36C25019B0007-011.pdf

PDF 6 MB Posted

Attached to
Correct OIT Deficiencies 610A4-16-101 Federal contract opportunity
Solicitation number
36C25019B0007
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0007 Drawings 6 of 11.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Correct OIT Deficiencies 610A4-16-101, newest first.
File Type Posted
36C25019C0184-000.docx DOCX document
VA251-15-D-0142-000.docx DOCX document
36C25019B0007-0007004.docx DOCX document
36C25019B0007-0006000.docx DOCX document
36C25019B0007-0005000.docx DOCX document
36C25019B0007-0004000.docx DOCX document
36C25019B0007-0003001.pdf PDF
36C25019B0007-0003000.docx DOCX document
36C25019B0007-0002000.docx DOCX document
36C25019B0007-0001000.docx DOCX document
36C25019B0007-009.pdf PDF
36C25019B0007-007.pdf PDF
36C25019B0007-001.docx DOCX document
36C25019B0007-010.pdf PDF
36C25019B0007-004.pdf PDF
36C25019B0007-013.pdf PDF
36C25019B0007-016.pdf PDF
36C25019B0007-014.pdf PDF
36C25019B0007-012.pdf PDF
36C25019B0007-005.docx DOCX document
36C25019B0007-003.doc DOC document
36C25019B0007-006.pdf PDF
36C25019B0007-015.pdf PDF
36C25019B0007-008.pdf PDF
36C25019B0007-002.pdf PDF
36C25019B0007-000.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL

EC

HVAC

EXISTING

CORRIDOR

A02

EXISTING

VESTIBULE

A03

EXISTING

MAIN SERVER

A057

EXISTING

ROOM

A058

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

HVAC

EL

EC

EL

EC

SERVER / TELECOM

SERVER / TELECOM

M

ET

ER

UPS

UPS

TOOL

CART

CABLE TRAYRACK

SHELVING

HB

3/4" CW

3/4" CW

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

LOWER LEVEL

SCALE: 1/4" = 1'-0"

PLUMBING - PLAN - PARTIAL LOWER LEVEL 1

1.PL100

1. ALL WORK SHALL CONFORM TO STATE AND LOCAL PLUMBING AND

BACKFLOW PREVENTION CODES, AND THE REQUIREMENTS OF THE

LOCAL WATER UTILITY.

2. EQUIPMENT, DOMESTIC WATER PIPING, SANITARY WASTE, SANITARY

VENT, AND STORM PIPING LAYOUTS ARE SCHEMATIC IN NATURE.

CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE

WITH OTHER TRADES DURING CONSTRUCTION BY ADDING OFFSETS

AND ELBOWS WHERE REQUIRED.

3. VACUUM BREAKERS MUST BE INSTALLED ON ALL EXISTING OR

PROPOSED HOSE THREAD FITTINGS, INCLUDING BUT NOT LIMITED TO

HOSE BIBBS, WALL / YARD HYDRANTS, MOP / SERVICE SINKS.

4. A CROSS-CONNECTION CONTROL DEVICE INSPECTOR SHALL TEST ALL

BACKFLOW DEVICES AT THE TIME OF INSTALLATION AND SUBMIT

REPORTS TO THE LOCAL WATER UTILITY AS REQUIRED.

5. ALL WATER LINES 3" AND LARGER MUST BE DISINFECTED PER ANSI/

AWWA C651-92. SAMPLES FROM 2 CONSECUTIVE DAYS MUST BE

TAKEN TO AN APPROVED TEST LAB. LAB ANALYSES REPORTS SHALL BE

SUBMITTED TO THE LOCAL WATER UTILITY AS REQUIRED FOR

COMPLIANCE.

6. COORDINATE EXACT LOCATION OF ROOF DRAINS WITH ARCHITECTURAL

AND STRUCTURAL PLANS.

7. ALL MATERIALS INSTALLED WITHIN PLENUM SHALL HAVE FLAME SPREAD

RATING OF NOT MORE THEN 25 AND A SMOKE DEVELOPED RATING

NOT EXCEEDING 50 IN ACCORDANCE WITH STATE CODES.

8. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, AND

LABOR FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF PIPING

PENETRATING BUILDING CONSTRUCTION.

9. ALL EQUIPMENT USING NATURAL GAS SHALL HAVE A GAS COCK AND

DIRT LEG FOR EACH PIECE OF EQUIPMENT.

10. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS,

TYPICAL.

PROVIDE AND INSTALL TIE IN TO EXISTING CW PIPING AND EXTEND AS INDICATED.

PATCH AND REPAIR WALL AS REQUIRED TO MATCH EXISTING. CONTRACTOR TO

PROVIDE AND INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND

REMOVING EXISTING PIPING TO LIMIT SHUTDOWN TIME. REFER TO SHEET 1.PD100

FOR ADDITIONAL INFORMATION.

CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING AS

REQUIRED TO MAINTAIN FIRE RATING OF WALL. REFER TO ARCHITECTURAL DRAWINGS

FOR ADDITIONAL INFORMATION.

COORDINATE ROUTING OF NEW PIPING WITH EXISTING IT EQUIPMENT. NEW PIPING

SHALL NOT BE ROUTED ABOVE EXISTING EQUIPMENT.

VERTICAL PORTION OF EXISTING PIPING IN WALL TO REMAIN. NEW PIPING TIE INS TO

BE INSTALLED AT THE TOP OF PIPE RISER.

NOTE:

PATCH ALL ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF WALL.

NOTE:

CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING

CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS

A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

EC

HVAC

EXISTING

CORRIDOR

A02

EXISTING

VESTIBULE

A03

EXISTING

MAIN SERVER

A057

EXISTING

ROOM

A058

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

HVAC

EL

EC

EL

EC

SERVER / TELECOM

SERVER / TELECOM

M

ET

ER

UPS

UPS

TOOL

CART

CABLE TRAYRACK

SHELVING

REFRIGERANT LINE SET

REFRIGERANT LINE SET TO LIEBERT CONDENSER UNIT

REFRIGERANT LINE SET TO

INDOOR LIEBERT UNIT

EX

IS

TI

NG

HW

R

AD

IA

TO

R

HWS

HWR

HW

S

HW

R

2 2

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

LOWER LEVEL

SCALE: 1/4" = 1'-0"

MECHANICAL - DEMOLITION PLAN - PARTIAL LOWER LEVEL 1

1.MD100

REMOVE HOT WATER SUPPLY AND RETURN PIPING TO POINT INDICATED AND PREPARE

PIPING FOR NEW WORK. CONTRACTOR TO PROVIDE AND INSTALL NEW PIPING RUNS

AND TIE INS PRIOR TO DISCONNECTING AND REMOVING EXISTING PIPING TO LIMIT

SHUTDOWN TIME PERIOD. REFER TO SHEET 1.MH100 FOR ADDITIONAL INFORMATION.

REMOVE REFRIGERANT PIPING FOR LIEBERT UNIT TO POINT INDICATED AND PREPARE

FOR NEW WORK. RECOVER R-22 REFRIGERANT FOR REUSE. CONTRACTOR TO

PROVIDE AND INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND

REMOVING EXISTING PIPING TO LIMIT SHUTDOWN TIME PERIOD. REFER TO SHEET

1.MH100 FOR ADDITIONAL INFORMATION.

DISCONNECT AND REMOVE HWS AND HWR PIPING AT EXISTING RADIATOR AND

PREPARE UNIT FOR NEW WORK.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR

SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO

ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING

SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY

MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)

IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY

THE CONTRACTOR - DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS

AND DAMAGE DURING CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE.

BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.

10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND

DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF

CONSTRUCTION.

NOTE:

PATCH AND REPAIR ALL ABANDONED PENETRATIONS TO MAINTAIN FIRE RATING OF

WALLS.

NOTE:

CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING

CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS

A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.

NOTE:

THE VA SHALL RETAIN FIRST RIGHT OF REFUSAL FOR ALL PRODUCTS TO BE

REMOVED.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

TR

AN

S.

FD

PANEL

PH

ON

ES

EXISTING

MECH

A155

EXISTING

ROOM

A192

EXISTING

CORRIDOR

A154

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

(AREA FOR CONDENSER

ON ROOF-VERIFY WITH VA)

PANELPANEL

OPTICOM

TR

AN

S.

UPS

CAMERA

SW

ITC

H

EL

EC

SW

ITC

H

EL

EC

OH

P

AG

IN

G

EL

EC

EL

EC

IT

RA

CK

HWS

HWR

HW

S

HW

R

HWR

HWR

HW

S

S(15#)

COND

CO

ND

S(

HWP

HX

COND.

PUMP

COND.

PUMP

HWP

2"

1-1/2" 1-1/2"

2"

2" 1-1/2"

1 1

DB

EXISTING

CORRIDOR

EXISTING

OFFICE

EXISTING

ROOM

EXISTING

CORRIDOR

EXISTING

ROOM

EXISTING

OIT CLOSET

176A

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

IT RACK IT RACK

CA

M

ER

A

UPS

PA

NE

L

CP GRND

PA

NE

L

IT CAB

PANELS

SHELVING

PTAC L

2 2

SCALE: 1/4" = 1'-0"

MECHANICAL - DEMOLITION FLOOR PLAN - PARTIAL FIRST FLOOR 1

1.MD101

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

FIRST FLOOR

SCALE: 1/4" = 1'-0"

MECHANICAL - DEMOLITION FLOOR PLAN - PARTIAL FIRST FLOOR 2

1.MD101

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO

ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING

SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY

MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)

IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY

THE CONTRACTOR - DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS

AND DAMAGE DURING CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE.

BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.

10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND

DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF

CONSTRUCTION.

