S06 Amendment to Solicitation 6 Amendment Opportunties.pdf
PDF 845 KB Posted
- Attached to
- Walk-In Refrigerator
- Solicitation number
- 36C24W25Q0218(updated)
- Issued by
-
Department of Veterans Affairs
About this file
This document is an Amendment to a Previous Solicitation for a Walk-In Refrigerator for the Eastern Oklahoma VA Healthcare System in Tulsa. The solicitation (Number 36C24W25Q0218) is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC) and requires a panel-by-panel assembled walk-in medical laboratory refrigerator to be installed on the second floor of a new VA medical center. The project has a response deadline of September 5, 2025, at 12:00 PM Central Time, with delivery required after November 10, 2025, and full installation by January 30, 2026.
The refrigerator must meet extensive healthcare-specific requirements, including air-cooled cooling system, 100% compressor redundancy, stainless steel surfaces, LED lighting, integrated temperature monitoring, and compatibility with the building's automation system. The contractor is responsible for comprehensive installation, including plumbing, electrical work, drywall, firestopping, and ensuring all work meets healthcare facility standards. The refrigerator will be located in room 2A308F, with specific site conditions requiring panel-by-panel assembly, an insulated and heated floor, and potential modifications to accommodate the installation. The project is being managed by the Department of Veterans Affairs Regional Procurement Office West, located in McClellan Park, California.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Solicitation
SUBJECT* Walk-in Refrigerator |Tulsa 623
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE* 95652
SOLICITATION NUMBER* 36C24W25Q0218
RESPONSE DATE/TIME/ZONE 09-05-2025 12:00pm CENTRAL TIME, CHICAGO, USA
ARCHIVE 99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS N
SET-ASIDE SDVOSBC
PRODUCT SERVICE CODE* 6695
NAICS CODE* 333415
CONTRACTING OFFICE ADDRESS Department of Veterans Affairs
Regional Procurement Office West (RPOW)
3237 Peacekeeper Way
Building 200 Suite 204
McClellan Park CA 95652
POINT OF CONTACT*
Contract Specialist
Robert M. Clark Jr robert.clark15@va.gov
254-538-0487
PLACE OF PERFORMANCE
ADDRESS Department of Veterans Affairs
Eastern Oklahoma VA Healthcare System
Tulsa VA Medical Center
440 S. Houston Ave
Tulsa OK
POSTAL CODE 74127
COUNTRY U.S.A.
ADDITIONAL INFORMATION
AGENCY’S URL http://www.va.gov
URL DESCRIPTION Department of Veterans Affairs
AGENCY CONTACT’S EMAIL ADDRESS robert.clark15@va.gov
EMAIL DESCRIPTION
DESCRIPTION
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
623-25-3-2455-0193
None
36C24W
Department of Veterans Affairs
Regional Procurement Office West (RPOW)
3237 Peacekeeper Way
Building 200 Suite 204
36C24W
Department of Veterans Affairs
Regional Procurement Office West (RPOW)
3237 Peacekeeper Way
Building 200 Suite 204
To all Offerors/Bidders
36C24W25Q0218
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-05-2025 12:00pm CDT
Not Applicable
X 1
The above referenced Solicitation, as indicated in Block 9A, to provide
Panel-by-Panel Walk-In Medical Laboratory Refrigerator to the Eastern
Oklahoma VA Healthcare System, Tulsa, OK is hereby Amended as follows:
The purpose of this Amendment is to provide an update to the Solicitation. Refer to the attached
Notice of Amendment to Request for Quote.
Except as provided in all Amendments issued to date, all other provisions and language set forth in the original Solicitation Number 36C24W25Q0218, remains unchanged.
NOTICE FOR REQUEST FOR QUOTE AMENDMENT
SOLICITATION NUMBER: 36C24W25Q0218
AMENDMENT NUMBER: 0006
DATE: August 29, 2025
PROJECT NUMBER: N/A
PROJECT TITLE: Walk-In Refrigerator
LOCATION: VA Medical Center, Tulsa, OK, 74127
REASON FOR AMENDMENT: Revised Statement of Work
AMENDMENT: 0006
REVISED STATEMENT OF WORK IS ATTACHED
DUE DATE FOR OFFERS IS NOW SEPTEMBER 05, 2025 @12:00PM.
All other terms and conditions remain unchanged.
STATEMENT OF WORK
Eastern Oklahoma VA Health Care System
Walk-In Medical Laboratory Refrigerator
At the new Tulsa VA Medical Center
GENERAL
PURPOSE / OBJECTIVE: Eastern Oklahoma VA Health Care System (EOVAHCS) requires a walk-in refrigerator in the lab to house a variety of lab materials. The Tulsa
VAMC requires a contractor to provide all tools, materials, and labor to install the lab walk-in refrigerator.
BACKGROUND: The Eastern Oklahoma VA Healthcare System (EOVAHCS) is activating a new 58 bed inpatient hospital in downtown Tulsa. The hospital will have an in-house lab. The hospital is a brand-new facility housed in the structure of the historic
Kerr-Edmondson building in downtown Tulsa.
LOCATION: The new Tulsa VA Medical Center will be located at 440 S. Houston Ave, Tulsa, Oklahoma 74127.
PERFORMANCE PERIOD/DELIVERY TIMES: The VA requires delivery of product after November 10, 2025, and fully installed by January 30, 2026.
SCOPE: The contractor will design, procure, and install a walk-in refrigerator on the second floor in room 2A308F. The VA requires the refrigerator to be assembled (panel-by-panel) onsite. The VA cannot accept pre-assembled or one-piece solutions. The refrigerator must be air cooled. Installation will include all new associated subsystems associated with the function of the units, and connections to building systems including power and data. The refrigerator must have an insulated and heated floor to prevent condensation from accumulating in the concrete slab. The contractor is responsible for ensuring all measurements, power requirements, etc. are compatible with the infrastructure. The contractor is responsible for all plumbing, electrical, drywall, painting, firestopping, and other materials and labor required to deliver a turnkey solution. The contractor is responsible for making sure the installer has any necessary licenses and qualifications to install the specific devices in a healthcare setting.
Site Condition
The following is the site condition for the refrigerator in 2A308F. The following will need to be verified by the contractor prior to design and installation. The site condition may be modified to accommodate the refrigerator. All modifications to the site condition must be coordinated and approved by the COR and chief of engineering. All modifications to the site condition must meet industry standard for the type of product being installed, and final finish must match surrounding finish and meet infection control, safety, engineering and interior designs approval:
1. The refrigerator will be on the 2nd floor, on a concrete slab. The building is 3 floors.
2. There will be sheetrock on three sides, making a footprint of 9 foot 3 inches by 9 foot 9 inches (this will need to be verified by the contractor).
3. The ceiling will be solid sheetrock in the entire footprint of the refrigerator (the height will need to be verified by the contractor). The ceiling can be opened in support of installation above the walk-in, but shall require an airtight seal to the surrounding lab space upon completion.
4. There is a fire sprinkler head in the center of the sheetrock ceiling. This sprinkler can be relocated above, or inside the refrigerator box. The final location of the sprinkler must meet the current NFPA requirements.
5. Walls, windows and doors throughout the building will be complete and in-place.
The walk-in must be assembled panel-by-panel in its final location. Hall and door widths are typical of healthcare facilities.
6. There will not be any equipment kept inside the walk-in other than those installed by the contractor and outlined in this SOW. Internal heat load is expected to consist of lighting, door open, introduction of new lab samples, and transient lab personnel only.
7. The following image provides the known dimensions and illustrates the general path of MEP above. Ceiling height is estimated at 8ft. The ceiling height and final
MEP positioning will have to be field verified by the contractor. The deck-to-deck height of the concrete slabs between floors is approximately 12 feet.
Design Guide
The following is a guide, through the facility MEP spaces in an effort to provide the most plausible installation locations of the refrigerator systems. The contractor may submit a design that varies from this guide, but all designs will require approval from the COR.
The design process and approval will occur post award.
An existing junction box is available for power near the floor, on the north wall of the walk-in. The contractor may relocate this as needed. The contractor is responsible for integrating the refrigerator into the building automation system, for control and monitoring.
Below: Approximate location of junction box.
There are two possible locations for drains. Near the north wall, a core can be drilled in the concrete to pass a drain line down to the floor below, where it can be tied into a drain line for a nearby sink.
Near the south wall, a core can be drilled in the concrete to pass a drain line down to the floor below, where it can be tied into a drain line for a nearby floor sink.
Below: Approximate footprint of walk-in, overlayed on plumbing diagram for ceiling below. Pipes labeled SS are useable drains.
The compressor units can be placed remotely on the roof of the building. The ideal path for running necessary lines will be to a nearby pipe chase, and up into the HVAC penthouse. The pipe chase is enclosed in drywall, with limited or no access. Drywall work will be required to use the chase.
Below: location of the pipe chase on the 2nd floor.
Below: Location of the pipe chase on the 3rd floor.
Below: Location of the pipe chase on the 4th floor. Location of the compressor unit.
The entry of pipes into the mechanical penthouse shall not impede egress around the existing air handling unit. If the compressor unit is placed on the roof, it shall be wall mounted to the exterior of the HVAC penthouse at working height. The penthouse wall is concrete, with EIFS (Exterior Insulation and Finish System). The brackets used will require approval from the COR. Any damage to the EFIS must be repaired to the satisfaction of VA Engineering. 4 branch panels are available nearby, for electrical power. A dedicated circuit must be run to the compressor.
Below: The branch panels in proximity to the mounting location of the compressor unit.
Construction requirements
The contractor is responsible for supplying trained, licensed personnel to preform all installation, plumbing, electrical, drywall, firestopping, painting, and other work required to deliver a turnkey solution.
Contractor shall have a minimum of one OHSA 30 certified personnel on site at all times work is being performed.
The contractor shall use the appropriate Hilti Firestop product to maintain the required fire-rate assemblies. Contractor to seal all penetrations, to conform with the rest of the building.
The contractor shall maintain the finishes of the building, and repair any damage caused.
The building will be owned by the VA, and no patients will be seen during the period of performance.
The contractor is required to provide and maintain infection control barriers and walk-off mats to prevent the spread of dust and debris outside work areas.
Refrigerator requirements and features
1. Panels must be sized accordingly and be able to be moved through the building to the installation site. It is the contractor’s responsibility to field verify and establish this size.
2. The refrigerator shall meet all applicable specifications in ATTATCHMENT A – Lab Walk in Specs.
3. The cooling system must be air cooled.
4. Walk-in to have a back-up compressor for 100% compressor redundancy.
5. The floor must be insulated and heated to prevent condensation buildup on the slab below, and a ramp is required to span the gap between the interior floor and exterior floor. The ramp will not have a handrail and will extend into the refrigerator to reduce minimize walkway obstructions outside and maximize usable space inside. The ramp will be in the center of the refrigerator floor to maximize space for shelves along either side of the ramp.
6. Overall size and layout of the walk-in to maximize given space.
7. The refrigerator must have stainless steel skins on all visible surfaces, with slip resistant texturing on the floor.
8. All gaskets and visible surfaces must be resistant to oil, water and detergents.
9. The door must open with a mechanical mechanism from both sides.
10. The refrigerator door must be self-closing.
11. Lights must be LED, mounted to the ceiling and with a low profiled design that maximizes light coverage and air space inside the refrigerator.
12. There must be a control system that automatically compensates for a cooling system failure and switches to redundant cooling equipment and sets off an alarm.
13. The refrigerator and it’s systems must be healthcare-grade.
14. Refrigerant and refrigeration system must meet or exceed relevant EPA regulations.
15. Refrigerator must have an alarm that sounds when the temperature differs from set temperature by an amount selected in the controls, or when the door is held open longer than an amount selected in the controls.
a. Target temperature, door open timer and alarm threshold temperatures must be adjustable. This control must be lockable.
16. The refrigerator must have an integrated display on the exterior that gives, at a minimum, the current temperature, and a visual indication of any alarms.
17. The refrigerator controls must be able to be linked into the Building Automation System (BAS) in order to set target and alarm temperatures, see current temperature, and report and log errors and alarms with their time and date.
18. Installation must be completed by factory trained personnel. All work and materials shall fall in full accordance with local and or state ordinances, and with any other prevailing rules and regulations.
VA STANDARD BUSINESS HOURS AND FEDERAL HOLIDAYS
Hours: Normal duty hours are 8:00 a.m. to 4:30 p.m. Monday through Friday, not including federal holidays. Whenever contact with a facility is required outside of normal duty hours, the Contractor shall coordinate these times with the designated
COR.
New Year’s Day January 1st
Martin Luther King’s Birthday Third Monday in January
President’s Day Last Monday in February
Memorial Day Last Monday in May
Juneteenth June 19th
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veteran’s Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
PARKING
The Contractor will be allowed only 1 vehicle on the work site during installation.
Contractor parking is only allowed in authorized areas. Contractor shall abide by all
Police requirements. Parking for unloading equipment necessary to perform the work will be authorized in advance of starting the project. The contractor is responsible for any offsite parking needs and the shuttling of their employees and equipment to and from the site.
STORAGE OF EQUIPMENT & MATERIALS
The contractor shall arrange with the COR for allocation of required workspace and for the storage of equipment and material to be used for this project. Storage space is very limited. There are no exclusive areas within the campus that can be provided to the contractor for their storage needs.
Additionally, no space will be made available for the placement of a contractor trailer for this project. The Contractor should schedule delivery of materials and removal of waste to limit the amount of storage space and time on site.
DEBRIS REMOVAL
Contractors shall remove waste materials and debris daily from the campus. All waste material and debris shall be removed off the site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations. All recyclable materials shall be recycled. Weight tickets shall be provided to the COR for all waste and recycling.
SITE UTILITIES
The Contractor shall note this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required. All proposed utility relocations, reallocations, and shutdowns shall be approved by the
COR/Facility Engineer prior to commencing such work. The contractor shall field verify all existing utility installations and take appropriate action prior to working around any potential utility installation.
In the event a shutdown, restriction, or interruption of any utility services is required, a written request shall be submitted to the COR with a minimum of 72 hours’ notice.
Requests shall be approved by the COR prior to commencing work.
PROJECT SAFETY
The contractor shall always comply with the following and keep a copy of the attached-on site:
OSHA
Interim Life Safety Measure Assessment (completed on site by phase)
Infection Control Risk Assessment (completed on site by phase)
Hot work Permits required as needed
Confined Space Permits required as needed
INTERIM LIFE SAFETY PROTECTION MEASURES
Contractor is not required to prepare a formal interim life safety measures plan for this project. At a minimum, contractor shall comply with the following requirements of an interim life safety measures and fire protection plan:
Maintain the construction area to minimize the potential for fire or safety hazards resulting from storage of construction material, construction waste and debris during construction operations.
PREVENTION OF FALSE FIRE ALARMS
Contractor shall comply with the requirements of Tulsa VAMC and as directed by the
COR to prevent false fire alarms.
MATERIAL & WORKMANSHIP QUALITY
All materials and workmanship shall comply with all codes, standards, and recommendations of all Authorities Having Jurisdiction (AHJ). All work shall be done in a first-class manner according to the best trade practices and to the satisfaction of the
COR.
SECURITY
All contractor personnel are subject to inspection of personal effects when entering or leaving the project site.
Health screenings and face coverings may be required by all contract staff while on site.