36C25019B0007-010.pdf

PDF 17 MB Posted

Attached to
Correct OIT Deficiencies 610A4-16-101 Federal contract opportunity
Solicitation number
36C25019B0007
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0007 Drawings 5 of 11.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Correct OIT Deficiencies 610A4-16-101, newest first.
File Type Posted
36C25019C0184-000.docx DOCX document
VA251-15-D-0142-000.docx DOCX document
36C25019B0007-0007004.docx DOCX document
36C25019B0007-0006000.docx DOCX document
36C25019B0007-0005000.docx DOCX document
36C25019B0007-0004000.docx DOCX document
36C25019B0007-0003000.docx DOCX document
36C25019B0007-0003001.pdf PDF
36C25019B0007-0002000.docx DOCX document
36C25019B0007-0001000.docx DOCX document
36C25019B0007-004.pdf PDF
36C25019B0007-013.pdf PDF
36C25019B0007-016.pdf PDF
36C25019B0007-014.pdf PDF
36C25019B0007-012.pdf PDF
36C25019B0007-005.docx DOCX document
36C25019B0007-003.doc DOC document
36C25019B0007-006.pdf PDF
36C25019B0007-015.pdf PDF
36C25019B0007-008.pdf PDF
36C25019B0007-002.pdf PDF
36C25019B0007-009.pdf PDF
36C25019B0007-011.pdf PDF
36C25019B0007-007.pdf PDF
36C25019B0007-001.docx DOCX document
36C25019B0007-000.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TR

AN

S.

FD

EL

EC

EL

EC

EXISTING

MECH

EXISTING

ROOM

EXISTING

CORRIDOR

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

TR

AN

S.

155A

EL

EC

EL

EC

EL

EC

EXISTING

MECHANICAL

UNIT

PA

NE

L

CR

-1

4'-8"

(FIELD VERIFY)

6'- 3"

5'- 6"

(FI

EL

D

VE

RI

FY

A1

A1

A2

A3

33 5

TYP.

EXISTING

CORRIDOR

EXISTING

OFFICE

EXISTING

ROOM

EXISTING

CORRIDOR

EXISTING

ROOM

EXISTING

OIT CLOSET

176A

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

SERVICE

ELEVATOR

PA

NE

L

CR

-1

A

176A6

OPTICOM

IT RACK E1

E9

E2

W E8

E4

E3 E5 E14 E18

E11

E11

E15

(CEILING)

E15

(CEILING)

VERIFY

POWER

VERIFY

POWER

2'- 0"

(V .I.

F.

T

E6

COORDINATE WITH COR AND OIT TO

EVALUATE IMPROVED LOCATION OF

EQUIPMENT WITHIN THE CLOSET.

CAM

PA

NE

LS

CR E7

/ 1

.A S1

7 / 1.AS101

2'-

2'-0"

1'- 4"

METAL FOLD DOWN

WRITING DESK,

(FUTURE)

E9

NEW WALL W/

PLYWOOD

NEW FLOOR AND

BASE

3"

7'- 43 4"

1 4"

8" (V

.I.

F.

H

VA

C

UN

IT

M

OU

NT

IN

G)

(C

LE

AR

E6(U

NI

T)

OPTICOM

WALL RACK

(SIDE VIEW)

8'- 6"

(LI

GH

TS

, M

IN

IM

UM

H

EIG

HT

O R

CE

ILI

NG

M

T.

E8

PHONE

REINSTALL

VE

RI

FY

H

EIG

HT

FU

LL

H T.

6" (V

.I.

F.

E4

OPTICOM

WALL RACK

REINSTALL FIBER

RACK. VERIFY EXIST

FIBER CABLE LENGTH.

EQUIPMENT INTENDS

TO REMAIN ACTIVE.

M

AT

CH

E

XIS

TIN

G

E3 E5 E14 E18

EXISTING

IT RACK

E11

VERIFY EXIST POWER

NEW FURRED

PLYWOOD

REINSTALL

EQUIPMENT

E6

E11

IT RACK E1E2

IT RACK E1E2 E2

PA

NE

LS E3

E5 E14 E18

PANELS

PA

NE

LS

IT CABINET

E10

SHELVING

W E8

CA

M

E4

CR E7

E15

E15

E15 E15

E15

E15

M

AT

CH

E

XIS

TIN

G (V

.I.

F.

M

AT

CH

E

XIS

TIN

G

(V .I.

F.

3'-0"

(CLEAR)

VERIFY EXIST POWER

E9

3'- 0"

(V .I.

F.

CA

BL

E

TR

AY

A

BO

VE

E6

ADJUST CAMERA

HEIGHT BELOW

EVAPORATOR

T

3'- 41 4"

(V .I.

F.

COORDINATE WITH COR AND OIT TO

EVALUATE IMPROVED LOCATION OF

EQUIPMENT WITHIN THE CLOSET.

/ 1

.A S1

FU

LL

H T.

6" (V

.I.

F.

E3 E5 E14 E18

EXISTING

IT RACK

E11

VERIFY EXIST POWER

EXISTING

IT CABINET

E15 E15E15

E15

E8

'-2

(LI

GH

TS

, M

IN

IM

UM

H

EIG

HT

O R

CE

ILI

NG

M

T.

REINSTALL

EQUIPMENT

REINSTALL

PHONE

REINSTALL

GROUND BAR

FIRE CAULK GAPS

IN CONDUIT, TYP.

NEW FINISHES

ON EXISTING

WALL BOARD

REINSTALL

EXISTING PANELS

ON SIDE WALL

EXIST CABLE TRAY

2'-

1'-

4"E9

3'-0" (V.I.F.)

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - PLAN - ROOM 155 OIT CLOSET 1

1.AS101

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

FIRST FLOOR

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - PLAN - ROOM 176A OIT CLOSET 3

1.AS101

PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.

SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.

CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.21

1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.

2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER

TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.

3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL

CONTRACTOR.

4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.

5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH

CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO

THE END OF THE DAY OF CONSTRUCTION.

8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER

REFERENCED PROJECT DETAILS.

CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND

CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.

PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET

AG001 FOR SPECIFIC WALL TYPES NOTED.

CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR

ADDITIONAL INFORMATION.

EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7

NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"

CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT

PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR

ADDITIONAL INFORMATION.

PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.

PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.

SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL

SURFACES.

PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.

CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW

AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.

CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE

MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR

WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING OPENING, PROVIDE MATERIALS OF LIKE CONSTRUCTION AND PATCH TO MATCH ADJACENT WALLS TO SHOW NO EVIDENCE OF CONSTRUCTION. FLASH & CAULK GAPS AROUND OPENINGS FOR WEATHER TIGHT SEAL. SEE DETAIL 6/AG001. SEE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME. PROVIDE BLOCKING AND WALL INFILL TO MATCH ADJACENT WALL CONSTRUCTION AT THE INSIDE WALL

OPENING BELOW THE WINDOW. SEE DETAIL 5 / AG001 FOR ADDITIONAL INFORMATION.

