TO PHASE 4.

CONSTRUCTION PHASING SEQUENCE - PHASE 3

CONSTRUCTION PHASING GENERAL NOTES

1. GENERAL CONTRACTOR SHALL PROVIDE APPROPRIATE TEMPORARY

BARRIER THAT WILL ALLOW CONTINUING OPERATIONS OF THE FACILITY

DURING CONSTRUCTION AS DETERMINED BY COR. THE GENERAL

CONTRACTOR SHALL NOTIFY THE OWNER, AT LEAST 48 HOURS IN

ADVANCE, OF ANY ACTIVITY THAT WILL PRODUCE DISRUPTIONS TO THE

FACILITY OR OPERATIONS.

2. BASED ON THE PROXIMITY TO THE EXISTING AUDIOLOGY DEPARTMENT,

G.C. SHALL COORDINATE WITH THE OWNER CONSTRUCTION ACTIVITIES,

GENERATION OF NOISE AND / OR VIBRATION TRANSMISSION AT TIME OF

CONSTRUCTION, WHICH WILL IMPACT THE AUDIOLOGY DEPARTMENT

OPERATION. ASSUME THAT CONSTRUCTION OPERATIONS SHALL ONLY

OCCUR DURING OFF HOURS OF OPERATION (NIGHTS AND WEEKENDS)

UNLESS DETERMINED OTHERWISE.

3. THE GENERAL CONTRACTOR SHALL INCLUDE 3 WEEKS BETWEEN

COMPLETION OF EACH CONSTRUCTION PHASE FOR VA STAFF TO OCCUPY

THE COMPLETED CONSTRUCTION AREA, PRIOR TO BEGINNING WORK ON

THE SUBSEQUENT AREA OF WORK. GENERAL CONTRACTOR SHALL

SCHEDULE / COORDINATE WITH THE OWNER ALL ASPECTS OF TRANSITION

BETWEEN CONSTRUCTION PHASES.

4. THE FOLLOWING PHASES ARE INDENTED TO PROVIDE A GUIDELINE

SEQUENCE OF CONSTRUCTION. THESE SHALL INCLUDE ALL ACTIVITIES,

METHODS, CONSTRUCTION SCHEDULING AND / OR COORDINATION, WHICH

WILL ENSURE THE UNINTERRUPTED OPERATIONS IN THE FACILITY. IF

THERE IS A NEED TO VARY AND / OR REVISE THESE PHASES, THE

GENERAL CONTRACTOR SHALL INFORM BOTH THE OWNER AND THE

ARCHITECT PRIOR TO ANY VARIATION / REVISION OF THE PHASES AND

THEIR EXECUTION.

INFECTION CONTROL NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 1/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GI102.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO FULL SET OF CONTRACT DOCUMENTS FOR ALL PHASING

INFORMATION.

PROJECT SHALL BE COMPLETED IN 4 PHASES AS OUTLINED IN THESE

DOCUMENTS.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR.

TEMPORARY IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS

ARE APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR ONCE

ICRA PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM WEEKDAYS OR ON THE WEEKENDS.

EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A

MINIMUM.

PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH

TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS

DETERMINED BY COR.

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-

PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS

UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH

A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

PHASING LEGEND AND NOTES

# HATCH AND NUMBER INDICATE CURRENT

PHASE - SEE PHASING PLANS

TEMPORARY WALLS AND DOORS

AREA NOT IN SCOPE OF

WORK

PHASE 1

PHASE 2

PHASE 3

AREA 1A - EXISTING VENDING AREA, EXIT

PASSAGEWAY, AND EAST SHELL SPACE.

AREA 1B - BREAK ROOM AND ON CALL TLT.

