36C25019B0007-014.pdf

PDF 15 MB Posted

Attached to
Correct OIT Deficiencies 610A4-16-101 Federal contract opportunity
Solicitation number
36C25019B0007
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0007 Drawings 9 of 11.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Correct OIT Deficiencies 610A4-16-101, newest first.
File Type Posted
36C25019C0184-000.docx DOCX document
VA251-15-D-0142-000.docx DOCX document
36C25019B0007-0007004.docx DOCX document
36C25019B0007-0006000.docx DOCX document
36C25019B0007-0005000.docx DOCX document
36C25019B0007-0004000.docx DOCX document
36C25019B0007-0003000.docx DOCX document
36C25019B0007-0003001.pdf PDF
36C25019B0007-0002000.docx DOCX document
36C25019B0007-0001000.docx DOCX document
36C25019B0007-010.pdf PDF
36C25019B0007-004.pdf PDF
36C25019B0007-012.pdf PDF
36C25019B0007-005.docx DOCX document
36C25019B0007-003.doc DOC document
36C25019B0007-006.pdf PDF
36C25019B0007-015.pdf PDF
36C25019B0007-008.pdf PDF
36C25019B0007-002.pdf PDF
36C25019B0007-013.pdf PDF
36C25019B0007-016.pdf PDF
36C25019B0007-009.pdf PDF
36C25019B0007-011.pdf PDF
36C25019B0007-007.pdf PDF
36C25019B0007-001.docx DOCX document
36C25019B0007-000.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IT

RA

CK

FD

CRAWL SPACE

APPROX. 3 FOOT CLEAR HT.

FASIREN CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

BOILER

CONSTRUCTION LIMIT LINE

(AREA FOR CONDENSER

ON EXIST CONC PAD)

ELEC

CRAWL SPACE

APPROX. 3 FOOT CLEAR HT.

SP

KR

P

GU

AG

E

PA

NE

L

OIT

CLOSET

4.01

EXISTING

BASEMENT

MECHANICAL

PANELS

CR

4 / 4.AD100

2 / 4.AD100

3 / 4.

AD

/ 4

.A D1

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - DEMOLITION PLAN - BASEMENT OIT CLOSET 4.011

4.AD100

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 4 KEY PLAN

RENOVATION

AREA

UNEXCAVATED

BASEMENT

(THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR

SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.)

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL FINISHES AND

MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING SITE OR BUILDING, OR COMPROMISE ANY BUILDING SYSTEMS OR HOSPITAL FUNCTIONS. IF THE INSPECTION INDICATES THAT THE INTEGRITY OF EXISTING CONDITIONS MAY BE COMPROMISED, NOTIFY THE CONTRACTING

OFFICER REPRESENTATIVE (COR) IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND

EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY THE

CONTRACTOR - DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS AND DAMAGE

DURING CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO COMPLETING ALL

DEMOLITION WORK.

9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO

BEGINNING OF CONSTRUCTION.

10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS TO CONTACT THE COR

IMMEDIATELY, PRIOR TO THE END OF THE DAY OF CONSTRUCTION.

11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING EQUIPMENT TO REMAIN

AND DEMOLISHED MATERIALS WITH THE COR PRIOR TO THE START OF CONSTRUCTION.

REMOVE DUMBWAITER LIGHT AND CONTROLS TO ALLOW FLUSH CONDITION AT WALL FACE. PREP

WALLS AROUND DUMBWAITER FOR NEW WALL FRAMING. DUMBWAITER DOOR AND CAB TO REMAIN,

CONTRACTOR TO ENSURE NOT TO DAMAGE EXISTING FRAME AND DOOR. SEE ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

21 CONTRACTOR TO COORDINATE WITH THE VA TO RELOCATE EXISTING REFRIGERATOR OUT OF AREA

OF DEMOLITION AND NEW CONSTRUCTION.

22 CONTRACTOR SHALL REMOVE EXISTING STAINLESS STEEL MEDICINE CABINET FROM WALL IN ITS

ENTIRETY. TURN EQUIPMENT OVER TO THE COR. CONTRACTOR TO COORDINATE AND SCHEDULE

FOR AFTER HOURS WORK WITH THE COR FOR THIS ITEM. SEE NEW ARCHITECTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

CONTRACTOR SHALL REMOVE EXISTING SINK AND RELATED APPURTENANCES FROM THIS SIDE OF

WALL IN THEIR ENTIRETY--SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. REMOVE

PLASTER AND BLOCK TO EXTENT REQUIRED FOR ACCESS TO BEHIND WALL WORK. PATCH / FILL ALL

HOLES WITH LIKE MATERIAL TO MATCH ADJACENT SURFACES AND PREP FOR NEW FINISHES.

24 EXTERIOR METAL GRILLE TO REMAIN IN PLACE. CONTRACTOR TO VERIFY PROPER FLASHING PRIOR TO PROVIDING WALL INFILL BEHIND IT. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

25 EXISTING FUEL METER BOX AND CONDUIT TO REMAIN IN PLACE. CONTRACTOR TO ENSURE

NOT TO DAMAGE. COORDINATE WITH THE COR IF ANY ITEM RELATED TO THIS EQUIPMENT IS

IN THE WAY OF THE NEW CONSTRUCTION.

28 CONTRACTOR TO REMOVE AND SALVAGE EXISTING FIRE ALARM PANEL AND SIREN. MOVE TO NEW

LOCATION OUTSIDE OF THE OIT CLOSET. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

27 EXISTING WATER HEATER TO REMAIN IN PLACE DURING CONSTRUCTION. CONTRACTOR TO ENSURE

NOT TO DAMAGE.

26 CONTRACTOR TO REMOVE EXISTING ACCESS HOLE AND PANEL COVER TO CRAWL SPACE AS

REQUIRED. CONTRACTOR TO PUT BACK IN PLACE AND SECURE AFTER CONSTRUCTION IS

COMPLETE.

31 CONTRACTOR TO PREPARE GRADE FOR CONCRETE PAD FOR GROUND MOUNTED CONDENSER. SEE MECHANICAL, ELECTRICAL AND NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

30 CONTRACTOR SHALL CORE DRILL HOLES AT BLOCK AND BRICK WALL FOR NEW MECHANICAL PIPING

PENETRATIONS AS REQUIRED. FIELD VERIFY CLEARANCES AT JOISTS AND HEADERS AT THIS

LOCATION. PROVIDE PROPER SLEEVES AND CAULKING AROUND ALL PENETRATIONS FOR SMOKE

TIGHT OR WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

32 EXISTING JOIST FLOOR FRAMING TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING

CONSTRUCTION.

EXISTING STEEL BEAM TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING

CONSTRUCTION.