22 CONTRACTOR TO PROVIDE AN EMERGENCY POWER SYSTEM. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

23 CONTRACTOR TO PROVIDE AND INSTALL NEW WALL INFILL BETWEEN EXISTING MASONRY CORRIDOR WALL--SEE WALL PARTITION SCHEDULE FOR ADDITIONAL INFORMATION. ALIGN NEW WALL FINISH BOARD FLUSH WITH FACE OF CORRIDOR WALL, PATCH AND PAINT FOR SEAMLESS APPEARANCE BETWEEN OLD AND NEW CONSTRUCTION.

CAULK AND SEAL GAPS IN WALL FOR SMOKE RESISTANT ASSEMBLY. SEE SHEET AG001 FOR ADDITIONAL

INFORMATION.

24 CONTRACTOR TO INSTALL SALVAGED DOOR AND DOOR HARDWARE IN NEW LOCATION. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.

25 CONTRACTOR TO PROVIDE AND INSTALL NEW DOOR, FRAME AND SALVAGED HARDWARE. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.

26 CONTRACTOR TO PROVIDE AND INSTALL ROOM SIGN AT NEW LOCATION. MATCH EXISTING MOUNTING HEIGHTS.

SEE DETAIL 5/ 6.AS101. COORDINATE WITH COR AND VA INTERIORS FOR APPROVAL OF SIGN SUBMITTALS AND

NUMBERING.

27 CONTRACTOR TO INSTALL SALVAGED ROOM SIGN THAT READS "ROOM 210D", MATCH MOUNTING HEIGHTS TO

EXISTING. COORDINATE WITH THE COR ON SIGN DETAILS.

28 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT NEW WALLS IN THEIR ENTIRETY OUTSIDE OF OIT

ROOM. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

29 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON EXISTING WALLS IN THEIR ENTIRETY FROM CORNER TO CORNER AND FULL HEIGHT. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

30 CONTRACTOR TO INSTALL SALVAGED LOCKERS IN NEW LOCATION. COORDINATE WITH THE VA

31 CONTRACTOR TO COORDINATE WITH COR AND OIT DESIGNATED PERSON TO RELOCATE ANY OIT EQUIPMENT IN THE ROOM AND EQUIPMENT TO REMOUNT AS REQUIRED. COORDINATE WITH DOOR SECURITY CONTRACTOR

FOR ALL WORK WITH DOOR HARDWARE AND SECURITY SYSTEM PANELS.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW

FRAME. PROVIDE PERIMETER TRIM AS REQUIRED.

CONTRACTOR TO PROVIDE AND INSTALL DOOR. VERIFY SALVAGED HARDWARE AND DOOR SLABS. SEE DOOR

SCHEDULE ON SHEET AG001.

CONTRACTOR SHALL CUT DOWN AND INSTALL SALVAGED HANDRAIL AND ACCESSORIES. PROVIDE INSERT FITTINGS REQUIRED TO SECURE SEPARATE PIECES (FASTENED TIGHT, PREVENTING ROTATION) AND ANCHOR TO WALL ASSEMBLY FOR A CONTINUOUS LENGTH OF RAIL AT EACH WALL SEGMENT. NO MORE THAN ONE JOINT MARK PER RAILING AT EITHER END CENTERED ON A BRACKET. IN EXISTING WALLS, USE MASONRY ANCHORS CAPABLE OF RESISTING PULL OUT; AT THE WALL INFILL PROVIDE BLOCKING TO MOUNT EACH BRACKET CAPABLE OF RESISTING A SINGLE CONCENTRATED LOAD OF 200 LBS AT ANY POINT ALONG THE TOP. HANDRAIL MOUNTING HEIGHT ABOVE FINISH FLOOR AND PROJECTION FROM WALL SHALL MATCH EXISTING.

CONTRACTOR SHALL PROVIDE AND INSTALL DRYWALL END CAP ON EXPOSED PORTION OF CMU, FULL HEIGHT.35

CONTRACTOR SHALL PROVIDE AND INSTALL HEADER SUPPORT FOR A LOAD BEARING CONDITION AT TOP OF

WALL AND AS REQUIRED FOR NEW DOORS, VERIFY IN FIELD.

CONTRACTOR SHALL PROVIDE AND INSTALL 3/4" PLYWOOD OVER EXISTING STUD WALL. VERIFY CLEARANCES BETWEEN EXISTING EQUIPMENT PANELS AND NEW WALLS. PROVIDE 2 COATS OF PAINT TO MATCH NEW WALLS.

CONTRACTOR TO PROVIDE IN-WALL BLOCKING BETWEEN FRAMING FOR EQUIPMENT SUPPORT. PATCH FINISH

BOARD AS REQUIRED TO MATCH EXISTING WALL TO SHOW NO EVIDENCE OF CONSTRUCTION.

CONTRACTOR TO VERIFY AND PROVIDE CABLE PENETRATION SLEEVE THROUGH WALLS. PROVIDE SPLIT CONDUIT (2-PIECE) WITH CLAMPS AT EXISTING CABLE PENETRATIONS WITHOUT SLEEVED PROTECTION.

SLEEVES RESERVED FOR FUTURE USE SHALL BE INSTALLED WITH A CLOSED CAP ON EACH END. FIELD VERIFY NUMBER REQUIRED WITH COR AND OIT AT EACH ROOM. INSTALL FIRE BLOCKING AND SEALANT AS REQUIRED AT EACH. SEE EQUIPMENT SCHEDULE AND DETAIL 12 / AG001 FOR ADDITIONAL INFORMATION. SEE

REFLECTED CEILING PLAN FOR ADDITIONAL PENETRATIONS SHOWN.

EXISTING WALL FRAMING AND FINISH TO REMAIN. PROTECT WALL AND EQUIPMENT FROM DAMAGE, NO NEW

FINISHES IN AREA OF EXISTING WALL MOUNTED PANELS.

CONTRACTOR TO PATCH AND PROVIDE 2 COATS OF PAINT ON WALLS IN COORDINATION WITH NOTE 1 ON

SHEET 1.AS900 AND NOTE 39 ON SHEET 1.AS100.

NOTE:

ALL NON-OIT RELATED EQUIPMENT AND WALL

ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,

HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO

PERFORMING DEMOLITION OR NEW CONSTRUCTION

WORK, AND SALVAGED FOR REUSE. COORDINATE WITH

THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

NOTE:

THE CONTRACTOR SHALL NOT DAMAGE, MOVE,

DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR

RELATED APPURTENANCES WITHOUT THE FIRST

APPROVAL AND SUPERVISION OF THE OIT MANAGER OR

DESIGNATED PERSON.

