36C25019R0093-A00007000.docx

DOCX document Posted

Attached to
Community-Based Outpatient Clinic (CBOC) Services to include Primary Care Services in Goshen, IN
Solicitation number
36C25019R0093
Issued by

About this file

36C25019R0093 A00007 36C25019R0093 A00007.docx

View the file

Other files

File Type Posted
36C25019R0093-A00011000.docx DOCX document
36C25019R0093-A00010000.docx DOCX document
36C25019R0093-A00009000.docx DOCX document
VHA Notice 2020-02 Storage of Vaccines and Medications in Pharmaceutical Grade Purpose-built Refrigerators and Freezers at VA Medical Facilities.pdf PDF
36C25019R0093-A00008001.pdf PDF
36C25019R0093-A00008002.pdf PDF
36C25019R0093-A00008000.docx DOCX document
36C25019R0093-A00006000.docx DOCX document
36C25019R0093-A00005000.docx DOCX document
36C25019R0093-A00004000.docx DOCX document
36C25019R0093-A00003000.docx DOCX document
36C25019R0093-A00002000.docx DOCX document
36C25019R0093-A00001000.docx DOCX document
36C25019R0093-005.pdf PDF
36C25019R0093-018.pdf PDF
36C25019R0093-008.pdf PDF
36C25019R0093-015.pdf PDF
36C25019R0093-020.pdf PDF
36C25019R0093-003.pdf PDF
36C25019R0093-024.pdf PDF
36C25019R0093-017.pdf PDF
36C25019R0093-023.pdf PDF
36C25019R0093-006.pdf PDF
36C25019R0093-011.pdf PDF
36C25019R0093-019.pdf PDF
36C25019R0093-013.pdf PDF
36C25019R0093-012.pdf PDF
36C25019R0093-025.pdf PDF
36C25019R0093-026.pdf PDF
36C25019R0093-021.pdf PDF
36C25019R0093-009.pdf PDF
36C25019R0093-001.docx DOCX document
36C25019R0093-016.pdf PDF
36C25019R0093-004.pdf PDF
36C25019R0093-022.pdf PDF
36C25019R0093-007.pdf PDF
36C25019R0093-014.pdf PDF
36C25019R0093-010.pdf PDF
36C25019R0093-002.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00007 02-26-2020

NONE

Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis

IN

46240 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis

IN

46240 To all Offerors/Bidders

36C25019R0093 12-06-2019

X X

X 1 (one) The purpose of this amendment is to correct an answer provided previously under amendments A00003 and A00006 regarding set back requirements (or bollards). Please see the attached (beginning on page 2).

Questions received on 2/24/20 will be posted in a separate amendment. This amendment is not being extended because amendment A00005 has provided the extension to March 17, 2020 at 3pm ET.

Lisa Bailey Contracting Officer Set Back Question & Answer Correction Answer previously Posted on 2/26/20 around 10:15am:

1. Question 62 cites Section 4.9.16.1.2 and states that the required setback distance of the site to the bollards for physical security is 25 feet. “Setback distance from the face of the Building's exterior to the protected/defended perimeter (i.e., any potential point of explosion). This means the distance from the Building to the curb or other boundary protected by bollards, planters or other street furniture. Such potential points of explosion may be, but are not limited to, such areas that could be accessible by any motorized vehicle (i.e., street, alley, sidewalk, driveway, parking lot).”

a. Due to lack of availability of physical locations, will the Government consider allowing bollards to be placed 10- to 12-feet from the building provided any windows are covered with blast resistant film? If not, please extend the due date by at least 30 days to allow contractors to find other locations. As stated under Amendment A00003, the requirement is for 25 feet and blast resistant film cannot be used as an equivalent for this set back.

Updated/Corrected Answer effective 3pm ET on 2/26/20.

Any answers regarding set back or bollards are previously rescinded and replaced with the following answer:

The requirement for a 25-foot setback is no longer required. A 10 foot to 12-foot set back is acceptable. Blast resistant film is not necessary.