REQUEST FOR INFORMATION (RFI)
36C250-18-B-0081
PROJECT NUMBER: 610-15-100 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE:
Demolish Bldgs.
7,10,11,18,24,60 and Connecting Corridors
PROJECT LOCATION:
Department of Veterans Affairs VA Northern Indiana HCS 1700 E. 38th Street Marion, IN 46953
TO:
Felecia Beamen, Contracting Officer Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Felecia.Beamen@va.gov
RFI NO.: 006 DATE: 12/26/2017
SPEC/DWG. REFERENCE(s):
01 General Requirements - Temporary Utilities
REPLY NEEDED BY: 01/05/2018
INFORMATION NEEDED:
Will contractor be allowed to use the existing electrical system? If so, will there be cost associated?
REPLY:
RFI’s will be answered by amendment(s) posted to fbo.gov.
REPLY FROM:
DATE:
ATTACHMENTS COPY TO:
SUBMITTED BY: Redline Contractors CITY/STATE: Lowell, Arkansas
PHONE: 479-419-4100
mailto:Felecia.Beamen@va.gov VHANINElkinS Typewritten Text The Contractor shall meter and pay for electricity required for large equipment such as electric cranes, hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.
| 2017-12-28T10:22:05-0500 | |
| Samuel L. Elkins 173786 |