COMPLETE ASAP FOR TEMP. PHARM USE

PHASE 1 IS COMPLETED UPON TEMPORARY PHARMACY

AREA READY FOR OCCUPANCY

AREA 1C - WEST SHELL SPACE

PHASE 2 IS COMPLETED UPON

PERMANENT PHARMACY AREA READY

FOR OCCUPANCY

AREA 2 - EXISTING PHARMACY AREA

VA MOVES

PHARMACY TO

TEMPORARY

AREA

VA MOVES

PHARMACY TO

PERMANENT

LOCATION

PHASE 3 IS COMPLETED UPON AUDIOLOGY OFFICE

AREAS, PATIENT FUNDS, AND AGENT CASHIER READY

FOR OCCUPANCY

AREA 3A - NEW AUDIOLOGY OFFICE AREA AND

PASSAGE INTO EXISTING AUDIOLOGY

AREA 4A - EXISTING URGENT CARE

AREA 3B - NEW PATIENT FUNDS AND AGENT CASHER VA OCCUPIES

COMPLETED

SPACES

PHASE 4

PHASE 4 IS COMPLETED UPON URGENT CARE AND ALL REMAINING WORK IS READY FOR

OCCUPANCY

VA OCCUPIES

COMPLETED

SPACES

AREA 3B - NEW BOX BREAKDOWN

AND NF AND PENDING

SUB-PHASE 3C

PHASE 3C IS COMPLETED UPON BOX

BREAKDOWN, AND NF AND PENDING

READY FOR OCCUPANCY VA OCCUPIES

COMPLETED

SPACES

AREA 4B - EAST VESTIBULE

AREA 4C - ENTRY AREA TO

AUDIOLOGY WAITING, FINISH ASAP

AREA 4E - AREA OF

NEW PUBLIC

HALLWAY THROUGH

URGENT CARE,

FINISH ASAP

AREA 4D - AREA OF EXISTING

PUBLIC HALLWAY NOT BEING USED

FOR NEW HALLWAY, FINISH ASAP

AREA 4F - NEW MAIN SOUTH

VESTIBULE

AREA 4G - CORRIDOR NIGHT AND

WEEKEND WORK

PHASE 4 – URGENT CARE RENOVATION AND VESTIBULE RENOVATIONS AND

ADDITION

ESTIMATED DURATION: 32 WEEKS

THE FOLLOWING DESCRIBESTHE SEQUENCE OF CONSTRUCTION FOR

URGENT CARE, VESTIBULE RENOVATION AND ADDITION, AND CORRIDOR

WORK.

PHASE 4 AREA A – MAIN AREA OF URGENT CARE RENOVATION

• DEMOLITION AND NEW WORK AS REQUIRED.

• THIS WORK IS THE CRITICAL PATH. WHEN THIS WORK IS COMPLETED,

PHASE 4 CAN BE COMPLETED.

PHASE 4 AREA B - NEW CANOPY AND VESTIBULE

• CONSTRUCTION OF NEW CANOPY ADDITION VESTIBULE FOR A COVERED

EXTERIOR ACCESS TO URGENT CARE.

• THIS WORK IS CRITICAL PATH. UPON COMPLETION OF AREA B, PHASE 4

AREAS D AND E MAY BEGIN.

PHASE 4 AREA C - EAST ENTRANCE AND ENTRANCE TO AUDIOLOGY

WAITING

• DEMOLITION AND NEW WORK MAY BEGIN IN PHASE 4, BUT WILL BE

REQUIRED TO BE COMPELTED PRIOR TO AREAS D AND E.

PHASE 4 AREA D – EXISTING PUBLIC HALLWAY AREA TO BECOME URGENT

CARE SUPPORT SPACE

• DEMOLITION AND NEW WORK MAY BEGIN UPON COMPLETION OF PHASE

4 AREAS B AND C, BUT WILL NOT NEED TO BE COMPLETED UNTIL PHASE

4 IS COMPLETED.

PHASE 4 AREA E – AREA OF NEW PUBLIC HALLWAY THROUGH URGENT

CARE

• DEMOLITION AND NEW WORK MAY BEGIN UPON COMPLETION OF PHASE 4

AREAS B AND C.

• THIS AREA WILL NEED TO BE COMPLETED PRIOR TO START OF PHASE 4

AREAS F AND G.

PHASE 4 AREA F – RENOVATION OF MAIN SOUTH VESTIBULE

• DEMOLITION AND NEW WORK AS INDICATED TO CREATE NEW VESTIBULE

AND MAIN ENTRY. ENTRANCE TO THE FACILITY SHALL BE THROUGH THE

NEW EAST VESTIBULE.

• WORK MAY NOT BEGIN UNTIL PHASE 4 AREAS D AND E ARE COMPLETED.

• WORK DOES NOT NEED TO BE COMPLETE UNTIL PHASE 4 IS COMPLETED.

PHASE 4 AREA G - RENOVATION OF PUBLIC CORRIDORS

• RENOVATION WORK AS INDICATED ON NIGHTS AND WEEKENDS AS

REQUIRED TO MAINTAIN ONGOING OPERATIONS OF FACILITY.