33 EXISTING SPRINKLER RISER PIPING TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE

DURING CONSTRUCTION.

34 FIELD VERIFY EXISTING PVC SLEEVE CAPPED OFF ABOVE GRADE THAT ROUTES THROUGH WALL

INTO CRAWL SPACE (MAY USE FOR NEW PIPING WALL PENETRATION). SEE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

35 EXISTING SINK, WATER HEATER AND SHELF TO REMAIN IN PLACE DURING CONSTRUCTION.

CONTRACTOR TO ENSURE TO PROTECT FROM DAMAGE.

36 EXISTING BOILER UNIT TO REMAIN IN PLACE DURING CONSTRUCTION. CONTRACTOR TO ENSURE

TO PROTECT FROM DAMAGE.

37 CONTRACTOR SHALL REMOVE EXISTING SOLID SURFACE SHELF AND METAL BRACKETS IN THEIR

ENTIRETY. PATCH/FILL HOLES IN BRICK WALL TO MATCH EXISTING SURFACE.

42 EXISTING ACCESS HOLE AND PANEL COVER TO CRAWL SPACE. CONTRACTOR TO PUT BACK IN

PLACE AND SECURE AFTER CONSTRUCTION IS COMPLETE.

43 CONTRACTOR SHALL REMOVE VINYL FLOORING AND WALL BASE IN ITS ENTIRETY. PREP FLOOR

AND WALLS FOR NEW FLOOR COVER AND BASE.

CONTRACTOR SHALL REMOVE EXISTING FLOOR RETURN AIR GRILLE AND RELATED DUCT-SEE

MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION. ADD BLOCKING BETWEEN JOISTS AND

PATCH/FILL HOLE WITH PLYWOOD TO MATCH EXISTING FLOOR CONSTRUCTION.

38 CONTRACTOR SHALL REMOVE EXISTING CAGE OVER WINDOW IN ITS ENTIRETY. PATCH/FILL HOLES IN TRIM TO MATCH EXISTING MATERIAL. SEE NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

EXISTING SIDEWALK TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.

REMOVE EXISTING AIR SUPPLY GRILLE IN ITS ENTIRETY. PREP INSIDE OPENING FOR NEW WALL INFILL

WITH LIKE CONSTRUCTION AND MATERIALS TO MATCH ADJACENT SURFACES.

45 CONTRACTOR SHALL MOVE EXISTING METAL LOCKERS TO A NEW LOCATION WITHIN THE ROOM.

COORDINATE WITH COR FOR SCHEDULE.

46 CONTRACTOR SHALL REMOVE EXISTING BLOCK AND PLASTER PARTITION IN THEIR ENTIRETY.

SALVAGE EXISTING DOOR AND DOOR HARDWARE FOR REUSE. PREP OPENING FOR NEW WALL

INFILL, CEILING, FLOORING PATCH AND DOORS. CONTRACTOR TO EVALUATE STRUCTURAL

SUPPORT REQUIREMENTS AND TEMPORARY SHORING AT HEAD OF WALL PRIOR TO REMOVING

BLOCK.

47 CONTRACTOR TO REMOVE EXISTING ROOM SIGN AND SALVAGE FOR REUSE.

CONTRACTOR TO ENLARGE OPENING FOR RETURN AIR GRILLE IN EXISTING WALL. SEE

MECHANICAL DRAWING FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL REMOVE AND SALVAGE EXISTING DOOR AND DOOR HARDWARE. SEE NEW

ARCHITECTURAL PLANS AND DOOR SCHEDULE FOR ADDITIONAL INFORMATION.

EXISTING INSULATED COLD WATER PIPING DROP FOR "TRAP PRIMER" TO REMAIN. CONTRACTOR TO

ENSURE NOT TO DAMAGE DURING CONSTRUCTION.

EXISTING FLOOR MOUNTED TRANSFORMER TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE

DURING CONSTRUCTION.

EXISTING FLOOR DRAIN TO REMAIN. CONTRACTOR TO PROVIDE TEMPORARY COVER TO PROTECT

FROM DUST AND DEBRIS THAT COULD CLOG DRAIN DURING CONSTRUCTION.

CONTRACTOR SHALL REMOVE EXISTING CARPET, WALL BASE AND FLOORING TRANSITION TRIM IN ITS

ENTIRETY (ONLY WITHIN THE FOOTPRINT OF THE NEW CLOSET AREA). PREP EXISTING FLOOR

SURFACES TO RECEIVE NEW FLOORING AND TRIM MATERIAL. SEE NEW ARCHITECTURAL DRAWINGS

FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL REMOVE EXISTING PTAC AND ASSOCIATED INTERIOR WALL TRIM IN THEIR

ENTIRETY. CONTRACTOR TO PREP OPENING FOR NEW BLOCKING AND INFILL CONSTRUCTION. SEE

NEW ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

EXISTING WINDOW FRAME TO REMAIN. CONTRACTOR SHALL REMOVE EXISTING ALUMINUM BLINDS AND INSULATED GLASS PANEL IN THEIR ENTIRETY AND PREP FOR NEW METAL INSULATED SPANDREL

PANEL. CONTRACTOR TO ENSURE NOT TO DAMAGE EXISTING WINDOW FRAME SYSTEM. SEE NEW

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO COORDINATE WITH DOOR SECURITY CONTRACTOR PRIOR TO REMOVING CAGE FOR

THE REMOVAL AND SALVAGE OF ALL DOOR LEVER HARDWARE, REQUEST FOR EXIT BOXES, DOOR

CORDS, ACCESS CONTROL SENSORS, CONTROL PANELS (BOTH LENEL AND ALTRONIX) AND RELATED ELECTRICAL BOXES AND CONDUIT ASSOCIATED WITH DOOR ACCESS. CONTRACTOR SHALL REMOVE EXISTING WIRE MESH CAGE AND ASSOCIATED ANGLES, ANCHORS AND PLATES IN THEIR ENTIRETY AND PATCH / FILL ALL HOLES RELATED TO ANCHORS FOR AN APPEARANCE TO MATCH ADJACENT FLOOR

AND WALL SURFACES . SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL REMOVE EXISTING METAL GRILLE FROM THE EXTERIOR FACE OF THE WALL.

CONTRACTOR TO PROVIDE FLASHING AT THE OPENING AND NEW BLOCKING FOR COVER PANEL. SEE

NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL PREP EXISTING WALLS FOR NEW FINISHES. SCRAPE ALL PEELING PAINT AND REMOVE ALL LOOSE OR DAMAGED MATERIALS FROM WALL SURFACES IN THEIR ENTIRETY. REMOVE ALL ACCESSORY EQUIPMENT. PATCH / REPAIR AND INFILL SURFACES AS REQUIRED WITH MATERIALS

TO MATCH ADJACENT SURFACES FOR LIKE NEW APPEARANCE. WORK WITH CARE AND PROTECT

EXISTING CONDITIONS TO REMAIN IN PLACE.