REMOVE STEAM AND CONDENSATE PIPING TO POINT INDICATED AND PREPARE PIPING

FOR NEW WORK. CONTRACTOR TO PROVIDE AND INSTALL NEW PIPING RUNS AND TIE

INS PRIOR TO DISCONNECTING AND REMOVING EXISTING PIPING TO LIMIT SHUTDOWN

TIME. REFER TO SHEET 1.MH101 FOR ADDITIONAL INFORMATION.

REMOVE PTAC UNIT COMPLETE INCLUDING ALL ASSOCIATED HARDWARE, WIRING,

CONTROLS, DUCTWORK, AND LOUVER. PATCH AND REPAIR WALL TO MATCH EXISTING.

REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

NOTE:

THE VA SHALL RETAIN FIRST RIGHT OF REFUSAL FOR ALL PRODUCTS TO BE

REMOVED.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

S.S. MEDICINE

CABINET

ELECSOV

EXISTING

CORRIDOR

A500

EXISTING

WAITING

A528

EXISTING

ROOM

A527

EXISTING

OIT CLOSET

528C

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

SERVICE

ELEVATOR

PTAC

L

SCALE: 1/4" = 1'-0"

MECHANICAL - DEMOLITION PLAN - PARTIAL FIFTH FLOOR 1

1.MD105

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

FIFTH FLOOR

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR

SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO

ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING

SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY

MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)

IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY

THE CONTRACTOR - DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS

AND DAMAGE DURING CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE.

BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.

10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND

DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF

CONSTRUCTION.

REMOVE PTAC UNIT COMPLETE INCLUDING ALL ASSOCIATED HARDWARE, WIRING,

CONTROLS AND DUCTWORK. LOUVER IS TO REMAIN. PATCH AND REPAIR WALL TO

MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

NOTE:

THE VA SHALL RETAIN FIRST RIGHT OF REFUSAL FOR ALL PRODUCTS TO BE

REMOVED.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

EXISTING

CORRIDOR

A02

EXISTING

VESTIBULE

A03

EXISTING

MAIN SERVER

A057

EXISTING

ROOM

A058

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

REFRIGERANT LINE SET

EX

IS

TI

N G

H W

R A D

IA

TO

R

HW

S

HW

R

HWS

HWR

HW

S

HW

R

REFRIGERANT LINE SET TO LIEBERT CONDENSER UNIT

REFRIGERANT LINE SET TO

INDOOR LIEBERT UNIT

EXISTING

CORRIDOR

A01

EXISTING

CORRIDOR

A02

EXISTING

HALL

A60

EXISTING

ROOM

A62

EXISTING

ROOM

A61

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CONSTRUCTION LIMIT LINE

EXISTING

OIT CLOSET

A63

EXISTING

EMS

A63A

EXISTING

LOADING DOCK

EXISTING

N&FS

HWS

HWR

FD

AC-1-A63

SUCTION

LIQUID

1/4" DRAIN

D

8 9

AC-1-A63

3/4"

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

LOWER LEVEL

SCALE: 1/4" = 1'-0"

MECHANICAL - PLAN - PARTIAL LOWER LEVEL 1

1.MH100

SCALE: 1/4" = 1'-0"

MECHANICAL - PLAN - PARTIAL LOWER LEVEL 2

1.MH100

PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING

ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, CONDENSATE PUMP,

AND ACCESSORIES. MAINTAIN ALL REQUIRED CLEARANCES PER MANUFACTURERS

RECOMMENDED INSTALLATION.

ROUTE SUCTION, LIQUID, AND CONDENSATE PIPING UP THROUGH ROOF FOR FINAL

CONNECTION TO ACCU. REFER TO DRAWING 1.MH101 FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL TIE INTO EXISTING HOT WATER SUPPLY AND RETURN PIPING AND

EXTEND AS INDICATED FOR FINAL CONNECTION TO EXISTING CEILING HUNG UNIT IN EXISTING VESTIBULE A03. MATCH EXISTING PIPING SIZE. PROVIDE AND INSTALL NEW SHUTOFF VALVES

AND CONTROL VALVES FOR EXISTING UNIT AS REQUIRED. CONTRACTOR TO PROVIDE AND

INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND REMOVING EXISTING

PIPING TO LIMIT SHUTDOWN TIME. REFER TO SHEET 1.MD100 FOR ADDITIONAL

INFORMATION.

PROVIDE AND INSTALL TIE INTO EXISTING REFRIGERANT LINE SET. REFRIGERANT PIPING SIZED

TO MATCH EXISTING. RECHARGE REFRIGERANT SYSTEM USING RECOVERED R-22

REFRIGERANT. PROVIDE ADDITIONAL R-22 AS REQUIRED FOR A COMPLETE AND

FUNCTIONING SYSTEM. CONTRACTOR TO PROVIDE AND INSTALL NEW PIPING RUNS AND TIE

INS PRIOR TO DISCONNECTING AND REMOVING EXISTING PIPING TO LIMIT SHUTDOWN TIME.

