36C25019B0007-014.pdf
PDF 15 MB Posted
- Attached to
- Correct OIT Deficiencies 610A4-16-101 Federal contract opportunity
- Solicitation number
- 36C25019B0007
About this file
36C25019B0007 Drawings 9 of 11.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019C0184-000.docx | DOCX document | |
| VA251-15-D-0142-000.docx | DOCX document | |
| 36C25019B0007-0007004.docx | DOCX document | |
| 36C25019B0007-0006000.docx | DOCX document | |
| 36C25019B0007-0005000.docx | DOCX document | |
| 36C25019B0007-0004000.docx | DOCX document | |
| 36C25019B0007-0003000.docx | DOCX document | |
| 36C25019B0007-0003001.pdf | ||
| 36C25019B0007-0002000.docx | DOCX document | |
| 36C25019B0007-0001000.docx | DOCX document | |
| 36C25019B0007-010.pdf | ||
| 36C25019B0007-004.pdf | ||
| 36C25019B0007-012.pdf | ||
| 36C25019B0007-005.docx | DOCX document | |
| 36C25019B0007-003.doc | DOC document | |
| 36C25019B0007-006.pdf | ||
| 36C25019B0007-015.pdf | ||
| 36C25019B0007-008.pdf | ||
| 36C25019B0007-002.pdf | ||
| 36C25019B0007-013.pdf | ||
| 36C25019B0007-016.pdf | ||
| 36C25019B0007-009.pdf | ||
| 36C25019B0007-011.pdf | ||
| 36C25019B0007-007.pdf | ||
| 36C25019B0007-001.docx | DOCX document | |
| 36C25019B0007-000.docx | DOCX document |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IT
RA
CK
FD
CRAWL SPACE
APPROX. 3 FOOT CLEAR HT.
FASIREN CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
BOILER
CONSTRUCTION LIMIT LINE
(AREA FOR CONDENSER
ON EXIST CONC PAD)
ELEC
CRAWL SPACE
APPROX. 3 FOOT CLEAR HT.
SP
KR
P
GU
AG
E
PA
NE
L
OIT
CLOSET
4.01
EXISTING
BASEMENT
MECHANICAL
PANELS
CR
4 / 4.AD100
2 / 4.AD100
3 / 4.
AD
/ 4
.A D1
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - DEMOLITION PLAN - BASEMENT OIT CLOSET 4.011
4.AD100
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 4 KEY PLAN
RENOVATION
AREA
UNEXCAVATED
BASEMENT
(THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.)
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL FINISHES AND
MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING SITE OR BUILDING, OR COMPROMISE ANY BUILDING SYSTEMS OR HOSPITAL FUNCTIONS. IF THE INSPECTION INDICATES THAT THE INTEGRITY OF EXISTING CONDITIONS MAY BE COMPROMISED, NOTIFY THE CONTRACTING
OFFICER REPRESENTATIVE (COR) IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL SUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND
EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY THE
CONTRACTOR - DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS AND DAMAGE
DURING CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO COMPLETING ALL
DEMOLITION WORK.
9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS TO CONTACT THE COR
IMMEDIATELY, PRIOR TO THE END OF THE DAY OF CONSTRUCTION.
11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING EQUIPMENT TO REMAIN
AND DEMOLISHED MATERIALS WITH THE COR PRIOR TO THE START OF CONSTRUCTION.
REMOVE DUMBWAITER LIGHT AND CONTROLS TO ALLOW FLUSH CONDITION AT WALL FACE. PREP
WALLS AROUND DUMBWAITER FOR NEW WALL FRAMING. DUMBWAITER DOOR AND CAB TO REMAIN,
CONTRACTOR TO ENSURE NOT TO DAMAGE EXISTING FRAME AND DOOR. SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
21 CONTRACTOR TO COORDINATE WITH THE VA TO RELOCATE EXISTING REFRIGERATOR OUT OF AREA
OF DEMOLITION AND NEW CONSTRUCTION.
22 CONTRACTOR SHALL REMOVE EXISTING STAINLESS STEEL MEDICINE CABINET FROM WALL IN ITS
ENTIRETY. TURN EQUIPMENT OVER TO THE COR. CONTRACTOR TO COORDINATE AND SCHEDULE
FOR AFTER HOURS WORK WITH THE COR FOR THIS ITEM. SEE NEW ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
CONTRACTOR SHALL REMOVE EXISTING SINK AND RELATED APPURTENANCES FROM THIS SIDE OF
WALL IN THEIR ENTIRETY--SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. REMOVE
PLASTER AND BLOCK TO EXTENT REQUIRED FOR ACCESS TO BEHIND WALL WORK. PATCH / FILL ALL
HOLES WITH LIKE MATERIAL TO MATCH ADJACENT SURFACES AND PREP FOR NEW FINISHES.
24 EXTERIOR METAL GRILLE TO REMAIN IN PLACE. CONTRACTOR TO VERIFY PROPER FLASHING PRIOR TO PROVIDING WALL INFILL BEHIND IT. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
25 EXISTING FUEL METER BOX AND CONDUIT TO REMAIN IN PLACE. CONTRACTOR TO ENSURE
NOT TO DAMAGE. COORDINATE WITH THE COR IF ANY ITEM RELATED TO THIS EQUIPMENT IS
IN THE WAY OF THE NEW CONSTRUCTION.
28 CONTRACTOR TO REMOVE AND SALVAGE EXISTING FIRE ALARM PANEL AND SIREN. MOVE TO NEW
LOCATION OUTSIDE OF THE OIT CLOSET. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
27 EXISTING WATER HEATER TO REMAIN IN PLACE DURING CONSTRUCTION. CONTRACTOR TO ENSURE
NOT TO DAMAGE.
26 CONTRACTOR TO REMOVE EXISTING ACCESS HOLE AND PANEL COVER TO CRAWL SPACE AS
REQUIRED. CONTRACTOR TO PUT BACK IN PLACE AND SECURE AFTER CONSTRUCTION IS
COMPLETE.
31 CONTRACTOR TO PREPARE GRADE FOR CONCRETE PAD FOR GROUND MOUNTED CONDENSER. SEE MECHANICAL, ELECTRICAL AND NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
30 CONTRACTOR SHALL CORE DRILL HOLES AT BLOCK AND BRICK WALL FOR NEW MECHANICAL PIPING
PENETRATIONS AS REQUIRED. FIELD VERIFY CLEARANCES AT JOISTS AND HEADERS AT THIS
LOCATION. PROVIDE PROPER SLEEVES AND CAULKING AROUND ALL PENETRATIONS FOR SMOKE
TIGHT OR WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
32 EXISTING JOIST FLOOR FRAMING TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING
CONSTRUCTION.