CONTRACTOR SHALL REMOVE AND SALVAGE 25" X 18" X 18' RACK MOUNTED ON PLYWOOD, HIGH

ON CAGE WALL WITH FIBER OPTIC EQUIPMENT. COORDINATE WITH COR FOR RELOCATION OF

EQUIPMENT MOUNTED ON THIS RACK WITHIN CLOSET AREA AND TEMPORARY SHUTDOWNS.

CONTRACTOR SHALL TEMPORARILY RELOCATE STORAGE SHELVING, TABLES AND CARTS IN ORDER TO COMPLETE WORK. THESE ITEMS SHALL BE PUT BACK IN SAME LOCATION AND CONDITION AS FOUND AFTER WORK IS COMPLETE. COORDINATE WITH THE COR PRIOR TO MOVING ANY SHELF OR CART.

CONTRACTOR TO COORDINATE WITH THE COR TO TEMPORARILY MOVE OIT / PHONE, GROUNDING

BARS OR OTHER "NON-ESSENTIAL" EQUIPMENT IN AREA OF NEW WORK. CONTRACTOR SHALL

SALVAGE ALL EQUIPMENT FOR REINSTALL IN SAME RELATIVE LOCATION AFTER NEW WORK IS

COMPLETE. SOME EQUIPMENT MAY REQUIRE TO REMAIN ACTIVE IN TEMPORARY LOCATION. SEE

NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL PROVIDE TEMPORARY COVER TO PROTECT ALL EXISTING NON-OIT RELATED

DEVICES FROM DAMAGE DURING CONSTRUCTION, INCLUDING RELATED DEVICES FOR T-COM, NURSE

CALL, OVERHEAD PAGING EQUIPMENT AND ELECTRICAL. SUCH WORK MAY INCLUDE PROTECTION

FROM THE RELOCATION OF OVERHEAD WATER, SPRINKLER AND STEAM PIPING.

CONTRACTOR SHALL PROVIDE AND INSTALL BREATHABLE MEMBRANE AND COVER TO PROTECT ALL

OIT EQUIPMENT, IT CABINETS AND OTHER OIT RELATED EQUIPMENT FROM DAMAGE DURING

CONSTRUCTION. ALL T-COM AND SERVER HARDWARE TO REMAIN IN OPERATION DURING EACH

PHASE OF CONSTRUCTION. CONTRACTOR TO PROVIDE TEMPERATURE MONITOR FOR EQUIPMENT

AND MAINTAIN WITHIN ACCEPTABLE RANGE.

CONTRACTOR TO VERIFY WORK REQUIRED AT THE PANELS. SEE ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

CONTRACTOR SHALL COORDINATE WITH THE VA TO RELOCATE EQUIPMENT WITHIN THE FOOTPRINT

OF THE NEW CLOSET SPACE.

CONTRACTOR SHALL TEMPORARILY REMOVE AND SALVAGE ANY / ALL EXISTING RAISED ACCESS

FLOOR PANELS IN AISLES AS REQUIRED TO CONDUCT BELOW FLOOR WORK. REINSTALL EXISTING PANELS IN SAME LOCATION WHEN WORK IS COMPLETE OR AT THE END OF EACH DAY IF WORK IS NOT

COMPLETE.

CONTRACTOR SHALL REMOVE ALL EXISTING VCT TILES AND RUBBER BASE IN THEIR ENTIRETY WITHIN

THE ROOM, FROM CORNER TO CORNER. CLEAN AND PREP EXISTING WALL AND FLOOR SURFACES

FOR NEW FLOOR COVER AND BASE. SEE NEW ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

48 CONTRACTOR TO CUT OPENING IN EXISTING WALL FOR NEW DUCT PENETRATION AND GRILLE. SEE

MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

49 CONTRACTOR TO REMOVE AND SALVAGE EXISTING METAL HANDRAIL AND BRACKETS. PATCH

HOLES IN WALLS TO MATCH WALL CONSTRUCTION AND PREP FOR NEW FINISHES.

50 CONTRACTOR TO FILL ALL FLOOR RUTS AS REQUIRED FROM REMOVAL OF BLOCK WALL AND

PATCH SMOOTH FOR NEW FLOOR FINISHES.

51 CONTRACTOR TO REMOVE EXISTING DRYWALL AND INSTALL 2X BLOCKING BETWEEN STUDS.

PATCH DRYWALL TO MATCH EXISTING AND PREP PAINT. SEE ELEVATIONS FOR DIMENSIONS.

52 CONTRACTOR TO PREP EXISTING WALL FOR NEW FINISHES. WORK AROUND EXISTING EQUIPMENT

TO REMAIN AND PROTECT FROM DAMAGE.

NOTE:

ALL NON-OIT RELATED EQUIPMENT AND WALL

ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,

HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO

PERFORMING DEMOLITION OR NEW CONSTRUCTION

WORK, AND SALVAGED FOR REUSE. COORDINATE WITH

THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

NOTE:

THE CONTRACTOR SHALL NOT DAMAGE, MOVE,

DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR

RELATED APPURTENANCES WITHOUT THE FIRST

APPROVAL AND SUPERVISION OF THE OIT MANAGER OR

DESIGNATED PERSON.

NOTE:

ANY WORK PERFORMED BY THE CONTRACTOR THE VA

RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO

SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND

PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY

/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS

OR CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROTECT EXISTING CEILING,

FLOOR, AND WALLS FROM DAMAGE DURING

CONSTRUCTION AND IMPLEMENTATION OF INFECTION

AND DUST CONTROL BARRIERS. AFTER THE REMOVAL

OF TEMPORARY BARRIERS, TOUCH UP PAINT ON

CEILINGS AND WALLS AS NEEDED TO SHOW NO

EVIDENCE OF CONSTRUCTION.

NOTE:

SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM

REQUIREMENTS, DETAILS AND PHASING NOTES.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS

ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN

EXISTING MECHANICAL AND PIPING EQUIPMENT.

CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR

WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

NOTE:

NOT ALL KEYNOTES ARE USED ON EVERY SHEET.

CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR

COMPLETE SCOPE OF WORK IN EACH SPACE.

NOTE:

IN THE EVENT THAT THE PRESENCE OF HAZARDOUS

MATERIALS IS SUSPECT, THE CONTRACTOR SHALL

NOTIFY THE COR IMMEDIATELY FOR EVALUATION AND

TESTING. IF HAZARDOUS MATERIAL IS FOUND, THE

CONTRACTOR SHALL COORDINATE WITH THE COR TO

COMPLETE A SEPARATE ABATEMENT CONTRACT PRIOR

TO CONTINUING WITH ANY NEW WORK IN THIS AREA.