COORDINATE WITH VA.

CONSTRUCTION PHASING SEQUENCE - PHASE 4

PROVIDE

CONSTRUCTION

PHASE 4 FENCE

PROVIDE

CONSTRUCTION

PHASE 4 FENCE

CONSTRUCTION

ENTRANCE

PHASE 4

AREA A

PHASE 4

AREA B

PHASE 4

AREA C

PHASE 4

AREA D

PHASE 4

AREA E

PHASE 4

AREA F

PHASE 4

AREA G -

CORRIDORS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI 48126

313.441.3000 | WWW.GHAFARI.COM

FRED VOLLMERHAUSEN

CHIEF, ENGINEERING PROJECTS

100% DESIGN SUBMISSION 03/13/2020

95% DESIGN SUBMISSION 9/13/2019

65% DESIGN SUBMISSION 12/05/2018

35% DESIGN SUBMISSION 10/12/2018

100% BID DOCUMENTS 05/20/2020

C U s e rs

\t s a n d e rs \D o c u m e n ts \1

.1

.0

V

A B

C P

H A

R U

C A ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:0

A

M

GI103

CONSTRUCTION PHASE 3 & 4

PLAN / INFECTION CONTROL

PLAN

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

May 20, 2020 JDF JDJ

100% BID DOCUMENTS

PART. SPRINKLERED

100% BID DOCUMENTS

SCALE: 1" = 20'-0"GI103

1 PHASE 3 PLAN - 3A

SCALE: 12" = 1'-0"

PHASING TIMELINE LEGEND

SCALE: 1" = 20'-0"GI103

2 PHASE 4 PLAN

REF.REF.

REF.

REF.

UP

UP

PROCEDURE

0111A

STOR.

0110B

ISO EXAM

TRIAGE

RECEPTION

0103A

TRIAGE

VAULT

0103B

585 SF

A

EQUIP. STORAGE

MH EXAM

M.H. TLT

EXAM / FLEX M.H.

EXAM / FLEX M.H.

0120 EXAM

SOILED

STAFF TLT

STAFF TLT

CONSULT

772 SF

A

CONSULT

CONSULT

CONSULT

VAULT

CONFERENCE RM

UC BREAK RM AND

LOCKERS

HAC

RECEIVING

DISPENSING

WINDOWS

BREAK RM

STAFF TLT

OFFICE

GENERAL WAITING

PROCEDURE ROOM

GAS - FULL

2084 SF

10022

B

EXAM SOUND

BOOTH

SECURITY OFFICE

MECHANICAL

EXIST. IT CLOSET

OFFICE

OFFICE

TEMP PHARMACY

CONSULT

AGENT CASHIER

0051A

HAC

MECH

MECH

ON-CALL

0097A

GAS - EMPTY AND

IN-USE

ON-CALL TLT /

SHOWER

0097B

VEST. / BOX BREAK

DOWN

HVAC

021E

HOUSE KEEPING

OFFICE

OFFICE

FILLING

WORK STATIONS

PHARM. STORAGE

MH EXAM

AUDIOLOGY EXAM

SHOWER

0106A

ISO / PATIENT

TOILET

NURSE MANAGER

LINEN

AUDIOLOGY CLEAN

NF AND PENDING

STORAGE

NURSE

0135A

NURSE / DICTATION

EXAM

EXAM

PATIENT TLT

0134 CLEAN

EXAM

MED

PROCEDURE

0110A

MAIL-OUT

B

5,820 SF

CONSULT /

DISPENSING

B

3,540 SF

PHARMACY SUITE

URGENT CARE SUITE

FEC

FEC

FEC

FEC

FEC

FEC

FEC

FEC

FEC

STOR.

I.T.

