36C25019B0007-0002000.docx

DOCX document 30 KB Posted

Attached to
Correct OIT Deficiencies 610A4-16-101 Federal contract opportunity
Solicitation number
36C25019B0007
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0007 0002 36C25019B0007 0002.docx

View the file

Other files for this federal contract opportunity

Other files attached to Correct OIT Deficiencies 610A4-16-101, newest first.
File Type Posted
36C25019C0184-000.docx DOCX document
VA251-15-D-0142-000.docx DOCX document
36C25019B0007-0007004.docx DOCX document
36C25019B0007-0006000.docx DOCX document
36C25019B0007-0005000.docx DOCX document
36C25019B0007-0004000.docx DOCX document
36C25019B0007-0003001.pdf PDF
36C25019B0007-0003000.docx DOCX document
36C25019B0007-0001000.docx DOCX document
36C25019B0007-009.pdf PDF
36C25019B0007-011.pdf PDF
36C25019B0007-007.pdf PDF
36C25019B0007-001.docx DOCX document
36C25019B0007-010.pdf PDF
36C25019B0007-004.pdf PDF
36C25019B0007-014.pdf PDF
36C25019B0007-012.pdf PDF
36C25019B0007-005.docx DOCX document
36C25019B0007-003.doc DOC document
36C25019B0007-006.pdf PDF
36C25019B0007-015.pdf PDF
36C25019B0007-008.pdf PDF
36C25019B0007-002.pdf PDF
36C25019B0007-013.pdf PDF
36C25019B0007-016.pdf PDF
36C25019B0007-000.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-15-2019 610A4-16-101 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240 To all Offerors/Bidders

36C25019B0007

X x x

The purpose of this amendment is to address Request For Information submissions.

All other terms and conditions remain unchanged.

Yvonne Demorest Contracting Officer

RFI 0001

1. Is this project tax exempt?

RESPONSE: Yes. The contracting office will supply the proper form for you upon request.

2. Confirm we are able to perform work during normal working hours.

RESPONSE: Yes, and any work that will be required after hours and during the weekend shall be coordinated with the COR 36 hours prior. Any power and network outage shall also coordinated 36 hours prior.

3. Will we have a dumpster/staging area? Where will this be located? Can you mark on a drawing/map?

RESPONSE: Yes., the dumpster area will be coordinated at the kickoff meeting.

4. Will we be required to have temporary port-a-johns?

RESPONSE: Yes.

5. Will an office trailer be required?

RESPONSE: Whatever you bid must be required to be on site. If you bid an office trailer, then the VA requires a trailer and necessary equipment on site.

6. Spec 01 35 25 Paragraph 1.7.C states a separate SSHO is required in addition to the Superintendent. Is this correct?

RESPONSE: The SSHO can also be the superintendent as long as that person is certified to conduct the SSHO requirements.

7. Is LEED part of this project?

RESPONSE: No

8. Is COBIE required?

RESPONSE: No

9. Is BIM coordination required?

RESPONSE: Yes, coordinate with AE (see SOW 1.10.5)

10. Is Commissioning required?

RESPONSE: No

RFI 0002

1. What action, supervision, and security measures need to be coordinated and put in place once cages are demoed and IT towers are unsecure?

RESPONSE: Any areas where the cages have been demoed need to be locked so that only IT and Engineering have access. The only place this may be a problem is Bldg. 7 in FW. The “cage” is a spot on the wall next to the back door. A155-1-F cannot have the door propped open on either side if the cage has been removed from the IT gear. The cage on the second floor may also be a problem because it is in a break room that the lab staff have access to until the new walls are put up. I believe the rest of the cages are in basement or closet areas that already have limited access.

2. Drawing 1.MH100, The new heating hot water supply & return piping has no size indicated. Please indicate sizes. The new suction & liquid refrigeration piping are not sized. Please indicate sizes.

RESPONSE: Contractor to field verify existing Refrigerant, HWS and HWR piping and match existing size for new routing.

3. Specifications Division 23: There is no insulation specs for the refrigeration suction or liquid piping. Please provide. There is no insulation specs for the condensate drain piping. Please provide.

RESPONSE:

INDOOR PIPING INSULATION SCHEDULE

Condensate and Equipment Drain Water below 60 Deg F:

All Pipe Sizes: Insulation shall be in compliance with the Indiana Energy Code.

Flexible Elastomeric: ¾ inch or 1 inch thick.

Mineral-Fiber, Preformed Pipe Insulation, Type I: ½ inch or 1 inch thick.

Refrigerant Suction and Hot-Gas Piping:

All Pipe Sizes: Insulation shall be one of the following:

Flexible Elastomeric: 1 inch thick.

Refrigerant Suction and Hot-Gas Flexible Tubing:

All Pipe Sizes: Insulation shall be the following:

Flexible Elastomeric: 1 ½ inches thick.

OUTDOOR, ABOVEGROUND PIPING INSULATION SCHEDULE

0. Refrigerant Suction and Hot-Gas Flexible Tubing:

All Pipe Sizes: Insulation shall be one the following:

Flexible Elastomeric: 2 inches thick.

File details come from the government source that posted it.