EXISTING STEEL BEAM TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING
CONSTRUCTION.
33 EXISTING SPRINKLER RISER PIPING TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE
DURING CONSTRUCTION.
34 FIELD VERIFY EXISTING PVC SLEEVE CAPPED OFF ABOVE GRADE THAT ROUTES THROUGH WALL
INTO CRAWL SPACE (MAY USE FOR NEW PIPING WALL PENETRATION). SEE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
35 EXISTING SINK, WATER HEATER AND SHELF TO REMAIN IN PLACE DURING CONSTRUCTION.
CONTRACTOR TO ENSURE TO PROTECT FROM DAMAGE.
36 EXISTING BOILER UNIT TO REMAIN IN PLACE DURING CONSTRUCTION. CONTRACTOR TO ENSURE
TO PROTECT FROM DAMAGE.
37 CONTRACTOR SHALL REMOVE EXISTING SOLID SURFACE SHELF AND METAL BRACKETS IN THEIR
ENTIRETY. PATCH/FILL HOLES IN BRICK WALL TO MATCH EXISTING SURFACE.
42 EXISTING ACCESS HOLE AND PANEL COVER TO CRAWL SPACE. CONTRACTOR TO PUT BACK IN
PLACE AND SECURE AFTER CONSTRUCTION IS COMPLETE.
43 CONTRACTOR SHALL REMOVE VINYL FLOORING AND WALL BASE IN ITS ENTIRETY. PREP FLOOR
AND WALLS FOR NEW FLOOR COVER AND BASE.
CONTRACTOR SHALL REMOVE EXISTING FLOOR RETURN AIR GRILLE AND RELATED DUCT-SEE
MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION. ADD BLOCKING BETWEEN JOISTS AND
PATCH/FILL HOLE WITH PLYWOOD TO MATCH EXISTING FLOOR CONSTRUCTION.
38 CONTRACTOR SHALL REMOVE EXISTING CAGE OVER WINDOW IN ITS ENTIRETY. PATCH/FILL HOLES IN TRIM TO MATCH EXISTING MATERIAL. SEE NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
EXISTING SIDEWALK TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.
REMOVE EXISTING AIR SUPPLY GRILLE IN ITS ENTIRETY. PREP INSIDE OPENING FOR NEW WALL INFILL
WITH LIKE CONSTRUCTION AND MATERIALS TO MATCH ADJACENT SURFACES.
45 CONTRACTOR SHALL MOVE EXISTING METAL LOCKERS TO A NEW LOCATION WITHIN THE ROOM.
COORDINATE WITH COR FOR SCHEDULE.
46 CONTRACTOR SHALL REMOVE EXISTING BLOCK AND PLASTER PARTITION IN THEIR ENTIRETY.
SALVAGE EXISTING DOOR AND DOOR HARDWARE FOR REUSE. PREP OPENING FOR NEW WALL
INFILL, CEILING, FLOORING PATCH AND DOORS. CONTRACTOR TO EVALUATE STRUCTURAL
SUPPORT REQUIREMENTS AND TEMPORARY SHORING AT HEAD OF WALL PRIOR TO REMOVING
BLOCK.
47 CONTRACTOR TO REMOVE EXISTING ROOM SIGN AND SALVAGE FOR REUSE.
CONTRACTOR TO ENLARGE OPENING FOR RETURN AIR GRILLE IN EXISTING WALL. SEE
MECHANICAL DRAWING FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL REMOVE AND SALVAGE EXISTING DOOR AND DOOR HARDWARE. SEE NEW
ARCHITECTURAL PLANS AND DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
EXISTING INSULATED COLD WATER PIPING DROP FOR "TRAP PRIMER" TO REMAIN. CONTRACTOR TO
ENSURE NOT TO DAMAGE DURING CONSTRUCTION.
EXISTING FLOOR MOUNTED TRANSFORMER TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE
DURING CONSTRUCTION.
EXISTING FLOOR DRAIN TO REMAIN. CONTRACTOR TO PROVIDE TEMPORARY COVER TO PROTECT
FROM DUST AND DEBRIS THAT COULD CLOG DRAIN DURING CONSTRUCTION.
CONTRACTOR SHALL REMOVE EXISTING CARPET, WALL BASE AND FLOORING TRANSITION TRIM IN ITS
ENTIRETY (ONLY WITHIN THE FOOTPRINT OF THE NEW CLOSET AREA). PREP EXISTING FLOOR
SURFACES TO RECEIVE NEW FLOORING AND TRIM MATERIAL. SEE NEW ARCHITECTURAL DRAWINGS
FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL REMOVE EXISTING PTAC AND ASSOCIATED INTERIOR WALL TRIM IN THEIR
ENTIRETY. CONTRACTOR TO PREP OPENING FOR NEW BLOCKING AND INFILL CONSTRUCTION. SEE
NEW ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING WINDOW FRAME TO REMAIN. CONTRACTOR SHALL REMOVE EXISTING ALUMINUM BLINDS AND INSULATED GLASS PANEL IN THEIR ENTIRETY AND PREP FOR NEW METAL INSULATED SPANDREL
PANEL. CONTRACTOR TO ENSURE NOT TO DAMAGE EXISTING WINDOW FRAME SYSTEM. SEE NEW
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO COORDINATE WITH DOOR SECURITY CONTRACTOR PRIOR TO REMOVING CAGE FOR
THE REMOVAL AND SALVAGE OF ALL DOOR LEVER HARDWARE, REQUEST FOR EXIT BOXES, DOOR
CORDS, ACCESS CONTROL SENSORS, CONTROL PANELS (BOTH LENEL AND ALTRONIX) AND RELATED ELECTRICAL BOXES AND CONDUIT ASSOCIATED WITH DOOR ACCESS. CONTRACTOR SHALL REMOVE EXISTING WIRE MESH CAGE AND ASSOCIATED ANGLES, ANCHORS AND PLATES IN THEIR ENTIRETY AND PATCH / FILL ALL HOLES RELATED TO ANCHORS FOR AN APPEARANCE TO MATCH ADJACENT FLOOR
AND WALL SURFACES . SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL REMOVE EXISTING METAL GRILLE FROM THE EXTERIOR FACE OF THE WALL.
CONTRACTOR TO PROVIDE FLASHING AT THE OPENING AND NEW BLOCKING FOR COVER PANEL. SEE
NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL PREP EXISTING WALLS FOR NEW FINISHES. SCRAPE ALL PEELING PAINT AND REMOVE ALL LOOSE OR DAMAGED MATERIALS FROM WALL SURFACES IN THEIR ENTIRETY. REMOVE ALL ACCESSORY EQUIPMENT. PATCH / REPAIR AND INFILL SURFACES AS REQUIRED WITH MATERIALS
TO MATCH ADJACENT SURFACES FOR LIKE NEW APPEARANCE. WORK WITH CARE AND PROTECT
EXISTING CONDITIONS TO REMAIN IN PLACE.