SCALE: NTS

IT CLOSET WEST VIEW 2

4.AD100SCALE: NTS

IT CLOSET SOUTH VIEW 3

4.AD100SCALE: NTS

BUILDING 4 OUTSIDE VIEW 4

4.AD100SCALE: NTS

MECHANICAL EAST VIEW 5

4.AD100

AutoCAD SHX Text

TWT

AutoCAD SHX Text

ARCHITECTURAL-DEMOLITION-PLAN

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text

NRF

AutoCAD SHX Text

TWT

AutoCAD SHX Text

ARCHITECTURAL-DEMOLITION-PLAN

AutoCAD SHX Text

4.AD100

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of 87

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FORT WAYNE, INDIANA

AutoCAD SHX Text

CORRECT OIT DEFICIENCIES

AutoCAD SHX Text 610A4-16-101

AutoCAD SHX Text 2/13/2018

AutoCAD SHX Text

CERTIFICATION:

AutoCAD SHX Text

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL DEMOLITION NOTES

AutoCAD SHX Text

PLAN DEMOLITION NOTES

AutoCAD SHX Text

PLAN DEMOLITION NOTES (CONT'D)

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 10800038

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text No.

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text W.

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text T

FD

CRAWL SPACE

APPROX. 3 FOOT CLEAR HT.

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

BOILER

CONSTRUCTION LIMIT LINE

(AREA FOR CONDENSER

ON EXIST CONC PAD)

CRAWL SPACE

APPROX. 3 FOOT CLEAR HT.

HWS

HWR SP

KR

M

AI

N 4"

SPKR 4"

SP

KR

SP

KR

M

AI

N 4"

SPKR 1"

SAN SAN

SA

N

SA

N

CO

ND

UI

T

2" G

AL

V

SAN

C.

O

HWR

OIT

CLOSET

4.01

EXISTING

BASEMENT

MECHANICAL

HW

S

BOTT CONC. CEILING

EL. -8'-0" AFF

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - DEMO CEILING - BASEMENT BUILDING #41

4.AD900

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 4 KEY PLAN

RENOVATION

AREA

UNEXCAVATED

BASEMENT

S

SOME SYMBOLS MAY NOT BE USED. SYMBOLS SHOWN ON PLAN ARE FOR

REFERENCE ONLY. SEE MECHANICAL, ELECTRICAL, AND FIRE DRAWINGS FOR

ADDITIONAL INFORMATION.

REFLECTED CEILING PLAN

SYMBOL LEGEND

NOTE:

SYMBOL DESCRIPTION

SMOKE DETECTOR

FIRE PROTECTION SPRINKLER HEAD

2'x2' ACOUSTICAL CEILING PANELS & GRID

AUDIBLE / VISUAL ALARM

SPEAKER SYSTEM

EXIT LIGHT FIXTURE

2'x4' LIGHTING FIXTURE

2' X 2' SUPPLY AIR DIFFUSER

2' X 2' RETURN AIR GRATE

INCANDESCENT FIXTURE

2'x2' LIGHTING FIXTURE

F

MECHANICAL DIFFUSER

PENDANT LIGHT FIXTURE

2'x4' ACOUSTICAL CEILING PANELS & GRID

1'x1' ACOUSTICAL INTERLOCKING TILE

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR SUBCONTRACTORS

THAT WORK WITHIN THIS BUILDING.

CONTRACTOR TO REMOVE EXISTING GLASS BULB SPRINKLER HEAD AND REMOVE PIPING SECTION FOR NEW T AND PREPARE TO EXTEND PIPING TO NEW LOCATION. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

CONTRACTORS SHALL TEMPORARILY REMOVE AND SALVAGE ANY / ALL EXISTING CEILING PANELS AS REQUIRED TO CONDUCT ABOVE CEILING WORK. REINSTALL SALVAGED CEILING PANELS IN SAME LOCATION WHEN WORK IS COMPLETE OR AT THE END OF EACH DAY IF WORK IS NOT COMPLETE. COMPLY WITH COR REQUIREMENTS LIMITING NUMBER OF PANELS THAT CAN BE REMOVED AT A GIVEN TIME PER INFECTION CONTROL STANDARD.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL FINISHES AND MATERIALS

NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE CONTRACTOR IN THE EVALUATION OF

THE EXTENT OF DEMOLITION: BUT SHALL NOT BE HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY MAY BE COMPROMISED, NOTIFY THE

CONTRACTING OFFICER REPRESENTATIVE (COR) IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT

WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY THE CONTRACTOR -

DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS AND DAMAGE DURING

CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO COMPLETING ALL DEMOLITION

WORK.

9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE. BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO BEGINNING

OF CONSTRUCTION.

10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR IS TO CONTACT THE COR

IMMEDIATELY; PRIOR TO THE END OF THE DAY OF CONSTRUCTION.

11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND DEMOLISHED

EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF CONSTRUCTION.

CONTRACTOR TO REMOVE ALL QUICK RESPONSE GLASS BULB SPRINKLER HEADS SHOWN AND PREPARE TO REPLACE WITH NEW TYPE. HEAD LOCATION TO REMAIN AS EXISTING, U.N.O. SEE ARCHITECTURAL DRAWINGS

FOR ADDITIONAL INFORMATION.

7 CONTRACTOR TO PREP ADJACENT SURFACES FOR A NEW STAINLESS STEEL DRAIN PAN ENCLOSURE OVER EXISTING PIPING (TO REMAIN IN PLACE). CORE DRILL THROUGH MASONRY FOR DRAIN LINE TO EXTEND TO OTHER SIDE. SEAL ALL GAPS AROUND WALL PENETRATIONS. SEE PLUMBING AND MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

8 CONTRACTOR SHALL REMOVE EXISTING BULKHEAD AND SOFFIT IN ITS ENTIRETY. REMOVE AND SALVAGE EXISTING ELECTRICAL BOXES, CONDUIT AND WIRING MOUNTED TO THE BULKHEAD AND RELOCATE AS REQUIRED. COORDINATE WITH COR FOR ANY REQUIRED DISRUPTIONS OF POWER OR SERVICES TO OIT

EQUIPMENT. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

9 CONTRACTOR TO CUT AND REMOVE WALLBOARD AND CREATE AN OPENING THROUGH EXISTING WALL TO ALLOW ALL CABLE PENETRATIONS TO BE REORGANIZED AND FIREBLOCKS INSTALLED. CONTRACTOR COORDINATE WITH COR IN MOVING AND ORGANIZING THE CABLING WHILE MINIMIZING OR CREATING ANY DISRUPTION TO OIT SERVICES. SEE NEW ARCHITECTURAL CEILING DRAWINGS FOR ADDITIONAL

INFORMATION.