OFFICE

TOILET

0078A

OFFICE

STAFF LOUNGE/

LOCKER ROOM

EXAM

CORRIDOR

C04

OFFICE

CORRIDOR

C08

VESTIBULE

C09

DEDUCTIVE ALTERNATE #1: THE EAST CANOPY

RENOVATION / ADDITION. THE WORK IS INDICATED TO

BE CONSTRUCTED IN PHASE 4, SEE SHEET GI103

DEDUCTIVE ALTERNATE #2: THE URGENT CARE

RENOVATION AND MAIN CORRIDOR FINISHES. THIS

SCOPE OF WORK IS DOCUMENTED IN PHASE 4. SEE

SHEET GI103

BID DEDUCTIVE ALTERNATES

BASE BID:

ALL WORK NOTED IN THESE CONSTRUCTION DOCUMENTS INCLUDING THE BUILD

OUT OF THE EAST SHELL SPACE FOR A TEMPORARY PHARMACY, THE

RENOVATION OF THE WEST SHELL SPACE AND EXISTING PHARMACY, THE

RENOVATION OF THE TEMPORARY PHARMACY AND ASSOCIATED AREAS TO BE

OFFICES, PATIENT FUNDS, AND AGENT CASHIER, THE RENOVATION / ADDITION OF

2 VESTIBULES, THE RENOVATION OF URGENT CARE, AND THE RENOVATION OF

THE MAIN CORRIDORS IN THE PHASING INDICATED IN THESE DOCUMENTS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI 48126

313.441.3000 | WWW.GHAFARI.COM

FRED VOLLMERHAUSEN

CHIEF, ENGINEERING PROJECTS

100% DESIGN SUBMISSION 03/13/2020

95% DESIGN SUBMISSION 9/13/2019

65% DESIGN SUBMISSION 12/05/2018

35% DESIGN SUBMISSION 10/12/2018

100% BID DOCUMENTS 05/20/2020

C U s e rs

\t s a n d e rs \D o c u m e n ts \1

.1

.0

V

A B

C P

H A

R U

C A ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:2

A

M

GI104

BID ALTERNATES RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

May 20, 2020 JDF JDJ

100% BID DOCUMENTS

PART. SPRINKLERED

100% BID DOCUMENTS

SCALE: 3/32" = 1'-0"GI104

1 ALTERNATE FLOOR PLAN

N

HAZARDOUS MATERIAL REMOVAL GENERAL NOTES

REFER TO 'LIMITED ASBESTOS AND LEAD-BASED PAINT SURVEY' PROVIDED BY

TTL ASSOCIATES MARCH 2019. ALL NOTES THIS SHEET ARE BASED ON

INFORMATION PROVIDED BY THIS SURVEY. CONTRACTOR IS RESPONSIBLE TO

REMEDIATE ALL MATERIALS CONTAINING HAZARDOUS MATERIALS AS NOTED

IN THIS REPORT.

HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL

IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND REMOVE

ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION 02 82 11.

ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH

APPLICABLE CODES AND LAWS.

THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL OF

PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS TO

COMPLETE THE CONSTRUCTION WORK.

REFER TO SPECIFICATIONS AND ATTACHMENTS FOR ADDITIONAL

INFORMATION.

BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED LEAD

PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE EXISTING

SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED PLASTER WALLS

AND PAINTED SURFACES. REFER TO SPECIFICATION SECTION 02 83 33.13

LEAD-BASED PAINT REMOVAL, DISPOSAL AND FOR ADDITIONAL INFORMATION.

CONTRACTOR TO SUBMIT LEAD SURFACES STABILIZATION PLAN AND

PROCEDURES PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN

ACCORDANCE WITH SPECIFICATIONS.

A.

B.

C.

D.

E.

F.

G.

HAZARDOUS MATERIAL REMOVAL PLAN NOTES #

REMEDIATE APPROX. 400SF BLACK WALL MASTIC.

REMOVE DOOR ASSUMED TO CONTAIN ASBESTOS.

REMEDIATE APPROX. 2 LF AIRCELL PIPE INSULATION.

REMEDIATE APPROX. 1,800 SF FLOOR TILE AND MASTIC.

REMEDIATE APPROX. 36 LAYERED PIPE INSULATION JOINTS.

REMEDIATE APPROX. 40 SF OF FLOOR TILE AND ASSOCIATED MASTIC.

H

J

L

M

M.4

N

M.1

2.1 2.2 4.2 5.4 6.3 6.4 6.8 10.2 10.7 11.7 12.913.3

13.3

14.814.9

A

B

3.8 4.9 5.3 5.7 6.5 6.9 9.9 10.6 10.8 11.311.811.9 13.2

HH

FF

JJ

GG

KK

12 3 4 5 6 7 8 9 10 11 12 13 14 15

16 C1

C2

C

DD

EE

C3

7.7 9.3

C4

C5

TEMPORARY

PHARMACY

(PHASE 1) OPEN

OFFICE AND

AUDIOLOGY

(PHASE 3)

PHARMACY

(PHASE 2)

URGENT CARE

(PHASE 4)

SHADE

INDICATES

APPROXIMATE

AREA OUT OF

SCOPE

OFFICE

STOR.

MALE

FEMALE

OFFICE

MALE

FEMALE

WAITING

C03

PHARMACY

CONTROLLED

SUBSTANCE

0015A

HVAC

0015E

SHELL

0F-001

VEST.

0F-002

STAIR

S6

EXAM

OFFICE

OFFICE

STAFF LOUNGE/

LOCKER ROOM

OFFICE

OFFICE

OFFICE

STOR.

OFFICE

CUSTOMER SERVICE

OFFICE

OFFICE

I.T.

0076 OFFICE

TOILET

SECURITY OFFICE

HSK

ELEC.

SUB WAITING

ADMISSIONS

WAITING ROOM

STAIR

S5

CORRIDOR

C01

PATIENT

INFORMATION

RECEPTION

STOR.

TRIAGE

TRIAGE

TRIAGE

0113 OFFICE

EXAM

EXAM

EXAM

TOILET

0122A

EXAM

NURSE STATION

CORRIDOR

C011

CORRIDOR

C012

RECORDS

WOMEN'S

MEN'S

CORRIDOR

C09

WAITING

SECRETARY

EXAM SOUND

BOOTH

CHIEF

HVAC

0042E

EXAM SOUND

BOOTH

EXAM SOUND

BOOTH

OFFICE

TREATMENT

PROSTHETICS

CORRIDOR

C07

STOR.

STAIR

S2

HSK

RECOVERY

CORRIDOR

C06

SHELL

0G-001

HVAC

0021E

VENDING

OFFICE

OFFICE

HOUSEKEEPING

HVAC

0020E

ELEV.

E2

ELEV. MACH.

0018E

ELEV.

E1

HVAC

0017A

PATIENT FUNDS

AGENT CASHIER

STOR.

0016A

STAIR

S1

PIPE

0014E

ELEV.

E3

TOILET

0092A

DRESSING ROOM

SOILED UTILITY

TREATMENT

TOILET

Room

EQUIP.

STAFF LOUNGE

IMMEDIATE CARE

TOILET

0103A HVAC

0050A

IT

0050E

OFFICE

CORRIDOR

C08

STAIR

S3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI 48126

313.441.3000 | WWW.GHAFARI.COM

FRED VOLLMERHAUSEN

CHIEF, ENGINEERING PROJECTS

100% DESIGN SUBMISSION 03/13/2020

95% DESIGN SUBMISSION 9/13/2019

65% DESIGN SUBMISSION 12/05/2018

35% DESIGN SUBMISSION 10/12/2018

100% BID DOCUMENTS 05/20/2020

C U s e rs

\t s a n d e rs \D o c u m e n ts \1

.1

.0

V

A B

C P

H A

R U

C A ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:2

A

M

HA101

HAZARDOUS MATERIALS

REMOVAL PLAN

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

May 20, 2020 JDF JDJ

100% BID DOCUMENTS

PART. SPRINKLERED

100% BID DOCUMENTS

SCALE: 3/32" = 1'-0"HA101

1 HAZMAT DEMO PLAN

SCALE: 1" = 80'-0"

