This document contains responses to questions regarding a solicitation for demolition services. The solicitation will be issued on or around January 31, 2020 via SAM.gov for Project 610-19-201 to demolish buildings 35, 36, 37, 38, 75, 94, 95, 96, 118 and 149 at the Marion Campus of the VA Northern Indiana Health Care System. The work includes asbestos/lead paint abatement, utility disconnect, building removal including foundations and backfilling, and grading and seeding. The bid amount is to be entered on the SF1442 and the only required documents are the SF1442, offer guarantee of 20% or $3,000,000, and safety/environmental certification. The project size is between $500,000 and $1,000,000 and has been set aside for SDVOSBs under NAICS Code 236220. Questions regarding the solicitation should be directed to the named contracting officer.

36C25020B0017 0004 RFI Responses.docx

View the file

Other files

File Type Posted
36C25020B0017-0005000.docx DOCX document
36C25020B0017-0004000.docx DOCX document
36C25020B0017-0003000.docx DOCX document
36C25020B0017-0002002.xlsx XLSX spreadsheet
36C25020B0017-0002001.pdf PDF
36C25020B0017-0002004.docx DOCX document
36C25020B0017-0002003.pdf PDF
36C25020B0017-0002000.docx DOCX document
36C25020B0017-0001000.docx DOCX document
36C25020B0017-0001001.pdf PDF
36C25020B0017-012.txt TXT text file
36C25020B0017-009.pdf PDF
36C25020B0017-010.doc DOC document
36C25020B0017-007.docx DOCX document
36C25020B0017-008.pdf PDF
36C25020B0017-011.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Responses

Question: What is the required Offer Guarantee amount?

Response: Bid Bonds shall be 20% or $3,000,000.00, whichever is less.

Question: When is the deadline for RFIs?

Response: RFIs are due by 2:00pm on Wednesday, 15 April 2020

Question: Are there any proposal documents required in additions to the SF1442, an Offer Guarantee and the Safety & Environmental Certification?

Response: No additional documents will be required.

Question: Is our proposal to be broken down per the Bid Items on 01 00 00 Page 1-2? Is there a specific Bid Form to be used?

Response: Items II, IIA, III and IIIA of the Statement of Bid Items on 01 00 00 Page 1-2 are no longer part of the scope of work. The scope of work described in the Statement of Work/Drawings/Revised Specifications (attached) is what is required to be included in the bid amount, which will be entered on page 2 of the SF 1442 document in the Bid Amount space provided. The SF1442 is the only Bid Form authorized for bid submission.

Question: On CD401, are the information notes for B-118 & B-149 reversed?

Response: Yes, this was simply a mistake.

Question: Should we include any dollars for removing B-75 storm and/or sanitary sewer lines as mentioned on CU401 and CU402?

Response: No, as no septic or sewer lines are located at Bldg 75 per Note #7 on CU401 and CU402.

Question: Is any new asphalt paving required or are the details on CS501 just for any necessary edge patching?

Response: No new paving, details are for patching.