10 CONTRACTOR TO REMOVE EXISTING LIGHT FIXTURE AND SALVAGE AS REQUIRED. SEE ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

EXISTING 12" X 12" CELLULOSE CEILING TILES TO REMAIN. CONTRACTOR TO CLEAN AND PREP FOR NEW

FINISHES. SEE NEW ARCHITECTURAL CEILING DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REMOVE AND SALVAGE EXISTING CEILING MOUNTED EQUIPMENT PRIOR TO NEW FINISH

WORK. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.

14 CONTRACTOR TO REMOVE EXISTING CEILING PANELS AND T-GRID IN THEIR ENTIRETY WITHIN AREA SHOWN. SEE

NEW ARCHITECTURAL RCP DRAWING FOR ADDITIONAL INFORMATION.

EXISTING FIBEROPTIC AND COPPER CABLING TO REMAIN IN PLACE DURING DEMOLITION AND NEW

CONSTRUCTION. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.

COORDINATE WITH COR FOR ANY REQUIRED DISRUPTION OF OIT SERVICES.

EXISTING ELECTRICAL CONDUIT MOUNTED TO WALLS AND CEILING TO REMAIN IN PLACE DURING

CONSTRUCTION. COORDINATE WITH COR FOR ANY ITEM THAT MUST MOVE AS A RESULT OF NEW

CONSTRUCTION AT NO ADDITIONAL COST TO THE VA.

EXISTING LIGHT FIXTURES TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE DURING CONSTRUCTION.

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

18 EXISTING PIPING SUPPLY AND RETURN LINES TO BE CUT AND MOVED OUT OF AREA ABOVE OIT

ROOM CEILING. COORDINATE WITH COR FOR SHUTDOWN REQUIRED. SEE MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

ROOF TOP MOUNTED CONDENSER LOCATION FOR DEDICATED COOLING UNIT. MECHANICAL PIPING TO EXTEND TO THIS LOCATION FROM COOLING UNIT IN THE OIT CLOSET. SEE MECHANICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

20 CONTRACTOR TO REMOVE EXISTING PIPING AT THROUGH WALL LOCATIONS. CONTRACTOR TO PATCH

ANY REMAINING HOLES WITH MATERIAL TO MATCH ADJACENT CONSTRUCTION FOR A LIKE NEW

APPEARANCE. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

19 CONTRACTOR TO CAREFULLY REMOVE NEAREST SEGMENT OF LARGE METAL PIPING COVER ON OUTSIDE

OF THE BUILDING AND SALVAGE FOR REUSE. SEE MECHANICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

22 CONDUIT AND WIRING WORK ABOVE CEILING AT ELECTRICAL PANEL LOCATIONS. SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

24 REMOVE PORTION OF SANITARY DRAIN PIPING AND REROUTE TIGHT TO WALL OF OIT CLOSET CEILING.

SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

25 EXISTING SPRINKLER LINES AND PENDANTS TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE

DURING DEMOLITION AND CONSTRUCTION PHASES.

27 EXISTING PLASTER CEILING WITH POPCORN FINISH TO REMAIN. VERIFY STRUCTURE FOR MOUNTING BLOCKING REQUIRED FOR NEW WORK. CLEAN AND PREP EXISTING SURFACES FOR NEW FINISHES. SEE

NEW ARCHITECTURAL RCP DRAWINGS FOR ADDITIONAL INFORMATION.

23 EXISTING INCANDESCENT LIGHT AND SOCKET TO REMAIN IN PLACE DURING CONSTRUCTION.

CONTRACTOR TO ENSURE NOT TO DAMAGE DURING DEMOLITION AND CONSTRUCTION PHASES.

26 REMOVE PORTION OF WATER PIPING AND REROUTE OUTSIDE THE AREA OF THE OIT CLOSET CEILING.

SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO REMOVE AND SALVAGE EXISTING DOOR SECURITY SYSTEM, CONDUIT AND BOXES.

SEE NEW ARCHITECTURAL DRAWINGS AND ELECTRICAL FOR ADDITIONAL INFORMATION.

EXISTING DRYWALL CEILING TO REMAIN. CONTRACTOR TO CLEAN & PREP FOR NEW PAINT FINISHES.

SEE ARCHITECTURAL FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL REMOVE EXISTING CEILING PANELS FROM GRID AND SALVAGE FOR REUSE IN AREA

SHOWN FOR ABOVE CEILING WORK. EXISTING T-GRID TO REMAIN.

EXISTING CONCRETE CEILING TO REMAIN. CONTRACTOR TO CLEAN & PREP FOR NEW PAINT FINISHES.

SEE ARCHITECTURAL FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

GROUND MOUNTED CONDENSER LOCATION FOR NEW DEDICATED COOLING UNIT. MECHANICAL

PIPING TO EXTEND FROM COOLING UNIT IN OIT ROOM TO THIS LOCATION. SEAL ALL GAPS AROUND WALL PENETRATIONS FOR A WEATHER TIGHT OR SMOKE TIGHT SEAL. SEE MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION. SEE MOUNTING FRAME DETAIL 2 / 3.AS100. SEE DETAIL

30 CONTRACTOR TO CORE DRILL HOLES AT BLOCK AND BRICK WALLS FOR NEW MECHANICAL PIPING

PENETRATIONS. FIELD VERIFY CLEARANCES AROUND JOISTS, HEADERS AND COLUMNS AT THIS

LOCATION--DO NOT CORE DRILL THROUGH EXISTING CONCRETE STRUCTURAL FRAME. PROVIDE

PROPER SLEEVES AND CAULKING AROUND ALL PENETRATIONS FOR SMOKE TIGHT OR WEATHER TIGHT

SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL SCRAPE ALL PEELING PAINT FROM WALLS AND BULKHEAD AND PREP FOR NEW FINISHES.

REMOVE SECTIONS OF DAMAGED PLASTER IN ITS ENTIRETY AND PATCH / REPAIR AND INFILL SURFACES AS REQUIRED WITH MATERIALS TO MATCH ADJACENT SURFACES FOR LIKE NEW APPEARANCE. WORK WITH CARE AND PROTECT EXISTING CABLES OR CONDUIT TO REMAIN IN PLACE. COORDINATE WITH COR FOR ANY

REQUIRED DISRUPTION TO OIT EQUIPMENT AND SERVICES.

CONTRACTOR SHALL PROVIDE TEMPORARY COVER AND PROTECT EXISTING OIT EQUIPMENT, IT CABINETS AND OTHER OIT RELATED EQUIPMENT FROM PAINT, DAMAGE AND DUST DURING CONSTRUCTION. ALL T-COM AND SERVER HARDWARE TO REMAIN IN OPERATION DURING EACH PHASE OF CONSTRUCTION. CONTRACTOR TO PROVIDE TEMPERATURE MONITOR FOR EQUIPMENT AND MAINTAIN WITHIN ACCEPTABLE RANGE.

DRYWALL FURRING AROUND EXISTING COLUMN--FIELD VERIFY COLUMN LOCATION AND CLEARANCES

AROUND STRUCTURE FOR PIPING PENETRATIONS.

NOTE:

ALL NON-OIT RELATED EQUIPMENT AND WALL

ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,

HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO

PERFORMING DEMOLITION OR NEW CONSTRUCTION

WORK, AND SALVAGED FOR REUSE. COORDINATE WITH

THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

NOTE:

THE CONTRACTOR SHALL NOT DAMAGE, MOVE,

DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR

RELATED APPURTENANCES WITHOUT THE FIRST

APPROVAL AND SUPERVISION OF THE OIT MANAGER OR

DESIGNATED PERSON.

NOTE:

ANY WORK PERFORMED BY THE CONTRACTOR THE VA

RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO

SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND

PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY

/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS

OR CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROTECT EXISTING CEILING,

FLOOR, AND WALLS FROM DAMAGE DURING

CONSTRUCTION AND IMPLEMENTATION OF INFECTION

AND DUST CONTROL BARRIERS. AFTER THE REMOVAL

OF TEMPORARY BARRIERS, TOUCH UP PAINT ON

CEILINGS AND WALLS AS NEEDED TO SHOW NO

EVIDENCE OF CONSTRUCTION.

NOTE:

SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM

REQUIREMENTS, DETAILS AND PHASING NOTES.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS

ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN

EXISTING MECHANICAL AND PIPING EQUIPMENT.

CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR

WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

NOTE:

NOT ALL KEYNOTES ARE USED ON EVERY SHEET.

CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR

COMPLETE SCOPE OF WORK IN EACH SPACE.

NOTE:

IN THE EVENT THAT THE PRESENCE OF HAZARDOUS

MATERIALS IS SUSPECT, THE CONTRACTOR SHALL

NOTIFY THE COR IMMEDIATELY FOR EVALUATION AND

TESTING. IF HAZARDOUS MATERIAL IS FOUND, THE

CONTRACTOR SHALL COORDINATE WITH THE COR TO

COMPLETE A SEPARATE ABATEMENT CONTRACT PRIOR

TO CONTINUING WITH ANY NEW WORK IN THIS AREA.

AutoCAD SHX Text

TWT

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text

NRF

AutoCAD SHX Text

TWT

AutoCAD SHX Text

ARCHITECTURAL-DEMOLITION-RCP

AutoCAD SHX Text

4.AD900

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of 87

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FORT WAYNE, INDIANA

AutoCAD SHX Text

CORRECT OIT DEFICIENCIES

AutoCAD SHX Text 610A4-16-101

AutoCAD SHX Text 2/13/2018

AutoCAD SHX Text

CERTIFICATION:

AutoCAD SHX Text

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL DEMOLITION NOTES

AutoCAD SHX Text

DEMOLITION CEILING NOTES

AutoCAD SHX Text

DEMOLITION CEILING NOTES (CONT'D)

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 10800038

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text No.

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text W.

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text Y

EXISTING

OIT

4.001

FD

CRAWL SPACE

APPROX. 3 FOOT CLEAR HT.

FASIREN CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

BOILER

CONSTRUCTION LIMIT LINE

(AREA FOR CONDENSER

ON EXIST CONC PAD)

ELEC

CRAWL SPACE

APPROX. 3 FOOT CLEAR HT.

SP

KR

P

GU

AG

E

PA

NE

L

4.

OIT

CLOSET

4.01

EXISTING

BASEMENT

MECHANICAL

7'-4"

4'- 5"

A6

A6

SEE DETAIL

2 / 3.AS100

39 A4

REMARKS

2,3

FURNISHED BY:MARK

E1 FLOOR / WALL

MOUNT

EQUIPMENT SCHEDULE (FOR REFERENCE ONLY)

IT RACK AND PATCH PANELS

DESCRIPTION

E2

E3

E4

EXISTING

CABLE MANAGEMENT (VERTICAL)

DOOR SECURITY SYSTEM

VIDEO SURVEILLANCE CAMERA

EXISTING IT RACK

EXIST WALL

INSTALLED BY:

E5 DATABASE ACCESS CONTROL SYSTEM EXISTING

VA JSN #:

A0921

A0923

M0436

A1020

E6

E7

E8

AIR CONDITIONER R3000 CONTRACTOR CONTRACTOR

8" CLEAR @ TOP

6'-5" MIN. BOTT.

SEE KEYNOTES

TO REMAIN

VA

VA

VA

VA

SECURITY ACCESS DETECTION A1026 CONTRACTOR

DOOR SECURITY MATCH

EXISTING

EXIST WALL

TO REMAIN

EXIST WALL

TO REMAIN

TELEPHONE WITH SPEAKER A1012 EXIST WALL

TO REMAINVA

PARTS

E9 FOLD DOWN WRITING SURFACE F0610 VA DESK SURFACE

34" A.F.F.VA

CONTRACTOR

DOOR SECURITY

E10 CABINET WITH INTERNAL EQUIPMENT A0919 FLOOR

VA

2,3

E11 POWER RECEPTICLE, QUAD OR DUPLEXA0925 EXISTING EXIST WALL

TO REMAINN / A

E12

E13

ALUMINUM LADDER TRAY AND BRACKETS

4" J-HOOK & HANGER VA

VA CONTRACTOR

CONTRACTOR

1,2,5,6

CEILING / WALL

CEILING / JOIST

E14 DATA SUPPORT DEVICES AND EXIST WALL

TO REMAINVA- VA

E15

WALL OR FLOOR PENETRATIONS.

PER KEYNOTE, OR

EXISTING CABLECONTRACTOR- CONTRACTOR

METAL CONDUIT SLEEVE (2" DIA. MIN) 4"

DIA, TYP. (ALT) 2-PIECE SLEEVE FOR EXIST LOCATION, V.I.F.

SCHEDULE 40 PIPE OR EQUIVALENT SLEEVE.

SOME LOCATIONS REQUIRE 2-PIECE PIPE WITH

CLAMPS. SEE DETAIL 12 / AG001

E16 3" x 5" METAL D RING CABLE SUPPORT VA CONTRACTOR

CEILING / WALL

- SPACED 36" C / C

REMARKS:

1. CONTRACTOR TO COORDINATE WITH COR AND VERIFY THE EXISTING CONDITION AT EACH LOCATION, THE OVERHEAD STRUCTURE FOR MOUNTING CABLE SUPPORT HARDWARE. PROVIDE BRACKET AND FASTENERS REQUIRED.