KEY PLAN - GROUND FLOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

P

V

A

V

I S

N

M

I

A

E

I D

I Q

P h a r m a c y

U r g e n t

C a r e

R e n o

D r a w i n g s C i v i l G

E N

E R

A L

N

O T

E S d w g

P

M

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

MAY 20, 2020

PART. SPRINKLERED

Revisions: Date: DSMCMB

100% BID DOCUMENTS

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN

46202 317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI

48126 313.441.3000 | WWW.GHAFARI.COM

100% BID DOCUMENTS

S

T

A

T

E

O

F M

I

C

H

I

G

A

N

L I C

E

N

S

D

P

R

O

F

E

SS

I O

N

A

L

G

I

N

E

E R

GENERAL CIVIL NOTES

CI001

0 2010

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

P

V

A

V

I S

N

M

I

A

E

I D

I Q

P h a r m a c y

U r g e n t

C a r e

R e n o

D r a w i n g s C i v i l D

E M

O L I T

I O

N d w g

P

M

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

MAY 20, 2020

PART. SPRINKLERED

Revisions: Date: DSMCMB

100% BID DOCUMENTS

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN

46202 317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI

48126 313.441.3000 | WWW.GHAFARI.COM

100% BID DOCUMENTS

S

T

A

M

I

C

H

I

G

A

N

L I C

E

N

S

O

F

E

SS

I O

N

G

I

N

E

E R

DEMOLITION PLAN

CD101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

P

V

A

V

I S

N

M

I

A

E

I D

I Q

P h a r m a c y

U r g e n t

C a r e

R e n o

D r a w i n g s C i v i l S

I T

E

P

L A

N d w g

P

M

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

MAY 20, 2020

PART. SPRINKLERED

Revisions: Date: DSMCMB

100% BID DOCUMENTS

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN

46202 317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI

48126 313.441.3000 | WWW.GHAFARI.COM

100% BID DOCUMENTS

S

T

A

M

I

C

H

I

G

A

N

L I C

E

N

S

O

F

E

SS

I O

N

G

I

N

E

E R

SITE LAYOUT PLAN

CS101

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

P

V

A

V

I S

N

M

I

A

E

I D

I Q

P h a r m a c y

U r g e n t

C a r e

R e n o

D r a w i n g s C i v i l D

E T

A I L S d w g

P

M

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

MAY 20, 2020

PART. SPRINKLERED

Revisions: Date: DSMCMB

100% BID DOCUMENTS

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN

46202 317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI

48126 313.441.3000 | WWW.GHAFARI.COM

100% BID DOCUMENTS

SITE DETAILS

CS501

S

T

A

M

I

C

H

I

G

A

N

L I C

E

N

S

O

F

E

SS

I O

N

G

I

N

E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

P

V

A

V

I S

N

M

I

A

E

I D

I Q

P h a r m a c y

U r g e n t

C a r e

R e n o

D r a w i n g s C i v i l G

R A

D I N

G

P

L A

N d w g

P

M

RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

MAY 20, 2020

PART. SPRINKLERED

Revisions: Date: DSMCMB

100% BID DOCUMENTS

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN

46202 317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI

48126 313.441.3000 | WWW.GHAFARI.COM

100% BID DOCUMENTS

S

T

A

M

I

C

H

I

G

A

N

L I C

E

N

S

O

F

E

SS

I O

N

G

I

N

E

E R

GRADING PLAN

CG101

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC. | 1221 N PENNSYLVANIA SUITE 200 | INDIANAPOLIS, IN 46202

317.800.6388 | WWW.GUIDONDESIGN.COM

GHAFARI ASSOCIATES LLC. | 17101 MICHIGAN AVENUE | DEARBORN, MI 48126

313.441.3000 | WWW.GHAFARI.COM

C U s e rs

\a k e n n e d y \D o c u m e n ts \1

.1

.0

V A

U C

S v a k e n n e d y g u id o n d e s ig n .c o m

.r v t

/2

/2

:3

:3

A

M

SI001

GENERAL STRUCTURAL NOTES RENOVATE OUTPATIENT

PHARMACY & URGENT CARE

5500 Armstrong Road, Battle Creek

515-18-109

MAY 20, 2020 MAV ADK

100% BID DOCUMENTS

PART. SPRINKLERED

100% BID DOCUMENTS

GENERAL

THE STRUCTURE HAS BEEN DESIGNED FOR THE IN-SERVICE LOADS ONLY. THE METHODS, MEANS, PROCEDURES, AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE BUILDING IS COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE ERECTION PROCEDURES AND SEQUENCE TO INSURE SAFETY OF THE BUILDING AND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION OF

NECESSARY SHORING, SHEETING, TEMPORARY BRACING, GUYS, TIEDOWNS, ETC.

THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH CIVIL, ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING

DRAWINGS AND SPECIFICATIONS.

THE GENERAL NOTES ON THE DRAWINGS ARE TO BE USED IN CONJUNCTION WITH THE FULL WRITTEN MATERIAL SPECIFICATIONS (IF ANY) FOR THE PROJECT. IF A DISCREPANCY OCCURS BETWEEN THE NOTES AND THE FULL SPECIFICATIONS, THE MORE STRINGENT

REQUIREMENT SHALL APPLY.

NO PENETRATIONS THROUGH STRUCTURAL ELEMENTS, OTHER THAN THOSE SHOWN ON THE DRAWINGS, SHALL BE MADE WITHOUT

THE APPROVAL OF THE COR.

CONTRACTOR TO COORDINATE ALL EQUIPMENT, ROOF DRAINS, CHASES, AND OTHER ITEMS CONNECTED TO THE STRUCTURE BEFORE

FABRICATION BEGINS.

CONCRETE MIX DESIGN SUBMITTAL

THE CONTRACTOR SHALL SUBMIT FOR THE REVIEW OF THE COR A MIX DESIGN FOR EACH PROPOSED CLASS OF CONCRETE. EACH MIX DESIGN SHALL BE IDENTIFIED BY A MIX NUMBER OR OTHER UNIQUE IDENTIFICATION. THE CONTRACTOR SHALL NOT VARY FROM THE MIX DESIGNS NOR USE ANY CONCRETEOTHER THAN THE APPROVED MIX DESIGNS WITHOUT THE APPROVAL OF THE COR. MIX DESIGN

SUBMITTALS SHALL INCLUDE THE FOLLOWING INFORMATION:

1. MIX DESIGN NUMBER OR UNIQUE IDENTIFICATION AND INTENDED LOCATION OF PLACEMENT.

2. CEMENT TYPE, PROPORTION AND NAME OF MANUFACTURER.

3. FLY ASH PROPORTION (WHEN USED), LABORATORY ANALYSIS CERTIFICATION, AND NAME AND LOCATION OF SUPPLIER.

4. COURSE AGGREGATE PROPORTION, GRADATION REPORT, NAME AND LOCATION OF SUPPLIER.

5. FINE AGGREGATE PROPORTION, GRADATION REPORT, NAME AND LOCATION OF SUPPLIER.

6. MIXING WATER PROPORTION AND SOURCE.

7. ADMIXTURE DOSAGES, PRODUCT NAME(S) AND MANUFACTURER NAME(S).

8. FIBER REINFORCEMENT DOSAGE (WHEN USED), PRODUCT NAME AND MANUFACTURER NAME.

9. DESIGN 28-DAY COMPRESSIVE STRENGTH (F'C).

10. DESIGN SLUMP RANGE.

11. DESIGN AIR-ENTRAINMENT (FOR CONCRETE REQUIRING ENTRAINED AIR).

12. STATISTICAL ANALYSIS OF LABORATORY STRENGTH TEST DATA IN ACCORDANCE WITH "STANDARD DEVIATION"

DETERMINATION OUTLINED IN ACI 318.

SHOP DRAWING SUBMITTALS

THE CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS TO ENABLE HIM TO FABRICATE, ERECT AND CONSTRUCT ALL PARTS OF THE WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. THESE SHOP DRAWINGS WILL BE REVIEWED FOR GENERAL COMPLIANCE WITH THE DESIGN INTENT ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS, ACCURACY AND FIT OF WORK.

ALL SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE COR. DRAWINGS SUBMITTED WITHOUT

CONTRACTOR'S REVIEW WILL BE RETURNED UNCHECKED.

SUBMIT ELECTRONIC VERSIONS OF SHOP DRAWINGS. SUBMIT SHOP DRAWINGS IN PDF FORMAT.

SUBMIT SHOP DRAWINGS FOR EACH OF THE FOLLOWING ITEMS:

1. CONCRETE REINFORCEMENT

2. CONCRETE MASONRY REINFORCEMENT

3. STRUCTURAL STEEL (INCLUDING DESIGN CALCULATIONS SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE

WHERE THE PROJECT IS CONSTRUCTED FOR ALL CONNECTIONS NOT SPECIFICALLY DETAILED ON THE DRAWINGS)

4. METAL DECKING

PRODUCT DATA SUBMITTALS

THE CONTRACTOR SHALL SUBMIT FOR APPROVAL PRODUCT DATA FOR THE SPECIFIC ITEMS LISTED BELOW. CONTRACTOR SHALL NOT

USE PRODUCTS OTHER THAN THOSE SUBMITTED WITHOUT THE APPROVAL OF THE COR.

MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES, AND PATTERNS AS A BASIS OF DESIGN. PRODUCTS OF AUTHORIZED EQUAL MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES, AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL

SAMPLES, AND UPON…