S02 Exterior Elevation Drawings Showing Windows Revised.pdf

PDF 2 MB Posted

Attached to
7230--531 | Wall-mounted Window Shades & Installation | Boise, ID
Solicitation number
36C24W26Q0250
Issued by

About this file

This file consists of architectural construction documents for the Boise VA Medical Center Primary Care/Mental Health Building, prepared by Spees Design Build as the Architect/Engineer of Record. The documents include exterior elevation drawings and partial floor plans showing the building's design and layout.

The construction documents depict a multi-level healthcare facility featuring penthouse and gable structures with brick veneer, composite aluminum wall cladding, Swiss pearl panels, precast concrete elements, fiber cement siding, asphalt shingled roofing, and metal studs. The exterior elevations (West, North, East, and South) illustrate the building's facade with various window and door configurations, rain screen systems, expansion joints, and exterior lighting. The floor plans show functional spaces including examination rooms (124 SF each), staff lounges (369 SF), corridors, office spaces, restrooms, storage areas, mechanical rooms, electrical rooms, and support facilities. Notable rooms include a PACT Team shell area (5064 SF), staff lockers, soiled medical equipment storage, a server room, reception area (317 SF), vestibule (603 SF), and various support services. The documents reference multiple construction details, wall types, door and window schedules, and signage specifications on related sheets. The project is located at Boise VA Medical Center in Boise, Idaho, with an issue date of 07/23/2021 and approval from the Medical Center Director and Chief, Facility Management Service.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIQUINNM2

Callout UPPERS: Revised to show bottom panes only. Top panes are blacked out (above ceiling).

VHABOIQUINNM2

Callout UPPERS: Revised to show bottom panes only. Top panes are blacked out (above ceiling).

VHABOIQUINNM2

Callout UPPERS: Revised to show bottom panes only. Top panes are blacked out (above ceiling).

VHABOIIfflaR

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIIfflaR Rectangle

VHABOIQUINNM2

Cloud

VHABOIQUINNM2

Callout No Covering Needed

VHABOIQUINNM2

Callout No Covering Needed

VHABOIQUINNM2

Cloud

VHABOIQUINNM2

Cloud

VHABOIQUINNM2

Callout UPPERS: Revised to show bottom panes only. Top panes are blacked out (above ceiling).

