36C25019B0007-010.pdf
PDF 17 MB Posted
- Attached to
- Correct OIT Deficiencies 610A4-16-101 Federal contract opportunity
- Solicitation number
- 36C25019B0007
About this file
36C25019B0007 Drawings 5 of 11.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019C0184-000.docx | DOCX document | |
| VA251-15-D-0142-000.docx | DOCX document | |
| 36C25019B0007-0007004.docx | DOCX document | |
| 36C25019B0007-0006000.docx | DOCX document | |
| 36C25019B0007-0005000.docx | DOCX document | |
| 36C25019B0007-0004000.docx | DOCX document | |
| 36C25019B0007-0003000.docx | DOCX document | |
| 36C25019B0007-0003001.pdf | ||
| 36C25019B0007-0002000.docx | DOCX document | |
| 36C25019B0007-0001000.docx | DOCX document | |
| 36C25019B0007-004.pdf | ||
| 36C25019B0007-013.pdf | ||
| 36C25019B0007-016.pdf | ||
| 36C25019B0007-014.pdf | ||
| 36C25019B0007-012.pdf | ||
| 36C25019B0007-005.docx | DOCX document | |
| 36C25019B0007-003.doc | DOC document | |
| 36C25019B0007-006.pdf | ||
| 36C25019B0007-015.pdf | ||
| 36C25019B0007-008.pdf | ||
| 36C25019B0007-002.pdf | ||
| 36C25019B0007-009.pdf | ||
| 36C25019B0007-011.pdf | ||
| 36C25019B0007-007.pdf | ||
| 36C25019B0007-001.docx | DOCX document | |
| 36C25019B0007-000.docx | DOCX document |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TR
AN
S.
FD
EL
EC
EL
EC
EXISTING
MECH
EXISTING
ROOM
EXISTING
CORRIDOR
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
TR
AN
S.
155A
EL
EC
EL
EC
EL
EC
EXISTING
MECHANICAL
UNIT
PA
NE
L
CR
-1
4'-8"
(FIELD VERIFY)
6'- 3"
5'- 6"
(FI
EL
D
VE
RI
FY
A1
A1
A2
A3
33 5
TYP.
EXISTING
CORRIDOR
EXISTING
OFFICE
EXISTING
ROOM
EXISTING
CORRIDOR
EXISTING
ROOM
EXISTING
OIT CLOSET
176A
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
SERVICE
ELEVATOR
PA
NE
L
CR
-1
A
176A6
OPTICOM
IT RACK E1
E9
E2
W E8
E4
E3 E5 E14 E18
E11
E11
E15
(CEILING)
E15
(CEILING)
VERIFY
POWER
VERIFY
POWER
2'- 0"
(V .I.
F.
T
E6
COORDINATE WITH COR AND OIT TO
EVALUATE IMPROVED LOCATION OF
EQUIPMENT WITHIN THE CLOSET.
CAM
PA
NE
LS
CR E7
/ 1
.A S1
7 / 1.AS101
2'-
2'-0"
1'- 4"
METAL FOLD DOWN
WRITING DESK,
(FUTURE)
E9
NEW WALL W/
PLYWOOD
NEW FLOOR AND
BASE
3"
7'- 43 4"
1 4"
8" (V
.I.
F.
H
VA
C
UN
IT
M
OU
NT
IN
G)
(C
LE
AR
E6(U
NI
T)
OPTICOM
WALL RACK
(SIDE VIEW)
8'- 6"
(LI
GH
TS
, M
IN
IM
UM
H
EIG
HT
O R
CE
ILI
NG
M
T.
E8
PHONE
REINSTALL
VE
RI
FY
H
EIG
HT
FU
LL
H T.
6" (V
.I.
F.
E4
OPTICOM
WALL RACK
REINSTALL FIBER
RACK. VERIFY EXIST
FIBER CABLE LENGTH.
EQUIPMENT INTENDS
TO REMAIN ACTIVE.
M
AT
CH
E
XIS
TIN
G
E3 E5 E14 E18
EXISTING
IT RACK
E11
VERIFY EXIST POWER
NEW FURRED
PLYWOOD
REINSTALL
EQUIPMENT
E6
E11
IT RACK E1E2
IT RACK E1E2 E2
PA
NE
LS E3
E5 E14 E18
PANELS
PA
NE
LS
IT CABINET
E10
SHELVING
W E8
CA
M
E4
CR E7
E15
E15
E15 E15
E15
E15
M
AT
CH
E
XIS
TIN
G (V
.I.
F.
M
AT
CH
E
XIS
TIN
G
(V .I.
F.
3'-0"
(CLEAR)
VERIFY EXIST POWER
E9
3'- 0"
(V .I.
F.
CA
BL
E
TR
AY
A
BO
VE
E6
ADJUST CAMERA
HEIGHT BELOW
EVAPORATOR
T
3'- 41 4"
(V .I.
F.
COORDINATE WITH COR AND OIT TO
EVALUATE IMPROVED LOCATION OF
EQUIPMENT WITHIN THE CLOSET.
/ 1
.A S1
FU
LL
H T.
6" (V
.I.
F.
E3 E5 E14 E18
EXISTING
IT RACK
E11
VERIFY EXIST POWER
EXISTING
IT CABINET
E15 E15E15
E15
E8
'-2
(LI
GH
TS
, M
IN
IM
UM
H
EIG
HT
O R
CE
ILI
NG
M
T.
REINSTALL
EQUIPMENT
REINSTALL
PHONE
REINSTALL
GROUND BAR
FIRE CAULK GAPS
IN CONDUIT, TYP.
NEW FINISHES
ON EXISTING
WALL BOARD
REINSTALL
EXISTING PANELS
ON SIDE WALL
EXIST CABLE TRAY
2'-
1'-
4"E9
3'-0" (V.I.F.)
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - PLAN - ROOM 155 OIT CLOSET 1
1.AS101
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
FIRST FLOOR
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - PLAN - ROOM 176A OIT CLOSET 3
1.AS101
PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.
SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.
CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.21
1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.
2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER
TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.
3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL
CONTRACTOR.
4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.
5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.
6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH
CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO
THE END OF THE DAY OF CONSTRUCTION.
8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER
REFERENCED PROJECT DETAILS.
CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND
CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.
PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET
AG001 FOR SPECIFIC WALL TYPES NOTED.
CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR
ADDITIONAL INFORMATION.
EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7
NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"
CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT
PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR
ADDITIONAL INFORMATION.
PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.
PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.
SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL
SURFACES.
PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.
CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW
AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.
CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE
MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR
WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING OPENING, PROVIDE MATERIALS OF LIKE CONSTRUCTION AND PATCH TO MATCH ADJACENT WALLS TO SHOW NO EVIDENCE OF CONSTRUCTION. FLASH & CAULK GAPS AROUND OPENINGS FOR WEATHER TIGHT SEAL. SEE DETAIL 6/AG001. SEE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME. PROVIDE BLOCKING AND WALL INFILL TO MATCH ADJACENT WALL CONSTRUCTION AT THE INSIDE WALL
OPENING BELOW THE WINDOW. SEE DETAIL 5 / AG001 FOR ADDITIONAL INFORMATION.
22 CONTRACTOR TO PROVIDE AN EMERGENCY POWER SYSTEM. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
23 CONTRACTOR TO PROVIDE AND INSTALL NEW WALL INFILL BETWEEN EXISTING MASONRY CORRIDOR WALL--SEE WALL PARTITION SCHEDULE FOR ADDITIONAL INFORMATION. ALIGN NEW WALL FINISH BOARD FLUSH WITH FACE OF CORRIDOR WALL, PATCH AND PAINT FOR SEAMLESS APPEARANCE BETWEEN OLD AND NEW CONSTRUCTION.
CAULK AND SEAL GAPS IN WALL FOR SMOKE RESISTANT ASSEMBLY. SEE SHEET AG001 FOR ADDITIONAL
INFORMATION.
24 CONTRACTOR TO INSTALL SALVAGED DOOR AND DOOR HARDWARE IN NEW LOCATION. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.
25 CONTRACTOR TO PROVIDE AND INSTALL NEW DOOR, FRAME AND SALVAGED HARDWARE. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.
26 CONTRACTOR TO PROVIDE AND INSTALL ROOM SIGN AT NEW LOCATION. MATCH EXISTING MOUNTING HEIGHTS.
SEE DETAIL 5/ 6.AS101. COORDINATE WITH COR AND VA INTERIORS FOR APPROVAL OF SIGN SUBMITTALS AND
NUMBERING.
27 CONTRACTOR TO INSTALL SALVAGED ROOM SIGN THAT READS "ROOM 210D", MATCH MOUNTING HEIGHTS TO
EXISTING. COORDINATE WITH THE COR ON SIGN DETAILS.
28 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT NEW WALLS IN THEIR ENTIRETY OUTSIDE OF OIT
ROOM. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
29 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON EXISTING WALLS IN THEIR ENTIRETY FROM CORNER TO CORNER AND FULL HEIGHT. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
30 CONTRACTOR TO INSTALL SALVAGED LOCKERS IN NEW LOCATION. COORDINATE WITH THE VA
31 CONTRACTOR TO COORDINATE WITH COR AND OIT DESIGNATED PERSON TO RELOCATE ANY OIT EQUIPMENT IN THE ROOM AND EQUIPMENT TO REMOUNT AS REQUIRED. COORDINATE WITH DOOR SECURITY CONTRACTOR
FOR ALL WORK WITH DOOR HARDWARE AND SECURITY SYSTEM PANELS.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW
FRAME. PROVIDE PERIMETER TRIM AS REQUIRED.
CONTRACTOR TO PROVIDE AND INSTALL DOOR. VERIFY SALVAGED HARDWARE AND DOOR SLABS. SEE DOOR
SCHEDULE ON SHEET AG001.
CONTRACTOR SHALL CUT DOWN AND INSTALL SALVAGED HANDRAIL AND ACCESSORIES. PROVIDE INSERT FITTINGS REQUIRED TO SECURE SEPARATE PIECES (FASTENED TIGHT, PREVENTING ROTATION) AND ANCHOR TO WALL ASSEMBLY FOR A CONTINUOUS LENGTH OF RAIL AT EACH WALL SEGMENT. NO MORE THAN ONE JOINT MARK PER RAILING AT EITHER END CENTERED ON A BRACKET. IN EXISTING WALLS, USE MASONRY ANCHORS CAPABLE OF RESISTING PULL OUT; AT THE WALL INFILL PROVIDE BLOCKING TO MOUNT EACH BRACKET CAPABLE OF RESISTING A SINGLE CONCENTRATED LOAD OF 200 LBS AT ANY POINT ALONG THE TOP. HANDRAIL MOUNTING HEIGHT ABOVE FINISH FLOOR AND PROJECTION FROM WALL SHALL MATCH EXISTING.
CONTRACTOR SHALL PROVIDE AND INSTALL DRYWALL END CAP ON EXPOSED PORTION OF CMU, FULL HEIGHT.35
CONTRACTOR SHALL PROVIDE AND INSTALL HEADER SUPPORT FOR A LOAD BEARING CONDITION AT TOP OF
WALL AND AS REQUIRED FOR NEW DOORS, VERIFY IN FIELD.
CONTRACTOR SHALL PROVIDE AND INSTALL 3/4" PLYWOOD OVER EXISTING STUD WALL. VERIFY CLEARANCES BETWEEN EXISTING EQUIPMENT PANELS AND NEW WALLS. PROVIDE 2 COATS OF PAINT TO MATCH NEW WALLS.
CONTRACTOR TO PROVIDE IN-WALL BLOCKING BETWEEN FRAMING FOR EQUIPMENT SUPPORT. PATCH FINISH
BOARD AS REQUIRED TO MATCH EXISTING WALL TO SHOW NO EVIDENCE OF CONSTRUCTION.
CONTRACTOR TO VERIFY AND PROVIDE CABLE PENETRATION SLEEVE THROUGH WALLS. PROVIDE SPLIT CONDUIT (2-PIECE) WITH CLAMPS AT EXISTING CABLE PENETRATIONS WITHOUT SLEEVED PROTECTION.
SLEEVES RESERVED FOR FUTURE USE SHALL BE INSTALLED WITH A CLOSED CAP ON EACH END. FIELD VERIFY NUMBER REQUIRED WITH COR AND OIT AT EACH ROOM. INSTALL FIRE BLOCKING AND SEALANT AS REQUIRED AT EACH. SEE EQUIPMENT SCHEDULE AND DETAIL 12 / AG001 FOR ADDITIONAL INFORMATION. SEE
REFLECTED CEILING PLAN FOR ADDITIONAL PENETRATIONS SHOWN.
EXISTING WALL FRAMING AND FINISH TO REMAIN. PROTECT WALL AND EQUIPMENT FROM DAMAGE, NO NEW
FINISHES IN AREA OF EXISTING WALL MOUNTED PANELS.
CONTRACTOR TO PATCH AND PROVIDE 2 COATS OF PAINT ON WALLS IN COORDINATION WITH NOTE 1 ON
SHEET 1.AS900 AND NOTE 39 ON SHEET 1.AS100.
NOTE:
ALL NON-OIT RELATED EQUIPMENT AND WALL
ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,
HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO
PERFORMING DEMOLITION OR NEW CONSTRUCTION
WORK, AND SALVAGED FOR REUSE. COORDINATE WITH
THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.
SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
NOTE:
THE CONTRACTOR SHALL NOT DAMAGE, MOVE,
DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR
RELATED APPURTENANCES WITHOUT THE FIRST
APPROVAL AND SUPERVISION OF THE OIT MANAGER OR
DESIGNATED PERSON.
NOTE:
ANY WORK PERFORMED BY THE CONTRACTOR THE VA
RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO
SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND
PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY
/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS
OR CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROTECT EXISTING CEILING,
FLOOR, AND WALLS FROM DAMAGE DURING
CONSTRUCTION AND IMPLEMENTATION OF INFECTION
AND DUST CONTROL BARRIERS. AFTER THE REMOVAL
OF TEMPORARY BARRIERS, TOUCH UP PAINT ON
CEILINGS AND WALLS AS NEEDED TO SHOW NO
EVIDENCE OF CONSTRUCTION.
NOTE:
SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM
REQUIREMENTS, DETAILS AND PHASING NOTES.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS
ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN
EXISTING MECHANICAL AND PIPING EQUIPMENT.
CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR
WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
NOTE:
NOT ALL KEYNOTES ARE USED ON EVERY SHEET.
CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR
COMPLETE SCOPE OF WORK IN EACH SPACE.
SCALE: 1/2" = 1'-0"
ENLARGED EQUIPMENT PLAN A155 2
1.AS101
**SEE REFERENCE EQUIPMENT SCHEDULE ON SHEET 1.AS100
SCALE: 1/2" = 1'-0"
ELEVATION 6
1.AS101SCALE: 1/2" = 1'-0"
ELEVATION 7
1.AS101
SCALE: 3/8" = 1'-0"
ENLARGED EQUIPMENT PLAN 176 4
1.AS101SCALE: 1/2" = 1'-0"
ELEVATION 5
1.AS101
**SEE REFERENCE EQUIPMENT SCHEDULE ON SHEET 1.AS100
AutoCAD SHX Text
TWT
AutoCAD SHX Text
PARTIAL-FIRST-FLOOR
AutoCAD SHX Text
NRF
AutoCAD SHX Text
TWT
AutoCAD SHX Text
ARCHITECTURAL-PLAN
AutoCAD SHX Text
1.AS101
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of 87
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FORT WAYNE, INDIANA
AutoCAD SHX Text
CORRECT OIT DEFICIENCIES
AutoCAD SHX Text 610A4-16-101
AutoCAD SHX Text 2/13/2018
AutoCAD SHX Text
CERTIFICATION:
AutoCAD SHX Text
AutoCAD SHX Text Engineering and Facilities Management Services
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
PLAN CONSTRUCTION NOTES
AutoCAD SHX Text
GENERAL CONSTRUCTION NOTES
AutoCAD SHX Text
PLAN CONSTRUCTION NOTES CONT.
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text 10800038
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text No.
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text W.
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text T
AutoCAD SHX Text
2/1.AS101
AutoCAD SHX Text
4/1.AS101
PANEL
EXISTING
ROOM
EXISTING
CORRIDOR
EXISTING
CORRIDOR
EXISTING
RESTROOM
210B
EXISTING
BREAK ROOM
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
210CIT
CLOSET
210C
EP
PANELPANEL
DUMBWAITER
SERVICE
ELEVATOR
(AREA FOR CONDENSER
ON ROOF DIRECTLY OUTSIDE
ROOM 210, ONE FLOOR
DOWN--SEE MECHANICAL
DRAWINGS)
EXISTING
STORAGE
210A
210D
FRIDGE
CHASE
12'-218"
3'- 6"
'-1
0" (V
.I.
F.
7'-714"+\- A1
A3 6
A7
4'- 01 2"
(V .I.
F.
6"
(V.I.F.)
PANEL
OPTICOM
E9
IT RACK E1
E3 E5 E14 E18
E2
W E8
E11E11
1'- 6"
(V .I.
F.
1'- 91 2"
(V .I.
F.
E4
E15
(CEILING)
E15
E6 T
COORDINATE WITH COR AND OIT TO
EVALUATE IMPROVED LOCATION OF
EQUIPMENT WITHIN THE CLOSET.
CAM
PA
NE
LS
CR E7
3 / 1.AS102
/ 1
.A S1
2'-
1'-
4"
METAL FOLD DOWN
WRITING DESK,
(FUTURE)
E9
NEW FLOOR AND
BASE
VERIFY CLEAR
FU
LL
H T.
