This document provides details for a federal contract solicitation to correct Legionella deficiencies and provide monitoring services at a Veterans Affairs medical center. The solicitation seeks to engage a contractor to provide all tools, equipment, parts, materials, labor and supervision necessary to complete corrective work and initiate monitoring services related to Legionella at the Northern IN VA Healthcare System located in Fort Wayne, Indiana. The solicitation references attachments and a statement of work that further outline the project requirements. The soliciting agency is identified as the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS CONTAINING MATERIAL (ACM) STATEMENT

(PLACE AN "X" IN THE APPROPRIATE BOX.)

THIS FACILITY CONTAINS NO KNOWN OR SUSPECTED ASBESTOS.

THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED BY THE VAMC.

THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED UNDER THIS

CONTRACT.

THIS FACILITY CONTAINS ASBESTOS THAT WILL BE REMOVED UNDER A

SEPARATE CONTRACT.

NOTES:

1. REFER TO SPECIFICATIONS FOR ABATEMENT PROCEDURES.

2. GENERAL CONTRACTOR SHALL REVIEW FACILITY ASBESTOS SURVEY AND HIRE AN

INDEPENDENT CIH TO VERIFY THE ABATEMENT QUANTITIES PRIOR TO THE START OF

ABATEMENT IN EACH CONTAINMENT AND ALSO CHECK IF ALL ASBESTOS HAS BEEN REMOVED

PRIOR TO CLEARANCE TESTING AND REMOVAL OF CONTAINMENT.

3. ASBESTOS CONTRACTOR SHALL COORDINATE ALL WORK WITH THE INSULATION

CONTRACTOR.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/1

/2

:2

:3

P

M

GI001

PROJECT COVER

1 1DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

CORRECT LEGIONELLA DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE SYSTEM

2121 Lake Avenue, Ft. Wayne, IN 46240

VA PROJECT #:

610A4-18-104

APOGEE PROJECT #: 17-283

DRAWING LIST

No. Description Dwg of Dwg

COVER

GI001 PROJECT COVER 1 1

PLUMBING

P-001 PLUMBING AND ARCHITECTURAL GENERAL INFORMATION 1 82

P-002 ELECTRICAL GENERAL INFORMATION 2 82

PD100 SUB-BASEMENT PLUMBING DEMOLITION PLAN 3 82

PD101 BASEMENT PLUMBING DEMOLITION PLAN - AREA A1 4 82

PD102 BASEMENT PLUMBING DEMOLITION PLAN - AREA A2 5 82

PD103 BASEMENT PLUMBING DEMOLITION PLAN - AREA B1 6 82

PD104 BASEMENT PLUMBING DEMOLITION PLAN - AREA B2 7 82

PD105 BASEMENT PLUMBING DEMOLITION PLAN - AREA C1 8 82

PD106 BASEMENT PLUMBING DEMOLITION PLAN - AREA C2 9 82

PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A1 10 82

PD112 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A2 11 82

PD113 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A3 12 82

PD114 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A4 13 82

PD115 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA B1 14 82

PD116 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA B2 15 82

PD117 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA C1 16 82

PD118 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA C2 17 82

PD121 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA A1 18 82

PD122 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA A2 19 82

PD123 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA B1 20 82

PD124 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA B2 21 82

PD125 SECOND FLOOR PLUMBING DEMOLIOTION PLAN - AREA C1 22 82

PD126 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA C2 23 82

PD131 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA A1 24 82

PD132 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA A2 25 82

PD133 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA B1 26 82

PD134 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA B2 27 82

PD135 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA C1 28 82

PD136 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA C2 29 82

PD141 FOURTH FLOOR PLUMBING DEMOLITION PLAN - AREA A1 30 82

PD142 FOURTH FLOOR PLUMBING DEMOLITION PLAN - AREA A2 31 82

PD143 FOURTH FLOOR PLUMBING DEMOLITION PLAN - AREA B1 32 82

PD144 FOURTH FLOOR PLUMBING DEMOLITION PLAN - AREA B2 33 82

PD145 FOURTH FLOOR PLUMBING DEMOLITION PLAN - AREA C1 34 82

PD151 FIFTH FLOOR PLUMBING DEMOLITION PLAN - AREA A1 35 82

PD152 FIFTH FLOOR PLUMBING DEMOLITION PLAN - AREA A2 36 82

PD153 FIFTH FLOOR PLUMBING DEMOLITION PLAN - AREA B1 37 82

PD154 FIFTH FLOOR PLUMBING DEMOLITION PLAN - AREA B2 38 82

PD155 FIFTH FLOOR PLUMBING DEMOLITION PLAN - AREA C1 39 82

PD161 PENTHOUSE PLUMBING DEMOLITION PLAN 40 82

PP100 SUB-BASEMENT PLUMBING PLAN 41 82

PP101 BASEMENT PLUMBING PLAN - AREA A1 42 82

PP102 BASEMENT PLUMBING PLAN - AREA A2 43 82

PP103 BASEMENT PLUMBING PLAN - AREA B1 44 82

PP104 BASEMENT PLUMBING PLAN - AREA B2 45 82

PP105 BASEMENT PLUMBING PLAN - AREA C1 46 82

PP106 BASEMENT PLUMBING PLAN - AREA C2 47 82

PP111 FIRST FLOOR PLUMBING PLAN - AREA A1 48 82

PP112 FIRST FLOOR PLUMBING PLAN - AREA A2 49 82

PP113 FIRST FLOOR PLUMBING PLAN - AREA A3 50 82

PP114 FIRST FLOOR PLUMBING PLAN - AREA A4 51 82

PP115 FIRST FLOOR PLUMBING PLAN - AREA B1 52 82

PP116 FIRST FLOOR PLUMBING PLAN - AREA B2 53 82

PP117 FIRST FLOOR PLUMBING PLAN - AREA C1 54 82

PP118 FIRST FLOOR PLUMBING PLAN - AREA C2 55 82

PP121 SECOND FLOOR PLUMBING PLAN - AREA A1 56 82

PP122 SECOND FLOOR PLUMBING PLAN - AREA A2 57 82

PP123 SECOND FLOOR PLUMBING PLAN - AREA B1 58 82

PP124 SECOND FLOOR PLUMBING PLAN - AREA B2 59 82

PP125 SECOND FLOOR PLUMBING PLAN - AREA C1 60 82

PP126 SECOND FLOOR PLUMBING PLAN - AREA C2 61 82

PP131 THIRD FLOOR PLUMBING PLAN - AREA A1 62 82

PP132 THIRD FLOOR PLUMBING PLAN - AREA A2 63 82

PP133 THIRD FLOOR PLUMBING PLAN - AREA B1 64 82

PP134 THIRD FLOOR PLUMBING PLAN - AREA B2 65 82

PP135 THIRD FLOOR PLUMBING PLAN - AREA C1 66 82

PP136 THIRD FLOOR PLUMBING PLAN - AREA C2 67 82

PP141 FOURTH FLOOR PLUMBING PLAN - AREA A1 68 82

PP142 FOURTH FLOOR PLUMBING PLAN - AREA A2 69 82

PP143 FOURTH FLOOR PLUMBING PLAN - AREA B1 70 82

PP144 FOURTH FLOOR PLUMBING PLAN - AREA B2 71 82

PP145 FOURTH FLOOR PLUMBING PLAN - AREA C1 72 82

PP151 FIFTH FLOOR PLUMBING PLAN - AREA A1 73 82

PP152 FIFTH FLOOR PLUMBING PLAN - AREA A2 74 82

PP153 FIFTH FLOOR PLUMBING PLAN - AREA B1 75 82

PP154 FIFTH FLOOR PLUMBING PLAN - AREA B2 76 82

PP155 FIFTH FLOOR PLUMBING PLAN - AREA C1 77 82

PP161 PENTHOUSE PLUMBING PLAN 78 82

P-401 PLUMBING SCHEDULES 79 82

P-501 PLUMBING DETAILS 80 82

P-601 PLUMBING CONTROLS 81 82

P-602 DOMESTIC WATER RISER DIAGRAM 82 82

SITE

BUILDING 1

EMERGENCY

ENTRANCE

MAIN ENTRANCE

DocuSign Envelope ID: D1B98FB9-32E9-49B1-B632-91616C54206C

3/17/2020

PLUMBING ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALANCING/SHUTOFF VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CALIBRATED BALANCING VALVE

CONTROL VALVE

EXPANSION VALVE

GATE VALVE

GLOBE VALVE

QUICK OPEN VALVE

SAFETY RELIEF VALVE

SOLENOID VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIB / SILLCOCK

VACUUM RELIEF VALVE

GAS COCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER WITH DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

F

P

T

M

PIPING SYSTEM

PLUMBING SYMBOLS

ANNOTATION SYMBOLS

(E)EXISTING

NEW KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

LIGHT ITALIC TEXT INDICATES EXISTING

ITEM

PLUMBING EQUIPMENT DESIGNATION

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMITS OF DEMOLITION

P-###

PLUMBING AND ARCHITECTURAL GENERAL NOTES

PLUMBING AND ARCHITECTURAL DEMOLITION GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND

ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE W ORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE W ITH NEW

PLUMBING AND WORK OF OTHER TRADES.

10. REMOVE ACT CEILING TILES AND GRID AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE. SALVAGE ACT

CEILING AND GRID FOR REINSTALLATION AFTER COMPLETION OF PLUMBING WORK.

11. REMOVE GYPSUM BOARD OR PLASTER WALLS AND CEILING, FLOORING AS REQUIRED TO PERFORM PLUMBING

WORK IN SPACE.

12. REMOVE GYPSUM BOARD OR PLASTER WALLS TO FRAMING, ACT CEILING TILE AND GRID, AND FLOORING AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE. SALVAGE ACT CEILING AND GRID FOR REINSTALLATION

AFTER COMPLETION OF PLUMBING WORK.

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE

GRADE FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY

AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN W ALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF

WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

12. COORDINATE PLUMBING PIPING WITH W ORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL

CODES AND APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF PIPING SYSTEMS.

17. CONTRACTOR SHALL SUBMIT SCHEDULE OF W ORK AND OUTAGES THREE WEEKS IN ADVANCE OF WORK ON

PARTICULAR AREAS.

18. CONTRACTOR SHALL PROVIDE POTABLE WATER FOR DRINKING AND WATER FOR FLUSHING FIXTURES

DURING SHUTDOWN.

19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

22. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

23. REINSTALL ACT TILES AND GRID PER SPECIFICATION 095100 AS REQUIRED TO PERFORM PLUMBING WORK.

24. INSTALL GYPSUM BOARD ON EXISTING STUD WALL AND CEILING FRAMING. FEATHER EXISTING GYPSUM BOARD OR PLASTER FINISH INTO NEW GYPSUM BOARD AS REQUIRED TO PERFORM PLUMBING WORK. FINISH

AND PAINT TO MATCH ADJACENT EXISTING WALL AND CEILING.

25. INSTALL FLOOR TILE AS REQUIRED TO PERFORM PLUMBING WORK IN SPACE TO MATCH EXISTING.

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

CW COLD WATER

DCWS DOMESTIC COLD WATER SUPPLY

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOW N

DOE DEPARTMENT OF ENERGY

DS DOW NSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HW HOT WATER

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICRA INFECTION CONTROL RISK ASSESMENT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS W ATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD W ATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PACAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

THRU THROUGH

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TW R TEMPERED WATER RETURN

TW S TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

W\ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

PHASING NOTES

1. THIS FACILITY OPERATES 24 HOURS PER DAY, 7 DAYS PER WEEK. CONSTRUCTION WORK SHALL BE PHASED TO MINIMIZE BOTH QUANTITY AND DURATION OF SHUTDOW NS. SCHEDULE ALL SHUTDOW NS W ITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) A MINIMUM OF THREE (3) W EEKS IN ADVANCE.

2. SUBMIT A DETAILED PHASING PLAN FOR REVIEW BY THE COR, ARCHITECT AND ENGINEER. PHASING PLAN SHALL INCLUDE, BUT NOT BE LIMITED TO, START AND END DATES OF ALL TASKS THROUGHOUT THE ENTIRE PROJECT, AND DATE

AND DURATION OF SUGGESTED SHUTDOWNS.

3. TO MINIMIZE SHUTDOWNS, MAKE CONNECTIONS TO EXISTING PIPING VIA "HOT TAPPING" WHEREVER POSSIBLE, IN ORDER

TO ALLOW S THE PIPING TO REMAIN ACTIVE.

4. OLD PIPING MAINS SHALL BE DEMOLISHED AFTER NEW MAINS HAVE BEEN BROUGHT INTO OPERATION.

5. WORK IN OFFICES, CONFERENCE ROOMS, EXAM ROOMS, CONSULTATION ROOMS, AND OTHER SIMILAR AREAS THAT ARE OCCUPIED ON A REGULAR BASIS DURING BUSINESS HOURS SHALL BE PERFORMED AFTER BUSINESS HOURS.

GENERALLY, AFTER HOURS MEANS FROM 6 P.M. UNTIL 5 A.M. COORDINATE EXACT HOURS WITH THE COR. SPECIFIC APPROVAL FROM THE COR IS REQUIRED TO PERFORM WORK IN THESE AREAS DURING BUSINESS HOURS.

6. ALL MEANS OF EGRESS SHALL BE MAINTAINED DURING CONSTRUCTION. ACCESSIBLE ICRA BARRIERS SHALL BE ERECTED

AND TAKEN DOWN AS REQUIRED TO MEET THE VA SCHEDULING REQUIREMENTS.

7. TEMPORARILY REMOVE CEILINGS, LIGHT FIXTURES, AIR DEVICES, CEILING-MOUNTED FIRE ALARM DEVICES AND SMOKE DETECTORS, CEILING-MOUNTED WIRELESS ACCESS POINTS, AND ALL OTHER CEILING-MOUNTED IN ORDER TO ACCOMPLISH WORK. CEILING REMOVAL INCLUDES, BUT IS NOT LIMITED TO, REMOVING CEILING TILES, CEILING T-BAR GRID, AND PARTIALLY OR FULLY REMOVING HARD SURFACE CEILINGS. SPRINKLER HEADS SHALL BE TURNED UP W ITHIN THE AREA OF WORK. THERE ARE BOTH LAY-IN CEILINGS AND HARD SURFACE CEILINGS IN THE AREAS OF WORK. AFTER WORK ABOVE CEILINGS IS COMPLETED, REINSTALL CEILINGS AND REINSTALL ALL CEILING-MOUNTED DEVICES AND EQUIPMENT. TURN SPRINKLER HEADS BACK DOW N AND REINSTALL IN CEILING. ANY ITEMS DAMAGED AS A RESULT OF THE DEMOLITION OR NEW W ORK SHALL BE REPLACED AT NO ADDITIONAL COST TO THE GOVERNMENT.

PIPE RISER MARK

RISER NUMBER

RISER PIPING SYSTEM TYPE

DEAD LEG PIPING MARK

DEAD LEG SCHEDULE NUMBER

PIPE DEAD LEG

DL

BID ALTERNATES

1. DEDUCT ALTERNATE NO. 1: OMIT SCOPE OF WORK INDICATED ON THE PLANS AS "BID ALTERNATE 1" FOR THIRD

FLOOR AREAS B1, AND B2.

2. DEDUCT ALTERNATE NO. 2: OMIT SCOPE OF WORK INDICATED ON THE PLANS AS "BID ALTERNATE 2" FOR THIRD

FLOOR AREAS A1, AND A2.

3. DEDUCT ALTERNATE NO 3: OMIT SCOPE OF WORK INDICATED ON THE PLANS AS "BID ALTERNATE 3" FOR

BASEMENT FLOOR AREAS C1, AND C2.

DCWR

DHWS

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCWS DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

HW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

NON-INSULATED PIPING MARK

NON-INSULATED SCHEDULE NUMBER

NON-INSULATED PIPE

NI

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:3

P

M

P-001

PLUMBING AND ARCHITECTURAL

GENERAL INFORMATION

1 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

L

ELECTRICAL ABBREVIATIONS LIST

SS STAINLESS STEEL

SSW SELECTOR SWITCH

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TC TIMECLOCK

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TP TW ISTED PAIR

TPS TW ISTED PAIR SHIELDED

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UL UNDERW RITER'S LABORATORY

UT UNDERGROUND TELEPHONE

UTP UNSHIELDED TWISTED PAIR

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Φ PHASE

C CENTER LINE

P PLATE

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFDS NON-FUSED SAFETY DISCONNECT

SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OL OVERLOAD

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT

UNIT

PCB POLYCHLORINATED BYPHENYL

PC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

POE POWER-OVER-ETHERNET

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

PWR POWER

QTY QUANTITY

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SF SQUARE FEET/FOOT

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

1P 1 POLE (2P, 3P, 4P, ETC.)

1PH 1 PHASE

2/C TW O-CONDUCTOR (3/C, 4/C, ETC.)

W2 TW O-WIRE (3W, 4W, ETC.)

3PH 3 PHASE

A AMPERE

AAP ALARM ANNUNCIATOR PANEL

AC ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACC ACCESSIBLE

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

A/E ARCHITECT/ENGINEER

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT (KILOAMPS)

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT INTERRUPTER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ALTALTERNATE

AMP AMPERE

APPROX APPROXIMATELY

ARCH ARCHITECT, ARCHITECTURAL

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BATT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATED

CAP CAPACITY

CAT CATALOG, CATEGORY

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR-FURNISHED

CKT CIRCUIT

CLG CEILING

COAX COAXIAL CABLE

COMM COMMUNICATION

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

COORDCOORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CTR CENTER

CU COPPER

CU FT CUBIC FEET

dB DECIBEL

DB DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLISH/DEMOLITION

DEPT DEPARTMENT

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EG EQUIPMENT GROUND

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMIELECTROMAGNETIC INTERFERENCE

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EX EXISTING

EXP EXPLOSION PROOF

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT SWITCH

FVR FULL VOLTAGE REVERSING

FVNR FULL VOLTAGE NON-REVERSING

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BDGYPSUM BOARD

HID HIGH-INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

IES ILLUMINATION ENGINEERING SOCIETY

IG ISOLATED GROUND

IMCINTERMEDIATE METAL CONDUIT

IR INFRARED

I/W INTERLOCK WITH

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LED LIGHT-EMITTING DIODE

LF LINEAR FEET/FOOT

LM LUMEN

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MICMICROPHONE

MINMINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MOA MULTIOUTLET ASSEMBLY

MSBD MAIN SW ITCHBOARD

MT MOUNT

A1 b

E1 c d

T1

'LPN'

ELECTRICAL SYMBOL NOTES

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SW ITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES W ALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW .

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

EXAMPLE 1: W ALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' W ITH DOUBLE

FACE AND DIRECTIONAL ARROWS.

E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

GENERAL ELECTRICAL NOTES

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE

WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL

APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND W ITH THE LATEST

EDITION OF THE NATIONAL ELECTRICAL CODE.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE

BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL

PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH

THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE

APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED

MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID

CONFLICT DURING CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR

SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.

PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS

MUST COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR

EQUIPMENT MANUFACTURER'S SPECIFICATIONS.

11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE

DEVICE'S SCREW TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS

NOTED OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC

CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN

APPROVED THIRD PARTY TESTING AGENCY.

17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE

SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC

PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE

MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT

BROW NOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.

PROVIDE STATEMENT W ITH THE FIXTURE SUBMITTALS.

18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS

DETERMINED BY THE OWNER, SHALL BE PROVIDED.

19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

20. ALL ELECTRICAL W ORK IS INDICATED ON THE PLUMBING PLANS.

SHORT CIRCUIT CURRENT CALCULATIONS WILL BE

PERFORMED ON THE ELECTRICAL SYSTEM USING A

BOLTED THREE PHASE FAULT CONDITION FOR

CALCULATIONS TO ACHIEVE MAXIMUM THERMAL AND

MECHANICAL STRESS TO THE SYSTEM FOR

CALCULATIONS PURPOSES. EXISTING SHORT CIRCUIT

VALUES WILL BE USED OUTSIDE THE WORK AREA, FOR

THE STARTING POINT OF THE CALCULATIONS.

METHOD OF SHORT CIRCUIT

CURRENT CALCULATIONS

USING OHM'S LAW AND THE KNOWN RESISTIVITY

CONSTANT OF CONDUCTOR METAL (CIRCULAR MIL-OHM

PER FOOT) FOR COPPER CONDUCTORS, OUR INTENT IS

TO CALCULATE THE REQUIRED WIRE SIZE NECESSARY SO

AS NOT TO EXCEED THE RECOMMENDED VOLTAGE DROP

OF 3% FOR BRANCH CIRCUIT CONDUCTORS.

METHOD OF VOLTAGE DROP

CALCULATIONS

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:3

P

M

P-002

ELECTRICAL GENERAL INFORMATION

2 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

K

18 19 20 21 22

TO HX

TO HX

1" DHWS

1/2" DHWS

1" DHWS

1" DHWS

3/4" DHWS

2" DHWR

3" DHWS

D L

DL

DL

DL

DL

DL

SUB-BASEMENT

SB-01

STAIRS

SB-02

SUB-BASEMENT

SB-01

STAIRS

SB-02

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:0

P

M

PD100

SUB-BASEMENT PLUMBING

DEMOLITION PLAN

3 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A1 A2 B1 B2

C1

C2

BASEMENT

Scale: 1/4" = 1'-0"

SUB-BASEMENT PLUMBING DEMOLITION PLAN 0 2 4 8

NORTH

TRUE

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 1" DHWS AND 1"DCWS UP TO BASEMENT.

CONTINUED ON PD105.

04 1/2" DCWS UP TO BASEMENT. CONTINUED ON

PD105.

05 3" DHWS AND 3" DCWS UP FROM

RECIRCULATION STATION AND WATER

HEATER.

06 1/2" DHW AND 1" DCW UP TO BASEMENT.

CONTINUED ON PD105.

07 1" DHWS UP TO BASEMENT. CONTINUED ON

PD105.

08 4" DCWS, 3" DHWS, AND 2" DHWR UP TO

BASEMENT. CONTINUED ON SHEET PD105.

C

G

H

2 3 3A 4 5 6

P D

P

D

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

D L

DL

DL

DL

DL

DL

DL

1" DCWS

1 1/2" DCWS

1 1/4" DHWS

DL

DL

TO HX

3/4" DHWS

1" DCWS

1" DCWS

1/2" DHWS

1/2" DHWS

1/2" DCWS

3/4" DCWS

3/4" DHWS

1 1/2" DCWS

1" DHWS

1 1/2" DCWS

DL

DL

2" DHWS

4" DCWS

4" DCWS

3" DHWS

1 1/2" DHWR

1/2" DCWS

1/2" DHWS

1" DCWS

3/4" DHWS

2" DCWS

3/4" DHWS

3/4" DHWR

1 1/4" DHWS

2" DCWS

1" DCWS

3/4" DHWS

2" DCWS

2" DCWS

1 1/4" DHWS

1/2" DHWS 3/4" DCWS

1/2" DCWS

1/2" DHWS

1/2" DHWS

1/2" DHWS

3/4" DCWS

1" DHWS

1" DCWS

1" DCWS

1/2" DCWS

1/2" DHWS

1/2" DCWS

1" DCWS

1" DHWS

1/2" DCWS

1/2" DHWS

3" DCWS

2" DHWS

DHWS

9-2

DCWS

9-1

D L

DL

DHWR

10-3

DHWS

10-2

DCWS

10-1

D L

DL

2" DCWS

LINEN STORAGE

30B

EMS CHIEF OFFICE

30C

Room

EMS SUPPLY STORAGE

30D

EMS SUPERVISORS

30A

MECHANICAL

EMS EQUIPMENT STORAGE

Room

WOMEN'S BATHROOM

CORRIDOR

MEN'S BATHROOM

MECHANICAL

D L

D L

2 1/2" DHWS

1 1/2" DHWR

3" DCWS

DL

DL

1210 1109

111009

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:1

P

M

PD101

BASEMENT PLUMBING DEMOLITION

PLAN - AREA A1

4 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A1 A2 B1 B2

C1

C2

BASEMENT

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA A1 0 2 4 8

NORTH

TRUE

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 1/2" DCWS AND DHWS UP TO FIXTURE ON

FIRST FLOOR. CONTINUED ON PD111.

04 2" DCWS UP TO FIRST FLOOR. CONTINUED

ON PD111.

05 1/2" DHWS AND DCWS DOWN TO FIXTURE.

06 1/2" DCWS AND DHWS UP TO FIRST FLOOR.

CONTINUED ON PD111.

07 DEAD LEG UP TO FIRST FLOOR. CONTINUED

ON SHEET PD111.

08 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN. SIZE AND SERVICE AS INDICATED.

09 DEMOLISH RISER PIPING, FITTINGS, AND

INSULATION COMPLETE.

10 REMOVE ACT CEILING TILES AND GRID AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE. SALVAGE ACT CEILING AND GRID

FOR REINSTALLATION AFTER COMPLETION

OF PLUMBING WORK.

11 REMOVE GYPSUM BOARD OR PLASTER

WALLS AND CEILING, FLOORING AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE.

12 REMOVE GYPSUM BOARD OR PLASTER

WALLS TO FRAMING, ACT CEILING TILE AND

GRID, AND FLOORING AS REQUIRED TO

PERFORM PLUMBING WORK IN SPACE.

SALVAGE ACT CEILING AND GRID FOR

REINSTLLATION AFTER COMPLETION OF

PLUMBING WORK.

A

G

H

7 8 9 10 11 12 13 14 15 18 1916

P D

P

D

P D

/1 PD105

/1 PD105

/1 PD103

DHWS

8-2

DHWR

8-3

DCWS

8-1

DL

DL

D L

D L

DL

DL

DL

DL

DL

DL

DL

D L

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

1/2" DCWS

1/2" DHWS

2" DHWS

2" DCWS

2" DCWS

2" DHWS

2" DHWS

2" DCWS

3" DHWS

1 1/2" DHWR

4" DCWS

4" DCWS

3/4" DHWR

3/4" DHWS

1 1/2" DCWS

3/4" DHWS

3/4" DCWS

3/4" DHWR

1" DHWR

1" DCWS

1" DHWS

1" DHWR

1" DCWS

1" DHWS

1" DCWS

1" DHWS

1" DHWR

1" DHWS

1 1/2" DCWS

1" DHWR

1" DCWS

1" DHWS

1 1/2" DCWS

3/4" DHWS

3" DHWS

1 1/2" DHWR

4" DCWS

1" DHWR

3" DHWS

3" DCWS

1" DCWS

1" DHWS

1" DHWS

1" DCWS

3/4" DHWS

3/4" DCWS

2" DCWS

3" DCWS

2 1/2" DHWS

1" DHWS

2" DCWS

4" DCWS

2" DCWS

2" DHWS

01 01

3/4" DCWS

MECHANICAL

Room

HAC

ELECTRICAL

FILE ROOM

ELECTRICAL

42A

MECHANICAL

Room

Room

Room

Room

MEDICAL SURGICAL

LOGISTICS OFFICE

MECHANICAL

Room

Room

HAC

ELECTRICAL

FILE ROOM

ELECTRICAL

42A

MECHANICAL

Room

VESTIBULE

Room

MEDICAL SURGICAL

LOGISTIC

MEDICAL SURGICAL

LOGISTIC

MECHANICAL

Room

Room

Room

MEDICAL SURGICAL

LOGISTIC

DL

DL

D

LD

L

DL

DL

STORAGE

STORAGE

44A

11 12 13 14

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:2

P

M

PD102

BASEMENT PLUMBING DEMOLITION

PLAN - AREA A2

5 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A1 A2 B1 B2

C1

C2

BASEMENT

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA A2

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 1" DHWS AND DCWS UP TO FIRST FLOOR.

CONTINUED ON PD112.

04 2" DHWS AND DCWS UP TO FIRST FLOOR.

CONTINUED ON PD112.

05 POSSIBLE CAP. NO FIXTURE OBSERVED.

06 1" DCWS UP TO FIRST FLOOR. CONTINUED ON

PD112.

07 1 1/2" DCWS, 3/4" DHWS, AND 3/4" DHWR UP

TO FIRST FLOOR. CONTINUED ON PD112.

08 3/4" DCWS AND DHWS UP TO FIRST FLOOR.

CONTINUED ON PD112.

09 3/4" DHWS UP TO FIRST FLOOR. CONTINUED

ON PD112.

10 6" BUILDING FIRE SERVICE ENTRANCE.

11 DEMOLISH RISER PIPING, FITTINGS, AND

INSULATION COMPLETE.

12 REMOVE ACT CEILING TILES AND GRID AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE. SALVAGE ACT CEILING AND GRID FOR

REINSTALLATION AFTER COMPLETION OF

PLUMBING WORK.

13 REMOVE GYPSUM BOARD OR PLASTER

WALLS AND CEILING, FLOORING AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE.

14 REMOVE GYPSUM BOARD OR PLASTER

WALLS TO FRAMING, ACT CEILING TILE AND

GRID, AND FLOORING AS REQUIRED TO

PERFORM PLUMBING WORK IN SPACE.

SALVAGE ACT CEILING AND GRID FOR

REINSTLLATION AFTER COMPLETION OF

PLUMBING WORK.

0 2 4 8

NORTH

TRUE

G

H

19 20 21 23 2422 25 26 27 28 29 30

BACKFLOW

PREVENTER ON BOTH

RUNOUTS

P D

P D

P

D

/1 PD105 /1 PD105

P D

/1 PD102

DL

DL

DL

DL

D L

D L

DL

DL

DL

2" DCWS

1 1/2" DHWR

3" DHWS

4" DHWS

4" DCWS

4" DHWS

4" DCWS

1 1/2" DHWR

3" DHWS

1" DHWS

2" DCWS

2" DHWS

4" DCWS

1" DHWS

4" DCWS

3" DHWS

4" DCWS

3" DCWS

2" DCWS

2" DHWR

1 1/4" DHWS

3" DHWS

3" DCWS

1/2" DHWS

1/2" DCWS

2" DCWS

1" DHWS

1" DCWS

1" DHWR

1" DHWR

1" DHWR

1" DHWS

1" DCWS

1" DCWS

4" DCWS

1" DHWS

2" DCWS

1" DHWR

2 1/2" DHWS

3" DCWS

1 1/2" DHWS

1 1/2" DCWS

1 1/2" DCWS

1 1/2" DHWR

3" DHWS

DHWS

6-2

1" DHW TO SINK

DHWR

6-3

WOMEN'S LOCKER ROOM

59C

Room

Room

HAC

P-501

DHWR

5-3

DHWS

5-2

DCWS

5-1

DL

STORAGE

STORAGE

44A

EMS EQUIPMENT STORAGE

63A

COVERED LOADING DOCK

Room

TOILETS

45A

MEN'S LOCKER ROOM

Room

45B

EMS STORAGE

SOILED UTILITY

TOILET

60B

Room

Room

60A

MECHANICAL

MECHANICAL

LOCKERS

59B

TOILETS

59A

DCWS

6-1

07 08 09

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:3

P

M

PD103

BASEMENT PLUMBING DEMOLITION

PLAN - AREA B1

6 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A1 A2 B1 B2

C1

C2

BASEMENT

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA B1

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 2" DCWS UP TO FIRST FLOOR. CONTINUED

ON PD103.

04 1" DCWS UP TO FIRST FLOOR. CONTINUED

ON PD115.

05 1/2" DHWS AND DCWS UP TO FIRST FLOOR.

CONTINUED ON PD103.

06 DEMOLISH RISER PIPING, FITTINGS, AND

INSULATION COMPLETE.

07 REMOVE ACT CEILING TILES AND GRID AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE. SALVAGE ACT CEILING AND GRID

FOR REINSTALLATION AFTER COMPLETION

OF PLUMBING WORK.

08 REMOVE GYPSUM BOARD OR PLASTER

WALLS AND CEILING, FLOORING AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE.

09 REMOVE GYPSUM BOARD OR PLASTER

WALLS TO FRAMING, ACT CEILING TILE AND

GRID, AND FLOORING AS REQUIRED TO

PERFORM PLUMBING WORK IN SPACE.

SALVAGE ACT CEILING AND GRID FOR

REINSTLLATION AFTER COMPLETION OF

PLUMBING WORK.

0 2 4 8

NORTH

TRUE

G

H

31 32 33 33A 34 35 36

P D

P

D

DL

DL

DL

DL

DL

DL

DL

DL DL

DL

DL

DL

DL

DL

1 1/2" DHWR

1" DCWS

4" DCWS

1 1/2" DCWS

2" DHWS

3" DCWS

1" DHWR

1" DCWS

3/4" DHWS

3" DCWS

3/4" DHWS

3/4" DCWS

1/2" DHWS

1/2" DCWS

1/2" DCWS

1/2" DHWS

2" DHWS

3/4" DHWR

2 1/2" DCWS

05 05 05

DHWS

7-2

DCWS

7-1

01 01

MAIL ROOM

49A

ARMAMENTARIUM

REINTEGRATION

STORAGE

Room

53A

MAIL ROOM

49A

ARMAMENTARIUM

REINTEGRATION

WET VAC STORAGE

Room

STORAGE

Room

53A

RESTROOM

Room

53B

OFFICE

MATERIALS MANAGEMENT

SECTION

WOMEN'S LOCKER ROOM

59C

DHWR

7-3

10090807

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:4

P

M

PD104

BASEMENT PLUMBING DEMOLITION

PLAN - AREA B2

7 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BASEMENT

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA B2

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 1/2" DCWS AND DHWS UP TO FIRST FLOOR.

CONTINUED ON PD114.

04 3/4" DCWS UP TO FIRST FLOOR. CONTINUED

ON PD114.

05 NEW SPS AREA IS NOT PART OF THIS

PROJECT.

06 1" DCWS UP TO FIRST FLOOR. CONTINUED

ON PD114.

07 DEMOLISH RISER PIPING, FITTINGS, AND

INSULATION COMPLETE.

08 REMOVE ACT CEILING TILES AND GRID AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE. SALVAGE ACT CEILING AND GRID

FOR REINSTALLATION AFTER COMPLETION

OF PLUMBING WORK.

09 REMOVE GYPSUM BOARD OR PLASTER

WALLS AND CEILING, FLOORING AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE.

10 REMOVE GYPSUM BOARD OR PLASTER

WALLS TO FRAMING, ACT CEILING TILE AND

GRID, AND FLOORING AS REQUIRED TO

PERFORM PLUMBING WORK IN SPACE.

SALVAGE ACT CEILING AND GRID FOR

REINSTLLATION AFTER COMPLETION OF

PLUMBING WORK.

0 2 4 8

NORTH

TRUE

H

I

J

K

L

M

N

13 14 15 18 19 20 21 232216

/1 PD102

/1 PD103

/1 PD106/1 PD106

/1 PD103/1 PD102

1/2" DHWS

1/2" DHWS

3/4" DHWS

D H W S

3/4" DHWS

1" DHWS

3/4" DHWS

D H W S

2" DHWS

1" DHWS

TO STEAMER

TO SPRAY HOSE

3/4" DCWS

3/4" DHWS

DL

D L

DL

1/2" DCWS

1/2" DHWS

2" DHWS

2" DCWS

DL

D L

DL

DL

DL

DL

DL

DL

D L

D L

D L

DL

DL

1" DHWS

2" DCWS

4" DCWS

3" DCWS

3" DHWS

2" DHWR

1" DCWS

1" DHWS

1" DHWR

1" DCWS

3" DHWR

3" DHWS

1" DHWS

1" DCWS

1 1/2" DHWS

1 1/2" DCWS

1 1/2" DCWS

1 1/4" DHWS

1 1/2" DCWS

1 1/2" DHWR

3" DHWS

2" DHWS

2" DCWS

3" DCWS

2" DHWS

DHWS

3-2

DCWS

3-1

DHWR

3-3

1" DHWR

1" DHWR

DHWR

2-3

DL

DL

1" DHW TO SINK

1" DHWS

DHWS

2-2

DCWS

2-1

Room

Room

KITCHEN

STAIRS

SB-02

COVERED LOADING DOCK

SPS

Room

Room

Room

22A

WALK-IN REFRIGERATOR

R1

Room

COVERED LOADING DOCK

Room

WALK-IN REFRIGERATOR

R2

COVERED LOADING DOCK

KITCHEN

COVERED LOADING DOCK

KITCHEN

COVERED LOADING DOCK

EXTERIOR LOADING DOCK

-DRFY FOOD STORAGE

15141312

1312 14 15

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:4

P

M

PD105

BASEMENT PLUMBING DEMOLITION

PLAN - AREA C1

8 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A1 A2 B1 B2

C1

C2

BASEMENT

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA C1

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 1" DHWS AND DCWS FROM SUB-BASEMENT

CONNECTED TO SINK.

04 DCWS AND DHWS UP TO FIXTURE ON FIRST

FLOOR. CONTINUED ON SHEET PD117.

05 2" DCWS UP TO FIRST FLOOR. CONTINUED

ON PD115.

06 1" DHWS DOWN TO FIXTURE.

07 3/4" DHWS AND DCWS DOWN TO FIXTURE.

08 1/2" DHWS AND 1 1/2" DCWS DOWN TO

FIXTURES.

09 3" DHWS, 4" DCWS, AND 2" DHWR UP FROM

SUB-BASEMENT. CONNECTED TO MAINS.

10 3/4" DHWS AND DCWS UP TO FIRST FLOOR.

CONTINUED ON PD115.

11 FILLED REGION PART OF BID ALTERNATE NO.

12 DEMOLISH RISER PIPING, FITTINGS, AND

INSULATION COMPLETE.

13 REMOVE ACT CEILING TILES AND GRID AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE. SALVAGE ACT CEILING AND GRID

FOR REINSTALLATION AFTER COMPLETION

OF PLUMBING WORK.

14 REMOVE GYPSUM BOARD OR PLASTER

WALLS AND CEILING, FLOORING AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE.

15 REMOVE GYPSUM BOARD OR PLASTER

WALLS TO FRAMING, ACT CEILING TILE AND

GRID, AND FLOORING AS REQUIRED TO

PERFORM PLUMBING WORK IN SPACE.

SALVAGE ACT CEILING AND GRID FOR

REINSTLLATION AFTER COMPLETION OF

PLUMBING WORK.

0 2 4 8

NORTH

TRUE

N

O

P

Q

R

S

13 14 15 18 19 20 21 232216

/1 PD105/1 PD105

3/4" D H

W S

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

D L

DL

DL

DL

DL

D L

D L

DL

DL

1" DHWR

3" DCWS

1" DHWS

4" DCWS

2" DCWS

2" DHWS

1" DCWS

1" DHWS

3/4" DCWS

1 1/4" DHWS

3/4" DHWR

1/2" DCWS

1 1/2" DHWS

3/4" DCWS

1" DCWS

1 1/4" DHWS

2" DHWR

2" DHWS

3" DCWS

3/4" DCWS

3/4" DCWS

3/4" DCWS

1" DCWS

1" DHWS

3/4" DHWS

3/4" DHWS

1 1/4" DHWS

1/2" DHWS

DHWR

1-3

DHWS

1-2

DCWS

1-1

D L

DL

EXTERIOR LOADING DOCK

WALK-IN REFRIGERATOR

R2

MECHANICAL

MECHANICAL

HAC

OFFICE

MANAGEMENT OFFICE

SUPERVISORS OFFICE

FOOD PANTRY

8B

VESTIBULE

CANTEEN STORAGE

8A

WALK-IN FREEZER

F1

EXTERIOR LOADING DOCK

-DRFY FOOD STORAGE

11 12 1310

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:5

P

M

PD106

BASEMENT PLUMBING DEMOLITION

PLAN - AREA C2

9 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A1 A2 B1 B2

C1

C2

BASEMENT

Scale: 1/4" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN - AREA C2 0 2 4 8

NORTH

TRUE

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 1 1/14" DHWS UP TO FIRST FLOOR.

CONTINUED ON PD116.

04 1/2" DHWS AND 1" DCWS UP TO FIRST FLOOR.

CONTINUED ON PD116.

05 1 1/14" DHWS AND 3/4" DCWS UP TO FIRST

FLOOR. CONTINUED ON PD116.

06 3/4" DCWS AND DHWS UP TO FIRST FLOOR.

CONTINUED ON PD116.

07 4" DCWS UP TO FIRST FLOOR. CONTINUED

ON PD116.

08 HOSE END DRAIN VALVE.

09 FILLED REGION PART OF BID ALTERNATE NO.

10 DEMOLISH RISER PIPING, FITTINGS, AND

INSULATION COMPLETE.

11 REMOVE ACT CEILING TILES AND GRID AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE. SALVAGE ACT CEILING AND GRID

FOR REINSTALLATION AFTER COMPLETION

OF PLUMBING WORK.

12 REMOVE GYPSUM BOARD OR PLASTER

WALLS AND CEILING, FLOORING AS

REQUIRED TO PERFORM PLUMBING WORK IN

SPACE.

13 REMOVE GYPSUM BOARD OR PLASTER

WALLS TO FRAMING, ACT CEILING TILE AND

GRID, AND FLOORING AS REQUIRED TO

PERFORM PLUMBING WORK IN SPACE.

SALVAGE ACT CEILING AND GRID FOR

REINSTLLATION AFTER COMPLETION OF

PLUMBING WORK.

E

C

G

H

2 3 3A 4 5 6

P D

P

D

/1 PD113 /1 PD113

DL

DL

DL

DL

DL

DL

DL

DL

D L

D L

1 1/2" DCWS

1" DHWR

1 1/4" DHWS

1 1/2" DHWS

1 1/2" DCWS

1" DHWS

1" DCWS

1 1/2" DCWS

1 1/2" DHWS

1" DHWS

1" DCWS

1" DCWS

1" DHWS

1 1/2" DCWS

1 1/2" DHWS

1 1/2" DCWS

1 1/2" DHWS

1 1/2" DHWR 1 1/2" DCWS

1" DHWR

1" DHWS

1 1/2" DCWS

1 1/2" DHWS

1 1/2" DHWS

1 1/2" DCWS

DL

DL

DCWS

10-1

DHWS

10-2

DHWS

9-2

DCWS

9-1

1 1/2" DHWS

1 1/2" DCWS

DL

DL

DL

DHWR

10-3

Room

109C

Room

109D

Room

Room

110B

Room

Room

Room

Room

Room

Room

Room

119A

Room

Room

120A

Room

120B

Room

Room

121A

Room

121B

Room

121C

Room

121E

Room

Room

121F

Room

121G

Room

A157

Room

A158

Room

A159

Room

110A

Room

Room

121D

Room

Room

A157

Room

A158

Room

A159

D L

D L

05 06 07

05 06 07

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

/1

/2

:2

:0

P

M

PD111

FIRST FLOOR PLUMBING DEMOLITION

PLAN - AREA A1

10 82DJR WLF

CORRECT LEGIONELLA

DEFICIENCIES

VA NORTHERN INDIANA HEALTH CARE

SYSTEM

2121 Lake Avenue, Ft. W ayne, IN 46240 03/20/2020

BID DOCUMENTS

610A4-18-10417-283

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

MAIN

ENTRANCE

A1 A2 B1 B2

C1

C2

A3

A4

FIRST FLOOR

Scale: 1/4" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A1 0 2 4 8

NORTH

TRUE

01 REMOVE DEAD LEG AND CAP PIPE AT ACTIVE

MAIN WITHIN 2.5 PIPE DIAMETERS. SIZE AND

SERVICE AS INDICATED.

02 SUSPECTED ASBESTOS CONTAINING PIPE

INSULATION.

03 1 1/2" DHWS AND DCWS UP TO FIXTURE ON

SECOND FLOOR.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .