36C25019B0007-011.pdf
PDF 6 MB Posted
- Attached to
- Correct OIT Deficiencies 610A4-16-101 Federal contract opportunity
- Solicitation number
- 36C25019B0007
About this file
36C25019B0007 Drawings 6 of 11.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019C0184-000.docx | DOCX document | |
| VA251-15-D-0142-000.docx | DOCX document | |
| 36C25019B0007-0007004.docx | DOCX document | |
| 36C25019B0007-0006000.docx | DOCX document | |
| 36C25019B0007-0005000.docx | DOCX document | |
| 36C25019B0007-0004000.docx | DOCX document | |
| 36C25019B0007-0003001.pdf | ||
| 36C25019B0007-0003000.docx | DOCX document | |
| 36C25019B0007-0002000.docx | DOCX document | |
| 36C25019B0007-0001000.docx | DOCX document | |
| 36C25019B0007-009.pdf | ||
| 36C25019B0007-007.pdf | ||
| 36C25019B0007-001.docx | DOCX document | |
| 36C25019B0007-010.pdf | ||
| 36C25019B0007-004.pdf | ||
| 36C25019B0007-013.pdf | ||
| 36C25019B0007-016.pdf | ||
| 36C25019B0007-014.pdf | ||
| 36C25019B0007-012.pdf | ||
| 36C25019B0007-005.docx | DOCX document | |
| 36C25019B0007-003.doc | DOC document | |
| 36C25019B0007-006.pdf | ||
| 36C25019B0007-015.pdf | ||
| 36C25019B0007-008.pdf | ||
| 36C25019B0007-002.pdf | ||
| 36C25019B0007-000.docx | DOCX document |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EL
EC
HVAC
EXISTING
CORRIDOR
A02
EXISTING
VESTIBULE
A03
EXISTING
MAIN SERVER
A057
EXISTING
ROOM
A058
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
HVAC
EL
EC
EL
EC
SERVER / TELECOM
SERVER / TELECOM
M
ET
ER
UPS
UPS
TOOL
CART
CABLE TRAYRACK
SHELVING
HB
3/4" CW
3/4" CW
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
LOWER LEVEL
SCALE: 1/4" = 1'-0"
PLUMBING - PLAN - PARTIAL LOWER LEVEL 1
1.PL100
1. ALL WORK SHALL CONFORM TO STATE AND LOCAL PLUMBING AND
BACKFLOW PREVENTION CODES, AND THE REQUIREMENTS OF THE
LOCAL WATER UTILITY.
2. EQUIPMENT, DOMESTIC WATER PIPING, SANITARY WASTE, SANITARY
VENT, AND STORM PIPING LAYOUTS ARE SCHEMATIC IN NATURE.
CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE
WITH OTHER TRADES DURING CONSTRUCTION BY ADDING OFFSETS
AND ELBOWS WHERE REQUIRED.
3. VACUUM BREAKERS MUST BE INSTALLED ON ALL EXISTING OR
PROPOSED HOSE THREAD FITTINGS, INCLUDING BUT NOT LIMITED TO
HOSE BIBBS, WALL / YARD HYDRANTS, MOP / SERVICE SINKS.
4. A CROSS-CONNECTION CONTROL DEVICE INSPECTOR SHALL TEST ALL
BACKFLOW DEVICES AT THE TIME OF INSTALLATION AND SUBMIT
REPORTS TO THE LOCAL WATER UTILITY AS REQUIRED.
5. ALL WATER LINES 3" AND LARGER MUST BE DISINFECTED PER ANSI/
AWWA C651-92. SAMPLES FROM 2 CONSECUTIVE DAYS MUST BE
TAKEN TO AN APPROVED TEST LAB. LAB ANALYSES REPORTS SHALL BE
SUBMITTED TO THE LOCAL WATER UTILITY AS REQUIRED FOR
COMPLIANCE.
6. COORDINATE EXACT LOCATION OF ROOF DRAINS WITH ARCHITECTURAL
AND STRUCTURAL PLANS.
7. ALL MATERIALS INSTALLED WITHIN PLENUM SHALL HAVE FLAME SPREAD
RATING OF NOT MORE THEN 25 AND A SMOKE DEVELOPED RATING
NOT EXCEEDING 50 IN ACCORDANCE WITH STATE CODES.
8. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, AND
LABOR FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF PIPING
PENETRATING BUILDING CONSTRUCTION.
9. ALL EQUIPMENT USING NATURAL GAS SHALL HAVE A GAS COCK AND
DIRT LEG FOR EACH PIECE OF EQUIPMENT.
10. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS,
TYPICAL.
PROVIDE AND INSTALL TIE IN TO EXISTING CW PIPING AND EXTEND AS INDICATED.
PATCH AND REPAIR WALL AS REQUIRED TO MATCH EXISTING. CONTRACTOR TO
PROVIDE AND INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND
REMOVING EXISTING PIPING TO LIMIT SHUTDOWN TIME. REFER TO SHEET 1.PD100
FOR ADDITIONAL INFORMATION.
CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING AS
REQUIRED TO MAINTAIN FIRE RATING OF WALL. REFER TO ARCHITECTURAL DRAWINGS
FOR ADDITIONAL INFORMATION.
COORDINATE ROUTING OF NEW PIPING WITH EXISTING IT EQUIPMENT. NEW PIPING
SHALL NOT BE ROUTED ABOVE EXISTING EQUIPMENT.
VERTICAL PORTION OF EXISTING PIPING IN WALL TO REMAIN. NEW PIPING TIE INS TO
BE INSTALLED AT THE TOP OF PIPE RISER.
NOTE:
PATCH ALL ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF WALL.
NOTE:
CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING
CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS
A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
EC
HVAC
EXISTING
CORRIDOR
A02
EXISTING
VESTIBULE
A03
EXISTING
MAIN SERVER
A057
EXISTING
ROOM
A058
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
HVAC
EL
EC
EL
EC
SERVER / TELECOM
SERVER / TELECOM
M
ET
ER
UPS
UPS
TOOL
CART
CABLE TRAYRACK
SHELVING
REFRIGERANT LINE SET
REFRIGERANT LINE SET TO LIEBERT CONDENSER UNIT
REFRIGERANT LINE SET TO
INDOOR LIEBERT UNIT
EX
IS
TI
NG
HW
R
AD
IA
TO
R
HWS
HWR
HW
S
HW
R
2 2
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
LOWER LEVEL
SCALE: 1/4" = 1'-0"
MECHANICAL - DEMOLITION PLAN - PARTIAL LOWER LEVEL 1
1.MD100
REMOVE HOT WATER SUPPLY AND RETURN PIPING TO POINT INDICATED AND PREPARE
PIPING FOR NEW WORK. CONTRACTOR TO PROVIDE AND INSTALL NEW PIPING RUNS
AND TIE INS PRIOR TO DISCONNECTING AND REMOVING EXISTING PIPING TO LIMIT
SHUTDOWN TIME PERIOD. REFER TO SHEET 1.MH100 FOR ADDITIONAL INFORMATION.
REMOVE REFRIGERANT PIPING FOR LIEBERT UNIT TO POINT INDICATED AND PREPARE
FOR NEW WORK. RECOVER R-22 REFRIGERANT FOR REUSE. CONTRACTOR TO
PROVIDE AND INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND
REMOVING EXISTING PIPING TO LIMIT SHUTDOWN TIME PERIOD. REFER TO SHEET
1.MH100 FOR ADDITIONAL INFORMATION.
DISCONNECT AND REMOVE HWS AND HWR PIPING AT EXISTING RADIATOR AND
PREPARE UNIT FOR NEW WORK.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO
ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING
SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY
MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)
IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS
AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY
THE CONTRACTOR - DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS
AND DAMAGE DURING CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE.
BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND
DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF
CONSTRUCTION.
NOTE:
PATCH AND REPAIR ALL ABANDONED PENETRATIONS TO MAINTAIN FIRE RATING OF
WALLS.
NOTE:
CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING
CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS
A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.
NOTE:
THE VA SHALL RETAIN FIRST RIGHT OF REFUSAL FOR ALL PRODUCTS TO BE
REMOVED.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
TR
AN
S.
FD
PANEL
PH
ON
ES
EXISTING
MECH
A155
EXISTING
ROOM
A192
EXISTING
CORRIDOR
A154
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
(AREA FOR CONDENSER
ON ROOF-VERIFY WITH VA)
PANELPANEL
OPTICOM
TR
AN
S.
UPS
CAMERA
SW
ITC
H
EL
EC
SW
ITC
H
EL
EC
OH
P
AG
IN
G
EL
EC
EL
EC
IT
RA
CK
HWS
HWR
HW
S
HW
R
HWR
HWR
HW
S
S(15#)
COND
CO
ND
S(
HWP
HX
COND.
PUMP
COND.
PUMP
HWP
2"
1-1/2" 1-1/2"
2"
2" 1-1/2"
1 1
DB
EXISTING
CORRIDOR
EXISTING
OFFICE
EXISTING
ROOM
EXISTING
CORRIDOR
EXISTING
ROOM
EXISTING
OIT CLOSET
176A
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
IT RACK IT RACK
CA
M
ER
A
UPS
PA
NE
L
CP GRND
PA
NE
L
IT CAB
PANELS
SHELVING
PTAC L
2 2
SCALE: 1/4" = 1'-0"
MECHANICAL - DEMOLITION FLOOR PLAN - PARTIAL FIRST FLOOR 1
1.MD101
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
FIRST FLOOR
SCALE: 1/4" = 1'-0"
MECHANICAL - DEMOLITION FLOOR PLAN - PARTIAL FIRST FLOOR 2
1.MD101
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO
ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING
SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY
MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)
IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS
AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY
THE CONTRACTOR - DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS
AND DAMAGE DURING CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE.
BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND
DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF
CONSTRUCTION.
REMOVE STEAM AND CONDENSATE PIPING TO POINT INDICATED AND PREPARE PIPING
FOR NEW WORK. CONTRACTOR TO PROVIDE AND INSTALL NEW PIPING RUNS AND TIE
INS PRIOR TO DISCONNECTING AND REMOVING EXISTING PIPING TO LIMIT SHUTDOWN
TIME. REFER TO SHEET 1.MH101 FOR ADDITIONAL INFORMATION.
REMOVE PTAC UNIT COMPLETE INCLUDING ALL ASSOCIATED HARDWARE, WIRING,
CONTROLS, DUCTWORK, AND LOUVER. PATCH AND REPAIR WALL TO MATCH EXISTING.
REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
NOTE:
THE VA SHALL RETAIN FIRST RIGHT OF REFUSAL FOR ALL PRODUCTS TO BE
REMOVED.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
S.S. MEDICINE
CABINET
ELECSOV
EXISTING
CORRIDOR
A500
EXISTING
WAITING
A528
EXISTING
ROOM
A527
EXISTING
OIT CLOSET
528C
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
SERVICE
ELEVATOR
PTAC
L
SCALE: 1/4" = 1'-0"
MECHANICAL - DEMOLITION PLAN - PARTIAL FIFTH FLOOR 1
1.MD105
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
FIFTH FLOOR
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND/OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO
ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING
SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY
MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)
IMMEDIATELY.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS
AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY
THE CONTRACTOR - DAILY.
7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS
AND DAMAGE DURING CONSTRUCTION.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS NOTED OTHERWISE.
BUILDING DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS PRIOR TO BEGINNING OF CONSTRUCTION.
10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND
DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF
CONSTRUCTION.
REMOVE PTAC UNIT COMPLETE INCLUDING ALL ASSOCIATED HARDWARE, WIRING,
CONTROLS AND DUCTWORK. LOUVER IS TO REMAIN. PATCH AND REPAIR WALL TO
MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
NOTE:
THE VA SHALL RETAIN FIRST RIGHT OF REFUSAL FOR ALL PRODUCTS TO BE
REMOVED.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
EXISTING
CORRIDOR
A02
EXISTING
VESTIBULE
A03
EXISTING
MAIN SERVER
A057
EXISTING
ROOM
A058
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
REFRIGERANT LINE SET
EX
IS
TI
N G
H W
R A D
IA
TO
R
HW
S
HW
R
HWS
HWR
HW
S
HW
R
REFRIGERANT LINE SET TO LIEBERT CONDENSER UNIT
REFRIGERANT LINE SET TO
INDOOR LIEBERT UNIT
EXISTING
CORRIDOR
A01
EXISTING
CORRIDOR
A02
EXISTING
HALL
A60
EXISTING
ROOM
A62
EXISTING
ROOM
A61
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
EXISTING
OIT CLOSET
A63
EXISTING
EMS
A63A
EXISTING
LOADING DOCK
EXISTING
N&FS
HWS
HWR
FD
AC-1-A63
SUCTION
LIQUID
1/4" DRAIN
D
8 9
AC-1-A63
3/4"
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
LOWER LEVEL
SCALE: 1/4" = 1'-0"
MECHANICAL - PLAN - PARTIAL LOWER LEVEL 1
1.MH100
SCALE: 1/4" = 1'-0"
MECHANICAL - PLAN - PARTIAL LOWER LEVEL 2
1.MH100
PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING
ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, CONDENSATE PUMP,
AND ACCESSORIES. MAINTAIN ALL REQUIRED CLEARANCES PER MANUFACTURERS
RECOMMENDED INSTALLATION.
ROUTE SUCTION, LIQUID, AND CONDENSATE PIPING UP THROUGH ROOF FOR FINAL
CONNECTION TO ACCU. REFER TO DRAWING 1.MH101 FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL TIE INTO EXISTING HOT WATER SUPPLY AND RETURN PIPING AND
EXTEND AS INDICATED FOR FINAL CONNECTION TO EXISTING CEILING HUNG UNIT IN EXISTING VESTIBULE A03. MATCH EXISTING PIPING SIZE. PROVIDE AND INSTALL NEW SHUTOFF VALVES
AND CONTROL VALVES FOR EXISTING UNIT AS REQUIRED. CONTRACTOR TO PROVIDE AND
INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND REMOVING EXISTING
PIPING TO LIMIT SHUTDOWN TIME. REFER TO SHEET 1.MD100 FOR ADDITIONAL
INFORMATION.
PROVIDE AND INSTALL TIE INTO EXISTING REFRIGERANT LINE SET. REFRIGERANT PIPING SIZED
TO MATCH EXISTING. RECHARGE REFRIGERANT SYSTEM USING RECOVERED R-22
REFRIGERANT. PROVIDE ADDITIONAL R-22 AS REQUIRED FOR A COMPLETE AND
FUNCTIONING SYSTEM. CONTRACTOR TO PROVIDE AND INSTALL NEW PIPING RUNS AND TIE
INS PRIOR TO DISCONNECTING AND REMOVING EXISTING PIPING TO LIMIT SHUTDOWN TIME.
REFER TO SHEET 1.MD100 FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL STAINLESS STEEL DRIP PAN ENCLOSURE AND WET SENSOR AROUND
HOT WATER SUPPLY AND RETURN PIPING. CONTRACTOR SHALL FIELD VERIFY REQUIRED
ENCLOSURE DIMENSION TO FULLY CONCEAL PIPING. WET SENSOR TO BE STAND ALONE WITH
AUDIBLE ALARM. ROUTE 3/4" DRAIN PIPING THROUGH WALL TO EXISTING FLOOR DRAIN
LOCATED IN EXISTING EMS A63A. PATCH AND REPAIR WALL TO MAINTAIN EXISTING FIRE
RATING AND MATCH SURROUNDING CONDITIONS. REFER TO DRIP PAN ENCLOSURE DETAILS
ON SHEET MG001 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING. REFER TO
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
COORDINATE ROUTING OF NEW PIPING WITH EXISTING IT EQUIPMENT. NEW PIPING SHALL NOT
BE ROUTED ABOVE EXISTING EQUIPMENT.
PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.
PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.
TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER PIPING AND ROUTE AS
INDICATED. TERMINATE 3/4" COPPER CONDENSATE PIPING THROUGH SIDE OF NEW PIPE
CURB FOR CONDENSATE DISCHARGE ONTO ROOF. REFER TO PIPE CURB DETAIL ON SHEET
MG001 FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL REFRIGERANT PIPING AND CONDENSATE DRAIN HOSE SIZED PER
MANUFACTURERS RECOMMENDATION.
1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.
2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.
CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER
TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE
REQUIRED.
3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED
MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.
4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.
5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS
AND ARCHITECTURAL CEILING PLAN.
6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS
NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE
A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.
7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR
REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL
PENETRATING BUILDING CONSTRUCTION.
8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.
9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.
10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS
SHOWN ON CONTRACT DETAIL SHEET.
11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.
NOTE:
CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING
CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS
A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
S.
FD
PANEL
PH
ON
ES
EXISTING
MECH
A155
EXISTING
ROOM
A192
EXISTING
CORRIDOR
A154
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
PANELPANEL
OPTICOM
TR
AN
S.
SW
ITC
H
EL
EC
SW
ITC
H
EL
EC
EL
EC
EL
EC
HWS
HWR
HW
S
HW
R
HWR
HWR
HW
S
S(15#)
COND
CO
ND
S(
HWP
HX
COND.
PUMP
COND.
PUMP
HWP
2"
1-1/2"
1-1/2"
2"
2" 1-1/2"
S(
CO
ND
AC
-1
-A
ACCU-1-A155
(ON ROOF)
SUCTION
LIQUID
D
AC-1-A155
D
3/4"
3/4"
DB
EXISTING
CORRIDOR
EXISTING
OFFICE
EXISTING
ROOM
EXISTING
CORRIDOR
EXISTING
ROOM
EXISTING
OIT CLOSET
176A
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
AC-1-176A1
ACCU-1-176A
(ON ROOF)
ACCU-1-A63
(ON ROOF)
3/4" DRAIN
SUCTION
LIQUID
3/4" DRAIN
SUCTION
LIQUID
AC-1-176A
SCALE: 1/4" = 1'-0"
MECHANICAL - FLOOR PLAN - PARTIAL FIRST FLOOR 1
1.MH101
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
FIRST FLOOR
SCALE: 1/4" = 1'-0"
MECHANICAL - FLOOR PLAN - PARTIAL FIRST FLOOR 2
1.MH101
PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING
ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, AND ACCESSORIES.
MAINTAIN ALL REQUIRED CLEARANCES PER MANUFACTURERS RECOMMENDED INSTALLATION.
TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER PIPING AND ROUTE AS
INDICATED.
PROVIDE AND INSTALL OUTDOOR CONDENSER UNIT AND EQUIPMENT SUPPORTS, FLASHED
IN EQUIPMENT CURB, AND PIPE SUPPORTS LOCATED ON GROUND FLOOR ROOF. ANCHOR
ALL EQUIPMENT FOR A COMPLETE INSTALLATION. COORDINATE LOCATION OF NEW
EQUIPMENT WITH REQUIRED CLEARANCES AND EXISTING CONDITIONS. REFER TO
ARCHITECTURAL DRAWING AS201 FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL TIE IN TO EXISTING STEAM AND CONDENSATE PIPING AND ROUTE AS
INDICATED TO MAINTAIN CLEARANCE FROM NEW OIT PARTITION. CONTRACTOR TO PROVIDE
AND INSTALL NEW PIPING RUNS AND TIE INS PRIOR TO DISCONNECTING AND REMOVING
EXISTING PIPING TO LIMIT SHUTDOWN TIME. REFER TO SHEET 1.MD101 FOR ADDITIONAL
INFORMATION.
REFER TO DRAWING 1.MH100 FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL FLASHED IN PIPE CURB AND ROUTE REFRIGERANT LINE SET UP
THROUGH ROOF FOR FINAL CONNECTION TO ACCU. TERMINATE 3/4" COPPER CONDENSATE
PIPING THROUGH SIDE OF NEW PIPE CURB FOR CONDENSATE DISCHARGE ONTO ROOF.
REFER TO PIPE CURB DETAIL ON SHEET MG001 AND ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
PROVIDE AND INSTALL STAINLESS STEEL DRIP PAN AND WET SENSOR UNDER ALL PIPING
INCLUDING HOT WATER SUPPLY, HOT WATER RETURN AND DOMESTIC WATER PIPING. WET
SENSOR TO BE STAND ALONE WITH AUDIBLE ALARM. ROUTE 3/4" DRAIN PIPE FROM DRIP PAN
DOWN TO EXISTING FLOOR DRAIN AS INDICATED AND TERMINATE.
PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.
ROUTE REFRIGERANT AND CONDENSATE DRAIN PIPING THROUGH EXISTING LOUVER OPENING
THAT IS TO BE INFILLED. SEAL OPENINGS AROUND PIPING. TERMINATE 3/4" COPPER
CONDENSATE PIPING OUTSIDE ONTO ROOF. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
ROUTE CONDENSATE PIPING ON NORTH SIDE OF NEW PARTITION AND FASTEN TO PARTITION.
TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER PIPING AND TERMINATE
AT FLOOR DRAIN AS INDICATED.
PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.
PROVIDE AND INSTALL REFRIGERANT PIPING SIZED PER MANUFACTURERS
RECOMMENDATION.
1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.
2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.
CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER
TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE
REQUIRED.
3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED
MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.
4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.
5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS
AND ARCHITECTURAL CEILING PLAN.
6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS
NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE
A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.
7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR
REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL
PENETRATING BUILDING CONSTRUCTION.
8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.
9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.
10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS
SHOWN ON CONTRACT DETAIL SHEET.
11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
ROOM
EXISTING
CORRIDOR
EXISTING
CORRIDOR
EXISTING
RESTROOM
210B
EXISTING
BREAK ROOM
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
IT
CLOSET
210C
DUMBWAITER
SERVICE
ELEVATOR
EXISTING
STORAGE
210A
FRIDGE
CHASE
ACCU-1-A210
(ON ROOF)
AC-1-A210
SUCTION
LIQUID
3/4" DRAIN
AC-1-A210
SCALE: 1/4" = 1'-0"
MECHANICAL - PLAN - PARTIAL SECOND FLOOR 1
1.MH102
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
SECOND FLOOR
PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING
ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, CONDENSATE PUMP,
AND ACCESSORIES. TRANSITION VINYL CONDENSATE DISCHARGE TUBE TO 3/4" COPPER
PIPING AND ROUTE AS INDICATED. MAINTAIN ALL REQUIRED CLEARANCES PER
MANUFACTURERS RECOMMENDED INSTALLATION.
PROVIDE AND INSTALL OUTDOOR CONDENSER UNIT AND EQUIPMENT SUPPORTS, FLASHED
IN EQUIPMENT CURB, AND PIPE SUPPORTS. ANCHOR ALL EQUIPMENT FOR A COMPLETE
INSTALLATION. COORDINATE LOCATION OF NEW EQUIPMENT WITH REQUIRED CLEARANCES
AND EXISTING CONDITIONS. REFER TO ARCHITECTURAL DRAWING AS201 FOR ADDITIONAL
INFORMATION.
PROVIDE AND INSTALL REFRIGERANT LINE SET AND CONDENSATE DRAIN PIPING ROUTED
ABOVE CEILING.
CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING. REFER TO
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL REFRIGERANT LINE SET AND CONDENSATE PIPING ROUTED DOWN
EXTERIOR WALL FOR FINAL CONNECTION TO ACCU-1-A210 LOCATED ON FIRST FLOOR ROOF.
PROVIDE AND INSTALL ANCHORED STAINLESS STEEL WALL SUPPORTS FOR VERTICAL RUN OF
PIPING. TERMINATE 3/4" COPPER CONDENSATE PIPING OUTSIDE ONTO ROOF.
PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.
PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.
PROVIDE AND INSTALL REFRIGERANT PIPING SIZED PER MANUFACTURERS
RECOMMENDATION.
1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.
2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.
CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER
TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE
REQUIRED.
3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED
MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.
4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.
5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS
AND ARCHITECTURAL CEILING PLAN.
6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS
NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE
A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.
7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR
REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL
PENETRATING BUILDING CONSTRUCTION.
8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.
9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.
10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS
SHOWN ON CONTRACT DETAIL SHEET.
11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.
NOTE:
CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING
CEILING TILES AND GRID AFFECTED BY THIS WORK. REPLACE ANY TILES DAMAGED AS
A RESULT OF THE ABOVE WORK. TILES SHALL MATCH SURROUNDING CONDITIONS.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
ELECSOV
CORRIDOR
A500
EXISTING
WAITING
A528
EXISTING
ROOM
A527
EXISTING
OIT CLOSET
528C
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
SERVICE
ELEVATOR
ACCU-1-528C
(ON ROOF)
AC-1-528C
3/4" DRAIN
SUCTION
LIQUID
AC-1-528C
SCALE: 1/4" = 1'-0"
MECHANICAL - PLAN - PARTIAL FIFTH FLOOR 1
1.MH105
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netV IRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
FIFTH FLOOR
PROVIDE AND INSTALL NEW SPLIT SYSTEM AIR CONDITIONING UNIT COMPLETE INCLUDING
ALL MOUNTING HARDWARE, REFRIGERANT PIPING, CONDENSATE DRAIN, CONDENSATE PUMP,
AND ACCESSORIES. MAINTAIN ALL REQUIRED CLEARANCES PER MANUFACTURERS
RECOMMENDED INSTALLATION.
PROVIDE AND INSTALL OUTDOOR CONDENSER UNIT AND EQUIPMENT SUPPORTS, FLASHED
IN EQUIPMENT CURB, AND PIPE SUPPORTS. ANCHOR ALL EQUIPMENT FOR A COMPLETE
INSTALLATION. REFER TO ARCHITECTURAL DRAWING AS201 FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL FLASHED IN PIPE CURB AND ROUTE REFRIGERANT LINE SET UP
THROUGH ROOF FOR FINAL CONNECTION TO ACCU. TRANSITION VINYL CONDENSATE
DISCHARGE TUBE TO 3/4" COPPER PIPING AND ROUTE AS INDICATED. TERMINATE 3/4"
COPPER CONDENSATE PIPING THROUGH SIDE OF NEW PIPE CURB FOR CONDENSATE
DISCHARGE ONTO ROOF. REFER TO PIPE CURB DETAIL ON SHEET MG001 AND
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. COORDINATE LOCATION OF
NEW EQUIPMENT AND PIPING WITH REQUIRED CLEARANCES AND EXISTING WALKWAY ON
ROOF.
CORE DRILL OPENING FOR ROUTING OF PIPING. PATCH AND SEAL OPENING. REFER TO
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
PROVIDE AND INSTALL NEW THERMOSTAT FOR CORRESPONDING AC UNIT.
PROVIDE AND INSTALL NEW TEMPERATURE SENSOR COMPLETE AND TIE INTO EXISTING BMS.
PROVIDE AND INSTALL REFRIGERANT PIPING AND CONDENSATE DRAIN HOSE SIZED PER
MANUFACTURERS RECOMMENDATION.
1. COORDINATE ALL WORK WITH OTHER TRADES AS REQUIRED.
2. EQUIPMENT, PIPING, AND DUCTWORK LAYOUTS ARE SCHEMATIC IN NATURE.
CONTRACTOR MUST ADJUST TO FIELD CONDITIONS AND COORDINATE WITH OTHER
TRADES DURING CONSTRUCTION BY ADDING OFFSETS AND ELBOWS WHERE
REQUIRED.
3. PRIOR TO INSTALLATION THE ENGINEER SHALL APPROVE ALL PROPOSED
MODIFICATIONS TO DUCTWORK LAYOUT AND DESIGN.
4. ALL SUPPLY AIR DUCTWORK SHALL BE INSULATED (WRAPPED) PER SPECIFICATIONS.
5. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND GRILLES WITH LIGHTS
AND ARCHITECTURAL CEILING PLAN.
6. FLEXIBLE DUCT SHALL BE USED WHERE INDICATED, FOR STRAIGHT LINE SEGMENTS
NOT EXCEEDING 6 FEET WHEN CONNECTING DIFFUSERS TO RIGID DUCTWORK ABOVE
A REMOVABLE CEILING. USE RIGID METAL ELBOWS FOR CHANGES IN DIRECTION.
7. THIS CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR
REQUIRED FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF MATERIAL
PENETRATING BUILDING CONSTRUCTION.
8. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL.
9. ALL SIZES ON DUCTWORK ARE IN INCHES UNLESS NOTED OTHERWISE.
10. SHEET METAL CONTRACTOR SHALL FABRICATE ALL DUCT TAKE-OFF FITTINGS AS
SHOWN ON CONTRACT DETAIL SHEET.
11. DUCT SIZES LISTED ARE "FREE AREA" AND SHALL NOT BE REDUCED.
NOTE:
CONTRACTOR SHALL VENT NEGATIVE AIR UNIT TO THE OUTSIDE WHENEVER POSSIBLE
AND ENSURE THAT THE OUTLET IS A MINIMUM 10 FEET AWAY FROM ANY
MECHANICAL AIR INTAKES.
NOTE:
FOR ANY WORK PERFORMED BY THE CONTRACTOR, THE VA RESERVES THE RIGHT TO
PROVIDE AN OIT ESCORT TO SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND PROVIDE A 2 WEEK NOTICE FOR
STAFF TO REMOVE ANY / ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS OR
CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS ADVANCE NOTICE FOR WORK THAT
MAY SHUTDOWN EXISTING MECHANICAL AND PIPING EQUIPMENT. CONTRACTOR SHALL
PROVIDE A 4 WEEK NOTICE FOR WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
EC
HVAC
EXISTING
CORRIDOR
EXISTING
VESTIBULE
EXISTING
MAIN SERVER
EXISTING
ROOM
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
HVAC
EL
EC
EL
EC
SERVERS / TELECOM
SERVERS/ TELECOM
M
ET
ER
UPS
UPS
RACK
TOOL
CART
CABLE TRAY
SHELVING
PANEL
DP-TELE-A
IT RACK
PHONES
EXISTING
CORRIDOR
EXISTING
CORRIDOR
EXISTING
HALL
EXISTING
ROOM
EXISTING
ROOM
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CONSTRUCTION LIMIT LINE
EXISTING
OIT CLOSET
EXISTING
EMS
63A
EXISTING
LOADING DOCK
EXISTING
N&FS
SERVICE
ELEVATOR
CABLE TRAY ABOVE
WALL MOUNTED PANELS ON PLYWOOD
UP
S
ELEC
ELEC
CAM
(AREA ON ROOF ABOVE FOR
NEW CONDENSER FOR
ROOM 063)
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
LOWER LEVEL
SCALE: 1/4" = 1'-0"
ELECTRICAL - DEMOLITION PLAN - ROOM 057 MAIN SERVER1
1.ED100SCALE: 1/4" = 1'-0"
ELECTRICAL - DEMOLITION PLAN - ROOM 063 OIT CLOSET 2
1.ED100
DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE AND LIGHT SWITCH. EXISTING
CIRCUIT SHALL REMAIN FOR RE-USE. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL
WORK IN THIS AREA.
1. REFER TO ELECTRICAL SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS
FOR EQUIPMENT INSTALLATION REQUIREMENTS.
2. CONTRACTORS SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES ON SITE.
3. PROTECT ALL EXISTING EQUIPMENT AND FINISHES FROM DUST, DEBRIS AND DAMAGE.
4. ALL WORK TO BE IN ACCORDANCE TO LOCAL, STATE AND NATIONAL ELECTRIC
CODES.
5. E.C. SHALL DISCONNECT AND REMOVE ALL ELECTRICAL DEVICES IN WALLS TO BE
DEMOLISHED.
6. E.C. SHALL DISCONNECT ALL MECHANICAL AND PLUMBING DEVICES TO BE
DEMOLISHED.
7. ALL DEMOLISHED ELECTRICAL ITEMS SHALL BE OFFERED TO THE COR FOR SALVAGE.
IF THE VA DOES NOT ACCEPT ITEMS, CONTRACTOR SHALL REMOVE THEM FROM SITE
AND SHALL LEGALLY DISPOSE OF ALL ITEMS.
DISCONNECT AND REMOVE EXISTING FEEDER BETWEEN EXISTING UPS AND EXISTING
PANEL DP-TELE-A. REMOVE CONDUCTORS, CONDUIT AND ALL APPURTENANCES. SEE
SHEET 1.ES100 FOR ADDITIONAL INFORMATION.
DISCONNECT EXISTING HVAC UNIT FOR REMOVAL BY MECHANICAL CONTRACTORS.
DISCONNECT AND REMOVE OUTLET/JUNCTION BOX, CIRCUIT, CONDUIT AND ALL
APPURTENANCES BACK TO PANEL AND UPDATE PANEL SCHEDULE.
DISCONNECT EXISTING LIGHT FIXTURES FOR RELOCATION. EXISTING CIRCUIT SHALL
BE RE-USED. SEE NEW ELECTRICAL PLAN FOR ADDITIONAL WORK IN THIS AREA.
TEMPORARILY DISCONNECT AND REMOVE EXISTING DOOR ACCESS SYSTEM AND
TURN OVER TO OWNER. INSTALLATION NOT IN THIS CONTRACT.5
DISCONNECT AND REMOVE EXISTING LIGHT SWITCH, BACKBOX AND
APPURTENANCES. EXISTING CIRCUIT SHALL BE REMOVED TO ABOVE CEILING AND
RE-USED. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL WORK IN THIS AREA.
DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE, CIRCUIT, CONDUIT AND ALL
APPURTENANCES BACK TO PANEL.
NOTE:
SEE SHEET 1.ES100 FOR LIGHT FIXTURE SCHEDULE.
NOTE:
ALL NON-OIT RELATED EQUIPMENT AND WALL
ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,
HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO
PERFORMING DEMOLITION OR NEW CONSTRUCTION
WORK, AND SALVAGED FOR REUSE. COORDINATE WITH
THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.
NOTE:
THE CONTRACTOR SHALL NOT DAMAGE, MOVE,
DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR
RELATED APPURTENANCES WITHOUT THE FIRST
APPROVAL AND SUPERVISION OF THE OIT MANAGER OR
DESIGNATED PERSON.
NOTE:
ANY WORK PERFORMED BY THE CONTRACTOR THE VA
RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO
SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND
PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY
/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS
OR CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROTECT EXISTING CEILING,
FLOOR, AND WALLS FROM DAMAGE DURING
CONSTRUCTION AND IMPLEMENTATION OF INFECTION
AND DUST CONTROL BARRIERS. AFTER THE REMOVAL
OF TEMPORARY BARRIERS, TOUCH UP PAINT ON
CEILINGS AND WALLS AS NEEDED TO SHOW NO
EVIDENCE OF CONSTRUCTION.
NOTE:
SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM
REQUIREMENTS, DETAILS AND PHASING NOTES.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS
ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN
EXISTING MECHANICAL AND PIPING EQUIPMENT.
CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR
WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
NOTE:
NOT ALL KEYNOTES ARE USED ON EVERY SHEET.
CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR
COMPLETE SCOPE OF WORK IN EACH SPACE.
NOTE:
IN THE EVENT THAT THE PRESENCE OF HAZARDOUS
MATERIALS IS SUSPECT, THE CONTRACTOR SHALL
NOTIFY THE COR IMMEDIATELY FOR EVALUATION AND
TESTING. IF HAZARDOUS MATERIAL IS FOUND, THE
CONTRACTOR SHALL COORDINATE WITH THE COR TO
COMPLETE A SEPARATE ABATEMENT CONTRACT PRIOR
TO CONTINUING WITH ANY NEW WORK IN THIS AREA.
AutoCAD SHX Text S
AutoCAD SHX Text
TWT
AutoCAD SHX Text
PARTIAL-LOWER-LEVEL
AutoCAD SHX Text
JAH
AutoCAD SHX Text
TWT
AutoCAD SHX Text
ELECTRICAL-DEMOLITION-PLAN
AutoCAD SHX Text
1.ED100
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of 87
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FORT WAYNE, INDIANA
AutoCAD SHX Text
CORRECT OIT DEFICIENCIES
AutoCAD SHX Text 610A4-16-101
AutoCAD SHX Text 2/13/2018
AutoCAD SHX Text
CERTIFICATION:
AutoCAD SHX Text
AutoCAD SHX Text Engineering and Facilities Management Services
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
ELECTRICAL DEMOLITION NOTES
AutoCAD SHX Text
GENERAL ELECTRICAL DEMO NOTES
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text No.PE 10303057
AutoCAD SHX Text J
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text A.
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text E
S.
EL
EC
EL
EC
IT
RA
CK
PANEL
PH
ON
ES
NURSE CALL
EXISTING
MECH
EXISTING
ROOM
EXISTING
CORRIDOR
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
PANELPANEL
TR
AN
S.
UPS
OH
P
AG
IN
G
EL
EC
EL
EC
EL
EC
EXISTING
MECHANICAL
UNIT
CAM
PA
NE
L
CR
-1
PANEL
EQ1A
PANEL
EM1A
PANEL
LP1N
PT
AC
EXISTING
CORRIDOR
EXISTING
OFFICE
EXISTING
ROOM
EXISTING
CORRIDOR
EXISTING
ROOM
EXISTING
OIT CLOSET
176A
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
IT RACK IT RACK
CA
M
UPS
SERVICE
ELEVATOR
PA
NE
LCP GRND
PA
NE
L
IT CAB
PANELS
SHELVING
PA
NE
L
CR
-1
A
SCALE: 1/4" = 1'-0"
ELECTRICAL - DEMOLITION PLAN - ROOM 155 OIT CLOSET 1
1.ED101
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
FIRST FLOOR
SCALE: 1/4" = 1'-0"
ELECTRICAL - DEMOLITION PLAN - ROOM 176A OIT CLOSET 2
1.ED101
DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE AND LIGHT SWITCH. EXISTING
CIRCUIT SHALL REMAIN FOR RE-USE. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL
WORK IN THIS AREA.
1. REFER TO ELECTRICAL SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS
FOR EQUIPMENT INSTALLATION REQUIREMENTS.
2. CONTRACTORS SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES ON SITE.
3. PROTECT ALL EXISTING EQUIPMENT AND FINISHES FROM DUST, DEBRIS AND DAMAGE.
4. ALL WORK TO BE IN ACCORDANCE TO LOCAL, STATE AND NATIONAL ELECTRIC
CODES.
5. E.C. SHALL DISCONNECT AND REMOVE ALL ELECTRICAL DEVICES IN WALLS TO BE
DEMOLISHED.
6. E.C. SHALL DISCONNECT ALL MECHANICAL AND PLUMBING DEVICES TO BE
DEMOLISHED.
7. ALL DEMOLISHED ELECTRICAL ITEMS SHALL BE OFFERED TO THE COR FOR SALVAGE.
IF THE VA DOES NOT ACCEPT ITEMS, CONTRACTOR SHALL REMOVE THEM FROM SITE
AND SHALL LEGALLY DISPOSE OF ALL ITEMS.
DISCONNECT AND REMOVE EXISTING FEEDER BETWEEN EXISTING UPS AND EXISTING
PANEL DP-TELE-A. REMOVE CONDUCTORS, CONDUIT AND ALL APPURTENANCES. SEE
SHEET 1.ES100 FOR ADDITIONAL INFORMATION.
DISCONNECT EXISTING HVAC UNIT FOR REMOVAL BY MECHANICAL CONTRACTORS.
DISCONNECT AND REMOVE OUTLET/JUNCTION BOX, CIRCUIT, CONDUIT AND ALL
APPURTENANCES BACK TO PANEL AND UPDATE PANEL SCHEDULE.
DISCONNECT EXISTING LIGHT FIXTURES FOR RELOCATION. EXISTING CIRCUIT SHALL
BE RE-USED. SEE NEW ELECTRICAL PLAN FOR ADDITIONAL WORK IN THIS AREA.
TEMPORARILY DISCONNECT AND REMOVE EXISTING DOOR ACCESS SYSTEM AND
TURN OVER TO OWNER. INSTALLATION NOT IN THIS CONTRACT.5
DISCONNECT AND REMOVE EXISTING LIGHT SWITCH, BACKBOX AND
APPURTENANCES. EXISTING CIRCUIT SHALL BE REMOVED TO ABOVE CEILING AND
RE-USED. SEE NEW ELECTRICAL PLANS FOR ADDITIONAL WORK IN THIS AREA.
DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE, CIRCUIT, CONDUIT AND ALL
APPURTENANCES BACK TO PANEL.
NOTE:
SEE SHEET 1.ES100 FOR LIGHT FIXTURE SCHEDULE.
NOTE:
ALL NON-OIT RELATED EQUIPMENT AND WALL
ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,
HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO
PERFORMING DEMOLITION OR NEW CONSTRUCTION
WORK, AND SALVAGED FOR REUSE. COORDINATE WITH
THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.
NOTE:
THE CONTRACTOR SHALL NOT DAMAGE, MOVE,
DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR
RELATED APPURTENANCES WITHOUT THE FIRST
APPROVAL AND SUPERVISION OF THE OIT MANAGER OR
DESIGNATED PERSON.
NOTE:
ANY WORK PERFORMED BY THE CONTRACTOR THE VA
RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO
SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND
PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY
/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS
OR CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROTECT EXISTING CEILING,
FLOOR, AND WALLS FROM DAMAGE DURING
CONSTRUCTION AND IMPLEMENTATION OF INFECTION
AND DUST CONTROL BARRIERS. AFTER THE REMOVAL
OF TEMPORARY BARRIERS, TOUCH UP PAINT ON
CEILINGS AND WALLS AS NEEDED TO SHOW NO
EVIDENCE OF CONSTRUCTION.
NOTE:
SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM
REQUIREMENTS, DETAILS AND PHASING NOTES.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS
ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN
EXISTING MECHANICAL AND PIPING EQUIPMENT.
CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR
WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUI…
This is the start of the file's text. The full file is on GovTribe.