About this file

36C25018B0581 Domestic Water Pump - SOW.pdf

View the file

Other files

File Type Posted
36C25018C0217-000.docx DOCX document
36C25018B0581-006.pdf PDF
36C25018B0581-005.docx DOCX document
36C25018B0581-0002000.docx DOCX document
36C25018B0581-0002001.pdf PDF
36C25018B0581-0001000.docx DOCX document
36C25018B0581-003.pdf PDF
36C25018B0581-004.pdf PDF
36C25018B0581-001.docx DOCX document
36C25018B0581-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Project Title: Add Domestic Water Pressure Booster

Project No.: 757-19-203

Description: This project will construct modifications to the domestic water system at

Columbus VA as shown on the plans and specifications for NRM Project 757-19- 203 Add Domestic Water Pressure Booster. Major scope items include replacement of a water pressure booster pump set, reconfiguration of main water lines, installation of real-time water monitoring equipment, installation of chlorine injection ports and installation of thermostatic mixing valves at sinks across the facility.

The Contractor shall provide all labor, materials and supervision to construct the renovations and improvements at the Chalmers P. Wylie VA Ambulatory Care Center at 420 N. James Rd., Columbus, OH 43219. Project includes interior demolition, plumbing, electrical, technology and minor architectural work as well as equipment installation. Project work will be predominately performed during off-hours/weekends. All work shall be performed per the drawings and specifications prepared by Collaborative Design, Ltd. The base bid period of performance for construction is 200 calendar days.

Statement of Work
Project No.: 757-19-203

File details come from the government source that posted it.