AE301

AE301

AE301

118 SF

ELEC

108 SF

OFFICE

108 SF

OFFICE

104 SF

SOILED MED

EQUIP

67 SF

STAFF TLT

369 SF

STAFF LOUNGE

107 SF

OIT SERVER

229 SF

MECH

29 SF

STAFF LOCKERS

28 SF

STAFF LOCKERS

41 SF

STAFF LOCKERS

29 SF

STAFF LOCKERS

124 SF

EXAM ROOM 07

124 SF

EXAM ROOM 06

124 SF

EXAM ROOM 05

124 SF

EXAM ROOM 04

124 SF

EXAM ROOM 14

124 SF

EXAM ROOM 13

124 SF

EXAM ROOM 12

124 SF

EXAM ROOM 11

5064 SF

PACT TEAM

SHELL

65 SF

PUBLIC TLT

25 SF

ALCOVE

/1 A-402 /1 A-402

AE410

1 2 3 4

B

C

D

E

67 SF

STAFF TLT

AE410

AE414

AE412

1.1 3.9

AE302

AE302

AE302

A.1

MATCH LINE A-A

A A

FACE OF STUDS, TYP UON

ALIGN ALIGN

ALIGN ALIGN

679 SF

CORRIDOR

C13

FOR CONTINUATION

SEE

67 SF

STAFF TLT

17768 SF

STAFF TLT

968 SF

CORRIDOR

C15

AE413

AE414

AE414

AE414

2.5

B.8

A

A-503

A-503

OPP

HAND

A-503

A-503

AE438

AE303

AE438

A-503

A-503

OPP

HAND

IN-09.03-09

IN-09.03-10

IN-01.26-03

IN-01.26-02

IN-07.02-09

IN-07.02-11

IN-07.02-13

IN-07.02-10

IN-07.02-12

IN-07.02-14

IN-07.02-16

IN-07.02-25

IN-07.02-27

IN-07.02-29

IN-07.02-31

IN-07.02-26

IN-07.02-28

IN-07.02-30

IN-07.02-32

IN-07.02-15

IN-04.02-10

IN-04.02-11

IN-04.02-12

IN-04.02-13

IN-04.02-14

IN-04.02-15

IN-04.02-16

IN-04.02-20

IN-08.02-04

IN-08.02-05

IN-08.02-06

FIRE DEPT CONNECTION

2427 SF

PACT TEAM

DO NOT CONSTRUCT THIS WALL IF

PACT (EAST) - ADD ALT 4 IS

SELECTED

FOR CONTINUATION

SEE

IN-09.08-04

IN-01.02-04

A-509

1. REFER TO THE FOLLOWING SHEETS:

DIMENSIONS & TAGS A-404 THRU A-406

WALL TYPES A-611 & A-612

SIGNAGE AW SERIES

DOORS, WINDOWS, EQUIP A-601

2. TYP FURNITURE/CASEWORK PLANS APPLY TO ALL ROOMS IN

THE BUILDING. ESPECIALLY FOR BUILT-INS LIKE CABINETS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-401

PARTIAL FLOOR PLAN - EAST

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 061 OF 206

1/4" = 1'-0"1

PARTIAL FLOOR PLAN - EAST

GENERAL NOTES

PROJECT

NORTH

Revisions: Date:

VHABOIQUINNM2

Cloud

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Callout 49" Square

VHABOIQUINNM2

Callout 49" Square

VHABOIQUINNM2

Architect 88" Wide

VHABOIQUINNM2

Architect 88" Wide

VHABOIQUINNM2

Architect 87" Wide

VHABOIQUINNM2

Architect 87" Wide

VHABOIQUINNM2

Architect 87" Wide

AE301

AE301

41 SF

STORAGE

100 SF

STORAGE

107A

467 SF

GROUP ROOM

173 SF

MSA & BUSINESS

SERVICES

110 160 SF

HOUSEKEEPING

AND LADDER

87 SF

POLICE

80 SF

FAMILY TLT

106 74 SF

PUBLIC TLT

84 SF

LACTATION

317 SF

RECEPTION

603 SF

VESTIBULE

/1 A-402 /1 A-402

1 2 3 4

I

J

K

L

M

N

AE433 2

AE410

AE414

AE412

1.1 3.9

L.2

MATCH LINE B-B

B B

AE302

LOBBY

2.1 2.9

AE413

AE413

4 AE413

AE414

AE414

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

CHECK IN CHECK IN

AE414

AE413

ALIGN

ALIGN

FACE OF

STUDS &

COLUMNS

2.5

118 SF

CORRIDOR

C10

SHIPS

LADDER

A-503

A-502

A-502

A-502

75 SF

PUBLIC TLT

74 SF

PUBLIC TLT

IN-09.08-01

IN-09.03-01

IN-09.03-02IN-09.08-02

IN-09.03-03

IN-09.03-04

IN-02.08-01

IN-02.07-01

IN-01.26-01

IN-02.10-01

IN-02.01-01

IN-04.02-01

IN-04.02-02

IN-04.02-03

IN-04.02-04 IN-04.02-05

IN-04.02-06

IN-02.02-01

IN-02.03-01

AE432

IN-02.04-01

• HOT & COLD DOMESTIC

WATER CONNECTION

• ELECTRICAL SERVICE

• FLOOR DRAIN / SINK

WASTE LINE AND VENT

STUB UTILITIES IN WALL FOR

COFFEE STATION. BID ALT

WILL CONTINUE THESE

UTILITIES IF APPROVED.

DRINKING FOUNTAIN /

BOTTLE FILL STATION

IN-09.08-05

IN-09.08-06 IN-09.08-07

FUTURE SECURITY

SCREENING

EQUIPMENT

779 SF

CORRIDOR

C11

A-502

A-507

AE432 10 AE43211

AW007

IN-04.02-17

F1

IN-01.02-01

IN-99.01-01

IN-99.02-01

1. REFER TO THE FOLLOWING SHEETS:

DIMENSIONS & TAGS A-404 THRU A-406

WALL TYPES A-611 & A-612

SIGNAGE AW SERIES

DOORS, WINDOWS, EQUIP A-601

2. TYP FURNITURE/CASEWORK PLANS APPLY TO ALL ROOMS IN

THE BUILDING. ESPECIALLY FOR BUILT-INS LIKE CABINETS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-403

PARTIAL FLOOR PLAN - WEST

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 063 OF 206

1/4" = 1'-0"1

PARTIAL FLOOR PLAN - WEST

PROJECT

NORTH

GENERAL NOTES

Revisions: Date:

VHABOIQUINNM2

Cloud

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

Rectangle

VHABOIQUINNM2

File details come from the government source that posted it. Updated .