RFI__3.pdf

PDF 113 KB Posted

Attached to
Replace CARES Tower Roof Overhangs 541-18-103 Federal contract opportunity
Solicitation number
36C25019B0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0001 0004 RFI #3.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace CARES Tower Roof Overhangs 541-18-103, newest first.
File Type Posted
07_52_16.13_-_SBS_Modified_Bituminous_Membrane_Roofing.pdf PDF
36C25019B0001_0004.docx DOCX document
RFI__2.pdf PDF
ATTACHMENT_-_Existing_Conditions_Photographs.pdf PDF
36C25019B0001_0003.docx DOCX document
RFI_response.pdf PDF
Addendum_01.pdf PDF
A3.1_ROOF_1,_2,_3___6_DETAILS.pdf PDF
X1_COVER_SHT.pdf PDF
A3.3_ROOF_DETAILS.pdf PDF
36C25019B0001_0002.docx DOCX document
36C25019B0001-0001001.pdf PDF
36C25019B0001-0001000.docx DOCX document
36C25019B0001-003.pdf PDF
36C25019B0001-004.pdf PDF
36C25019B0001-002.pdf PDF
36C25019B0001-001.docx DOCX document
36C25019B0001-005.pdf PDF
36C25019B0001-006.docx DOCX document
36C25019B0001-000.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

TO: Contracting Specialist

RFI NO.: DATE: 12/17/18 REFERENCE:

REPLY NEEDED BY:

INFORMATION NEEDED:

1. The Substitution Section 1.4, E:"Substituted roof membrane materials shall comply with the criteria of the specification, except as follows:". The products are then listed per roof system. Section 2.3 then lists the materials very differently. Is it possible to clarify which products are to be used. This will ensure that proper roof systems are bid.

REPLY:

Per paragraph 1.4A and 1.4B of specification 07 52 16.13, “Contractor may submit for consideration a roofing system of comparable quality, as determined by the Contracting Officer. Substitution requests must be submitted for review to the Contracting Officer no later than 21 days prior to delivery of bid. Requests received after that time may be considered or rejected at the sole discretion of the Contracting Officer.

The question regarding roofing system substitutions was received on Dec 17, 2018, which is less than 21 days prior to delivery of bid. The Contracting Officer has not received any other roofing system substitution requests. The Contracting Officer therefore rejects this roofing system substitution request and any future roofing system substitution requests.

REPLY FROM: Contracting Officer

DATE: 12/17/2018

ATTACHMENTS: 07 52 16.13 - SBS Modified Bituminous Membrane Roofing

COPY TO: N/A

PROJECT NUMBER: 541-18-103 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Replace CARES Tower Roof and Overhangs

PROJECT LOCATION: Department of Veterans Affairs VA Medical center

SUBMITTED BY: N/A City/State: N/A

PHONE NO.: N/A

File details come from the government source that posted it.