36C25019B0001-005.pdf

PDF 67 KB Posted

Attached to
Replace CARES Tower Roof Overhangs 541-18-103 Federal contract opportunity
Solicitation number
36C25019B0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0001 Attachment - Calculation of Self-Performed and Sub-Contracted Work.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace CARES Tower Roof Overhangs 541-18-103, newest first.
File Type Posted
RFI__3.pdf PDF
07_52_16.13_-_SBS_Modified_Bituminous_Membrane_Roofing.pdf PDF
36C25019B0001_0004.docx DOCX document
36C25019B0001_0003.docx DOCX document
ATTACHMENT_-_Existing_Conditions_Photographs.pdf PDF
RFI__2.pdf PDF
RFI_response.pdf PDF
X1_COVER_SHT.pdf PDF
A3.3_ROOF_DETAILS.pdf PDF
36C25019B0001_0002.docx DOCX document
Addendum_01.pdf PDF
A3.1_ROOF_1,_2,_3___6_DETAILS.pdf PDF
36C25019B0001-0001000.docx DOCX document
36C25019B0001-0001001.pdf PDF
36C25019B0001-003.pdf PDF
36C25019B0001-006.docx DOCX document
36C25019B0001-004.pdf PDF
36C25019B0001-002.pdf PDF
36C25019B0001-001.docx DOCX document
36C25019B0001-000.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for NAICS codes 238210 & 238220) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division SDVOB Vendor (Y or N)

Personnel Cost Material/Equipment Costs

Division 01 $ $

Division 02 $ $ Division 03 $ $

(Add additional lines as necessary for each Division applicable to this project)

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit $ Home Office Overhead $ Bond $ Grand Total $

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $__________________

4. Self-performed work = Line 3/Line 1 x 100 = __________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

(signature) Date