REFER TO SHEET 1.MD100 FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL STAINLESS STEEL DRIP PAN ENCLOSURE AND WET SENSOR AROUND

HOT WATER SUPPLY AND RETURN PIPING. CONTRACTOR SHALL FIELD VERIFY REQUIRED

ENCLOSURE DIMENSION TO FULLY CONCEAL PIPING. WET SENSOR TO BE STAND ALONE WITH

AUDIBLE ALARM. ROUTE 3/4" DRAIN PIPING THROUGH WALL TO EXISTING FLOOR DRAIN

LOCATED IN EXISTING EMS A63A. PATCH AND REPAIR WALL TO MAINTAIN EXISTING FIRE

RATING AND MATCH SURROUNDING CONDITIONS. REFER TO DRIP PAN ENCLOSURE DETAILS

ON SHEET MG001 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING. REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

COORDINATE ROUTING OF NEW PIPING WITH EXISTING IT EQUIPMENT. NEW PIPING SHALL NOT

BE ROUTED ABOVE EXISTING EQUIPMENT.

PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.

PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.

TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER PIPING AND ROUTE AS

INDICATED. TERMINATE 3/4" COPPER CONDENSATE PIPING THROUGH SIDE OF NEW PIPE

CURB FOR CONDENSATE DISCHARGE ONTO ROOF. REFER TO PIPE CURB DETAIL ON SHEET

MG001 FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL REFRIGERANT PIPING AND CONDENSATE DRAIN HOSE SIZED PER

MANUFACTURERS RECOMMENDATION.

1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.

2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.

CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER

TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE

REQUIRED.

3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED

MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.

4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.

5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS

AND ARCHITECTURAL CEILING PLAN.

6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS

NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE

A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.

7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR

REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL

PENETRATING BUILDING CONSTRUCTION.

8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.

9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.

10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS

SHOWN ON CONTRACT DETAIL SHEET.

11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.

NOTE:

CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING

CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS

A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

S.

FD

PANEL

PH

ON

ES

EXISTING

MECH

A155

EXISTING

ROOM

A192

EXISTING

CORRIDOR

A154

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

PANELPANEL

OPTICOM

TR

AN

S.

SW

ITC

H

EL

EC

SW

ITC

H

EL

EC

EL

EC

EL

EC

HWS

HWR

HW

S

HW

R

HWR

HWR

HW

S

S(15#)

COND

CO

ND

S(

HWP

HX

COND.

PUMP

COND.

PUMP

HWP

2"

1-1/2"

1-1/2"

2"

2" 1-1/2"

S(

CO

ND

AC

-1

-A

ACCU-1-A155

(ON ROOF)

SUCTION

LIQUID

D

AC-1-A155

D

3/4"

3/4"

DB

EXISTING

CORRIDOR

EXISTING

OFFICE

EXISTING

ROOM

EXISTING

CORRIDOR

EXISTING

ROOM

EXISTING

OIT CLOSET

176A

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

AC-1-176A1

ACCU-1-176A

(ON ROOF)

ACCU-1-A63

(ON ROOF)

3/4" DRAIN

SUCTION

LIQUID

3/4" DRAIN

SUCTION

LIQUID

AC-1-176A

SCALE: 1/4" = 1'-0"

MECHANICAL - FLOOR PLAN - PARTIAL FIRST FLOOR 1

1.MH101

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

FIRST FLOOR

SCALE: 1/4" = 1'-0"

MECHANICAL - FLOOR PLAN - PARTIAL FIRST FLOOR 2

1.MH101

PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING

ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, AND ACCESSORIES.

MAINTAIN ALL REQUIRED CLEARANCES PER MANUFACTURERS RECOMMENDED INSTALLATION.

TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER PIPING AND ROUTE AS

INDICATED.

PROVIDE AND INSTALL OUTDOOR CONDENSER UNIT AND EQUIPMENT SUPPORTS, FLASHED

IN EQUIPMENT CURB, AND PIPE SUPPORTS LOCATED ON GROUND FLOOR ROOF. ANCHOR

ALL EQUIPMENT FOR A COMPLETE INSTALLATION. COORDINATE LOCATION OF NEW

EQUIPMENT WITH REQUIRED CLEARANCES AND EXISTING CONDITIONS. REFER TO

ARCHITECTURAL DRAWING AS201 FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL TIE IN TO EXISTING STEAM AND CONDENSATE PIPING AND ROUTE AS

INDICATED TO MAINTAIN CLEARANCE FROM NEW OIT PARTITION. CONTRACTOR TO PROVIDE

AND INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND REMOVING

EXISTING PIPING TO LIMIT SHUTDOWN TIME. REFER TO SHEET 1.MD101 FOR ADDITIONAL

INFORMATION.

REFER TO DRAWING 1.MH100 FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL FLASHED IN PIPE CURB AND ROUTE REFRIGERANT LINE SET UP

THROUGH ROOF FOR FINAL CONNECTION TO ACCU. TERMINATE 3/4" COPPER CONDENSATE

PIPING THROUGH SIDE OF NEW PIPE CURB FOR CONDENSATE DISCHARGE ONTO ROOF.

REFER TO PIPE CURB DETAIL ON SHEET MG001 AND ARCHITECTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

PROVIDE AND INSTALL STAINLESS STEEL DRIP PAN AND WET SENSOR UNDER ALL PIPING

INCLUDING HOT WATER SUPPLY, HOT WATER RETURN AND DOMESTIC WATER PIPING. WET

SENSOR TO BE STAND ALONE WITH AUDIBLE ALARM. ROUTE 3/4" DRAIN PIPE FROM DRIP PAN

DOWN TO EXISTING FLOOR DRAIN AS INDICATED AND TERMINATE.

PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.

ROUTE REFRIGERANT AND CONDENSATE DRAIN PIPING THROUGH EXISTING LOUVER OPENING

THAT IS TO BE INFILLED. SEAL OPENINGS AROUND PIPING. TERMINATE 3/4" COPPER

CONDENSATE PIPING OUTSIDE ONTO ROOF. REFER TO ARCHITECTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

ROUTE CONDENSATE PIPING ON NORTH SIDE OF NEW PARTITION AND FASTEN TO PARTITION.

TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER PIPING AND TERMINATE

AT FLOOR DRAIN AS INDICATED.

PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.

PROVIDE AND INSTALL REFRIGERANT PIPING SIZED PER MANUFACTURERS

RECOMMENDATION.

1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.

2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.

CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER

TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE

REQUIRED.

3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED

MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.

4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.

5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS

AND ARCHITECTURAL CEILING PLAN.

6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS

NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE

A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.

7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR

REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL

PENETRATING BUILDING CONSTRUCTION.

8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.

9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.

10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS

SHOWN ON CONTRACT DETAIL SHEET.

11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

ROOM

EXISTING

CORRIDOR

EXISTING

CORRIDOR

EXISTING

RESTROOM

210B

EXISTING

BREAK ROOM

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

IT

CLOSET

210C

DUMBWAITER

SERVICE

ELEVATOR

EXISTING

STORAGE

210A

FRIDGE

CHASE

ACCU-1-A210

(ON ROOF)

AC-1-A210

SUCTION

LIQUID

3/4" DRAIN

AC-1-A210

SCALE: 1/4" = 1'-0"

MECHANICAL - PLAN - PARTIAL SECOND FLOOR 1

1.MH102

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

SECOND FLOOR

PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING

ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, CONDENSATE PUMP,

AND ACCESSORIES. TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER

PIPING AND ROUTE AS INDICATED. MAINTAIN ALL REQUIRED CLEARANCES PER

MANUFACTURERS RECOMMENDED INSTALLATION.

PROVIDE AND INSTALL OUTDOOR CONDENSER UNIT AND EQUIPMENT SUPPORTS, FLASHED

IN EQUIPMENT CURB, AND PIPE SUPPORTS. ANCHOR ALL EQUIPMENT FOR A COMPLETE

INSTALLATION. COORDINATE LOCATION OF NEW EQUIPMENT WITH REQUIRED CLEARANCES

AND EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWING AS201 FOR ADDITIONAL

INFORMATION.

PROVIDE AND INSTALL REFRIGERANT LINE SET AND CONDENSATE DRAIN PIPING ROUTED

ABOVE CEILING.

CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING. REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL REFRIGERANT LINE SET AND CONDENSATE PIPING ROUTED DOWN

EXTERIOR WALL FOR FINAL CONNECTION TO ACCU-1-A210 LOCATED ON FIRST FLOOR ROOF.

PROVIDE AND INSTALL ANCHORED STAINLESS STEEL WALL SUPPORTS FOR VERTICAL RUN OF

PIPING. TERMINATE 3/4" COPPER CONDENSATE PIPING OUTSIDE ONTO ROOF.

PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.

PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.

PROVIDE AND INSTALL REFRIGERANT PIPING SIZED PER MANUFACTURERS

RECOMMENDATION.

1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.

2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.

CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER

TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE

REQUIRED.

3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED

MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.

4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.

5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS

AND ARCHITECTURAL CEILING PLAN.

6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS

NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE

A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.

7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR

REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL

PENETRATING BUILDING CONSTRUCTION.

8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.

9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.

10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS

SHOWN ON CONTRACT DETAIL SHEET.

11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.

NOTE:

CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING

CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS

A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

ELECSOV

CORRIDOR

A500

EXISTING

WAITING

A528

EXISTING

ROOM

A527

EXISTING

OIT CLOSET

528C

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

SERVICE

ELEVATOR

ACCU-1-528C

(ON ROOF)

AC-1-528C

3/4" DRAIN

SUCTION

LIQUID

AC-1-528C

SCALE: 1/4" = 1'-0"

MECHANICAL - PLAN - PARTIAL FIFTH FLOOR 1

1.MH105

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

FIFTH FLOOR

PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING

ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, CONDENSATE PUMP,

AND ACCESSORIES. MAINTAIN ALL REQUIRED CLEARANCES PER MANUFACTURERS

RECOMMENDED INSTALLATION.