6" (V
.I.
F.
E8
EXIST PANEL
E3 E5 E14 E18
EXISTING IT RACK
PHONE
REINSTALL
EXIST EQUIPMENT
TO REMAIN (ON
SIDE WALL).
OPTICOM
WALL RACK
M
AT
CH
E
XIS
TIN
G
E11
E11
FU
LL
H T.
6"
1'-912" (V.I.F.)
E3 E5 E14
1'-6"
E4
EXISTING
EQUIPMENT
TO REMAIN
EXISTING
IT RACK
NEW FLOOR
AND BASE
E11
E18
8'- 6"
(LI
GH
TS
, M
IN
IM
UM
H
EIG
HT
O R
CE
ILI
NG
M
T.
ADJUST OUTLET
LOCATION
REINSTALL FIBER
RACK. VERIFY EXIST
FIBER CABLE LENGTH.
EQUIPMENT INTENDS
TO REMAIN ACTIVE.
E11
REMARKS
2,3
FURNISHED BY:MARK
E1 FLOOR / WALL
MOUNT
EQUIPMENT SCHEDULE (FOR REFERENCE ONLY)
IT RACK AND PATCH PANELS
DESCRIPTION
E2
E3
E4
EXISTING
CABLE MANAGEMENT (VERTICAL)
DOOR SECURITY SYSTEM
VIDEO SURVEILLANCE CAMERA
EXISTING IT RACK
EXIST WALL
INSTALLED BY:
E5 DATABASE ACCESS CONTROL SYSTEM EXISTING
VA JSN #:
A0921
A0923
M0436
A1020
E6
E7
E8
AIR CONDITIONER R3000 CONTRACTOR CONTRACTOR
8" CLEAR @ TOP
6'-5" MIN. BOTT.
SEE KEYNOTES
TO REMAIN
VA
VA
VA
VA
SECURITY ACCESS DETECTION A1026 CONTRACTOR
DOOR SECURITY MATCH
EXISTING
EXIST WALL
TO REMAIN
EXIST WALL
TO REMAIN
TELEPHONE WITH SPEAKER A1012 EXIST WALL
TO REMAINVA
PARTS
E9 FOLD DOWN WRITING SURFACE F0610 VA DESK SURFACE
34" A.F.F.VA
CONTRACTOR
DOOR SECURITY
E10 CABINET WITH INTERNAL EQUIPMENT A0919 FLOOR
VA
2,3
E11 POWER RECEPTICLE, QUAD OR DUPLEXA0925 EXISTING EXIST WALL
TO REMAINN / A
E12
E13
ALUMINUM LADDER TRAY AND BRACKETS
4" J-HOOK & HANGER VA
VA CONTRACTOR
CONTRACTOR
1,2,5,6
CEILING / WALL
CEILING / JOIST
E14 DATA SUPPORT DEVICES AND EXIST WALL
TO REMAINVA- VA
E15
WALL OR FLOOR PENETRATIONS.
PER KEYNOTE, OR
EXISTING CABLECONTRACTOR- CONTRACTOR
METAL CONDUIT SLEEVE (2" DIA. MIN) 4"
DIA, TYP. (ALT) 2-PIECE SLEEVE FOR EXIST LOCATION, V.I.F.
SCHEDULE 40 PIPE OR EQUIVALENT SLEEVE.
SOME LOCATIONS REQUIRE 2-PIECE PIPE WITH
CLAMPS. SEE DETAIL 12 / AG001
E16 3" x 5" METAL D RING CABLE SUPPORT VA CONTRACTOR
CEILING / WALL
- SPACED 36" C / C
REMARKS:
1. CONTRACTOR TO COORDINATE WITH COR AND VERIFY THE EXISTING CONDITION AT EACH LOCATION, THE OVERHEAD STRUCTURE FOR MOUNTING CABLE SUPPORT HARDWARE. PROVIDE BRACKET AND FASTENERS REQUIRED.
E17 VA CONTRACTOR
CEILING / JOIST
- SPACED 36" C / C
CAT64HP OR EQUIVALENT, TIA / EIA COMPLIANT
SPACING 36" C / CPROVIDE TREE MOUNTING TABS AND HANGER.
VERIFY MOUNTING CONDITION TO SELECT TYPE.
2. CONTRACTOR TO COORDINATE WITH COR ON EXACT MOUNTING LOCATIONS OF EQUIPMENT, CHANGES MADE TO LOCATIONS OF EXISTING EQUIPMENT, AND FULL EXTENT OF CABLE SUPPORT REQUIRED.
3. CONTRACTOR TO PROTECT EXISTING EQUIPMENT FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. EXISTING EQUIPMENT WILL REMAIN ACTIVE AND IN WORKING ORDER TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.
QUANTITY
4. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
5. VA STANDARD EQUIPMENT PROVIDED BY THE VA PER OIT DEPARTMENT SPECIFICATIONS.
6. CONTRACTOR TO PROVIDE CONTINUOUS CABLE SUPPORT (AS CABLE OR BUNDLE) WITHIN OIT CLOSET TO THE POINT OF PENETRATION (AT WALL, FLOOR OR CEILING), AND ADJACENT ROOMS WITHIN 6' FROM PENETRATION POINT.
7. CONTRACTOR TO PROVIDE AND INSTALL IN-WALL BLOCKING. FIRE TREATED WOOD 2X6 OR EQUIVALENT BETWEEN STUDS AT HEIGHTS REQUIRED. SEE ELEVATIONS AND WALL TYPE LEGEND FOR ADDITIONAL INFORMATION.
2,3,9
8. SPACE RESERVED FOR EXISTING EQUIPMENT OR FUTURE, ADJUST EQUIPMENT LOCATIONS TO ALLOW FOR EXPANSION AND CLEARANCES AROUND EQUIPMENT.
2,3
2,3
9. WORK PERFORMED BY SEPARATE CONTRACT. COORDINATE WITH VA'S DESIGNATED CONTRACTOR FOR FULL EQUIPMENT INSTALLATION AND TESTING. SEE DOOR SCHEDULE AND SPECIFICATION FOR ADDITIONAL INFORMATION.
2,3,9
2,3
3,4
1,2,5,6
1,2,5,6
1,2,5,6
E18 UNINTERUPTED POWER SUPPLY VA SUPPLIED
VA WALL BRACKETS
- OR IN RACK
2,5,10
10. VA TO PROVIDE ALL RELATED MOUNTING HARDWARE FOR EXISTING EQUIPMENT. CONTRACTOR TO COORDINATE WITH COR FOR MOUNTING REQUIREMENTS.
EXISTING UPS /
DST-500 OR EQUIVALENT 9 mm BENT WIRE, D RING BRACKET WITH (4) 5.5 mm HOLES FOR SCREWS.
FINISH TO NON-CONDUCTIVE, BLACK.
VA OR
CONT. OR EXISTING
DOOR SECURITY
1MATCH EXISTING LADDER RACK TYPE, SIZE AND
SUPPORT BRACKETS. VERIFY WIDTH. SEE DETAIL
12 / AG001.
25 MAX
2" J-HOOK & HANGER
CAT32HP OR EQUIVALENT, TIA / EIA COMPLIANT
PROVIDE TREE MOUNTING TABS AND HANGER.
VERIFY MOUNTING CONDITION TO SELECT TYPE.
ACCESSORIES, SECURITY + VIDEO
A0924
INDOOR UNIT EVAPORATOR
(PROJECT)
25 MAX
(PROJECT)
25 MAX
(PROJECT)
18" MIN. A.F.F.
CONT. OR EXISTING
DOOR SECURITY
EXISTING
VA OR
EXISTING
VA OR
EXISTING
VA OR
EXISTING
FUTURE
EXISTING /
EXISTING
EXISTING
EXISTING
EXISTING
DOOR / HDW
EXISTING
EXISTING
EXISTING
EXISTING
25 MAX
(PROJECT)
EXISTING
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
(5' SECTION)
A1026
(BADGE READERS, DOOR H.W. TIE-INS)
(CONTROL PANELS, RTE, CHORDS, CONDUIT)
FRAMING
3"
CORNER GUARD COVER
#6 X 1 5/8" BUGLE HD SMS
18" C / C MAX.
ALUMINUM RETAINER
GYPSUM BOARD
SHEATHING
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - PLAN - ROOM 210C 1
1.AS102
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
SECOND FLOOR
PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.
SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.
CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.21
1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.
2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER
TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.
3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL
CONTRACTOR.
4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.
5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.
6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH
CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO
THE END OF THE DAY OF CONSTRUCTION.
8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER
REFERENCED PROJECT DETAILS.
CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND
CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.
PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET
AG001 FOR SPECIFIC WALL TYPES NOTED.
CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR
ADDITIONAL INFORMATION.
EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7
NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"
CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT
PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR
ADDITIONAL INFORMATION.
PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.
PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.
SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL
SURFACES.
PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.
CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW
AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.
CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE
MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR
WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING OPENING, PROVIDE MATERIALS OF LIKE CONSTRUCTION AND PATCH TO MATCH ADJACENT WALLS TO SHOW NO EVIDENCE OF CONSTRUCTION. FLASH & CAULK GAPS AROUND OPENINGS FOR WEATHER TIGHT SEAL. SEE DETAIL 6/AG001. SEE MECHANICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME. PROVIDE BLOCKING AND WALL INFILL TO MATCH ADJACENT WALL CONSTRUCTION AT THE INSIDE WALL
OPENING BELOW THE WINDOW. SEE DETAIL 5 / AG001 FOR ADDITIONAL INFORMATION.
22 CONTRACTOR TO PROVIDE AN EMERGENCY POWER SYSTEM. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
23 CONTRACTOR TO PROVIDE AND INSTALL NEW WALL INFILL BETWEEN EXISTING MASONRY CORRIDOR WALL--SEE WALL PARTITION SCHEDULE FOR ADDITIONAL INFORMATION. ALIGN NEW WALL FINISH BOARD FLUSH WITH FACE OF CORRIDOR WALL, PATCH AND PAINT FOR SEAMLESS APPEARANCE BETWEEN OLD AND NEW CONSTRUCTION.
CAULK AND SEAL GAPS IN WALL FOR SMOKE RESISTANT ASSEMBLY. SEE SHEET AG001 FOR ADDITIONAL
INFORMATION.
24 CONTRACTOR TO INSTALL SALVAGED DOOR AND DOOR HARDWARE IN NEW LOCATION. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.
25 CONTRACTOR TO PROVIDE AND INSTALL NEW DOOR, FRAME AND SALVAGED HARDWARE. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.
26 CONTRACTOR TO PROVIDE AND INSTALL ROOM SIGN AT NEW LOCATION. MATCH EXISTING MOUNTING HEIGHTS.
SEE DETAIL 5/ 6.AS101. COORDINATE WITH COR AND VA INTERIORS FOR APPROVAL OF SIGN SUBMITTALS AND
NUMBERING.
27 CONTRACTOR TO INSTALL SALVAGED ROOM SIGN THAT READS "ROOM 210D", MATCH MOUNTING HEIGHTS TO
EXISTING. COORDINATE WITH THE COR ON SIGN DETAILS.
28 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT NEW WALLS IN THEIR ENTIRETY OUTSIDE OF OIT
ROOM. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
29 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON EXISTING WALLS IN THEIR ENTIRETY FROM CORNER TO CORNER AND FULL HEIGHT. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
30 CONTRACTOR TO INSTALL SALVAGED LOCKERS IN NEW LOCATION. COORDINATE WITH THE VA
31 CONTRACTOR TO COORDINATE WITH COR AND OIT DESIGNATED PERSON TO RELOCATE ANY OIT EQUIPMENT IN THE ROOM AND EQUIPMENT TO REMOUNT AS REQUIRED. COORDINATE WITH DOOR SECURITY CONTRACTOR
FOR ALL WORK WITH DOOR HARDWARE AND SECURITY SYSTEM PANELS.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW
FRAME. PROVIDE PERIMETER TRIM AS REQUIRED.
CONTRACTOR TO PROVIDE AND INSTALL DOOR. VERIFY SALVAGED HARDWARE AND DOOR SLABS. SEE DOOR
SCHEDULE ON SHEET AG001.
CONTRACTOR SHALL CUT DOWN AND INSTALL SALVAGED HANDRAIL AND ACCESSORIES. PROVIDE INSERT FITTINGS REQUIRED TO SECURE SEPARATE PIECES (FASTENED TIGHT, PREVENTING ROTATION) AND ANCHOR TO WALL ASSEMBLY FOR A CONTINUOUS LENGTH OF RAIL AT EACH WALL SEGMENT. NO MORE THAN ONE JOINT MARK PER RAILING AT EITHER END CENTERED ON A BRACKET. IN EXISTING WALLS, USE MASONRY ANCHORS CAPABLE OF RESISTING PULL OUT; AT THE WALL INFILL PROVIDE BLOCKING TO MOUNT EACH BRACKET CAPABLE OF RESISTING A SINGLE CONCENTRATED LOAD OF 200 LBS AT ANY POINT ALONG THE TOP. HANDRAIL MOUNTING HEIGHT ABOVE FINISH FLOOR AND PROJECTION FROM WALL SHALL MATCH EXISTING.
CONTRACTOR SHALL PROVIDE AND INSTALL DRYWALL END CAP ON EXPOSED PORTION OF CMU, FULL HEIGHT.35
CONTRACTOR SHALL PROVIDE AND INSTALL HEADER SUPPORT FOR A LOAD BEARING CONDITION AT TOP OF
WALL AND AS REQUIRED FOR NEW DOORS, VERIFY IN FIELD.
CONTRACTOR SHALL PROVIDE AND INSTALL 3/4" PLYWOOD OVER EXISTING STUD WALL. VERIFY CLEARANCES BETWEEN EXISTING EQUIPMENT PANELS AND NEW WALLS. PROVIDE 2 COATS OF PAINT TO MATCH NEW WALLS.
CONTRACTOR TO PROVIDE IN-WALL BLOCKING BETWEEN FRAMING FOR EQUIPMENT SUPPORT. PATCH FINISH
BOARD AS REQUIRED TO MATCH EXISTING WALL TO SHOW NO EVIDENCE OF CONSTRUCTION.
CONTRACTOR TO VERIFY AND PROVIDE CABLE PENETRATION SLEEVE THROUGH WALLS. PROVIDE SPLIT CONDUIT (2-PIECE) WITH CLAMPS AT EXISTING CABLE PENETRATIONS WITHOUT SLEEVED PROTECTION.
SLEEVES RESERVED FOR FUTURE USE SHALL BE INSTALLED WITH A CLOSED CAP ON EACH END. FIELD VERIFY NUMBER REQUIRED WITH COR AND OIT AT EACH ROOM. INSTALL FIRE BLOCKING AND SEALANT AS REQUIRED AT EACH. SEE EQUIPMENT SCHEDULE AND DETAIL 12 / AG001 FOR ADDITIONAL INFORMATION. SEE
REFLECTED CEILING PLAN FOR ADDITIONAL PENETRATIONS SHOWN.
EXISTING WALL FRAMING AND FINISH TO REMAIN. PROTECT WALL AND EQUIPMENT FROM DAMAGE, NO NEW
FINISHES IN AREA OF EXISTING WALL MOUNTED PANELS.
CONTRACTOR TO PATCH AND PROVIDE 2 COATS OF PAINT ON WALLS IN COORDINATION WITH NOTE 1 ON
SHEET 1.AS900 AND NOTE 39 ON SHEET 1.AS100.
NOTE:
ALL NON-OIT RELATED EQUIPMENT AND WALL
ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,
HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO
PERFORMING DEMOLITION OR NEW CONSTRUCTION
WORK, AND SALVAGED FOR REUSE. COORDINATE WITH
THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.
SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
NOTE:
THE CONTRACTOR SHALL NOT DAMAGE, MOVE,
DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR
RELATED APPURTENANCES WITHOUT THE FIRST
APPROVAL AND SUPERVISION OF THE OIT MANAGER OR
DESIGNATED PERSON.
NOTE:
ANY WORK PERFORMED BY THE CONTRACTOR THE VA
RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO
SUPERVISE ANY / ALL WORK IN AND AROUND OIT
EQUIPMENT.
NOTE:
CONTRACTOR SHALL SCHEDULE WITH THE COR AND
PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY
/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS
OR CABINETS THAT MAY BE AFFECTED BY WORK.
NOTE:
CONTRACTOR SHALL PROTECT EXISTING CEILING,
FLOOR, AND WALLS FROM DAMAGE DURING
CONSTRUCTION AND IMPLEMENTATION OF INFECTION
AND DUST CONTROL BARRIERS. AFTER THE REMOVAL
OF TEMPORARY BARRIERS, TOUCH UP PAINT ON
CEILINGS AND WALLS AS NEEDED TO SHOW NO
EVIDENCE OF CONSTRUCTION.
NOTE:
SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM
REQUIREMENTS, DETAILS AND PHASING NOTES.
NOTE:
CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS
ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN
EXISTING MECHANICAL AND PIPING EQUIPMENT.
CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR
WORK THAT MAY SHUTDOWN OR DISCONNECT OIT
EQUIPMENT.
NOTE:
NOT ALL KEYNOTES ARE USED ON EVERY SHEET.
CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR
COMPLETE SCOPE OF WORK IN EACH SPACE.
SCALE: 1/2" = 1'-0"
ENLARGED EQUIPMENT PLAN (FOR REFERENCE ONLY)2
1.AS102
SCALE: 1/2" = 1'-0"
ELEVATION 3
1.AS102SCALE: 1/2" = 1'-0"
ELEVATION 4
1.AS102
SCALE: 6" = 1'-0"
ARCHITECTURAL CORNER GUARD DETAIL5
1.AS102
SOME SYMBOLS MAY NOT BE USED. SYMBOLS SHOWN ON PLAN ARE FOR
REFERENCE ONLY. SEE MECHANICAL AND ELECTRICAL FOR ADDITIONAL
INFORMATION. ALL OIT EQUIPMENT IS EXISTING AND INTENDED TO REMAIN
ACTIVE IN SAME LOCATION FOR MOST LOCATIONS, U.N.O.
PLAN EQUIPMENT
SYMBOL LEGEND
NOTE:
SYMBOL DESCRIPTION
EVAPORATOR UNIT (WALL MOUNTED) -
SEE MECH. DWGS. AND NOTES
FOLD DOWN (WALL MOUNTED)
WRITING DESK
VERTICAL CABLE MANAGEMENT ON IT
RACK
SURVEILLANCE CAMERA
SECURITY CONTROLLERS OR IT-RELATED,
WALL MOUNTED EQUIPMENT.
TEMPERATURE SENSOR OR HVAC
THERMOSTAT - SEE MECH. DWGS.
SPECIALTY POWER OUTLET
DUPLEX OR QUAD OUTLETS
SECURITY ACCESS, CARD READER
PHONE
PANELS
W
CAM
CR
T
AutoCAD SHX Text
TWT
AutoCAD SHX Text
PARTIAL-SECOND-FLOOR
AutoCAD SHX Text
NRF
AutoCAD SHX Text
TWT
AutoCAD SHX Text
ARCHITECTURAL-PLAN
AutoCAD SHX Text
1.AS102
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of 87
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FORT WAYNE, INDIANA
AutoCAD SHX Text
CORRECT OIT DEFICIENCIES
AutoCAD SHX Text 610A4-16-101
AutoCAD SHX Text 2/13/2018
AutoCAD SHX Text
CERTIFICATION:
AutoCAD SHX Text
AutoCAD SHX Text Engineering and Facilities Management Services
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
PLAN CONSTRUCTION NOTES
AutoCAD SHX Text
GENERAL CONSTRUCTION NOTES
AutoCAD SHX Text
PLAN CONSTRUCTION NOTES CONT.
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text 10800038
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text No.
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text W.
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text T
1/1.AS102
CORRIDOR
A500
EXISTING
WAITING
A528
EXISTING
ROOM
A527
EXISTING
OIT CLOSET
528C
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
CONSTRUCTION LIMIT LINE
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
SERVICE
ELEVATOR
CO
NS
TR
UC
TIO
N
LIM
IT
LIN
E
8A5
4'-1"
MATCH EDGE
C.J. ABOVE AS BELOW
CAULK AS REQ.
IT CABINET
EL
EC
E9
IT RACKE1
E10
WE8
E4
E3 E5 E14 E18
E11
E11 E11
E11
E2E2
10" +/- (V.I.F.)
2'-0" +/- (V.I.F.)
2'- 0"
(V .I.
F.
E11
E6
T
COORDINATE WITH COR AND OIT TO
EVALUATE IMPROVED LOCATION OF
EQUIPMENT WITHIN THE CLOSET.
CA
M
PA
NE
LS
CR E7
3 / 1.AS105
/ 1
.A S1
2'-
1'-
4"
METAL FOLD DOWN
WRITING DESK,
(FUTURE)
E9
NEW WALL PATCH
NEW FLOOR AND
BASE
1'-6"
FU
LL
H T.
6" (V
.I.
F.
E8
ELEC
PANEL
E3 E5 E14 E18
EXISTING IT RACK
E11
PHONE REINSTALL
SAME WALL
EXIST EQUIPMENT
TO REMAIN.
REMARKS
2,3
FURNISHED BY:MARK
E1 FLOOR / WALL
MOUNT
EQUIPMENT SCHEDULE (FOR REFERENCE ONLY)
IT RACK AND PATCH PANELS
DESCRIPTION
E2
E3
E4
EXISTING
CABLE MANAGEMENT (VERTICAL)
DOOR SECURITY SYSTEM
VIDEO SURVEILLANCE CAMERA
EXISTING IT RACK
EXIST WALL
INSTALLED BY:
E5 DATABASE ACCESS CONTROL SYSTEM EXISTING
VA JSN #:
A0921
A0923
M0436
A1020
E6
E7
E8
AIR CONDITIONER R3000 CONTRACTOR CONTRACTOR
8" CLEAR @ TOP
6'-5" MIN. BOTT.
SEE KEYNOTES
TO REMAIN
VA
VA
VA
VA
SECURITY ACCESS DETECTION A1026 CONTRACTOR
DOOR SECURITY MATCH
EXISTING
EXIST WALL
TO REMAIN
EXIST WALL
TO REMAIN
TELEPHONE WITH SPEAKER A1012 EXIST WALL
TO REMAINVA
PARTS
E9 FOLD DOWN WRITING SURFACE F0610 VA DESK SURFACE
34" A.F.F.VA
CONTRACTOR
DOOR SECURITY
E10 CABINET WITH INTERNAL EQUIPMENT A0919 FLOOR
VA
2,3
E11 POWER RECEPTICLE, QUAD OR DUPLEXA0925 EXISTING EXIST WALL
TO REMAINN / A
E12
E13
ALUMINUM LADDER TRAY AND BRACKETS
4" J-HOOK & HANGER VA
VA CONTRACTOR
CONTRACTOR
1,2,5,6
CEILING / WALL
CEILING / JOIST
E14 DATA SUPPORT DEVICES AND EXIST WALL
TO REMAINVA- VA
E15
WALL OR FLOOR PENETRATIONS.
PER KEYNOTE, OR
EXISTING CABLECONTRACTOR- CONTRACTOR
METAL CONDUIT SLEEVE (2" DIA. MIN) 4"
DIA, TYP. (ALT) 2-PIECE SLEEVE FOR EXIST LOCATION, V.I.F.
SCHEDULE 40 PIPE OR EQUIVALENT SLEEVE.
SOME LOCATIONS REQUIRE 2-PIECE PIPE WITH
CLAMPS. SEE DETAIL 12 / AG001
E16 3" x 5" METAL D RING CABLE SUPPORT VA CONTRACTOR
CEILING / WALL
- SPACED 36" C / C
REMARKS:
1. CONTRACTOR TO COORDINATE WITH COR AND VERIFY THE EXISTING CONDITION AT EACH LOCATION, THE OVERHEAD STRUCTURE FOR MOUNTING CABLE SUPPORT HARDWARE. PROVIDE BRACKET AND FASTENERS REQUIRED.
E17 VA CONTRACTOR
CEILING / JOIST
- SPACED 36" C / C
CAT64HP OR EQUIVALENT, TIA / EIA COMPLIANT
SPACING 36" C / CPROVIDE TREE MOUNTING TABS AND HANGER.
VERIFY MOUNTING CONDITION TO SELECT TYPE.
2. CONTRACTOR TO COORDINATE WITH COR ON EXACT MOUNTING LOCATIONS OF EQUIPMENT, CHANGES MADE TO LOCATIONS OF EXISTING EQUIPMENT, AND FULL EXTENT OF CABLE SUPPORT REQUIRED.
3. CONTRACTOR TO PROTECT EXISTING EQUIPMENT FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. EXISTING EQUIPMENT WILL REMAIN ACTIVE AND IN WORKING ORDER TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.
QUANTITY
4. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
5. VA STANDARD EQUIPMENT PROVIDED BY THE VA PER OIT DEPARTMENT SPECIFICATIONS.
6. CONTRACTOR TO PROVIDE CONTINUOUS CABLE SUPPORT (AS CABLE OR BUNDLE) WITHIN OIT CLOSET TO THE POINT OF PENETRATION (AT WALL, FLOOR OR CEILING), AND ADJACENT ROOMS WITHIN 6' FROM PENETRATION POINT.
7. CONTRACTOR TO PROVIDE AND INSTALL IN-WALL BLOCKING. FIRE TREATED WOOD 2X6 OR EQUIVALENT BETWEEN STUDS AT HEIGHTS REQUIRED. SEE ELEVATIONS AND WALL TYPE LEGEND FOR ADDITIONAL INFORMATION.
2,3,9
8. SPACE RESERVED FOR EXISTING EQUIPMENT OR FUTURE, ADJUST EQUIPMENT LOCATIONS TO ALLOW FOR EXPANSION AND CLEARANCES AROUND EQUIPMENT.
2,3
2,3
9. WORK PERFORMED BY SEPARATE CONTRACT. COORDINATE WITH VA'S DESIGNATED CONTRACTOR FOR FULL EQUIPMENT INSTALLATION AND TESTING. SEE DOOR SCHEDULE AND SPECIFICATION FOR ADDITIONAL INFORMATION.
2,3,9
2,3
3,4
1,2,5,6
1,2,5,6
1,2,5,6
E18 UNINTERUPTED POWER SUPPLY VA SUPPLIED
VA WALL BRACKETS
- OR IN RACK
2,5,10
10. VA TO PROVIDE ALL RELATED MOUNTING HARDWARE FOR EXISTING EQUIPMENT. CONTRACTOR TO COORDINATE WITH COR FOR MOUNTING REQUIREMENTS.
EXISTING UPS /
DST-500 OR EQUIVALENT 9 mm BENT WIRE, D RING BRACKET WITH (4) 5.5 mm HOLES FOR SCREWS.
FINISH TO NON-CONDUCTIVE, BLACK.
VA OR
CONT. OR EXISTING
DOOR SECURITY
1MATCH EXISTING LADDER RACK TYPE, SIZE AND
SUPPORT BRACKETS. VERIFY WIDTH. SEE DETAIL
12 / AG001.
25 MAX
2" J-HOOK & HANGER
CAT32HP OR EQUIVALENT, TIA / EIA COMPLIANT
PROVIDE TREE MOUNTING TABS AND HANGER.
VERIFY MOUNTING CONDITION TO SELECT TYPE.
ACCESSORIES, SECURITY + VIDEO
A0924
INDOOR UNIT EVAPORATOR
(PROJECT)
25 MAX
(PROJECT)
25 MAX
(PROJECT)
18" MIN. A.F.F.
CONT. OR EXISTING
DOOR SECURITY
EXISTING
VA OR
EXISTING
VA OR
EXISTING
VA OR
EXISTING
FUTURE
EXISTING /
EXISTING
EXISTING
EXISTING
EXISTING
DOOR / HDW
EXISTING
EXISTING
EXISTING
EXISTING
25 MAX
(PROJECT)
EXISTING
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
V.I.F.
(5' SECTION)
A1026
(BADGE READERS, DOOR H.W. TIE-INS)
(CONTROL PANELS, RTE, CHORDS, CONDUIT)
NEW WALL PATCH
NEW FLOOR AND
BASE
FU
LL
H T.
6" (V
.I.
F.
1 4" 8"
(C
LE
AR
E6(U
NI
T)
E4
CAMERA REINSTALL
SAME WALL
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - PLAN - ROOM 528C 1
1.AS105
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
NOT TO SCALE
BUILDING 1 KEY PLAN
RENOVATION
AREA
FIFTH FLOOR
PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.
SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.
CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.21
1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.
2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER
TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.
3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL
CONTRACTOR.
4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.
5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.
6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH
CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.
7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO
THE END OF THE DAY OF CONSTRUCTION.
8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER
REFERENCED PROJECT DETAILS.
CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND
CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.
PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET
AG001 FOR SPECIFIC WALL TYPES NOTED.
CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR
ADDITIONAL INFORMATION.
EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7
NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"
CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT
PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR
ADDITIONAL INFORMATION.
PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.
PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.
SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.
ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL
SURFACES.
PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH
SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.
CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW
AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.
CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE
MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR
WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.
CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.