CONTRACTOR SHALL REMOVE AND SALVAGE 25" X 18" X 18' RACK MOUNTED ON PLYWOOD, HIGH
ON CAGE WALL WITH FIBER OPTIC EQUIPMENT. COORDINATE WITH COR FOR RELOCATION OF
EQUIPMENT MOUNTED ON THIS RACK WITHIN CLOSET AREA AND TEMPORARY SHUTDOWNS.
CONTRACTOR SHALL TEMPORARILY RELOCATE STORAGE SHELVING, TABLES AND CARTS IN ORDER TO COMPLETE WORK. THESE ITEMS SHALL BE PUT BACK IN SAME LOCATION AND CONDITION AS FOUND AFTER WORK IS COMPLETE. COORDINATE WITH THE COR PRIOR TO MOVING ANY SHELF OR CART.
CONTRACTOR TO COORDINATE WITH THE COR TO TEMPORARILY MOVE OIT / PHONE, GROUNDING
BARS OR OTHER "NON-ESSENTIAL" EQUIPMENT IN AREA OF NEW WORK. CONTRACTOR SHALL
SALVAGE ALL EQUIPMENT FOR REINSTALL IN SAME RELATIVE LOCATION AFTER NEW WORK IS
COMPLETE. SOME EQUIPMENT MAY REQUIRE TO REMAIN ACTIVE IN TEMPORARY LOCATION. SEE
NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL PROVIDE TEMPORARY COVER TO PROTECT ALL EXISTING NON-OIT RELATED
DEVICES FROM DAMAGE DURING CONSTRUCTION, INCLUDING RELATED DEVICES FOR T-COM, NURSE
CALL, OVERHEAD PAGING EQUIPMENT AND ELECTRICAL. SUCH WORK MAY INCLUDE PROTECTION
FROM THE RELOCATION OF OVERHEAD WATER, SPRINKLER AND STEAM PIPING.
CONTRACTOR SHALL PROVIDE AND INSTALL BREATHABLE MEMBRANE AND COVER TO PROTECT ALL
OIT EQUIPMENT, IT CABINETS AND OTHER OIT RELATED EQUIPMENT FROM DAMAGE DURING
CONSTRUCTION. ALL T-COM AND SERVER HARDWARE TO REMAIN IN OPERATION DURING EACH
PHASE OF CONSTRUCTION. CONTRACTOR TO PROVIDE TEMPERATURE MONITOR FOR EQUIPMENT
AND MAINTAIN WITHIN ACCEPTABLE RANGE.
CONTRACTOR TO VERIFY WORK REQUIRED AT THE PANELS. SEE ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
CONTRACTOR SHALL COORDINATE WITH THE VA TO RELOCATE EQUIPMENT WITHIN THE FOOTPRINT
OF THE NEW CLOSET SPACE.
CONTRACTOR SHALL TEMPORARILY REMOVE AND SALVAGE ANY / ALL EXISTING RAISED ACCESS
FLOOR PANELS IN AISLES AS REQUIRED TO CONDUCT BELOW FLOOR WORK. REINSTALL EXISTING PANELS IN SAME LOCATION WHEN WORK IS COMPLETE OR AT THE END OF EACH DAY IF WORK IS NOT
COMPLETE.
CONTRACTOR SHALL REMOVE ALL EXISTING VCT TILES AND RUBBER BASE IN THEIR ENTIRETY WITHIN
THE ROOM, FROM CORNER TO CORNER. CLEAN AND PREP EXISTING WALL AND FLOOR SURFACES
FOR NEW FLOOR COVER AND BASE. SEE NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
48 CONTRACTOR TO CUT OPENING IN EXISTING WALL FOR NEW DUCT PENETRATION AND GRILLE. SEE
MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
49 CONTRACTOR TO REMOVE AND SALVAGE EXISTING METAL HANDRAIL AND BRACKETS. PATCH
HOLES IN WALLS TO MATCH WALL CONSTRUCTION AND PREP FOR NEW FINISHES.
50 CONTRACTOR TO FILL ALL FLOOR RUTS AS REQUIRED FROM REMOVAL OF BLOCK WALL AND
PATCH SMOOTH FOR NEW FLOOR FINISHES.
51 CONTRACTOR TO REMOVE EXISTING DRYWALL AND INSTALL 2X BLOCKING BETWEEN STUDS.
PATCH DRYWALL TO MATCH EXISTING AND PREP PAINT. SEE ELEVATIONS FOR DIMENSIONS.
52 CONTRACTOR TO PREP EXISTING WALL FOR NEW FINISHES. WORK AROUND EXISTING EQUIPMENT
TO REMAIN AND PROTECT FROM DAMAGE.
NOTE:
ALL NON-OIT RELATED EQUIPMENT AND WALL
ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,
HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO
PERFORMING DEMOLITION OR NEW CONSTRUCTION
WORK, AND SALVAGED FOR REUSE. COORDINATE WITH
THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.
SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
NOTE:
THE CONTRACTOR SHALL NOT DAMAGE, MOVE,
DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR
RELATED APPURTENANCES WITHOUT THE FIRST
APPROVAL AND SUPERVISION OF THE OIT MANAGER OR
DESIGNATED PERSON.
NOTE:
ANY WORK PERFORMED BY THE CONTRACTOR THE VA
RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO
SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND
PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY
/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS
OR CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROTECT EXISTING CEILING,
FLOOR, AND WALLS FROM DAMAGE DURING
CONSTRUCTION AND IMPLEMENTATION OF INFECTION
AND DUST CONTROL BARRIERS. AFTER THE REMOVAL
OF TEMPORARY BARRIERS, TOUCH UP PAINT ON
CEILINGS AND WALLS AS NEEDED TO SHOW NO
EVIDENCE OF CONSTRUCTION.
NOTE:
SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM
REQUIREMENTS, DETAILS AND PHASING NOTES.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS
ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN
EXISTING MECHANICAL AND PIPING EQUIPMENT.
CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR
WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
NOTE:
NOT ALL KEYNOTES ARE USED ON EVERY SHEET.
CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR
COMPLETE SCOPE OF WORK IN EACH SPACE.
NOTE:
IN THE EVENT THAT THE PRESENCE OF HAZARDOUS
MATERIALS IS SUSPECT, THE CONTRACTOR SHALL
NOTIFY THE COR IMMEDIATELY FOR EVALUATION AND
TESTING. IF HAZARDOUS MATERIAL IS FOUND, THE
CONTRACTOR SHALL COORDINATE WITH THE COR TO
COMPLETE A SEPARATE ABATEMENT CONTRACT PRIOR
TO CONTINUING WITH ANY NEW WORK IN THIS AREA.
SCALE: NTS
IT CLOSET WEST VIEW 2
4.AD100SCALE: NTS
IT CLOSET SOUTH VIEW 3
4.AD100SCALE: NTS
BUILDING 4 OUTSIDE VIEW 4
4.AD100SCALE: NTS
MECHANICAL EAST VIEW 5
4.AD100
AutoCAD SHX Text
TWT
AutoCAD SHX Text
ARCHITECTURAL-DEMOLITION-PLAN
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text
NRF
AutoCAD SHX Text
TWT
AutoCAD SHX Text
ARCHITECTURAL-DEMOLITION-PLAN
AutoCAD SHX Text
4.AD100
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of 87
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FORT WAYNE, INDIANA
AutoCAD SHX Text
CORRECT OIT DEFICIENCIES
AutoCAD SHX Text 610A4-16-101
AutoCAD SHX Text 2/13/2018
AutoCAD SHX Text
CERTIFICATION:
AutoCAD SHX Text
AutoCAD SHX Text Engineering and Facilities Management Services
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text
PLAN DEMOLITION NOTES
AutoCAD SHX Text
PLAN DEMOLITION NOTES (CONT'D)
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text 10800038
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text No.
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text W.
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text T
FD
CRAWL SPACE
APPROX. 3 FOOT CLEAR HT.
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
BOILER
CONSTRUCTION LIMIT LINE
(AREA FOR CONDENSER
ON EXIST CONC PAD)
CRAWL SPACE
APPROX. 3 FOOT CLEAR HT.
HWS
HWR SP
KR
M
AI
N 4"
SPKR 4"
SP
KR
SP
KR
M
AI
N 4"
SPKR 1"
SAN SAN
SA
N
SA
N
CO
ND
UI
T
2" G
AL
V
SAN
C.
O
HWR
OIT
CLOSET
4.01
EXISTING
BASEMENT
MECHANICAL
HW
S
BOTT CONC. CEILING
EL. -8'-0" AFF
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - DEMO CEILING - BASEMENT BUILDING #41
4.AD900
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 4 KEY PLAN
RENOVATION
AREA
UNEXCAVATED
BASEMENT
S
SOME SYMBOLS MAY NOT BE USED. SYMBOLS SHOWN ON PLAN ARE FOR
REFERENCE ONLY. SEE MECHANICAL, ELECTRICAL, AND FIRE DRAWINGS FOR
ADDITIONAL INFORMATION.
REFLECTED CEILING PLAN
SYMBOL LEGEND
NOTE:
SYMBOL DESCRIPTION
SMOKE DETECTOR
FIRE PROTECTION SPRINKLER HEAD
2'x2' ACOUSTICAL CEILING PANELS & GRID
AUDIBLE / VISUAL ALARM
SPEAKER SYSTEM
EXIT LIGHT FIXTURE
2'x4' LIGHTING FIXTURE
2' X 2' SUPPLY AIR DIFFUSER
2' X 2' RETURN AIR GRATE
INCANDESCENT FIXTURE
2'x2' LIGHTING FIXTURE
F
MECHANICAL DIFFUSER
PENDANT LIGHT FIXTURE
2'x4' ACOUSTICAL CEILING PANELS & GRID
1'x1' ACOUSTICAL INTERLOCKING TILE
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR SUBCONTRACTORS
THAT WORK WITHIN THIS BUILDING.
CONTRACTOR TO REMOVE EXISTING GLASS BULB SPRINKLER HEAD AND REMOVE PIPING SECTION FOR NEW T AND PREPARE TO EXTEND PIPING TO NEW LOCATION. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
CONTRACTORS SHALL TEMPORARILY REMOVE AND SALVAGE ANY / ALL EXISTING CEILING PANELS AS REQUIRED TO CONDUCT ABOVE CEILING WORK. REINSTALL SALVAGED CEILING PANELS IN SAME LOCATION WHEN WORK IS COMPLETE OR AT THE END OF EACH DAY IF WORK IS NOT COMPLETE. COMPLY WITH COR REQUIREMENTS LIMITING NUMBER OF PANELS THAT CAN BE REMOVED AT A GIVEN TIME PER INFECTION CONTROL STANDARD.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL FINISHES AND MATERIALS
NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE CONTRACTOR IN THE EVALUATION OF
THE EXTENT OF DEMOLITION: BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY MAY BE COMPROMISED, NOTIFY THE
CONTRACTING OFFICER REPRESENTATIVE (COR) IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL SUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT
WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY THE CONTRACTOR -
DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS AND DAMAGE DURING
CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO COMPLETING ALL DEMOLITION
WORK.
9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO BEGINNING
OF CONSTRUCTION.
10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS TO CONTACT THE COR
IMMEDIATELY; PRIOR TO THE END OF THE DAY OF CONSTRUCTION.
11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND DEMOLISHED
EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF CONSTRUCTION.
CONTRACTOR TO REMOVE ALL QUICK RESPONSE GLASS BULB SPRINKLER HEADS SHOWN AND PREPARE TO REPLACE WITH NEW TYPE. HEAD LOCATION TO REMAIN AS EXISTING, U.N.O. SEE ARCHITECTURAL DRAWINGS
FOR ADDITIONAL INFORMATION.
7 CONTRACTOR TO PREP ADJACENT SURFACES FOR A NEW STAINLESS STEEL DRAIN PAN ENCLOSURE OVER EXISTING PIPING (TO REMAIN IN PLACE). CORE DRILL THROUGH MASONRY FOR DRAIN LINE TO EXTEND TO OTHER SIDE. SEAL ALL GAPS AROUND WALL PENETRATIONS. SEE PLUMBING AND MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
8 CONTRACTOR SHALL REMOVE EXISTING BULKHEAD AND SOFFIT IN ITS ENTIRETY. REMOVE AND SALVAGE EXISTING ELECTRICAL BOXES, CONDUIT AND WIRING MOUNTED TO THE BULKHEAD AND RELOCATE AS REQUIRED. COORDINATE WITH COR FOR ANY REQUIRED DISRUPTIONS OF POWER OR SERVICES TO OIT
EQUIPMENT. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
9 CONTRACTOR TO CUT AND REMOVE WALLBOARD AND CREATE AN OPENING THROUGH EXISTING WALL TO ALLOW ALL CABLE PENETRATIONS TO BE REORGANIZED AND FIREBLOCKS INSTALLED. CONTRACTOR COORDINATE WITH COR IN MOVING AND ORGANIZING THE CABLING WHILE MINIMIZING OR CREATING ANY DISRUPTION TO OIT SERVICES. SEE NEW ARCHITECTURAL CEILING DRAWINGS FOR ADDITIONAL
INFORMATION.
10 CONTRACTOR TO REMOVE EXISTING LIGHT FIXTURE AND SALVAGE AS REQUIRED. SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
EXISTING 12" X 12" CELLULOSE CEILING TILES TO REMAIN. CONTRACTOR TO CLEAN AND PREP FOR NEW
FINISHES. SEE NEW ARCHITECTURAL CEILING DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REMOVE AND SALVAGE EXISTING CEILING MOUNTED EQUIPMENT PRIOR TO NEW FINISH
WORK. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.
14 CONTRACTOR TO REMOVE EXISTING CEILING PANELS AND T-GRID IN THEIR ENTIRETY WITHIN AREA SHOWN. SEE
NEW ARCHITECTURAL RCP DRAWING FOR ADDITIONAL INFORMATION.
EXISTING FIBEROPTIC AND COPPER CABLING TO REMAIN IN PLACE DURING DEMOLITION AND NEW
CONSTRUCTION. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.
COORDINATE WITH COR FOR ANY REQUIRED DISRUPTION OF OIT SERVICES.
EXISTING ELECTRICAL CONDUIT MOUNTED TO WALLS AND CEILING TO REMAIN IN PLACE DURING
CONSTRUCTION. COORDINATE WITH COR FOR ANY ITEM THAT MUST MOVE AS A RESULT OF NEW
CONSTRUCTION AT NO ADDITIONAL COST TO THE VA.
EXISTING LIGHT FIXTURES TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.
SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
18 EXISTING PIPING SUPPLY AND RETURN LINES TO BE CUT AND MOVED OUT OF AREA ABOVE OIT
ROOM CEILING. COORDINATE WITH COR FOR SHUTDOWN REQUIRED. SEE MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
ROOF TOP MOUNTED CONDENSER LOCATION FOR DEDICATED COOLING UNIT. MECHANICAL PIPING TO EXTEND TO THIS LOCATION FROM COOLING UNIT IN THE OIT CLOSET. SEE MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
20 CONTRACTOR TO REMOVE EXISTING PIPING AT THROUGH WALL LOCATIONS. CONTRACTOR TO PATCH
ANY REMAINING HOLES WITH MATERIAL TO MATCH ADJACENT CONSTRUCTION FOR A LIKE NEW
APPEARANCE. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
19 CONTRACTOR TO CAREFULLY REMOVE NEAREST SEGMENT OF LARGE METAL PIPING COVER ON OUTSIDE
OF THE BUILDING AND SALVAGE FOR REUSE. SEE MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
22 CONDUIT AND WIRING WORK ABOVE CEILING AT ELECTRICAL PANEL LOCATIONS. SEE ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
24 REMOVE PORTION OF SANITARY DRAIN PIPING AND REROUTE TIGHT TO WALL OF OIT CLOSET CEILING.
SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
25 EXISTING SPRINKLER LINES AND PENDANTS TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE
DURING DEMOLITION AND CONSTRUCTION PHASES.
27 EXISTING PLASTER CEILING WITH POPCORN FINISH TO REMAIN. VERIFY STRUCTURE FOR MOUNTING BLOCKING REQUIRED FOR NEW WORK. CLEAN AND PREP EXISTING SURFACES FOR NEW FINISHES. SEE
NEW ARCHITECTURAL RCP DRAWINGS FOR ADDITIONAL INFORMATION.
23 EXISTING INCANDESCENT LIGHT AND SOCKET TO REMAIN IN PLACE DURING CONSTRUCTION.
CONTRACTOR TO ENSURE NOT TO DAMAGE DURING DEMOLITION AND CONSTRUCTION PHASES.
26 REMOVE PORTION OF WATER PIPING AND REROUTE OUTSIDE THE AREA OF THE OIT CLOSET CEILING.
SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO REMOVE AND SALVAGE EXISTING DOOR SECURITY SYSTEM, CONDUIT AND BOXES.
SEE NEW ARCHITECTURAL DRAWINGS AND ELECTRICAL FOR ADDITIONAL INFORMATION.
EXISTING DRYWALL CEILING TO REMAIN. CONTRACTOR TO CLEAN & PREP FOR NEW PAINT FINISHES.
SEE ARCHITECTURAL FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL REMOVE EXISTING CEILING PANELS FROM GRID AND SALVAGE FOR REUSE IN AREA
SHOWN FOR ABOVE CEILING WORK. EXISTING T-GRID TO REMAIN.
EXISTING CONCRETE CEILING TO REMAIN. CONTRACTOR TO CLEAN & PREP FOR NEW PAINT FINISHES.
SEE ARCHITECTURAL FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
GROUND MOUNTED CONDENSER LOCATION FOR NEW DEDICATED COOLING UNIT. MECHANICAL
PIPING TO EXTEND FROM COOLING UNIT IN OIT ROOM TO THIS LOCATION. SEAL ALL GAPS AROUND WALL PENETRATIONS FOR A WEATHER TIGHT OR SMOKE TIGHT SEAL. SEE MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION. SEE MOUNTING FRAME DETAIL 2 / 3.AS100. SEE DETAIL
30 CONTRACTOR TO CORE DRILL HOLES AT BLOCK AND BRICK WALLS FOR NEW MECHANICAL PIPING
PENETRATIONS. FIELD VERIFY CLEARANCES AROUND JOISTS, HEADERS AND COLUMNS AT THIS
LOCATION--DO NOT CORE DRILL THROUGH EXISTING CONCRETE STRUCTURAL FRAME. PROVIDE
PROPER SLEEVES AND CAULKING AROUND ALL PENETRATIONS FOR SMOKE TIGHT OR WEATHER TIGHT
SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL SCRAPE ALL PEELING PAINT FROM WALLS AND BULKHEAD AND PREP FOR NEW FINISHES.
REMOVE SECTIONS OF DAMAGED PLASTER IN ITS ENTIRETY AND PATCH / REPAIR AND INFILL SURFACES AS REQUIRED WITH MATERIALS TO MATCH ADJACENT SURFACES FOR LIKE NEW APPEARANCE. WORK WITH CARE AND PROTECT EXISTING CABLES OR CONDUIT TO REMAIN IN PLACE. COORDINATE WITH COR FOR ANY
REQUIRED DISRUPTION TO OIT EQUIPMENT AND SERVICES.
CONTRACTOR SHALL PROVIDE TEMPORARY COVER AND PROTECT EXISTING OIT EQUIPMENT, IT CABINETS AND OTHER OIT RELATED EQUIPMENT FROM PAINT, DAMAGE AND DUST DURING CONSTRUCTION. ALL T-COM AND SERVER HARDWARE TO REMAIN IN OPERATION DURING EACH PHASE OF CONSTRUCTION. CONTRACTOR TO PROVIDE TEMPERATURE MONITOR FOR EQUIPMENT AND MAINTAIN WITHIN ACCEPTABLE RANGE.
DRYWALL FURRING AROUND EXISTING COLUMN--FIELD VERIFY COLUMN LOCATION AND CLEARANCES
AROUND STRUCTURE FOR PIPING PENETRATIONS.
NOTE:
ALL NON-OIT RELATED EQUIPMENT AND WALL
ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,
HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO
PERFORMING DEMOLITION OR NEW CONSTRUCTION
WORK, AND SALVAGED FOR REUSE. COORDINATE WITH
THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.
SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
NOTE:
THE CONTRACTOR SHALL NOT DAMAGE, MOVE,
DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR
RELATED APPURTENANCES WITHOUT THE FIRST
APPROVAL AND SUPERVISION OF THE OIT MANAGER OR
DESIGNATED PERSON.
NOTE:
ANY WORK PERFORMED BY THE CONTRACTOR THE VA
RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO
SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND
PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY
/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS
OR CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROTECT EXISTING CEILING,
FLOOR, AND WALLS FROM DAMAGE DURING
CONSTRUCTION AND IMPLEMENTATION OF INFECTION
AND DUST CONTROL BARRIERS. AFTER THE REMOVAL
OF TEMPORARY BARRIERS, TOUCH UP PAINT ON
CEILINGS AND WALLS AS NEEDED TO SHOW NO
EVIDENCE OF CONSTRUCTION.
NOTE:
SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM
REQUIREMENTS, DETAILS AND PHASING NOTES.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS
ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN
EXISTING MECHANICAL AND PIPING EQUIPMENT.
CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR
WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
NOTE:
NOT ALL KEYNOTES ARE USED ON EVERY SHEET.
CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR
COMPLETE SCOPE OF WORK IN EACH SPACE.
NOTE:
IN THE EVENT THAT THE PRESENCE OF HAZARDOUS
MATERIALS IS SUSPECT, THE CONTRACTOR SHALL
NOTIFY THE COR IMMEDIATELY FOR EVALUATION AND
TESTING. IF HAZARDOUS MATERIAL IS FOUND, THE
CONTRACTOR SHALL COORDINATE WITH THE COR TO
COMPLETE A SEPARATE ABATEMENT CONTRACT PRIOR
TO CONTINUING WITH ANY NEW WORK IN THIS AREA.
AutoCAD SHX Text
TWT
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text
NRF
AutoCAD SHX Text
TWT
AutoCAD SHX Text
ARCHITECTURAL-DEMOLITION-RCP
AutoCAD SHX Text
4.AD900
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of 87
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FORT WAYNE, INDIANA
AutoCAD SHX Text
CORRECT OIT DEFICIENCIES
AutoCAD SHX Text 610A4-16-101
AutoCAD SHX Text 2/13/2018
AutoCAD SHX Text
CERTIFICATION:
AutoCAD SHX Text
AutoCAD SHX Text Engineering and Facilities Management Services
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text
DEMOLITION CEILING NOTES
AutoCAD SHX Text
DEMOLITION CEILING NOTES (CONT'D)
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text 10800038
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text No.
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text W.
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text Y
EXISTING
OIT
4.001
FD
CRAWL SPACE
APPROX. 3 FOOT CLEAR HT.
FASIREN CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
BOILER
CONSTRUCTION LIMIT LINE
(AREA FOR CONDENSER
ON EXIST CONC PAD)
ELEC
CRAWL SPACE
APPROX. 3 FOOT CLEAR HT.
SP
KR
P
GU
AG
E
PA
NE
L
4.
OIT
CLOSET
4.01
EXISTING
BASEMENT
MECHANICAL
7'-4"
4'- 5"
A6
A6
SEE DETAIL
2 / 3.AS100
39 A4
REMARKS
2,3
FURNISHED BY:MARK
E1 FLOOR / WALL
MOUNT
EQUIPMENT SCHEDULE (FOR REFERENCE ONLY)
IT RACK AND PATCH PANELS
DESCRIPTION
E2
E3
E4
EXISTING
CABLE MANAGEMENT (VERTICAL)
DOOR SECURITY SYSTEM
VIDEO SURVEILLANCE CAMERA
EXISTING IT RACK
EXIST WALL
INSTALLED BY:
E5 DATABASE ACCESS CONTROL SYSTEM EXISTING
VA JSN #:
A0921
A0923
M0436
A1020
E6
E7
E8
AIR CONDITIONER R3000 CONTRACTOR CONTRACTOR
8" CLEAR @ TOP
6'-5" MIN. BOTT.
SEE KEYNOTES
TO REMAIN
VA
VA
VA
VA
SECURITY ACCESS DETECTION A1026 CONTRACTOR
DOOR SECURITY MATCH
EXISTING
EXIST WALL
TO REMAIN
EXIST WALL
TO REMAIN
TELEPHONE WITH SPEAKER A1012 EXIST WALL
TO REMAINVA
PARTS
E9 FOLD DOWN WRITING SURFACE F0610 VA DESK SURFACE
34" A.F.F.VA
CONTRACTOR
DOOR SECURITY
E10 CABINET WITH INTERNAL EQUIPMENT A0919 FLOOR
VA
2,3
E11 POWER RECEPTICLE, QUAD OR DUPLEXA0925 EXISTING EXIST WALL
TO REMAINN / A
E12
E13
ALUMINUM LADDER TRAY AND BRACKETS
4" J-HOOK & HANGER VA
VA CONTRACTOR
CONTRACTOR
1,2,5,6
CEILING / WALL
CEILING / JOIST
E14 DATA SUPPORT DEVICES AND EXIST WALL
TO REMAINVA- VA
E15
WALL OR FLOOR PENETRATIONS.
PER KEYNOTE, OR
EXISTING CABLECONTRACTOR- CONTRACTOR
METAL CONDUIT SLEEVE (2" DIA. MIN) 4"
DIA, TYP. (ALT) 2-PIECE SLEEVE FOR EXIST LOCATION, V.I.F.
SCHEDULE 40 PIPE OR EQUIVALENT SLEEVE.
SOME LOCATIONS REQUIRE 2-PIECE PIPE WITH
CLAMPS. SEE DETAIL 12 / AG001
E16 3" x 5" METAL D RING CABLE SUPPORT VA CONTRACTOR
CEILING / WALL
- SPACED 36" C / C
REMARKS:
1. CONTRACTOR TO COORDINATE WITH COR AND VERIFY THE EXISTING CONDITION AT EACH LOCATION, THE OVERHEAD STRUCTURE FOR MOUNTING CABLE SUPPORT HARDWARE. PROVIDE BRACKET AND FASTENERS REQUIRED.