E17 VA CONTRACTOR

CEILING / JOIST

- SPACED 36" C / C

CAT64HP OR EQUIVALENT, TIA / EIA COMPLIANT

SPACING 36" C / CPROVIDE TREE MOUNTING TABS AND HANGER.

VERIFY MOUNTING CONDITION TO SELECT TYPE.

2. CONTRACTOR TO COORDINATE WITH COR ON EXACT MOUNTING LOCATIONS OF EQUIPMENT, CHANGES MADE TO LOCATIONS OF EXISTING EQUIPMENT, AND FULL EXTENT OF CABLE SUPPORT REQUIRED.

3. CONTRACTOR TO PROTECT EXISTING EQUIPMENT FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. EXISTING EQUIPMENT WILL REMAIN ACTIVE AND IN WORKING ORDER TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.

QUANTITY

4. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

5. VA STANDARD EQUIPMENT PROVIDED BY THE VA PER OIT DEPARTMENT SPECIFICATIONS.

6. CONTRACTOR TO PROVIDE CONTINUOUS CABLE SUPPORT (AS CABLE OR BUNDLE) WITHIN OIT CLOSET TO THE POINT OF PENETRATION (AT WALL, FLOOR OR CEILING), AND ADJACENT ROOMS WITHIN 6' FROM PENETRATION POINT.

7. CONTRACTOR TO PROVIDE AND INSTALL IN-WALL BLOCKING. FIRE TREATED WOOD 2X6 OR EQUIVALENT BETWEEN STUDS AT HEIGHTS REQUIRED. SEE ELEVATIONS AND WALL TYPE LEGEND FOR ADDITIONAL INFORMATION.

2,3,9

8. SPACE RESERVED FOR EXISTING EQUIPMENT OR FUTURE, ADJUST EQUIPMENT LOCATIONS TO ALLOW FOR EXPANSION AND CLEARANCES AROUND EQUIPMENT.

2,3

2,3

9. WORK PERFORMED BY SEPARATE CONTRACT. COORDINATE WITH VA'S DESIGNATED CONTRACTOR FOR FULL EQUIPMENT INSTALLATION AND TESTING. SEE DOOR SCHEDULE AND SPECIFICATION FOR ADDITIONAL INFORMATION.

2,3,9

2,3

3,4

1,2,5,6

1,2,5,6

1,2,5,6

E18 UNINTERUPTED POWER SUPPLY VA SUPPLIED

VA WALL BRACKETS

- OR IN RACK

2,5,10

10. VA TO PROVIDE ALL RELATED MOUNTING HARDWARE FOR EXISTING EQUIPMENT. CONTRACTOR TO COORDINATE WITH COR FOR MOUNTING REQUIREMENTS.

EXISTING UPS /

DST-500 OR EQUIVALENT 9 mm BENT WIRE, D RING BRACKET WITH (4) 5.5 mm HOLES FOR SCREWS.

FINISH TO NON-CONDUCTIVE, BLACK.

VA OR

CONT. OR EXISTING

DOOR SECURITY

1MATCH EXISTING LADDER RACK TYPE, SIZE AND

SUPPORT BRACKETS. VERIFY WIDTH. SEE DETAIL

12 / AG001.

25 MAX

2" J-HOOK & HANGER

CAT32HP OR EQUIVALENT, TIA / EIA COMPLIANT

PROVIDE TREE MOUNTING TABS AND HANGER.

VERIFY MOUNTING CONDITION TO SELECT TYPE.

ACCESSORIES, SECURITY + VIDEO

A0924

INDOOR UNIT EVAPORATOR

(PROJECT)

25 MAX

(PROJECT)

25 MAX

(PROJECT)

18" MIN. A.F.F.

CONT. OR EXISTING

DOOR SECURITY

EXISTING

VA OR

EXISTING

VA OR

EXISTING

VA OR

EXISTING

FUTURE

EXISTING /

EXISTING

EXISTING

EXISTING

EXISTING

DOOR / HDW

EXISTING

EXISTING

EXISTING

EXISTING

25 MAX

(PROJECT)

EXISTING

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

(5' SECTION)

A1026

(BADGE READERS, DOOR H.W. TIE-INS)

(CONTROL PANELS, RTE, CHORDS, CONDUIT)

IT RACK

E1

E9 2'-0"

(MIN)

4'-038" (V.I.F.)

E4 E3 E5 E14 E18

3"

E15

E15

T

COORDINATE WITH COR AND OIT TO

EVALUATE IMPROVED LOCATION OF

EQUIPMENT WITHIN THE CLOSET.

W E8

CAMPANELS

CR E7

E11

E6 3 / 4.AS100

/ 4

.A S1

4 / 4.AS100

2'-

6"

4'- 6"

1'- 4"

NEW T-STAT

& TEMP SEN

SEE MECH.

NEW FLOOR AND

BASE

METAL FOLD DOWN

WRITING DESK,

(FUTURE)

E9FU

LL

H T.

6" (V

.I.

F.

) FU

LL

H T.

6"

(V .I.

F.

4'-638" (V.I.F.)

E3 E5 E14

1'-6"

E4

E8

EQUIPMENT

REMOUNT

EXISTING

IT RACK

NEW FLOOR AND BASE

NEW PLYWOOD

W/ FURRING

OVER EXIST

CONC. WALL

E11

E18

6'- 41 4"

M

IN

1 4" 8"

(V .I.

F.

H

VA

C

UN

IT

M

OU

NT

IN

G) (C

LE

AR

EQ

E6 (U

NI

T)

NEW WALL W/

PLYWOOD

NEW FLOOR AND

BASE

VERIFY EXIST POWER

EQ

PHONE

REINSTALL

CAMERA

REINSTALL

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - DEMOLITION PLAN - BASEMENT 1

4.AS100

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 4 KEY PLAN

RENOVATION

AREA

UNEXCAVATED

BASEMENT

PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.

SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.

CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.21

1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.

2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER

TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.

3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL

CONTRACTOR.

4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.

5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH

CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO

THE END OF THE DAY OF CONSTRUCTION.

8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER

REFERENCED PROJECT DETAILS.

CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND

CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.

PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET

AG001 FOR SPECIFIC WALL TYPES NOTED.

CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR

ADDITIONAL INFORMATION.

EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7

NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"

CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT

PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR

ADDITIONAL INFORMATION.

PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.

PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.

SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL

SURFACES.

PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.

CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW

AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.

CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE

MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR

WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING OPENING, PROVIDE MATERIALS OF LIKE CONSTRUCTION AND PATCH TO MATCH ADJACENT WALLS TO SHOW NO EVIDENCE OF CONSTRUCTION. FLASH & CAULK GAPS AROUND OPENINGS FOR WEATHER TIGHT SEAL. SEE DETAIL 6/AG001. SEE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME. PROVIDE BLOCKING AND WALL INFILL TO MATCH ADJACENT WALL CONSTRUCTION AT THE INSIDE WALL

OPENING BELOW THE WINDOW. SEE DETAIL 5 / AG001 FOR ADDITIONAL INFORMATION.

22 CONTRACTOR TO PROVIDE AN EMERGENCY POWER SYSTEM. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

23 CONTRACTOR TO PROVIDE AND INSTALL NEW WALL INFILL BETWEEN EXISTING MASONRY CORRIDOR WALL--SEE WALL PARTITION SCHEDULE FOR ADDITIONAL INFORMATION. ALIGN NEW WALL FINISH BOARD FLUSH WITH FACE OF CORRIDOR WALL, PATCH AND PAINT FOR SEAMLESS APPEARANCE BETWEEN OLD AND NEW CONSTRUCTION.

CAULK AND SEAL GAPS IN WALL FOR SMOKE RESISTANT ASSEMBLY. SEE SHEET AG001 FOR ADDITIONAL

INFORMATION.

24 CONTRACTOR TO INSTALL SALVAGED DOOR AND DOOR HARDWARE IN NEW LOCATION. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.

25 CONTRACTOR TO PROVIDE AND INSTALL NEW DOOR, FRAME AND SALVAGED HARDWARE. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.

26 CONTRACTOR TO PROVIDE AND INSTALL ROOM SIGN AT NEW LOCATION. MATCH EXISTING MOUNTING HEIGHTS.

SEE DETAIL 5/ 6.AS101. COORDINATE WITH COR AND VA INTERIORS FOR APPROVAL OF SIGN SUBMITTALS AND

NUMBERING.

27 CONTRACTOR TO INSTALL SALVAGED ROOM SIGN THAT READS "ROOM 210D", MATCH MOUNTING HEIGHTS TO

EXISTING. COORDINATE WITH THE COR ON SIGN DETAILS.

28 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT NEW WALLS IN THEIR ENTIRETY OUTSIDE OF OIT

ROOM. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

29 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON EXISTING WALLS IN THEIR ENTIRETY FROM CORNER TO CORNER AND FULL HEIGHT. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

30 CONTRACTOR TO INSTALL SALVAGED LOCKERS IN NEW LOCATION. COORDINATE WITH THE VA

31 CONTRACTOR TO COORDINATE WITH COR AND OIT DESIGNATED PERSON TO RELOCATE ANY OIT EQUIPMENT IN THE ROOM AND EQUIPMENT TO REMOUNT AS REQUIRED. COORDINATE WITH DOOR SECURITY CONTRACTOR

FOR ALL WORK WITH DOOR HARDWARE AND SECURITY SYSTEM PANELS.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW

FRAME. PROVIDE PERIMETER TRIM AS REQUIRED.

CONTRACTOR TO PROVIDE AND INSTALL DOOR. VERIFY SALVAGED HARDWARE AND DOOR SLABS. SEE DOOR

SCHEDULE ON SHEET AG001.

CONTRACTOR SHALL CUT DOWN AND INSTALL SALVAGED HANDRAIL AND ACCESSORIES. PROVIDE INSERT FITTINGS REQUIRED TO SECURE SEPARATE PIECES (FASTENED TIGHT, PREVENTING ROTATION) AND ANCHOR TO WALL ASSEMBLY FOR A CONTINUOUS LENGTH OF RAIL AT EACH WALL SEGMENT. NO MORE THAN ONE JOINT MARK PER RAILING AT EITHER END CENTERED ON A BRACKET. IN EXISTING WALLS, USE MASONRY ANCHORS CAPABLE OF RESISTING PULL OUT; AT THE WALL INFILL PROVIDE BLOCKING TO MOUNT EACH BRACKET CAPABLE OF RESISTING A SINGLE CONCENTRATED LOAD OF 200 LBS AT ANY POINT ALONG THE TOP. HANDRAIL MOUNTING HEIGHT ABOVE FINISH FLOOR AND PROJECTION FROM WALL SHALL MATCH EXISTING.

CONTRACTOR SHALL PROVIDE AND INSTALL DRYWALL END CAP ON EXPOSED PORTION OF CMU, FULL HEIGHT.35

CONTRACTOR SHALL PROVIDE AND INSTALL HEADER SUPPORT FOR A LOAD BEARING CONDITION AT TOP OF

WALL AND AS REQUIRED FOR NEW DOORS, VERIFY IN FIELD.

CONTRACTOR SHALL PROVIDE AND INSTALL 3/4" PLYWOOD OVER EXISTING STUD WALL. VERIFY CLEARANCES BETWEEN EXISTING EQUIPMENT PANELS AND NEW WALLS. PROVIDE 2 COATS OF PAINT TO MATCH NEW WALLS.

CONTRACTOR TO PROVIDE IN-WALL BLOCKING BETWEEN FRAMING FOR EQUIPMENT SUPPORT. PATCH FINISH

BOARD AS REQUIRED TO MATCH EXISTING WALL TO SHOW NO EVIDENCE OF CONSTRUCTION.

CONTRACTOR TO VERIFY AND PROVIDE CABLE PENETRATION SLEEVE THROUGH WALLS. PROVIDE SPLIT CONDUIT (2-PIECE) WITH CLAMPS AT EXISTING CABLE PENETRATIONS WITHOUT SLEEVED PROTECTION.

SLEEVES RESERVED FOR FUTURE USE SHALL BE INSTALLED WITH A CLOSED CAP ON EACH END. FIELD VERIFY NUMBER REQUIRED WITH COR AND OIT AT EACH ROOM. INSTALL FIRE BLOCKING AND SEALANT AS REQUIRED AT EACH. SEE EQUIPMENT SCHEDULE AND DETAIL 12 / AG001 FOR ADDITIONAL INFORMATION. SEE

REFLECTED CEILING PLAN FOR ADDITIONAL PENETRATIONS SHOWN.

EXISTING WALL FRAMING AND FINISH TO REMAIN. PROTECT WALL AND EQUIPMENT FROM DAMAGE, NO NEW

FINISHES IN AREA OF EXISTING WALL MOUNTED PANELS.

CONTRACTOR TO PATCH AND PROVIDE 2 COATS OF PAINT ON WALLS IN COORDINATION WITH NOTE 1 ON

SHEET 1.AS900 AND NOTE 39 ON SHEET 1.AS100.

NOTE:

ALL NON-OIT RELATED EQUIPMENT AND WALL

ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,

HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO

PERFORMING DEMOLITION OR NEW CONSTRUCTION

WORK, AND SALVAGED FOR REUSE.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.