PROVIDE AND INSTALL OUTDOOR CONDENSER UNIT AND EQUIPMENT SUPPORTS, FLASHED

IN EQUIPMENT CURB, AND PIPE SUPPORTS. ANCHOR ALL EQUIPMENT FOR A COMPLETE

INSTALLATION. REFER TO ARCHITECTURAL DRAWING AS201 FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL FLASHED IN PIPE CURB AND ROUTE REFRIGERANT LINE SET UP

THROUGH ROOF FOR FINAL CONNECTION TO ACCU. TRANSITION VINYL CONDENSATE

DISCHARGE TUBE TO 3/4" COPPER PIPING AND ROUTE AS INDICATED. TERMINATE 3/4"

COPPER CONDENSATE PIPING THROUGH SIDE OF NEW PIPE CURB FOR CONDENSATE

DISCHARGE ONTO ROOF. REFER TO PIPE CURB DETAIL ON SHEET MG001 AND

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. COORDINATE LOCATION OF

NEW EQUIPMENT AND PIPING WITH REQUIRED CLEARANCES AND EXISTING WALKWAY ON

ROOF.

CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING. REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.

PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.

PROVIDE AND INSTALL REFRIGERANT PIPING AND CONDENSATE DRAIN HOSE SIZED PER

MANUFACTURERS RECOMMENDATION.

1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.

2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.

CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER

TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE

REQUIRED.

3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED

MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.

4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.

5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS

AND ARCHITECTURAL CEILING PLAN.

6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS

NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE

A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.

7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR

REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL

PENETRATING BUILDING CONSTRUCTION.

8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.

9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.

10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS

SHOWN ON CONTRACT DETAIL SHEET.

11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.

NOTE:

CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE

AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY

MECHANICAL AIR INTAKES.

NOTE:

FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO

PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR

STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR

CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT

MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL

PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

EC

HVAC

EXISTING

CORRIDOR

EXISTING

VESTIBULE

EXISTING

MAIN SERVER

EXISTING

ROOM

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

HVAC

EL

EC

EL

EC

SERVERS / TELECOM

SERVERS/ TELECOM

M

ET

ER

UPS

UPS

RACK

TOOL

CART

CABLE TRAY

SHELVING

PANEL

DP-TELE-A

IT RACK

PHONES

EXISTING

CORRIDOR

EXISTING

CORRIDOR

EXISTING

HALL

EXISTING

ROOM

EXISTING

ROOM

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CONSTRUCTION LIMIT LINE

EXISTING

OIT CLOSET

EXISTING

EMS

63A

EXISTING

LOADING DOCK

EXISTING

N&FS

SERVICE

ELEVATOR

CABLE TRAY ABOVE

WALL MOUNTED PANELS ON PLYWOOD

UP

S

ELEC

ELEC

CAM

(AREA ON ROOF ABOVE FOR

NEW CONDENSER FOR

ROOM 063)

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

LOWER LEVEL

SCALE: 1/4" = 1'-0"

ELECTRICAL - DEMOLITION PLAN - ROOM 057 MAIN SERVER1

1.ED100SCALE: 1/4" = 1'-0"

ELECTRICAL - DEMOLITION PLAN - ROOM 063 OIT CLOSET 2

1.ED100

DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE AND LIGHT SWITCH. EXISTING

CIRCUIT SHALL REMAIN FOR RE-USE. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL

WORK IN THIS AREA.

1. REFER TO ELECTRICAL SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS

FOR EQUIPMENT INSTALLATION REQUIREMENTS.

2. CONTRACTORS SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES ON SITE.

3. PROTECT ALL EXISTING EQUIPMENT AND FINISHES FROM DUST, DEBRIS AND DAMAGE.

4. ALL WORK TO BE IN ACCORDANCE TO LOCAL, STATE AND NATIONAL ELECTRIC

CODES.

5. E.C. SHALL DISCONNECT AND REMOVE ALL ELECTRICAL DEVICES IN WALLS TO BE

DEMOLISHED.

6. E.C. SHALL DISCONNECT ALL MECHANICAL AND PLUMBING DEVICES TO BE

DEMOLISHED.

7. ALL DEMOLISHED ELECTRICAL ITEMS SHALL BE OFFERED TO THE COR FOR SALVAGE.

IF THE VA DOES NOT ACCEPT ITEMS, CONTRACTOR SHALL REMOVE THEM FROM SITE

AND SHALL LEGALLY DISPOSE OF ALL ITEMS.

