36C25018B0081-00001127.pdf

PDF 1 MB Posted

Attached to
Demolish Bldgs 7, 10, 11, 18, 24, 60 Project 610-15-100
Solicitation number
36C25018B0081
Issued by

About this file

36C25018B0081 00001 610-15-100 Pre-Bid RFI 14.pdf

View the file

Other files

File Type Posted
36C25018C0089-000.docx DOCX document
36C25018B0081-00005006.pdf PDF
36C25018B0081-00005001.pdf PDF
36C25018B0081-00005000.docx DOCX document
36C25018B0081-00005004.pdf PDF
36C25018B0081-00005007.pdf PDF
36C25018B0081-00005002.pdf PDF
36C25018B0081-00005005.pdf PDF
36C25018B0081-00005003.pdf PDF
36C25018B0081-00005008.pdf PDF
36C25018B0081-00004001.pdf PDF
36C25018B0081-00004003.pdf PDF
36C25018B0081-00004002.pdf PDF
36C25018B0081-00004000.docx DOCX document
36C25018B0081-00003000.docx DOCX document
36C25018B0081-00002000.docx DOCX document
36C25018B0081-00002001.pdf PDF
36C25018B0081-00002002.pdf PDF
36C25018B0081-00001113.jpg JPG image
36C25018B0081-00001131.pdf PDF
36C25018B0081-00001120.pdf PDF
36C25018B0081-00001118.pdf PDF
36C25018B0081-00001132.pdf PDF
36C25018B0081-00001111.pdf PDF
36C25018B0081-00001133.pdf PDF
36C25018B0081-00001112.jpg JPG image
36C25018B0081-00001121.pdf PDF
36C25018B0081-00001123.pdf PDF
36C25018B0081-00001108.docx DOCX document
36C25018B0081-00001114.pdf PDF
36C25018B0081-00001130.pdf PDF
36C25018B0081-00001125.pdf PDF
36C25018B0081-00001124.pdf PDF
36C25018B0081-00001119.pdf PDF
36C25018B0081-00001117.pdf PDF
36C25018B0081-00001122.pdf PDF
36C25018B0081-00001128.pdf PDF
36C25018B0081-00001129.pdf PDF
36C25018B0081-00001115.pdf PDF
36C25018B0081-00001110.pdf PDF
36C25018B0081-00001116.pdf PDF
36C25018B0081-00001134.pdf PDF
36C25018B0081-00001109.pdf PDF
36C25018B0081-00001126.pdf PDF
36C25018B0081-004.pdf PDF
36C25018B0081-002.pdf PDF
36C25018B0081-006.docx DOCX document
36C25018B0081-001.docx DOCX document
36C25018B0081-003.pdf PDF
36C25018B0081-007.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C250-18-B-0081

PROJECT NUMBER: 610-15-100 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE:

Demolish Bldgs.

7,10,11,18,24,60 and Connecting Corridors

PROJECT LOCATION:

Department of Veterans Affairs VA Northern Indiana HCS 1700 E. 38th Street Marion, IN 46953

TO:

Felecia Beamen, Contracting Officer Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Felecia.Beamen@va.gov

RFI NO.: DATE:

SPEC/DWG. REFERENCE(s):

REPLY NEEDED BY:

INFORMATION NEEDED:

REPLY:

RFI’s will be answered by amendment(s) posted to fbo.gov.

REPLY FROM:

DATE:

ATTACHMENTS:

COPY TO:

SUBMITTED BY: CITY/STATE:

PHONE:

mailto:Felecia.Beamen@va.gov crolfes Typewritten Text 1)During the site visit held on December 14th, it was said that buildings that had been deemed unsafe for entry (Keeler-Webb Assoc. Survey dated 6/2/16) would not have any asbestos removed and would be demolished as is and hauled to the landfill. Specifications section 02 82 13.41-1 Extent of Work states that all asbestos abatement must be completed prior to demolition of buildings.

2)If the buildings are being demolished with ACM in place, how would the VA like the abatement contractors to price oversight during demolition and loading of asbestos contaminated debris?

crolfes Typewritten Text Armcorp Construction, Inc Celina, Ohio crolfes Typewritten Text 419-778-7024

VHANINElkinS Typewritten Text

RFI #14

MINELSON

Text Box The entire building(s) are considered hazardous waste. How oversight of the process is priced will be based on the understanding of the contractor such that it accomplishes the requirements of the project.

MINELSON

Text Box None

MINELSON

Text Box HDR, Inc.

MINELSON

Text Box 12-21-17

2017-12-21T17:58:47-0500
Samuel L. Elkins 173786

File details come from the government source that posted it.