NOTE:

ANY WORK PERFORMED BY THE CONTRACTOR THE VA

RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO

SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND

PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY

/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS

OR CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROTECT EXISTING CEILING,

FLOOR, AND WALLS FROM DAMAGE DURING

CONSTRUCTION AND IMPLEMENTATION OF INFECTION

AND DUST CONTROL BARRIERS. AFTER THE REMOVAL

OF TEMPORARY BARRIERS, TOUCH UP PAINT ON

CEILINGS AND WALLS AS NEEDED TO SHOW NO

EVIDENCE OF CONSTRUCTION.

NOTE:

SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM

REQUIREMENTS, DETAILS AND PHASING NOTES.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS

ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN

EXISTING MECHANICAL AND PIPING EQUIPMENT.

CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR

WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

NOTE:

NOT ALL KEYNOTES ARE USED ON EVERY SHEET.

CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR

COMPLETE SCOPE OF WORK IN EACH SPACE.

SCALE: 1/2" = 1'-0"

ENLARGED EQUIPMENT PLAN A155 2

1.AS101

**SEE REFERENCE EQUIPMENT SCHEDULE ON SHEET 1.AS100

SCALE: 1/2" = 1'-0"

ELEVATION 6

1.AS101SCALE: 1/2" = 1'-0"

ELEVATION 7

1.AS101

SCALE: 3/8" = 1'-0"

ENLARGED EQUIPMENT PLAN 176 4

1.AS101SCALE: 1/2" = 1'-0"

ELEVATION 5

1.AS101

**SEE REFERENCE EQUIPMENT SCHEDULE ON SHEET 1.AS100

AutoCAD SHX Text

TWT

AutoCAD SHX Text

PARTIAL-FIRST-FLOOR

AutoCAD SHX Text

NRF

AutoCAD SHX Text

TWT

AutoCAD SHX Text

ARCHITECTURAL-PLAN

AutoCAD SHX Text

1.AS101

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of 87

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FORT WAYNE, INDIANA

AutoCAD SHX Text

CORRECT OIT DEFICIENCIES

AutoCAD SHX Text 610A4-16-101

AutoCAD SHX Text 2/13/2018

AutoCAD SHX Text

CERTIFICATION:

AutoCAD SHX Text

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PLAN CONSTRUCTION NOTES

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES

AutoCAD SHX Text

PLAN CONSTRUCTION NOTES CONT.

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 10800038

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text No.

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text W.

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text

2/1.AS101

AutoCAD SHX Text

4/1.AS101

PANEL

EXISTING

ROOM

EXISTING

CORRIDOR

EXISTING

CORRIDOR

EXISTING

RESTROOM

210B

EXISTING

BREAK ROOM

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

210CIT

CLOSET

210C

EP

PANELPANEL

DUMBWAITER

SERVICE

ELEVATOR

(AREA FOR CONDENSER

ON ROOF DIRECTLY OUTSIDE

ROOM 210, ONE FLOOR

DOWN--SEE MECHANICAL

DRAWINGS)

EXISTING

STORAGE

210A

210D

FRIDGE

CHASE

12'-218"

3'- 6"

'-1

0" (V

.I.

F.

7'-714"+\- A1

A3 6

A7

4'- 01 2"

(V .I.

F.

6"

(V.I.F.)

PANEL

OPTICOM

E9

IT RACK E1

E3 E5 E14 E18

E2

W E8

E11E11

1'- 6"

(V .I.

F.

1'- 91 2"

(V .I.

F.

E4

E15

(CEILING)

E15

E6 T

COORDINATE WITH COR AND OIT TO

EVALUATE IMPROVED LOCATION OF

EQUIPMENT WITHIN THE CLOSET.

CAM

PA

NE

LS

CR E7

3 / 1.AS102

/ 1

.A S1

2'-

1'-

4"

METAL FOLD DOWN

WRITING DESK,

(FUTURE)

E9

NEW FLOOR AND

BASE

VERIFY CLEAR

FU

LL

H T.

6" (V

.I.

F.

E8

EXIST PANEL

E3 E5 E14 E18

EXISTING IT RACK

PHONE

REINSTALL

EXIST EQUIPMENT

TO REMAIN (ON

SIDE WALL).

OPTICOM

WALL RACK

M

AT

CH

E

XIS

TIN

G

E11

E11

FU

LL

H T.

6"

1'-912" (V.I.F.)

E3 E5 E14

1'-6"

E4

EXISTING

EQUIPMENT

TO REMAIN

EXISTING

IT RACK

NEW FLOOR

AND BASE

E11

E18

8'- 6"

(LI

GH

TS

, M

IN

IM

UM

H

EIG

HT

O R

CE

ILI

NG

M

T.

ADJUST OUTLET

LOCATION

REINSTALL FIBER

RACK. VERIFY EXIST

FIBER CABLE LENGTH.

EQUIPMENT INTENDS

TO REMAIN ACTIVE.

E11

REMARKS

2,3

FURNISHED BY:MARK

E1 FLOOR / WALL

MOUNT

EQUIPMENT SCHEDULE (FOR REFERENCE ONLY)

IT RACK AND PATCH PANELS

DESCRIPTION

E2

E3

E4

EXISTING

CABLE MANAGEMENT (VERTICAL)

DOOR SECURITY SYSTEM

VIDEO SURVEILLANCE CAMERA

EXISTING IT RACK

EXIST WALL

INSTALLED BY:

E5 DATABASE ACCESS CONTROL SYSTEM EXISTING

VA JSN #:

A0921

A0923

M0436

A1020

E6

E7

E8

AIR CONDITIONER R3000 CONTRACTOR CONTRACTOR

8" CLEAR @ TOP

6'-5" MIN. BOTT.

SEE KEYNOTES

TO REMAIN

VA

VA

VA

VA

SECURITY ACCESS DETECTION A1026 CONTRACTOR

DOOR SECURITY MATCH

EXISTING

EXIST WALL

TO REMAIN

EXIST WALL

TO REMAIN

TELEPHONE WITH SPEAKER A1012 EXIST WALL

TO REMAINVA

PARTS

E9 FOLD DOWN WRITING SURFACE F0610 VA DESK SURFACE

34" A.F.F.VA

CONTRACTOR

DOOR SECURITY

E10 CABINET WITH INTERNAL EQUIPMENT A0919 FLOOR

VA

2,3

E11 POWER RECEPTICLE, QUAD OR DUPLEXA0925 EXISTING EXIST WALL

TO REMAINN / A

E12

E13

ALUMINUM LADDER TRAY AND BRACKETS

4" J-HOOK & HANGER VA

VA CONTRACTOR

CONTRACTOR

1,2,5,6

CEILING / WALL

CEILING / JOIST

E14 DATA SUPPORT DEVICES AND EXIST WALL

TO REMAINVA- VA

E15

WALL OR FLOOR PENETRATIONS.

PER KEYNOTE, OR

EXISTING CABLECONTRACTOR- CONTRACTOR

METAL CONDUIT SLEEVE (2" DIA. MIN) 4"

DIA, TYP. (ALT) 2-PIECE SLEEVE FOR EXIST LOCATION, V.I.F.

SCHEDULE 40 PIPE OR EQUIVALENT SLEEVE.

SOME LOCATIONS REQUIRE 2-PIECE PIPE WITH

CLAMPS. SEE DETAIL 12 / AG001

E16 3" x 5" METAL D RING CABLE SUPPORT VA CONTRACTOR

CEILING / WALL

- SPACED 36" C / C

REMARKS:

1. CONTRACTOR TO COORDINATE WITH COR AND VERIFY THE EXISTING CONDITION AT EACH LOCATION, THE OVERHEAD STRUCTURE FOR MOUNTING CABLE SUPPORT HARDWARE. PROVIDE BRACKET AND FASTENERS REQUIRED.

E17 VA CONTRACTOR

CEILING / JOIST

- SPACED 36" C / C

CAT64HP OR EQUIVALENT, TIA / EIA COMPLIANT

SPACING 36" C / CPROVIDE TREE MOUNTING TABS AND HANGER.

VERIFY MOUNTING CONDITION TO SELECT TYPE.

2. CONTRACTOR TO COORDINATE WITH COR ON EXACT MOUNTING LOCATIONS OF EQUIPMENT, CHANGES MADE TO LOCATIONS OF EXISTING EQUIPMENT, AND FULL EXTENT OF CABLE SUPPORT REQUIRED.

3. CONTRACTOR TO PROTECT EXISTING EQUIPMENT FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. EXISTING EQUIPMENT WILL REMAIN ACTIVE AND IN WORKING ORDER TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.

QUANTITY

4. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

5. VA STANDARD EQUIPMENT PROVIDED BY THE VA PER OIT DEPARTMENT SPECIFICATIONS.

6. CONTRACTOR TO PROVIDE CONTINUOUS CABLE SUPPORT (AS CABLE OR BUNDLE) WITHIN OIT CLOSET TO THE POINT OF PENETRATION (AT WALL, FLOOR OR CEILING), AND ADJACENT ROOMS WITHIN 6' FROM PENETRATION POINT.

7. CONTRACTOR TO PROVIDE AND INSTALL IN-WALL BLOCKING. FIRE TREATED WOOD 2X6 OR EQUIVALENT BETWEEN STUDS AT HEIGHTS REQUIRED. SEE ELEVATIONS AND WALL TYPE LEGEND FOR ADDITIONAL INFORMATION.

2,3,9

8. SPACE RESERVED FOR EXISTING EQUIPMENT OR FUTURE, ADJUST EQUIPMENT LOCATIONS TO ALLOW FOR EXPANSION AND CLEARANCES AROUND EQUIPMENT.

2,3

2,3

9. WORK PERFORMED BY SEPARATE CONTRACT. COORDINATE WITH VA'S DESIGNATED CONTRACTOR FOR FULL EQUIPMENT INSTALLATION AND TESTING. SEE DOOR SCHEDULE AND SPECIFICATION FOR ADDITIONAL INFORMATION.

2,3,9

2,3

3,4

1,2,5,6

1,2,5,6

1,2,5,6

E18 UNINTERUPTED POWER SUPPLY VA SUPPLIED

VA WALL BRACKETS

- OR IN RACK

2,5,10

10. VA TO PROVIDE ALL RELATED MOUNTING HARDWARE FOR EXISTING EQUIPMENT. CONTRACTOR TO COORDINATE WITH COR FOR MOUNTING REQUIREMENTS.

EXISTING UPS /

DST-500 OR EQUIVALENT 9 mm BENT WIRE, D RING BRACKET WITH (4) 5.5 mm HOLES FOR SCREWS.

FINISH TO NON-CONDUCTIVE, BLACK.

VA OR

CONT. OR EXISTING

DOOR SECURITY

1MATCH EXISTING LADDER RACK TYPE, SIZE AND

SUPPORT BRACKETS. VERIFY WIDTH. SEE DETAIL

12 / AG001.

25 MAX

2" J-HOOK & HANGER

CAT32HP OR EQUIVALENT, TIA / EIA COMPLIANT

PROVIDE TREE MOUNTING TABS AND HANGER.

VERIFY MOUNTING CONDITION TO SELECT TYPE.

ACCESSORIES, SECURITY + VIDEO

A0924

INDOOR UNIT EVAPORATOR

(PROJECT)

25 MAX

(PROJECT)

25 MAX

(PROJECT)

18" MIN. A.F.F.

CONT. OR EXISTING

DOOR SECURITY

EXISTING

VA OR

EXISTING

VA OR

EXISTING

VA OR

EXISTING

FUTURE

EXISTING /

EXISTING

EXISTING

EXISTING

EXISTING

DOOR / HDW

EXISTING

EXISTING

EXISTING

EXISTING

25 MAX

(PROJECT)

EXISTING

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

(5' SECTION)

A1026

(BADGE READERS, DOOR H.W. TIE-INS)

(CONTROL PANELS, RTE, CHORDS, CONDUIT)

FRAMING

3"

CORNER GUARD COVER

#6 X 1 5/8" BUGLE HD SMS

18" C / C MAX.

ALUMINUM RETAINER

GYPSUM BOARD

SHEATHING

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - PLAN - ROOM 210C 1

1.AS102

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

SECOND FLOOR

PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.

SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.

CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.21

1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.

2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER

TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.

3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL

CONTRACTOR.

4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.

5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH

CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO

THE END OF THE DAY OF CONSTRUCTION.

8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER

REFERENCED PROJECT DETAILS.

CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND

CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.

PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET

AG001 FOR SPECIFIC WALL TYPES NOTED.

CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR

ADDITIONAL INFORMATION.

EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7

NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"

CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT

PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR

ADDITIONAL INFORMATION.

PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.

PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.

SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL

SURFACES.

PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.

CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW

AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.

CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE

MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR

WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING OPENING, PROVIDE MATERIALS OF LIKE CONSTRUCTION AND PATCH TO MATCH ADJACENT WALLS TO SHOW NO EVIDENCE OF CONSTRUCTION. FLASH & CAULK GAPS AROUND OPENINGS FOR WEATHER TIGHT SEAL. SEE DETAIL 6/AG001. SEE MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME. PROVIDE BLOCKING AND WALL INFILL TO MATCH ADJACENT WALL CONSTRUCTION AT THE INSIDE WALL

OPENING BELOW THE WINDOW. SEE DETAIL 5 / AG001 FOR ADDITIONAL INFORMATION.

22 CONTRACTOR TO PROVIDE AN EMERGENCY POWER SYSTEM. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

23 CONTRACTOR TO PROVIDE AND INSTALL NEW WALL INFILL BETWEEN EXISTING MASONRY CORRIDOR WALL--SEE WALL PARTITION SCHEDULE FOR ADDITIONAL INFORMATION. ALIGN NEW WALL FINISH BOARD FLUSH WITH FACE OF CORRIDOR WALL, PATCH AND PAINT FOR SEAMLESS APPEARANCE BETWEEN OLD AND NEW CONSTRUCTION.

CAULK AND SEAL GAPS IN WALL FOR SMOKE RESISTANT ASSEMBLY. SEE SHEET AG001 FOR ADDITIONAL

INFORMATION.

24 CONTRACTOR TO INSTALL SALVAGED DOOR AND DOOR HARDWARE IN NEW LOCATION. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.

25 CONTRACTOR TO PROVIDE AND INSTALL NEW DOOR, FRAME AND SALVAGED HARDWARE. COORDINATE WITH DOOR SECURITY CONTRACTOR. SEE DOOR SCHEDULE ON SHEET AG001 FOR ADDITIONAL INFORMATION.

26 CONTRACTOR TO PROVIDE AND INSTALL ROOM SIGN AT NEW LOCATION. MATCH EXISTING MOUNTING HEIGHTS.

SEE DETAIL 5/ 6.AS101. COORDINATE WITH COR AND VA INTERIORS FOR APPROVAL OF SIGN SUBMITTALS AND

NUMBERING.

27 CONTRACTOR TO INSTALL SALVAGED ROOM SIGN THAT READS "ROOM 210D", MATCH MOUNTING HEIGHTS TO

EXISTING. COORDINATE WITH THE COR ON SIGN DETAILS.

28 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT NEW WALLS IN THEIR ENTIRETY OUTSIDE OF OIT

ROOM. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

29 CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON EXISTING WALLS IN THEIR ENTIRETY FROM CORNER TO CORNER AND FULL HEIGHT. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

30 CONTRACTOR TO INSTALL SALVAGED LOCKERS IN NEW LOCATION. COORDINATE WITH THE VA

31 CONTRACTOR TO COORDINATE WITH COR AND OIT DESIGNATED PERSON TO RELOCATE ANY OIT EQUIPMENT IN THE ROOM AND EQUIPMENT TO REMOUNT AS REQUIRED. COORDINATE WITH DOOR SECURITY CONTRACTOR

FOR ALL WORK WITH DOOR HARDWARE AND SECURITY SYSTEM PANELS.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW

FRAME. PROVIDE PERIMETER TRIM AS REQUIRED.

CONTRACTOR TO PROVIDE AND INSTALL DOOR. VERIFY SALVAGED HARDWARE AND DOOR SLABS. SEE DOOR

SCHEDULE ON SHEET AG001.

CONTRACTOR SHALL CUT DOWN AND INSTALL SALVAGED HANDRAIL AND ACCESSORIES. PROVIDE INSERT FITTINGS REQUIRED TO SECURE SEPARATE PIECES (FASTENED TIGHT, PREVENTING ROTATION) AND ANCHOR TO WALL ASSEMBLY FOR A CONTINUOUS LENGTH OF RAIL AT EACH WALL SEGMENT. NO MORE THAN ONE JOINT MARK PER RAILING AT EITHER END CENTERED ON A BRACKET. IN EXISTING WALLS, USE MASONRY ANCHORS CAPABLE OF RESISTING PULL OUT; AT THE WALL INFILL PROVIDE BLOCKING TO MOUNT EACH BRACKET CAPABLE OF RESISTING A SINGLE CONCENTRATED LOAD OF 200 LBS AT ANY POINT ALONG THE TOP. HANDRAIL MOUNTING HEIGHT ABOVE FINISH FLOOR AND PROJECTION FROM WALL SHALL MATCH EXISTING.

CONTRACTOR SHALL PROVIDE AND INSTALL DRYWALL END CAP ON EXPOSED PORTION OF CMU, FULL HEIGHT.35

CONTRACTOR SHALL PROVIDE AND INSTALL HEADER SUPPORT FOR A LOAD BEARING CONDITION AT TOP OF

WALL AND AS REQUIRED FOR NEW DOORS, VERIFY IN FIELD.

CONTRACTOR SHALL PROVIDE AND INSTALL 3/4" PLYWOOD OVER EXISTING STUD WALL. VERIFY CLEARANCES BETWEEN EXISTING EQUIPMENT PANELS AND NEW WALLS. PROVIDE 2 COATS OF PAINT TO MATCH NEW WALLS.

CONTRACTOR TO PROVIDE IN-WALL BLOCKING BETWEEN FRAMING FOR EQUIPMENT SUPPORT. PATCH FINISH

BOARD AS REQUIRED TO MATCH EXISTING WALL TO SHOW NO EVIDENCE OF CONSTRUCTION.

CONTRACTOR TO VERIFY AND PROVIDE CABLE PENETRATION SLEEVE THROUGH WALLS. PROVIDE SPLIT CONDUIT (2-PIECE) WITH CLAMPS AT EXISTING CABLE PENETRATIONS WITHOUT SLEEVED PROTECTION.

SLEEVES RESERVED FOR FUTURE USE SHALL BE INSTALLED WITH A CLOSED CAP ON EACH END. FIELD VERIFY NUMBER REQUIRED WITH COR AND OIT AT EACH ROOM. INSTALL FIRE BLOCKING AND SEALANT AS REQUIRED AT EACH. SEE EQUIPMENT SCHEDULE AND DETAIL 12 / AG001 FOR ADDITIONAL INFORMATION. SEE

REFLECTED CEILING PLAN FOR ADDITIONAL PENETRATIONS SHOWN.

EXISTING WALL FRAMING AND FINISH TO REMAIN. PROTECT WALL AND EQUIPMENT FROM DAMAGE, NO NEW

FINISHES IN AREA OF EXISTING WALL MOUNTED PANELS.

CONTRACTOR TO PATCH AND PROVIDE 2 COATS OF PAINT ON WALLS IN COORDINATION WITH NOTE 1 ON

SHEET 1.AS900 AND NOTE 39 ON SHEET 1.AS100.

NOTE:

ALL NON-OIT RELATED EQUIPMENT AND WALL

ACCESSORIES SUCH AS ELECTRICAL WALL PLATES,

HANGERS AND DEVICES SHALL BE REMOVED PRIOR TO

PERFORMING DEMOLITION OR NEW CONSTRUCTION

WORK, AND SALVAGED FOR REUSE. COORDINATE WITH

THE COR FOR ALL WORK DONE WITHIN THE OIT CLOSETS.

SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

NOTE:

THE CONTRACTOR SHALL NOT DAMAGE, MOVE,

DISCONNECT OR REMOVE ANY OIT EQUIPMENT OR

RELATED APPURTENANCES WITHOUT THE FIRST

APPROVAL AND SUPERVISION OF THE OIT MANAGER OR

DESIGNATED PERSON.

NOTE:

ANY WORK PERFORMED BY THE CONTRACTOR THE VA

RESERVES THE RIGHT TO PROVIDE AN OIT ESCORT TO

SUPERVISE ANY / ALL WORK IN AND AROUND OIT

EQUIPMENT.

NOTE:

CONTRACTOR SHALL SCHEDULE WITH THE COR AND

PROVIDE A 2 WEEK NOTICE FOR STAFF TO REMOVE ANY

/ ALL PERSONAL BELONGINGS FROM LOCKERS, DESKS

OR CABINETS THAT MAY BE AFFECTED BY WORK.

NOTE:

CONTRACTOR SHALL PROTECT EXISTING CEILING,

FLOOR, AND WALLS FROM DAMAGE DURING

CONSTRUCTION AND IMPLEMENTATION OF INFECTION

AND DUST CONTROL BARRIERS. AFTER THE REMOVAL

OF TEMPORARY BARRIERS, TOUCH UP PAINT ON

CEILINGS AND WALLS AS NEEDED TO SHOW NO

EVIDENCE OF CONSTRUCTION.

NOTE:

SEE SHEET GI004-8 FOR ADDITIONAL ICRA, ILSM

REQUIREMENTS, DETAILS AND PHASING NOTES.

NOTE:

CONTRACTOR SHALL PROVIDE THE COR 2 WEEKS

ADVANCE NOTICE FOR WORK THAT MAY SHUTDOWN

EXISTING MECHANICAL AND PIPING EQUIPMENT.

CONTRACTOR SHALL PROVIDE A 4 WEEK NOTICE FOR

WORK THAT MAY SHUTDOWN OR DISCONNECT OIT

EQUIPMENT.

NOTE:

NOT ALL KEYNOTES ARE USED ON EVERY SHEET.

CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR

COMPLETE SCOPE OF WORK IN EACH SPACE.

SCALE: 1/2" = 1'-0"

ENLARGED EQUIPMENT PLAN (FOR REFERENCE ONLY)2

1.AS102

SCALE: 1/2" = 1'-0"

ELEVATION 3

1.AS102SCALE: 1/2" = 1'-0"

ELEVATION 4

1.AS102

SCALE: 6" = 1'-0"

ARCHITECTURAL CORNER GUARD DETAIL5

1.AS102

SOME SYMBOLS MAY NOT BE USED. SYMBOLS SHOWN ON PLAN ARE FOR

REFERENCE ONLY. SEE MECHANICAL AND ELECTRICAL FOR ADDITIONAL

INFORMATION. ALL OIT EQUIPMENT IS EXISTING AND INTENDED TO REMAIN

ACTIVE IN SAME LOCATION FOR MOST LOCATIONS, U.N.O.

PLAN EQUIPMENT

SYMBOL LEGEND

NOTE:

SYMBOL DESCRIPTION

EVAPORATOR UNIT (WALL MOUNTED) -

SEE MECH. DWGS. AND NOTES

FOLD DOWN (WALL MOUNTED)

WRITING DESK

VERTICAL CABLE MANAGEMENT ON IT

RACK

SURVEILLANCE CAMERA

SECURITY CONTROLLERS OR IT-RELATED,

WALL MOUNTED EQUIPMENT.

TEMPERATURE SENSOR OR HVAC

THERMOSTAT - SEE MECH. DWGS.

SPECIALTY POWER OUTLET

DUPLEX OR QUAD OUTLETS

SECURITY ACCESS, CARD READER

PHONE

PANELS

W

CAM

CR

T

AutoCAD SHX Text

TWT

AutoCAD SHX Text

PARTIAL-SECOND-FLOOR

AutoCAD SHX Text

NRF

AutoCAD SHX Text

TWT

AutoCAD SHX Text

ARCHITECTURAL-PLAN

AutoCAD SHX Text

1.AS102

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of 87

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FORT WAYNE, INDIANA

AutoCAD SHX Text

CORRECT OIT DEFICIENCIES

AutoCAD SHX Text 610A4-16-101

AutoCAD SHX Text 2/13/2018

AutoCAD SHX Text

CERTIFICATION:

AutoCAD SHX Text

AutoCAD SHX Text Engineering and Facilities Management Services

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

PLAN CONSTRUCTION NOTES

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES

AutoCAD SHX Text

PLAN CONSTRUCTION NOTES CONT.

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 10800038

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text No.

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text W.

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text T

1/1.AS102

CORRIDOR

A500

EXISTING

WAITING

A528

EXISTING

ROOM

A527

EXISTING

OIT CLOSET

528C

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

CONSTRUCTION LIMIT LINE

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

SERVICE

ELEVATOR

CO

NS

TR

UC

TIO

N

LIM

IT

LIN

E

8A5

4'-1"

MATCH EDGE

C.J. ABOVE AS BELOW

CAULK AS REQ.

IT CABINET

EL

EC

E9

IT RACKE1

E10

WE8

E4

E3 E5 E14 E18

E11

E11 E11

E11

E2E2

10" +/- (V.I.F.)

2'-0" +/- (V.I.F.)

2'- 0"

(V .I.

F.

E11

E6

T

COORDINATE WITH COR AND OIT TO

EVALUATE IMPROVED LOCATION OF

EQUIPMENT WITHIN THE CLOSET.

CA

M

PA

NE

LS

CR E7

3 / 1.AS105

/ 1

.A S1

2'-

1'-

4"

METAL FOLD DOWN

WRITING DESK,

(FUTURE)

E9

NEW WALL PATCH

NEW FLOOR AND

BASE

1'-6"

FU

LL

H T.

6" (V

.I.

F.

E8

ELEC

PANEL

E3 E5 E14 E18

EXISTING IT RACK

E11

PHONE REINSTALL

SAME WALL

EXIST EQUIPMENT

TO REMAIN.

REMARKS

2,3

FURNISHED BY:MARK

E1 FLOOR / WALL

MOUNT

EQUIPMENT SCHEDULE (FOR REFERENCE ONLY)

IT RACK AND PATCH PANELS

DESCRIPTION

E2

E3

E4

EXISTING

CABLE MANAGEMENT (VERTICAL)

DOOR SECURITY SYSTEM

VIDEO SURVEILLANCE CAMERA

EXISTING IT RACK

EXIST WALL

INSTALLED BY:

E5 DATABASE ACCESS CONTROL SYSTEM EXISTING

VA JSN #:

A0921

A0923

M0436

A1020

E6

E7

E8

AIR CONDITIONER R3000 CONTRACTOR CONTRACTOR

8" CLEAR @ TOP

6'-5" MIN. BOTT.

SEE KEYNOTES

TO REMAIN

VA

VA

VA

VA

SECURITY ACCESS DETECTION A1026 CONTRACTOR

DOOR SECURITY MATCH

EXISTING

EXIST WALL

TO REMAIN

EXIST WALL

TO REMAIN

TELEPHONE WITH SPEAKER A1012 EXIST WALL

TO REMAINVA

PARTS

E9 FOLD DOWN WRITING SURFACE F0610 VA DESK SURFACE

34" A.F.F.VA

CONTRACTOR

DOOR SECURITY

E10 CABINET WITH INTERNAL EQUIPMENT A0919 FLOOR

VA

2,3

E11 POWER RECEPTICLE, QUAD OR DUPLEXA0925 EXISTING EXIST WALL

TO REMAINN / A

E12

E13

ALUMINUM LADDER TRAY AND BRACKETS

4" J-HOOK & HANGER VA

VA CONTRACTOR

CONTRACTOR

1,2,5,6

CEILING / WALL

CEILING / JOIST

E14 DATA SUPPORT DEVICES AND EXIST WALL

TO REMAINVA- VA

E15

WALL OR FLOOR PENETRATIONS.

PER KEYNOTE, OR

EXISTING CABLECONTRACTOR- CONTRACTOR

METAL CONDUIT SLEEVE (2" DIA. MIN) 4"

DIA, TYP. (ALT) 2-PIECE SLEEVE FOR EXIST LOCATION, V.I.F.

SCHEDULE 40 PIPE OR EQUIVALENT SLEEVE.

SOME LOCATIONS REQUIRE 2-PIECE PIPE WITH

CLAMPS. SEE DETAIL 12 / AG001

E16 3" x 5" METAL D RING CABLE SUPPORT VA CONTRACTOR

CEILING / WALL

- SPACED 36" C / C

REMARKS:

1. CONTRACTOR TO COORDINATE WITH COR AND VERIFY THE EXISTING CONDITION AT EACH LOCATION, THE OVERHEAD STRUCTURE FOR MOUNTING CABLE SUPPORT HARDWARE. PROVIDE BRACKET AND FASTENERS REQUIRED.

E17 VA CONTRACTOR

CEILING / JOIST

- SPACED 36" C / C

CAT64HP OR EQUIVALENT, TIA / EIA COMPLIANT

SPACING 36" C / CPROVIDE TREE MOUNTING TABS AND HANGER.

VERIFY MOUNTING CONDITION TO SELECT TYPE.

2. CONTRACTOR TO COORDINATE WITH COR ON EXACT MOUNTING LOCATIONS OF EQUIPMENT, CHANGES MADE TO LOCATIONS OF EXISTING EQUIPMENT, AND FULL EXTENT OF CABLE SUPPORT REQUIRED.

3. CONTRACTOR TO PROTECT EXISTING EQUIPMENT FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. EXISTING EQUIPMENT WILL REMAIN ACTIVE AND IN WORKING ORDER TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.

QUANTITY

4. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

5. VA STANDARD EQUIPMENT PROVIDED BY THE VA PER OIT DEPARTMENT SPECIFICATIONS.

6. CONTRACTOR TO PROVIDE CONTINUOUS CABLE SUPPORT (AS CABLE OR BUNDLE) WITHIN OIT CLOSET TO THE POINT OF PENETRATION (AT WALL, FLOOR OR CEILING), AND ADJACENT ROOMS WITHIN 6' FROM PENETRATION POINT.

7. CONTRACTOR TO PROVIDE AND INSTALL IN-WALL BLOCKING. FIRE TREATED WOOD 2X6 OR EQUIVALENT BETWEEN STUDS AT HEIGHTS REQUIRED. SEE ELEVATIONS AND WALL TYPE LEGEND FOR ADDITIONAL INFORMATION.

2,3,9

8. SPACE RESERVED FOR EXISTING EQUIPMENT OR FUTURE, ADJUST EQUIPMENT LOCATIONS TO ALLOW FOR EXPANSION AND CLEARANCES AROUND EQUIPMENT.

2,3

2,3

9. WORK PERFORMED BY SEPARATE CONTRACT. COORDINATE WITH VA'S DESIGNATED CONTRACTOR FOR FULL EQUIPMENT INSTALLATION AND TESTING. SEE DOOR SCHEDULE AND SPECIFICATION FOR ADDITIONAL INFORMATION.

2,3,9

2,3

3,4

1,2,5,6

1,2,5,6

1,2,5,6

E18 UNINTERUPTED POWER SUPPLY VA SUPPLIED

VA WALL BRACKETS

- OR IN RACK

2,5,10

10. VA TO PROVIDE ALL RELATED MOUNTING HARDWARE FOR EXISTING EQUIPMENT. CONTRACTOR TO COORDINATE WITH COR FOR MOUNTING REQUIREMENTS.

EXISTING UPS /

DST-500 OR EQUIVALENT 9 mm BENT WIRE, D RING BRACKET WITH (4) 5.5 mm HOLES FOR SCREWS.

FINISH TO NON-CONDUCTIVE, BLACK.

VA OR

CONT. OR EXISTING

DOOR SECURITY

1MATCH EXISTING LADDER RACK TYPE, SIZE AND

SUPPORT BRACKETS. VERIFY WIDTH. SEE DETAIL

12 / AG001.

25 MAX

2" J-HOOK & HANGER

CAT32HP OR EQUIVALENT, TIA / EIA COMPLIANT

PROVIDE TREE MOUNTING TABS AND HANGER.

VERIFY MOUNTING CONDITION TO SELECT TYPE.

ACCESSORIES, SECURITY + VIDEO

A0924

INDOOR UNIT EVAPORATOR

(PROJECT)

25 MAX

(PROJECT)

25 MAX

(PROJECT)

18" MIN. A.F.F.

CONT. OR EXISTING

DOOR SECURITY

EXISTING

VA OR

EXISTING

VA OR

EXISTING

VA OR

EXISTING

FUTURE

EXISTING /

EXISTING

EXISTING

EXISTING

EXISTING

DOOR / HDW

EXISTING

EXISTING

EXISTING

EXISTING

25 MAX

(PROJECT)

EXISTING

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

V.I.F.

(5' SECTION)

A1026

(BADGE READERS, DOOR H.W. TIE-INS)

(CONTROL PANELS, RTE, CHORDS, CONDUIT)

NEW WALL PATCH

NEW FLOOR AND

BASE

FU

LL

H T.

6" (V

.I.

F.

1 4" 8"

(C

LE

AR

E6(U

NI

T)

E4

CAMERA REINSTALL

SAME WALL

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - PLAN - ROOM 528C 1

1.AS105

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

NOT TO SCALE

BUILDING 1 KEY PLAN

RENOVATION

AREA

FIFTH FLOOR

PROVIDE AND INSTALL NEW CONCRETE PAD FOR MECHANICAL CONDENSER. SEE DETAIL 7/AG001 FOR TYPICAL CONCRETE INFORMATION. SEE DETAIL 2 / 3.AS100 FOR CONDENSER UNIT FRAME GROUND MOUNTING DETAIL.

SEE MECHANICAL DRAWINGS FOR ALL OTHER INFORMATION.

CONTRACTOR TO REINSTALL EXISTING FIRE ALARM PANEL AND SIREN AND REACTIVATE. SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL INFORMATION.21

1. DIMENSIONS ARE TO FACE OF WALL UNLESS NOTED OTHERWISE.

2. THE CONTRACTORS SHALL CONFORM TO ALL REQUIREMENTS FROM DRAWINGS AND SPECIFICATIONS PERTAINING TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED WORK BETWEEN TRADES AND PROVIDING INFORMATION REQUIRED FOR INSTALLATION AND SHOP DRAWINGS. REFER

TO PROJECT GENERAL NOTES AS SHOWN ON SHEET G1003.

3. FRAMING CONTRACTOR TO COORDINATE ELECTRICAL EQUIPMENT LOCATIONS AND WIRING WITH ELECTRICAL

CONTRACTOR.

4. FLOORING CONTRACTOR TO COORDINATE FINISH FLOOR HEIGHT WITH DOOR INSTALLATION CONTRACTOR.

5. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

6. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS AND EQUIPMENT WITH

CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BEGINNING OF CONSTRUCTION.

7. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO CONTACT THE COR IMMEDIATELY PRIOR TO

THE END OF THE DAY OF CONSTRUCTION.

8. SEE SHEET AG001 FOR DOOR SCHEDULE, ROOM FINISH SCHEDULE, WALL PARTITION SCHEDULE AND OTHER

REFERENCED PROJECT DETAILS.

CONTRACTOR TO PROVIDE AND INSTALL NEW FLOOR COVERING AND WALL BASE. SEE ROOM FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW TRANSITION STRIP BETWEEN HALLWAY FLOOR COVER AND

CLOSET FLOOR COVER. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW UNDERFLOOR WATER DETECTION SYSTEM CABLING AND MONITOR. REINSTALL ALL SALVAGED FLOOR TILES AFTER WORK IS COMPLETE. SEE ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW WALL PARTITIONS WITH CEILING ENCLOSURE AS SHOWN IN DETAIL "11 / AG001". SEE PARTITION TYPE SCHEDULE. PAINT WALLS IN THEIR ENTIRETY ON ALL SIDES. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL NEW FRT PLYWOOD PANELS AND FURRING PER DETAIL 10 / AG001.

PROVIDE J MOLD AT EXPOSED ENDS. PAINT PANELS IN THEIR ENTIRETY. FIELD VERIFY WIDTH, AND AVOID EXISTING PANELS. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION. SEE PARTITION TYPES ON SHEET

AG001 FOR SPECIFIC WALL TYPES NOTED.

CONTRACTOR TO REINSTALL SALVAGED DOOR SECURITY HARDWARE, CONDUIT, PANELS AND BOXES AT CLOSET DOOR LOCATIONS AND PROVIDE NEW HARDWARE AS REQUIRED. SEE DOOR SCHEDULE FOR

ADDITIONAL INFORMATION.

EXISTING CONCRETE FLOOR TO REMAIN. CONTRACTOR TO ENSURE NOT TO DAMAGE.7

NEW DEDICATED AC MECHANICAL UNIT MOUNTED HIGH ON WALL. PROVIDE AND INSTALL BLOCKING REQUIRED FOR MOUNTING FRAME. VERIFY MOUNTING HEIGHT WITH EXISTING CEILING OR DECK CONDITION, KEEPING 8"

CLEAR FROM TOP OF UNIT TO CEILING. SEE MECHANICAL FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE AN INSULATED METAL SPANDREL PANEL AND INSTALL IN THE EXISTING WINDOW FRAME AND PROVIDE A BRAKE METAL CLOSURE PANEL AT THE PTAC OPENING BELOW. SEE DETAIL 6 / AG001 FOR ADDITIONAL INFORMATION. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR PIPING AND CONDUIT

PENETRATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO PROVIDE AND INSTALL 2 COATS OF PAINT ON ALL WALLS WITHIN THE OIT CLOSET, FROM CORNER TO CORNER AND FULL HEIGHT. PROTECT EXISTING PANELS WITH EQUIPMENT FROM NEW FINISHES. COLOR INSIDE ROOM TO BE PT-3 "WHITE." DOOR FRAMES PT-2. SEE FINISH SCHEDULE FOR

ADDITIONAL INFORMATION.

PROVIDE NEW PARTITION AS NOTED, BUT EXTEND WALL FULL HEIGHT TO DECK ABOVE OR BOTTOM OF JOIST FRAMING. PROVIDE ACOUSTICAL SEALANT FULL DEPTH AT GAPS TOP AND BOTTOM ON BOTH SIDES.

PROVIDE AND INSTALL WALL INFILL STUDS WITH 1 LAYER OF DRYWALL ON ROOM SIDE. PATCH / TAPE AND SKIM COAT EDGES TO MATCH ADJACENT WALL SURFACE FOR SEAMLESS APPEARANCE. PAINT WALL IN ITS ENTIRETY.

SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

ALIGN FACE OF NEW WALL TO EXISTING WALL. PROVIDE CONTROL JOINT AND CAULK BETWEEN DIFFERENT WALL

SURFACES.

PROVIDE AND INSTALL NEW FULL HEIGHT PVC CORNER GUARDS WITH METAL RETAINER "WP-1." CUT DOWN CORNER GUARD TO MAINTAIN 3" CLEARANCE FROM CEILINGS WHERE REQUIRED. SEE FINISH

SCHEDULE FOR ADDITIONAL INFORMATION. SEE DETAIL 5 / 1.AS102.

CONTRACTOR TO PATCH / FILL CRACKS AND HOLES AND SMOOTH EDGES WITH LIKE MATERIALS BETWEEN NEW

AND ADJACENT SURFACES TO SHOW NO EVIDENCE OF CONSTRUCTION.

CONTRACTOR TO REINSTALL SALVAGED METAL PANEL COVER, RE-RIVET AND SEAL IN PLACE TO MATCH EXISTING ENCLOSURE. TOUCH UP WITH MATCHING PAINT TO SHOW NO EVIDENCE OF CONSTRUCTION. SEE

MECHANICAL / PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

CONTRACTOR TO SEAL ALL GAPS AROUND MECHANICAL PIPING PENETRATIONS FOR A SMOKE TIGHT OR

WEATHER TIGHT SEAL. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFO.

CONTRACTOR TO PROVIDE BLOCKING WITH WALL INFILL IN EXISTING…

This is the start of the file's text. The full file is on GovTribe.