E17 VA CONTRACTOR
CEILING / JOIST
- SPACED 36" C / C
CAT64HP OR EQUIVALENT, TIA / EIA COMPLIANT
SPACING 36" C / CPROVIDE TREE MOUNTING TABS AND HANGER.
VERIFY MOUNTING CONDITION TO SELECT TYPE.
2. CONTRACTOR TO COORDINATE WITH COR ON EXACT MOUNTING LOCATIONS OF EQUIPMENT, CHANGES MADE TO LOCATIONS OF EXISTING EQUIPMENT, AND FULL EXTENT OF CABLE SUPPORT REQUIRED.
3. CONTRACTOR TO PROTECT EXISTING EQUIPMENT FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. EXISTING EQUIPMENT WILL REMAIN ACTIVE AND IN WORKING ORDER TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.
QUANTITY
4. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
5. VA STANDARD EQUIPMENT PROVIDED BY THE VA PER OIT DEPARTMENT SPECIFICATIONS.
6. CONTRACTOR TO PROVIDE CONTINUOUS CABLE SUPPORT (AS CABLE OR BUNDLE) WITHIN OIT CLOSET TO THE POINT OF PENETRATION (AT WALL, FLOOR OR CEILING), AND ADJACENT ROOMS WITHIN 6' FROM PENETRATION POINT.
7. CONTRACTOR TO PROVIDE AND INSTALL IN-WALL BLOCKING. FIRE TREATED WOOD 2X6 OR EQUIVALENT BETWEEN STUDS AT HEIGHTS REQUIRED. SEE ELEVATIONS AND WALL TYPE LEGEND FOR ADDITIONAL INFORMATION.
2,3,9
8. SPACE RESERVED FOR EXISTING EQUIPMENT OR FUTURE, ADJUST EQUIPMENT LOCATIONS TO ALLOW FOR EXPANSION AND CLEARANCES AROUND EQUIPMENT.
2,3
2,3
9. WORK PERFORMED BY SEPARATE CONTRACT. COORDINATE WITH VA'S DESIGNATED CONTRACTOR FOR FULL EQUIPMENT INSTALLATION AND TESTING. SEE DOOR SCHEDULE AND SPECIFICATION FOR ADDITIONAL INFORMATION.
2,3,9
2,3
3,4
1,2,5,6
1,2,5,6
1,2,5,6
E18 UNINTERUPTED POWER SUPPLY VA SUPPLIED
VA WALL BRACKETS
- OR IN RACK
2,5,10
10. VA TO PROVIDE ALL RELATED MOUNTING HARDWARE FOR EXISTING EQUIPMENT. CONTRACTOR TO COORDINATE WITH COR FOR MOUNTING REQUIREMENTS.
EXISTING UPS /
DST-500 OR EQUIVALENT 9 mm BENT WIRE, D RING BRACKET WITH (4) 5.5 mm HOLES FOR SCREWS.
FINISH TO NON-CONDUCTIVE, BLACK.
VA OR
CONT. OR EXISTING
DOOR SECURITY
1MATCH EXISTING LADDER RACK TYPE, SIZE AND
SUPPORT BRACKETS. VERIFY WIDTH. SEE DETAIL
12 / AG001.
25 MAX
2" J-HOOK & HANGER
CAT32HP OR EQUIVALENT, TIA / EIA COMPLIANT
PROVIDE TREE MOUNTING TABS AND HANGER.
VERIFY MOUNTING CONDITION TO SELECT TYPE.
ACCESSORIES, SECURITY + VIDEO
A0924
INDOOR UNIT EVAPORATOR
(PROJECT)
25 MAX
(PROJECT)
25 MAX
(PROJECT)
18" MIN. A.F.F.
CONT. OR EXISTING
DOOR SECURITY
EXISTING
VA OR
EXISTING
VA OR
EXISTING
VA OR
EXISTING
FUTURE
EXISTING /
EXISTING
EXISTING
EXISTING
EXISTING
DOOR / HDW
EXISTING
EXISTING
EXISTING
EXISTING
25 MAX
(PROJECT)
EXISTING
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
(5' SECTION)
A1026
(BADGE READERS, DOOR H.W. TIE-INS)
(CONTROL PANELS, RTE, CHORDS, CONDUIT)
IT RACK
E1
E9 2'-0"
(MIN)
4'-038" (V.I.F.)
E4 E3 E5 E14 E18
3"
E15
E15
T
COORDINATE WITH COR AND OIT TO
EVALUATE IMPROVED LOCATION OF
EQUIPMENT WITHIN THE CLOSET.
W E8
CAMPANELS
CR E7
E11
E6 3 / 4.AS100
/ 4
.A S1
4 / 4.AS100
2'-
6"
4'- 6"
1'- 4"
NEW T-STAT
& TEMP SEN
SEE MECH.
NEW FLOOR AND
BASE
METAL FOLD DOWN
WRITING DESK,
(FUTURE)
E9FU
LL
H T.
6" (V
.I.
F.
) FU
LL
H T.
6"
(V .I.
F.
4'-638" (V.I.F.)
E3 E5 E14
1'-6"
E4
E8
EQUIPMENT
REMOUNT
EXISTING
IT RACK
NEW FLOOR AND BASE
NEW PLYWOOD
W/ FURRING
OVER EXIST
CONC. WALL
E11
E18
6'- 41 4"
M
IN
1 4" 8"
(V .I.
F.
H
VA
C
UN
IT
M
OU
NT
IN
G) (C
LE
AR
EQ
E6 (U
NI
T)
NEW WALL W/
PLYWOOD
NEW FLOOR AND
BASE
VERIFY EXIST POWER
EQ
PHONE
REINSTALL
CAMERA
REINSTALL
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - DEMOLITION PLAN - BASEMENT 1
4.AS100
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 4 KEY PLAN
RENOVATION
AREA
UNEXCAVATED
BASEMENT
PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.
SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.
CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.21
1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.
2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER
TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.
3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL
CONTRACTOR.
4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.
5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.
6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH
CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO
THE END OF THE DAY OF CONSTRUCTION.
8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER
REFERENCED PROJECT DETAILS.
CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND
CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.
PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET
AG001 FOR SPECIFIC WALL TYPES NOTED.
CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR
ADDITIONAL INFORMATION.
EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7
NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"
CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT
PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR
ADDITIONAL INFORMATION.
PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.
PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.
SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL
SURFACES.
PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.
CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW
AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.
CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE
MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR
WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING OPENING, PROVIDE MATERIALS OF LIKE CONSTRUCTION AND PATCH TO MATCH ADJACENT WALLS TO SHOW NO EVIDENCE OF CONSTRUCTION. FLASH & CAULK GAPS AROUND OPENINGS FOR WEATHER TIGHT SEAL. SEE DETAIL 6/AG001. SEE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME. PROVIDE BLOCKING AND WALL INFILL TO MATCH ADJACENT WALL CONSTRUCTION AT THE INSIDE WALL
OPENING BELOW THE WINDOW. SEE DETAIL 5 / AG001 FOR ADDITIONAL INFORMATION.
22 CONTRACTOR TO PROVIDE AN EMERGENCY POWER SYSTEM. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
23 CONTRACTOR TO PROVIDE AND INSTALL NEW WALL INFILL BETWEEN EXISTING MASONRY CORRIDOR WALL--SEE WALL PARTITION SCHEDULE FOR ADDITIONAL INFORMATION. ALIGN NEW WALL FINISH BOARD FLUSH WITH FACE OF CORRIDOR WALL, PATCH AND PAINT FOR SEAMLESS APPEARANCE BETWEEN OLD AND NEW CONSTRUCTION.
CAULK AND SEAL GAPS IN WALL FOR SMOKE RESISTANT ASSEMBLY. SEE SHEET AG001 FOR ADDITIONAL
INFORMATION.
24 CONTRACTOR TO INSTALL SALVAGED DOOR AND DOOR HARDWARE IN NEW LOCATION. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.
25 CONTRACTOR TO PROVIDE AND INSTALL NEW DOOR, FRAME AND SALVAGED HARDWARE. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.
26 CONTRACTOR TO PROVIDE AND INSTALL ROOM SIGN AT NEW LOCATION. MATCH EXISTING MOUNTING HEIGHTS.
SEE DETAIL 5/ 6.AS101. COORDINATE WITH COR AND VA INTERIORS FOR APPROVAL OF SIGN SUBMITTALS AND
NUMBERING.
27 CONTRACTOR TO INSTALL SALVAGED ROOM SIGN THAT READS "ROOM 210D", MATCH MOUNTING HEIGHTS TO
EXISTING. COORDINATE WITH THE COR ON SIGN DETAILS.
28 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT NEW WALLS IN THEIR ENTIRETY OUTSIDE OF OIT
ROOM. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
29 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON EXISTING WALLS IN THEIR ENTIRETY FROM CORNER TO CORNER AND FULL HEIGHT. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
30 CONTRACTOR TO INSTALL SALVAGED LOCKERS IN NEW LOCATION. COORDINATE WITH THE VA
31 CONTRACTOR TO COORDINATE WITH COR AND OIT DESIGNATED PERSON TO RELOCATE ANY OIT EQUIPMENT IN THE ROOM AND EQUIPMENT TO REMOUNT AS REQUIRED. COORDINATE WITH DOOR SECURITY CONTRACTOR
FOR ALL WORK WITH DOOR HARDWARE AND SECURITY SYSTEM PANELS.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW
FRAME. PROVIDE PERIMETER TRIM AS REQUIRED.
CONTRACTOR TO PROVIDE AND INSTALL DOOR. VERIFY SALVAGED HARDWARE AND DOOR SLABS. SEE DOOR
SCHEDULE ON SHEET AG001.
CONTRACTOR SHALL CUT DOWN AND INSTALL SALVAGED HANDRAIL AND ACCESSORIES. PROVIDE INSERT FITTINGS REQUIRED TO SECURE SEPARATE PIECES (FASTENED TIGHT, PREVENTING ROTATION) AND ANCHOR TO WALL ASSEMBLY FOR A CONTINUOUS LENGTH OF RAIL AT EACH WALL SEGMENT. NO MORE THAN ONE JOINT MARK PER RAILING AT EITHER END CENTERED ON A BRACKET. IN EXISTING WALLS, USE MASONRY ANCHORS CAPABLE OF RESISTING PULL OUT; AT THE WALL INFILL PROVIDE BLOCKING TO MOUNT EACH BRACKET CAPABLE OF RESISTING A SINGLE CONCENTRATED LOAD OF 200 LBS AT ANY POINT ALONG THE TOP. HANDRAIL MOUNTING HEIGHT ABOVE FINISH FLOOR AND PROJECTION FROM WALL SHALL MATCH EXISTING.
CONTRACTOR SHALL PROVIDE AND INSTALL DRYWALL END CAP ON EXPOSED PORTION OF CMU, FULL HEIGHT.35
CONTRACTOR SHALL PROVIDE AND INSTALL HEADER SUPPORT FOR A LOAD BEARING CONDITION AT TOP OF
WALL AND AS REQUIRED FOR NEW DOORS, VERIFY IN FIELD.
CONTRACTOR SHALL PROVIDE AND INSTALL 3/4" PLYWOOD OVER EXISTING STUD WALL. VERIFY CLEARANCES BETWEEN EXISTING EQUIPMENT PANELS AND NEW WALLS. PROVIDE 2 COATS OF PAINT TO MATCH NEW WALLS.
CONTRACTOR TO PROVIDE IN-WALL BLOCKING BETWEEN FRAMING FOR EQUIPMENT SUPPORT. PATCH FINISH
BOARD AS REQUIRED TO MATCH EXISTING WALL TO SHOW NO EVIDENCE OF CONSTRUCTION.
CONTRACTOR TO VERIFY AND PROVIDE CABLE PENETRATION SLEEVE THROUGH WALLS. PROVIDE SPLIT CONDUIT (2-PIECE) WITH CLAMPS AT EXISTING CABLE PENETRATIONS WITHOUT SLEEVED PROTECTION.
SLEEVES RESERVED FOR FUTURE USE SHALL BE INSTALLED WITH A CLOSED CAP ON EACH END. FIELD VERIFY NUMBER REQUIRED WITH COR AND OIT AT EACH ROOM. INSTALL FIRE BLOCKING AND SEALANT AS REQUIRED AT EACH. SEE EQUIPMENT SCHEDULE AND DETAIL 12 / AG001 FOR ADDITIONAL INFORMATION. SEE
REFLECTED CEILING PLAN FOR ADDITIONAL PENETRATIONS SHOWN.
EXISTING WALL FRAMING AND FINISH TO REMAIN. PROTECT WALL AND EQUIPMENT FROM DAMAGE, NO NEW
FINISHES IN AREA OF EXISTING WALL MOUNTED PANELS.
CONTRACTOR TO PATCH AND PROVIDE 2 COATS OF PAINT ON WALLS IN COORDINATION WITH NOTE 1 ON
SHEET 1.AS900 AND NOTE 39 ON SHEET 1.AS100.
NOTE:
ALL NON-OIT RELATED EQUIPMENT AND WALL
ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,
HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO
PERFORMING DEMOLITION OR NEW CONSTRUCTION
WORK, AND SALVAGED FOR REUSE.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.