REQUEST FOR INFORMATION (RFI)
36C250-18-B-0081
PROJECT NUMBER: 610-15-100 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE:
Demolish Bldgs.
7,10,11,18,24,60 and Connecting Corridors
PROJECT LOCATION:
Department of Veterans Affairs VA Northern Indiana HCS 1700 E. 38th Street Marion, IN 46953
TO:
Felecia Beamen, Contracting Officer Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Felecia.Beamen@va.gov
RFI NO.: DATE:
SPEC/DWG. REFERENCE(s):
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
RFI’s will be answered by amendment(s) posted to fbo.gov.
REPLY FROM:
DATE:
ATTACHMENTS:
COPY TO:
SUBMITTED BY: CITY/STATE:
PHONE:
mailto:Felecia.Beamen@va.gov crolfes Typewritten Text 1)During the site visit held on December 14th, it was said that buildings that had been deemed unsafe for entry (Keeler-Webb Assoc. Survey dated 6/2/16) would not have any asbestos removed and would be demolished as is and hauled to the landfill. Specifications section 02 82 13.41-1 Extent of Work states that all asbestos abatement must be completed prior to demolition of buildings.
2)If the buildings are being demolished with ACM in place, how would the VA like the abatement contractors to price oversight during demolition and loading of asbestos contaminated debris?
crolfes Typewritten Text Armcorp Construction, Inc Celina, Ohio crolfes Typewritten Text 419-778-7024
VHANINElkinS Typewritten Text
RFI #14
MINELSON
Text Box The entire building(s) are considered hazardous waste. How oversight of the process is priced will be based on the understanding of the contractor such that it accomplishes the requirements of the project.
MINELSON
Text Box None
MINELSON
Text Box HDR, Inc.
MINELSON
Text Box 12-21-17
| 2017-12-21T17:58:47-0500 | |
| Samuel L. Elkins 173786 |