DISCONNECT AND REMOVE EXISTING FEEDER BETWEEN EXISTING UPS AND EXISTING

PANEL DP-TELE-A. REMOVE CONDUCTORS, CONDUIT AND ALL APPURTENANCES. SEE

SHEET 1.ES100 FOR ADDITIONAL INFORMATION.

DISCONNECT EXISTING HVAC UNIT FOR REMOVAL BY MECHANICAL CONTRACTORS.

DISCONNECT AND REMOVE OUTLET/JUNCTION BOX, CIRCUIT, CONDUIT AND ALL

APPURTENANCES BACK TO PANEL AND UPDATE PANEL SCHEDULE.

DISCONNECT EXISTING LIGHT FIXTURES FOR RELOCATION. EXISTING CIRCUIT SHALL

BE RE-USED. SEE NEW ELECTRICAL PLAN FOR ADDITIONAL WORK IN THIS AREA.

TEMPORARILY DISCONNECT AND REMOVE EXISTING DOOR ACCESS SYSTEM AND

TURN OVER TO OWNER. INSTALLATION NOT IN THIS CONTRACT.5

DISCONNECT AND REMOVE EXISTING LIGHT SWITCH, BACKBOX AND

APPURTENANCES. EXISTING CIRCUIT SHALL BE REMOVED TO ABOVE CEILING AND

RE-USED. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL WORK IN THIS AREA.

DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE, CIRCUIT, CONDUIT AND ALL

APPURTENANCES BACK TO PANEL.

NOTE:

SEE SHEET 1.ES100 FOR LIGHT FIXTURE SCHEDULE.

NOTE:

ALL NON-OIT RELATED EQUIPMENT AND WALL

ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,

HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO

PERFORMING DEMOLITION OR NEW CONSTRUCTION

WORK, AND SALVAGED FOR REUSE. COORDINATE WITH

THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.

NOTE:

THE CONTRACTOR SHALL NOT DAMAGE, MOVE,

DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR

RELATED APPURTENANCES WITHOUT THE FIRST

APPROVAL AND SUPERVISION OF THE OIT MANAGER OR

DESIGNATED PERSON.

NOTE:

ANY WORK PERFORMED BY THE CONTRACTOR THE VA

RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO

SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND

PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY

/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS

OR CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROTECT EXISTING CEILING,

FLOOR, AND WALLS FROM DAMAGE DURING

CONSTRUCTION AND IMPLEMENTATION OF INFECTION

AND DUST CONTROL BARRIERS. AFTER THE REMOVAL

OF TEMPORARY BARRIERS, TOUCH UP PAINT ON

CEILINGS AND WALLS AS NEEDED TO SHOW NO

EVIDENCE OF CONSTRUCTION.

NOTE:

SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM

REQUIREMENTS, DETAILS AND PHASING NOTES.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS

ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN

EXISTING MECHANICAL AND PIPING EQUIPMENT.

CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR

WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

NOTE:

NOT ALL KEYNOTES ARE USED ON EVERY SHEET.

CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR

COMPLETE SCOPE OF WORK IN EACH SPACE.

NOTE:

IN THE EVENT THAT THE PRESENCE OF HAZARDOUS

MATERIALS IS SUSPECT, THE CONTRACTOR SHALL

NOTIFY THE COR IMMEDIATELY FOR EVALUATION AND

TESTING. IF HAZARDOUS MATERIAL IS FOUND, THE

CONTRACTOR SHALL COORDINATE WITH THE COR TO

COMPLETE A SEPARATE ABATEMENT CONTRACT PRIOR

TO CONTINUING WITH ANY NEW WORK IN THIS AREA.

AutoCAD SHX Text S

AutoCAD SHX Text

TWT

AutoCAD SHX Text

PARTIAL-LOWER-LEVEL

AutoCAD SHX Text

JAH

AutoCAD SHX Text

TWT

AutoCAD SHX Text

ELECTRICAL-DEMOLITION-PLAN

AutoCAD SHX Text

1.ED100

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of 87

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FORT WAYNE, INDIANA

AutoCAD SHX Text

CORRECT OIT DEFICIENCIES

AutoCAD SHX Text 610A4-16-101

AutoCAD SHX Text 2/13/2018

AutoCAD SHX Text

CERTIFICATION:

AutoCAD SHX Text

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text

ELECTRICAL DEMOLITION NOTES

AutoCAD SHX Text

GENERAL ELECTRICAL DEMO NOTES

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text No.PE 10303057

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text A.

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text E

S.

EL

EC

EL

EC

IT

RA

CK

PANEL

PH

ON

ES

NURSE CALL

EXISTING

MECH

EXISTING

ROOM

EXISTING

CORRIDOR

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

PANELPANEL

TR

AN

S.

UPS

OH

P

AG

IN

G

EL

EC

EL

EC

EL

EC

EXISTING

MECHANICAL

UNIT

CAM

PA

NE

L

CR

-1

PANEL

EQ1A

PANEL

EM1A

PANEL

LP1N

PT

AC

EXISTING

CORRIDOR

EXISTING

OFFICE

EXISTING

ROOM

EXISTING

CORRIDOR

EXISTING

ROOM

EXISTING

OIT CLOSET

176A

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

IT RACK IT RACK

CA

M

UPS

SERVICE

ELEVATOR

PA

NE

LCP GRND

PA

NE

L

IT CAB

PANELS

SHELVING

PA

NE

L

CR

-1

A

SCALE: 1/4" = 1'-0"

ELECTRICAL - DEMOLITION PLAN - ROOM 155 OIT CLOSET 1

1.ED101

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

FIRST FLOOR

SCALE: 1/4" = 1'-0"

ELECTRICAL - DEMOLITION PLAN - ROOM 176A OIT CLOSET 2

1.ED101

DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE AND LIGHT SWITCH. EXISTING

CIRCUIT SHALL REMAIN FOR RE-USE. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL

WORK IN THIS AREA.

1. REFER TO ELECTRICAL SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS

FOR EQUIPMENT INSTALLATION REQUIREMENTS.

2. CONTRACTORS SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES ON SITE.

3. PROTECT ALL EXISTING EQUIPMENT AND FINISHES FROM DUST, DEBRIS AND DAMAGE.

4. ALL WORK TO BE IN ACCORDANCE TO LOCAL, STATE AND NATIONAL ELECTRIC

CODES.

5. E.C. SHALL DISCONNECT AND REMOVE ALL ELECTRICAL DEVICES IN WALLS TO BE

DEMOLISHED.

6. E.C. SHALL DISCONNECT ALL MECHANICAL AND PLUMBING DEVICES TO BE

DEMOLISHED.

7. ALL DEMOLISHED ELECTRICAL ITEMS SHALL BE OFFERED TO THE COR FOR SALVAGE.

IF THE VA DOES NOT ACCEPT ITEMS, CONTRACTOR SHALL REMOVE THEM FROM SITE

AND SHALL LEGALLY DISPOSE OF ALL ITEMS.

DISCONNECT AND REMOVE EXISTING FEEDER BETWEEN EXISTING UPS AND EXISTING

PANEL DP-TELE-A. REMOVE CONDUCTORS, CONDUIT AND ALL APPURTENANCES. SEE

SHEET 1.ES100 FOR ADDITIONAL INFORMATION.

DISCONNECT EXISTING HVAC UNIT FOR REMOVAL BY MECHANICAL CONTRACTORS.

DISCONNECT AND REMOVE OUTLET/JUNCTION BOX, CIRCUIT, CONDUIT AND ALL

APPURTENANCES BACK TO PANEL AND UPDATE PANEL SCHEDULE.

DISCONNECT EXISTING LIGHT FIXTURES FOR RELOCATION. EXISTING CIRCUIT SHALL

BE RE-USED. SEE NEW ELECTRICAL PLAN FOR ADDITIONAL WORK IN THIS AREA.

TEMPORARILY DISCONNECT AND REMOVE EXISTING DOOR ACCESS SYSTEM AND

TURN OVER TO OWNER. INSTALLATION NOT IN THIS CONTRACT.5

DISCONNECT AND REMOVE EXISTING LIGHT SWITCH, BACKBOX AND

APPURTENANCES. EXISTING CIRCUIT SHALL BE REMOVED TO ABOVE CEILING AND

RE-USED. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL WORK IN THIS AREA.

DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE, CIRCUIT, CONDUIT AND ALL

APPURTENANCES BACK TO PANEL.

NOTE:

SEE SHEET 1.ES100 FOR LIGHT FIXTURE SCHEDULE.

NOTE:

ALL NON-OIT RELATED EQUIPMENT AND WALL

ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,

HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO

PERFORMING DEMOLITION OR NEW CONSTRUCTION

WORK, AND SALVAGED FOR REUSE. COORDINATE WITH

THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.

NOTE:

THE CONTRACTOR SHALL NOT DAMAGE, MOVE,

DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR

RELATED APPURTENANCES WITHOUT THE FIRST

APPROVAL AND SUPERVISION OF THE OIT MANAGER OR

DESIGNATED PERSON.

NOTE:

ANY WORK PERFORMED BY THE CONTRACTOR THE VA

RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO

SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND

PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY

/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS

OR CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROTECT EXISTING CEILING,

FLOOR, AND WALLS FROM DAMAGE DURING

CONSTRUCTION AND IMPLEMENTATION OF INFECTION

AND DUST CONTROL BARRIERS. AFTER THE REMOVAL

OF TEMPORARY BARRIERS, TOUCH UP PAINT ON

CEILINGS AND WALLS AS NEEDED TO SHOW NO

EVIDENCE OF CONSTRUCTION.

NOTE:

SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM

REQUIREMENTS, DETAILS AND PHASING NOTES.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS

ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN

EXISTING MECHANICAL AND PIPING EQUIPMENT.

CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR

WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUI…