C27_626-24-203 - CD 95 - Drawings_01.pdf
PDF 9 MB Posted
- Attached to
- 626-24-203_Cooling Tower and Chillers
- Solicitation number
- 36C24926R0054-1
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
THE CONTRACT DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) OF ANY DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.
DO NOT SCALE DIMENSIONED DRAWINGS; DIMENSIONS SHALL GOVERN.
VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, EXAMINE EXISTING BUILDING DOCUMENTS AND BRING DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE C.O.R.
VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW CONSTRUCTION. DETERMINE EXACT SIZE AND LOCATION OF PENETRATION WITHIN NEW CONSTRUCTION, TIGHTLY SEAL AND CAULK.
THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND
CONSTRUCTION.
MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO
THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE ’D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
PERFORM ALL WORK IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES AND REGULATIONS.
THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR
CONSTRUCTION TO REACH THE EXPECTED QUALITY.
ALL MATERIALS USED SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED. MATERIAL
QUALITY SHALL MEET OR EXCEED APPLICABLE INDUSTRY STANDARDS.
COORDINATING EQUIPMENT INSTALLATION AND VERIFY ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER
AND C.O.R. PRIOR TO CONSTRUCTION.
PREPARE EXISTING SURFACES THAT WILL SERVE AS SUBSTRATE TO RECEIVE THE NEW MATERIALS FOR A LEVEL AND
SMOOTH FINISH.
HOST ONLINE CONSTRUCTION MANAGEMENT SOFTWARE FOR THE DURATION OF THE PROJECT.
REMOVE, CUT, ALTER, REPLACE, PATCH AND REPAIR EXISTING WORK AS NECESSARY TO INSTALL NEW WORK. UPON COMPLETION OF CONTRACT, DELIVER WORK COMPLETE AND UNDAMAGED. EXISTING WORK (WALLS, CEILINGS, PARTITIONS, FLOORS, MECHANICAL AND ELECTRICAL WORK, LAWNS, PAVING, ROADS, WALKS, ETC.) DISTURBED OR REMOVED AS A RESULT OF PERFORMING REQUIRED NEW WORK, SHALL BE PATCHED, REPAIRED, REINSTALLED, OR REPLACED WITH NEW WORK, AND REFINISHED AND LEFT IN AS GOOD CONDITION AS EXISTED BEFORE COMMENCING
WORK.
WORK DEPICTED AS OUT OF SCOPE ON ONE DRAWING OR FROM ONE DISCIPLINE MAY STILL REQUIRE SCOPE ON A
DIFFERENT DRAWING OR FROM A DIFFERENT DISCIPLINE.
IF THE CONTRACTOR FINDS ANY PERCEIVED AMBIGUITY, CONFLICT, ERROR, OMISSION, OR DISCREPENCY ON OR BETWEEN ANY OF THE CONTRACT DOCUMENTS, OR BETWEEN ANY OF THE CONTRACT DOCUMENTS AND ANY APPLICABLE LAW, THE CONTRACTOR, BEFORE PROCEEDING WITH THE WORK, SHALL PROMPTLY SUBMIT A REQUEST FOR
INTERPRETATION ( “RFI”) TO THE A/E FOR AN INTERPRETATION OR CLARIFICATION.
IN THE EVENT OF INCONSISTENCY OR CONFLICT WITH THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK, AND COMPLY WITH THE STRICTER REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
Au to de sk
D oc s:
//N as hv ille V
A
- U pg ra de C oo lin g To w er a nd
C hi lle r/F
FE
_N as hv ille
C oo lin g
To w er a nd C hi lle r_ B1
(2
4) .rv t 2/
/2
1:
:3
PM
GI000
COVER SHEET
02/13/2026 PQ JV
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: Owner
UPGRADE COOLING TOWER AND
CHILLER
PROJECT NUMBER: 626-24-203
VA TENNESSEE VALLEY HEALTHCARE SYSTEM
DEPARTMENT OF VETERANS AFFAIRS
1310 24TH AVENUE SOUTH
NASHVILLE, TN 37212
CAMPUS LOCATION PROJECT LOCATION
LOCATION MAP VICINITY MAP
VA
GENERAL NOTES
NORTHNORTH
3D ISO VIEW
SCHEMATIC DESIGN 35% REVISION 05/28/2025
DESIGN DEVELOPMENT 10/20/2025
CONSTRUCTION DOCUMENTS 95% 02/13/2026
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI001 ICRA PLAN
GENERAL: 2
STRUCTURAL
S101 STRUCTURAL NOTES AND PARTIAL ROOF PLAN
S102 ENLARGED FRAMING PLANS
S103 SECTIONS
STRUCTURAL: 3
ARCHITECTURE
AE401 ENLARGED DETAILS
ARCHITECTURE: 1
PLUMBING
P001 LEGEND & DRAWING INDEX
P101 BASEMENT & FIRST FLOOR PLAN
P102 SECOND FLOOR PLAN
PLUMBING: 3
MECHANICAL
M001 LEGEND, DRAWING INDEX, & GENERAL NOTES
MD100 BASEMENT FLOOR PLAN DEMOLITION PLAN
MD101 FIRST FLOOR PLAN - DEMOLITION PLAN
MD102 SECOND FLOOR PLAN (FAN ROOM #2 & ROOF) - DEMOLITION PLAN
MD105 FIFTH FLOOR PLAN DEMOLITION PLAN
M100 BASEMENT FLOOR PLAN
M101 FIRST FLOOR PLAN
M102 SECOND FLOOR PLAN
M401 MECHANICAL SCHEMATICS
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M701 MECHANICAL CONTROLS
M702 MECHANICAL CONTROLS
MECHANICAL: 14
ELECTRICAL
E001 LEGEND AND INDEX OF DRAWINGS
ED100 BASEMENT DEMOLITION PLAN
ED102 SECOND FLOOR DEMOLITION PLAN
ED106 SIXTH FLOOR DEMOLITION PLAN
E101 FIRST FLOOR PLAN
E102 SECOND FLOOR PLAN
E500 BASEMENT FEEDER PLAN
E600 EMERGENCY BRANCH SINGLE LINE NEW WORK
E601 NORMAL BRANCH SINGLE LINE DEMO & NEW WORK
ELECTRICAL: 9
Grand total: 32
2221.52121off20
D
E
F
G
H
Ca
Da
Ea
Ga
Fb
21.5off
C.1
F.1
D.1
DINING AREA
IC
R
A C
LA
SS
II
1. FOR VISUAL INSPECTION ONLY, DAMPEN CEILING TILE WITH WATER SPRAY BEFORE
REMOVING. REPLACE CEILING TILE IMMEDIATELY AFTER INSPECTION; DO NOT LEAVE
UNATTENDED.
2. PROVIDE ACTIVE MEANS TO PREVENT DUST FROM DISPERSING. DUST LEFT ON FLOORS,
CLOTHING AND/ OR BODY IS NOT ALLOWED IN ORDER TO PREVENT SPREADING AND
A.
B.
C.
D.
E.
F.
G.
VACUUM ATTACHMENTS ON TOOLS WITH HEPA VACUUM WHEN
GENERATING DUST, OR HEPA VACUUMING IMMEDIATELY AS THE DUST IS
GENERATED.
REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
SEAL UNUSED DOORS WITH DUCT TAPE.
BLOCK OFF AND SEAL ALL HVAC AIR VENTS.
PLACE STICKY MAT AT INSIDE OF ENTRANCE AND EXIT OF WORK AREA.
CHANGE FREQUENTLY OR WHEN INEFFECTIVE.
WET MOP AND/OR VACUUM (WITH HEPA-FILTERED VACUUM) THE WORK
AREA BEFORE LEAVING THE SITE. BROOMING IS NOT SUFFICIENT.
1. WHENEVER TRANSPORTING OUTSIDE OF CONSTRUCTION SITE: WIPE MATERIALS,
EQUIPMENT, AND WORK SURFACES WITH EPA REGISTERED UNSCENTED DISINFECTANT
(WHICH HAS MANUFACTURERS LABELING AS A BACTERICIDE, TUBERCULOCIDE, VIRUCIDE, AND
FUNGICIDE).
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
TRACKING. "ACTIVE MEANS" ARE:
A.
B.
C.
D.
E.
F.
G.
H.
CLEAN UP CEILING TILE AND FLOORING SURFACES BELOW WITH THE HEPA FILTERED
VACUUM OR DAMP MOP.
WET MOP AND/OR VACUUM WITH HEPA-FILTERED VACUUM BEFORE LEAVING WORK
AREA AND WIPE WORK SURFACES WITH DISINFECTANT.
ALL APPLICABLE FORMS SHALL BE COMPLETED AND APPROVED PRIOR TO STARTING
WORK.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS. TAPE MAY BE USED TO ENSURE A TIGHT COVER.
REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHEN WORK AND AREA CLEANUP HAS
BEEN COMPLETED.
EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
THERE SHALL BE NO STANDING, UNCOVERED WATER DURING CONSTRUCTION. THIS
INCLUDES WATER IN EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE
CONSTRUCTION AREAS. ALL ACCIDENTAL SPILLS MUST BE CLEANED UP AND DRIED
WITHIN 12 HOURS.
CONSTRUCTION CLASS WILL BE DETERMINED BY THE VA SAFETY COMMITTEE.
GENERAL NOTES - CLASS II
1.
2.
3.
4.
5.
6.
THIS APPENDIX PROVIDES AN EQUIVALENT ICRA CONTROL MEASURE TO REQUIREMENTS DETAILED
IN THIS VHA ICRA TEMPLATE (TABLE 5 LEVEL III, ITEM 5) THAT WOULD ALLOW INTERIOR
CONSTRUCTION SPACE EXHAUST.
INTERIOR CONSTRUCTION SPACE EXHAUST:
IF THE FACILITY IS NOT ABLE TO EXHAUST TO THE BUILDING EXTERIOR , THE HEALTHCARE
ENVIRONMENT AND FACILITIES PROGRAM OFFICE HAS IDENTIFIED AN ALTERNATE INDUSTRY-
RECOGNIZED STANDARD INTERIOR EXHAUST PROCEDURE THAT IS ACCEPTED AS PROVIDING AN
EQUIVALENT LEVEL OF INFECTION PREVENTION AND CONTROL (IPC), AND SAFETY. THE ALTERNATE
INTERIOR EXHAUST PROCEDURE IS IMPLEMENTED BY COMPLETING THE FOLLOWING:
IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE HEPA FILTERED. PRIOR
TO START OF WORK, INCLUDING ASSEMBLY OF THE ICRA BARRIERS, INITIAL BASELINE AIR
SAMPLING MEASUREMENTS FOR PARTICULATE LEVELS MUST BE TAKEN IN THE PLANNED
AREA OF DISCHARGE. ONCE CONTAINMENT IS ERECTED AND COMPLETED, HEPA
FILTRATION MUST THEN BE VERIFIED BY PARTICULATE MEASUREMENT (USING A
PARTICLE COUNTER WITH MULTI-CHANNEL CAPABILITIES TO MEASURE DOWN TO 0.3
MICRONS) TO CONFIRM THAT THE DISCHARGE OF THE HEPA UNIT DOES NOT EXCEED THE
BASELINE PARTICULATE COUNT OF THE AREA TO WHICH THE EXHAUST IS DIRECTED.
VERIFICATION MUST CONTINUE AT LEAST THREE TIMES PER DAY (ONCE EVERY 8 HOURS),
7 DAYS PER WEEK, DURING THE USE OF THE NEGATIVE AIR MACHINE AND HEPA FILTER.
ANY EXCEEDANCE MUST TRIGGER A WORK STOPPAGE AND AN IMMEDIATE RESPONSE
AND RESOLUTION. ALL PARTICULATE MEASUREMENTS, INCLUDING THE BASELINE
MEASUREMENT, MUST BE DOCUMENTED AND RETRIEVABLE.
TO ACCOMMODATE THE SAMPLING, THE NEGATIVE AIR PRESSURE MACHINE MUST BE
FITTED WITH A 2 FT SECTION OF RIGID DUCTWORK AT THE DISCHARGE. THE SAMPLE
PORT FOR MONITORING MUST BE IN THE RIGID DUCTWORK SECTION.
VAPOR GENERATING PROCESSES MUST BE ASSESSED AND APPROPRIATE FILTRATION
MUST BE INSTALLED TO MITIGATE TRANSMISSION TO THE FACILITY.
ENGINEERING MUST DO A COMPLETE FLOW AND PRESSURE ANALYSIS AND DOCUMENT
THE AREA TO WHICH THE AIR IS BEING DISCHARGED TO ENSURE THE FLOW AND
PRESSURE RELATIONSHIPS IN THAT AREA ARE NOT BEING ADVERSELY IMPACTED BY THE
ADDITIONAL FLOW. IDEALLY, THIS IS DONE AS PART OF THE CONSTRUCTION PACKAGE TO
ENSURE THE DESIGN IS IMPLEMENTABLE AND NO ADDITIONAL H.V.A.C. CHANGES ARE
REQUIRED TO ACCOMMODATE THE EXHAUST FROM THE NEGATIVE AIR EQUIPMENT.
INSTALL DEVICE(S) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR
NEGATIVE PRESSURIZATION. TO ENSURE PROPER PRESSURE IS CONTINUOUSLY
MAINTAINED, THE DEVICE(S) SHALL HAVE A VISUAL PRESSURE INDICATOR, DATA
COLLECTION, AND ALARM.
EXHAUST MUST BE DIRECTED TO LOW RISK AREAS AS DEFINED IN TABLE 3 IN THIS VHA
ICRA TEMPLATE. IDEALLY THIS DISCHARGE MUST BE LOCATED SO AS NOT TO INFRINGE
ON HIGH TRAFFIC AREAS OR CREATE A NUISANCE WITH NOISE OR EXCESSIVE AIRFLOW.
NOTE: EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER
SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS NOT ACCEPTABLE.
ALTERNATIVE TO OUTDOOR
EXHAUST REQUIREMENTS
ICRA PLAN LEGEND
INDICATES ICRA WALL
ICRA CLASS II ZONE
INDICATES ICRA DOOR SYSTEM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
Au to de sk
D oc s:
//N as hv ille V
A
- U pg ra de C oo lin g To w er a nd
C hi lle r/F
FE
_N as hv ille
C oo lin g
To w er a nd C hi lle r_ B1
(2
4) .rv t 2/
/2
1:
:3
PM
GI001
ICRA PLAN
02/13/2026 SPS SPS
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: Owner
1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN - ICRA
CONSTRUCTION DOCUMENTS 95% 02/13/2026
KEY PLAN
NOT TO SCALE
NORTH
M
M
M
M
M
MM
M
M
M
M
2221.521201918
B
C
D
E
F
G
H
J
171615141312
20' - 2" 21' - 10" 15' - 8" 22' - 2" 20' - 2" 20' - 1" 20' - 1" 20' - 0" 21' - 2"
S102
S102
ENLARGED SOUTH
PLATFORM
FRAMING PLAN
ENLARGED NORTH
PLATFORM
FRAMING PLAN
EXISTING TALLER
BUILDING EXTENTS
(R E
F O
N L
Y
STEP IN ROOF
EXISTING
TALLER
BUILDING
EXTENTS
EDGE OF
EXISTING ROOF
2221.52121off
B
C
D
E
Ca
Da
Ea
21.5off
C.1
F.1
B.1
B.2
D.1
F
G
H
Ga
Fb
GaOFF
20191818S18N1716151413
EXISTING BUILDING
EXPANSION JOINT
S102
3LOW ROOF PARTIAL
FRAMING PLAN (ROOF
PIPING PENETRATIONS)
S103(TYP.)
EXISTING
TALLER
BUILDING
EXTENTS
EXISTING BUILDING
EXPANSION JOINT
03.04
01.03
STEP IN ROOF
EDGE OF
EXISTING ROOF
EXISTING BUILDING
EXPANSION JOINT
05.06
05.06
05.06
05.06
05.07
TYP
UNO
05.06
S102
4FAN ROOM #2
PUMP PAD AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
A u to d e s k D o c s /N a s h v ill e V
A
U p g ra d e C o o lin g
T o w e r a n d
C h ill e r/
F F
E N a s h v ill e
C o o lin g T o w e r a n d
C h ill e r_ B rv t
/1
/2
:0
:3
P
M
S101
STRUCTURAL NOTES AND
PARTIAL ROOF PLAN
02/13/2026 EMO KES
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: Owner
1/8" = 1'-0"
PARTIAL THIRD STORY ROOF PLAN
STRUCTURAL STEEL:
MATERIAL STANDARDS:
WIDE FLANGE ASTM A992 Fy = 50,000 PSI ANGLE, CHANNEL, PLATE ASTM A36 Fy = 36,000 PSI RECTANGLE HSS ASTM A500 Gr. B Fy = 46,000 PSI ROUND HSS ASTM A500 Gr. B Fy = 42,000 PSI PIPE ASTM A53 Gr. B Fy = 35,000 PSI
BOLTS ASTM A325N
GROUT HIGH STRENGTH, NON-SHRINK, NON-METALLIC
STRUCTURAL DESIGN INFORMATION:
ABBREVIATIONS
GENERAL STRUCTURAL NOTES:
A. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
VERIFY ALL DIMENSIONS AND CONDITIONS AT
THE JOB SITE AND TO CROSS-CHECK DETAILS
AND DIMENSIONS ON THE STRUCTURAL
DRAWINGS WITH THE RELATED REQUIREMENTS
ON THE ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING PLANS. FLOOR
AND WALL OPENINGS, SLEEVES AND OTHER
ARCH., MECH., ELEC., REQUIREMENTS MUST BE
COORDINATED BEFORE THE CONTRACTOR
PROCEEDS WITH CONSTRUCTION.
B. ALL ENGINEERING DESIGN, CONSTRUCTION,
AND TESTING SHALL CONFORM TO THE
REQUIREMENTS OF THE INTERNATIONAL
BUILDING CODE MOST RECENT EDITION
(HEREIN REFERRED TO AS "THE CODE").
C. ALL STRUCTURAL WORK MUST BE
TEMPORARILY BRACED AND SUPPORTED UNTIL
THE STRUCTURE IS SUFFICIENTLY COMPLETED
AND CAN SAFELY CARRY THE DESIGN &
CONSTRUCTION LOADS.
D. ALL OMISSIONS OR CONFLICTS BETWEEN THE
VARIOUS ELEMENTS OF THE WORKING
DRAWINGS AND/OR SPECIFICATIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE COR
BEFORE PROCEEDING WITH ANY WORK THAT IS
INVOLVED IN THE CONFLICT.
E. THE MANUFACTURER PRODUCTS IDENTIFIED
WITHIN MEET THE SALIENT CHARACTERISTICS
OF THIS SPECIFICATION. SUCH INFORMATION IS
ONLY PROVIDED TO SHOW AN EXAMPLE OF
PRODUCTS WHICH MEET THE SPECIFICATIONS
AND DO NOT, IN ANY WAY, LIMIT THE OFFEROR
FROM PROVIDING PRODUCTS FROM OTHER
MANUFACTURERS WHICH MEET THE SALIENT
CHARACTERISTICS AS IDENTIFIED IN THE
SPECIFICATION.
ARCH ARCHITECTURAL
CJ CONTROL JOINT
CL CLEARANCE
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
DIM DIMENSION
DWGS DRAWINGS
EQ EQUAL
EL ELEVATION
EX OR (E) EXISTING
FFE FINISHED FLOOR ELEVATION
FF FINISHED FLOOR
FND FOUNDATION
GALV GALVANIZED
MECH MECHANICAL
NTS NOT TO SCALE
OC ON CENTER
OPNG OPENING
PL PLATE
SIM SIMILAR
SOG SLAB ON GRADE
STL STEEL
T/STL TOP OF STEEL
VIF VERIFY IN FIELD
VM VERIFY WITH MECHANICAL SCOPE
A. GOVERNING CODE: 2024 INTERNATIONAL BUILDING
CODE
B. RISK CATEGORY (OCCUPANCY CATEGORY): IV
C. LOADS:
a. SNOW LOAD DATA BASED ON ASCE 7-22:
GROUND SNOW LOAD, pg: 24 PSF
b. LIVE LOAD DATA BASED ON ASCE 7-22:
ROOF LIVE LOAD: 20 PSF
c. WIND LOAD DATA BASED ON ASCE 7-22:
BASIC WIND SPEED: 119 MPH
WIND EXPOSURE CATEGORY: 'B'
d. SEISMIC LOAD DATA BASED ON ASCE 7-22:
SEISMIC IMPORTANCE FACTOR, Ie: 1.5
SITE CLASS: D
SEISMIC DESIGN CATEGORY: D
SPECTRAL RESPONSE COEFFICIENTS:
Ss = 0.36 Sds = 0.28 S1 = 0.12 Sd1 = 0.17
RESPONSE MODIFICATION COEFFICIENT, R: 3.0
TOWER STRUCTURAL SYSTEM:
STEEL CONCENTRICALLY BRACED FRAME
STRUCTURAL STEEL:
A. STRUCTURAL AND MISC. STEEL SHALL BE DETAILED, FABRICATED AND
ERECTED IN ACCORDANCE WITH THE MOST RECENT EDITION OF AISC
STEEL CONSTRUCTION MANUAL AND CODE OF STANDARD PRACTICE.
B. USE WELDED CONNECTIONS OR BOLTED CONNECTIONS OF SIZE AND
QUANTITIY SPECIFIED IN FRAMING DETAILS FOR ALL STRUCTURAL
STEEL CONNECTIONS.
C. CONNECTIONS UTILIZING STRUCTURAL BOLTS SHALL BE BEARING
TYPE AND TIGHTENED PER AISC TURN-OF NUT OR SNUG-TIGHT
SPECIFICATIONS. ALL BOLTED CONNECTIONS SHALL BE STANDARD
ROUND HOLES (UNLESS NOTED OTHERWISE).
D. STEEL BOLTS SHALL CONFORM IN ALL RESPECTS TO THE CURRENT
SPECIFICATIONS FOR STRUCTURAL JOINTS USING 3/4" DIAMETER ASTM
A325-N BOLTS (U.N.O.) AS ENDORSED BY THE AISC.
E. WELDING SHALL BE DONE IN ACCORDANCE WITH "AMERICAN WELDING
SOCIETY" (AWS) D1.1, USING E70XX ELECTRODES. WELDING SHALL BE
PERFORMED BY AN APPROVED CERTIFIED WELDER.
F. NO CHANGES SHALL BE MADE IN THE STEEL STRUCTURE NOR ANY
MATERIAL CUT IN THE FIELD (UNLESS NOTED AS "FIELD CUT OR TRIM"
ON DRAWINGS), WITHOUT THE WRITTEN PERMISSION OF THE COR.
G. NO CUTTING, BURNING, OR ADDITION OF HOLES OTHER THAN THOSE
SPECIFICALLY DETAILED SHALL BE ALLOWED THROUGH STRUCTURAL
STEEL MEMBERS WITHOUT THE PRIOR CONSENT OF THE COR. BOLT
HOLES SHALL CONFORM WITH THE GOVERNING AISC SPECIFICATION.
H. CONTRACTOR SHALL PROVIDE NECESSARY LABOR, MATERIAL, AND
EQUIPMENT TO ERECT ALL MISCELLANEOUS IRON AND STEEL AS
DETAILED ON THESE DRAWINGS.
I. FOR PAINTING OF STEEL, SEE SPECIFICATIONS.
J. ALL STEEL ITEMS TO BE HOT DIP GALVANIZED AFTER FABRICATION, BY
THE HOT DIP PROCESS IN ACCORDANCE WITH ASTM A123 OR A386, AS
APPLICABLE.
K. PAINT ALL STEEL EXPOSED TO EARTH OR IN CONTACT WITH
CONCRETE WITH ASPHALT PAINT (TNEMEC 46-465, OR EQUAL).
L. CONNECTIONS:
• CONNECTION CAPACITY: FABRICATOR SHALL DESIGN
CONNECTIONS AND, WHEN REQUESTED, SUBMIT CALCULATIONS
TO AID THE ENGINEER IN REVIEW.
• DESIGN AND FABRICATE SHEAR CONNECTIONS TO RESIST
MAXIMUM UNIFORM LOAD CAPACITY OF THE MEMBER FOR THE
SPAN INCREASED BY 25%, BUT NOT MORE THAN THE SHEAR
CAPACITY OF THE MEMBER UNLESS NOTED OTHERWISE ON
DRAWINGS.
• CONNECTION DEPTH MUST BE A MINIMUM OF 1/2 THE BEAM
DEPTH.
N O
R T
H
SCHEMATIC DESIGN 35% REVISION 05/28/2025
DESIGN DEVELOPMENT 10/20/2025
CONSTRUCTION DOCUMENTS 95% 02/13/2026
DRAWING NOTES
01.03 NONSTRUCTURAL PIPE PENETRATION THRU EXISTING, ABANDONED WALL LOUVER.
03.04 INTERIOR EQUIPMENT PAD AT NEW MECHANICAL PUMPS IN FAN ROOM - SEE RELATING SECTION AND
MECHANICAL DRAWINGS FOR MORE INFORMATION.
05.06 ROOFTOP PIPE RACK SUPPORT FOR >18" DIA PIPES - SEE 93/S103 FOR MORE INFORMATION.
05.07 ROOFTOP PIPES SUPPORTED INDIVIDUALLY - SEE MECHANICAL DRAWINGS FOR MORE INFORMATION.
BASEMENT ROOF
21201918
E
F
F.1
20' - 1" 20' - 0" 21' - 2"
5' - 9" 8' - 3 1/2" 11' - 0 1/2"
(E X
W
L
O W
(EX) W12 LOW (EX) W12 LOW
(E X
W
L
O W
(EX) W12 LOW (EX) W12 LOW
/2
W
X
H
IG
H
E X
W10X22 HIGH (EX)
W
X
H
IG
H
E X
W10X22 HIGH (EX)
W
X
H
IG
H
E X
W10X22 HIGH (EX)
W
X
H
IG
H
E X
W10X22 HIGH (EX)
(E X
W
L
O W
(E X
W
L
O W
(E X
W
L
O W
(EX) W12 LOW
(EX) W12 LOW
3' - 0" 3' - 6"
W
X
H
IG
H
A
K
W
X
H
IG
H
A
K
W
X
H
IG
H
A
K
/2
EXISTING
COOLING
TOWER
CELL
EXISTING
COOLING
TOWER
CELL
30000#
COOLING
TOWER
CELL
30000#
COOLING
TOWER
CELL
W10X30 HIGH (A=20K)
W10X30 HIGH (A=5K)
W12X58 LOW (A=35K)
W12X30 LOW (A=35K)
W
X
L O
W
A
K
01.01
23.01
01.02
03.01
W
X
H
IG
H
A
K
O"
NOTES:
1. T/LOW STEEL = 583'-8".
2. T/HIGH STEEL = 584'-6" (MATCH EXISTING PLATFORM STEEL).
(TYP)
28' - 1"
05.02
(TYP)
05.03
(TYP)
05.04
(TYP)
01.01
05.05
S103
S103
S103
S103
S103
S103
S103
AE401
C
B.1
B.2
W12X65 (A = 25K EQ)
W
X
A
5K E
Q
W
X
A
5K E
Q
14' - 1" 8' - 1" 6' - 0"
/2
/2
W16X50 (A = 5K EQ)
W16X50 (A =5K EQ)
W
X
A
K E
Q
W
X w
3/ 8"
X
T
O P
P L
(A
K
"30000#
COOLING
TOWER
CELL
30000#
COOLING
TOWER
CELL
NOTES:
1. T/STEEL = 584'-6".
05.02
(TYP)
B
C
C.1
B.1
B.2
05.03
(TYP)
05.04
(TYP)
W12X65 (A = 5K EQ)
W12X65 (A =20K EQ)
W12X65 (A = 15K EQ)W12X65 (A = 30K EQ)
W12X65 (A = 15K EQ)
28' - 2"
S103
S103
S103
2221.521
B
C
Ca
2221.52121off
B
C
Ca
21.5off
C.1
B.1
B.2
3' - 11" 7' - 8" 7' - 4"
03.03 05.01
2' - 6" 13' - 2"
03.02
03.01
03.01
03.01 03.01
NOTES:
1. EXIST SLAB ELEVATION = 565'-0" +/-.
05.01
13' - 1 1/2" (VM) 4' - 2 3/4" (VM)
/4
(V M
/4
/4
21.521
G
H
Fb
GaOFF
21.521
G
H
Fb
GaOFF
S103
03.04
03.04
03.04
03.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
A u to d e s k D o c s /N a s h v ill e V
A
U p g ra d e C o o lin g
T o w e r a n d
C h ill e r/
F F
E N a s h v ill e
C o o lin g T o w e r a n d
C h ill e r_ B rv t
/1
/2
:0
:4
P
M
S102
ENLARGED FRAMING PLANS
02/13/2026 EMO KES
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: Owner
1/4" = 1'-0"
SOUTH PLATFORM FRAMING PLAN
1/4" = 1'-0"
NORTH PLATFORM FRAMING PLAN
DRAWING NOTES
01.01 EXISTING COOLING TOWER ON EXISTING STEEL PLATFORM.
01.02 BUILDING EXPANSION JOINT ALONG GRIDLINE 18. NEW COOLING TOWER FRAMING TO CANTILEVER OVER
EXPANSION JOINT.
03.01 EXSTING CONCRETE COLUMN BELOW.
03.02 EXISTING 12" THICK TWO-WAY SLAB
03.03 NEW PIPING OPENING IN EXISTING SLAB - SEE MECHANICAL DRAWINGS AND 92/S103 FOR MORE
INFORMATION.
03.04 INTERIOR EQUIPMENT PAD AT NEW MECHANICAL PUMPS IN FAN ROOM - SEE RELATING SECTION AND
MECHANICAL DRAWINGS FOR MORE INFORMATION.
03.06 REINFORCE UNDERSIDE OF EXIST SLAB IN HATCHED AREA USING CARBON FIBER REINFORCED POLYMER.
EXISTING MOMENT CAPACITY OF THE SLAB IS 7.3K*FT. DEMAND CAPACITY OF THE SLAB IS 13.4K*FT.
REINFORCE SLAB PRIOR TO EQUIPMENT PAD AND PUMP INSTALLATION.
05.01 ANGLE FRAMING SUPPORTING SLAB AT NEW OPENINGS - SEE 92/S103 FOR MORE INFORMATION.
05.02 HSS8X8X3/8 POST UP FROM EXISTING COL BELOW - SEE RELATING SECTIONS FOR MORE INFORMATION.
05.03 HSS4X4X3/8 VERTICAL BRACING - SEE RELATING SECTIONS FOR MORE INFORMATION.
05.04 1" DIAMETER ROD BRACING - SEE 3/S103 AND 4/S103 FOR MORE INFORMATION. PROVIDE (1) TURNBUCKLE
EA ROD. TIGHTEN TURNBUCKLE AFTER UNIT PLACEMENT.
05.05 EXISTING STEEL ACCESS CATWALK TO REMAIN. DO NOT ALTER.
23.01 NEW COOLING TOWER - SEE MECHANICAL DRAWINGS FOR MORE INFORMATION.
N O
R T
H
SCHEMATIC DESIGN 35% REVISION 05/28/2025
DESIGN DEVELOPMENT 10/20/2025
CONSTRUCTION DOCUMENTS 95% 02/13/2026
1/4" = 1'-0"
PARTIAL LOW ROOF FRAMING PLAN
1/4" = 1'-0"
FAN ROOM 2 FLOOR PLAN
POST PER PLAN w/ 3/4"
CAP PL AND 3/4" X 14" X
14" BASE PL + (4) 3/4"
DIA X 12" EMBED
THREADED RODS
BEAM PER PLAN
T/STEEL
PER PLAN
VERT BRACING PER PLAN
w/ 3/8" CAP PL EA END, DESIGN CONNECTIONS
FOR xxK AXIAL (TYP.)
3/8" STIFF PL
(N
T S
3/8" FITTED SHEAR TAB
(4) 3/4" DIA BOLTS
EXIST CONC COL
2" MAX NON-SHRINK
GROUT AS REQD
FOR LEVELING
HORIZ ROD BRACING
ATTACHMENT NOT SHOWN
FOR CLARITY. SEE 4/S103
FOR MORE INFORMATION.
MECH UNIT - SEE
MECH DRAWINGS
FOR MORE INFO
POST PER PLAN w/ 3/4"
CAP PL AND 3/4" X 14" X
14" BASE PL + (4) 3/4"
DIA X 12" EMBED
THREADED RODS
BEAM PER PLAN
T/STEEL
PER PLAN
VERT BRACING PER PLAN
w/ 3/8" CAP PL EA END, DESIGN CONNECTIONS
FOR xxK AXIAL (TYP.)
(N
T S
3/8" FITTED SHEAR TAB
(4) 3/4" DIA BOLTS
EXIST CONC COL
2" MAX NON-SHRINK
GROUT AS REQD
FOR LEVELING
HORIZ ROD BRACING
ATTACHMENT NOT SHOWN
FOR CLARITY. SEE 4/S103
FOR MORE INFORMATION.
MECH UNIT - SEE
MECH DRAWINGS
FOR MORE INFO
POST PER PLAN w/ 3/4"
CAP PL AND 3/4" X 14" X
14" BASE PL + (4) 3/4"
DIA X 12" EMBED
THREADED RODS
BEAM PER PLAN
T/LOW STEEL
PER PLAN
VERT BRACING PER PLAN
w/ 3/8" CAP PL EA END, DESIGN CONNECTIONS
FOR xxK AXIAL (TYP.)
(N
T S
3/8" FITTED SHEAR TAB
(4) 3/4" DIA BOLTS HORIZ ROD BRACING
ATTACHMENT NOT SHOWN
FOR CLARITY. SEE 4/S103
FOR MORE INFORMATION.
MECH UNIT - SEE
MECH DRAWINGS
FOR MORE INFO
T/HIGH STEEL
PER PLAN
SEE 2/S103 FOR
POST BASE INFO
3/8" STIFF PL
EA SIDE OF
BEAM WEB
EXIST BEAM PER PLAN
BEAM PER PLAN
(TYP. UNO)
T/HIGH STEEL
PER PLAN
MECH UNIT - SEE
MECH DRAWINGS
FOR MORE INFO
3/16 2-12
BEAM PER
PLAN HORIZ ROD
BRACING PER PLAN
POST PER PLAN
1/2" PLSECTION
DETAIL
1/2" PL
HORIZ ROD
BRACING
PER PLAN
3/4" DIA "J"-BOLT
FOR BRACING
SAG SUPPORT
HORIZ ROD
BRACING PER PLAN
BEAM PER
PLAN w/ TOP PL
T/STEEL
PER PLAN
3/16 2-12
TOP PL TO W
BEAM
MECH UNIT - SEE
MECH DRAWINGS
FOR MORE INFO
EXIST STRUCTURAL
SLAB
(TYP)
30" DIA CORE DRILL THRU
EXIST CONC SLAB FOR
PIPE PENETRATIONS (TYP)
1/2" SHEAR TAB +
(2) 1/2" DIA BOLTS
PIPING - SEE MECHANICAL
DRAWINGS FOR MORE INFO
L7X4X1/2 (LLV) ALL
SIDES OF OPNG (TYP)
USE REBAR DETECTOR
BEFORE DRILLING
ANCHOR HOLES. DO
NOT DRILL THRU EXIST
REINFORCING (TYP).
EQ
PIPE
SUPPORT
............................. TBD
6"X1/2" X CONT TOP PL (50KSI)
w/ 5/8" DIA BOLT @ 10"OC MAX .
ALIGN w/ ANGLE BELOW (TYP).
GROUT HOLES SOLID
AFTER BOLT
INSTALLATION (TYP)
AT CONTRACTOR'S OPTION
FOR FIT-UP, CONT TOP
PLATE CAN HAVE OVERSIZED
HOLES IF 2"X2"X1/4" PL
WASHERS ARE ADDED AND
FIELD WELDED TO CONT PL
CONT TOP PL AND THRU BOLT
REQUIRED BUT NOT SHOWN
FOR CLARITY ON THIS ANGLE
EQ
BEAM PER PLAN
w/ TOP PL
T/LOW STEEL
PER PLAN
3/16 2-12
TOP PL TO W
BEAM
MECH UNIT - SEE
MECH DRAWINGS
FOR MORE INFO
T/HIGH STEEL
PER PLAN
3/8" STIFF PL
EA SIDE OF
BEAM WEB
EXIST POST
PER PLAN
EXIST BEAM
PER PLAN
T/LOW STEEL
PER PLAN
VERT BRACING PER PLAN
(TYP.) w/ 3/8" CAP PL EA END, DESIGN CONNECTIONS FOR xxK AXIAL (TYP.)
(N
T S
3/8" STIFFENER/
FITTED SHEAR
TAB
HORIZ ROD BRACING
ATTACHMENT NOT SHOWN
FOR CLARITY. SEE 4/S103
FOR MORE INFORMATION.
BEAM PER PLAN
T/HIGH STEEL
PER PLAN
W/ EQUIPMENT SUPPLIER
COORDINATE DIMENSIONS
EQUIPMENT
3/4" CHAMFER (TYP)
(T Y
P
/2
C L
R
#4 BENT DOWELS @ 12"OC MAX, EMBED 3" INTO
FLOOR SLAB AROUND EQUIPMENT PAD PERIMETER
(TYP). USE A REBAR DETECTOR BEFORE DRILLING
INTO EXISTING SLAB. DO NOT DRILL THRU
EXISTING SLAB REINFORCING.
#4 @ 12" OC, EA WAY
(TYP)
6"
EXISTING ELEVATED
SLAB, ROUGHEN
SURFACE UNDER
NEW EQUIPMENT
PAD EXTENTS 6
PAINT YELLOW (TYP)
3/16
3/16
POST (TYP.): L6X6X3/8
BASE PL (TYP.): 1/2"X8"X8"
w/ (2) 1/4"DIA X 1" EMB
WOOD SCREWS
PROTECTION SHEET
UNDER PAD, (TYP.)
1'-6" X 1'-6" X 1-1/2"
COMPOSITE LUMBER
SUPPORT PAD (TYP.)
RACK WIDTH. SEE NOTE 3.
VARIES, 8'-0" MAX
NOTES:
1. PIPE SUPPORT SHALL BE HOT DIP GALVANIZED.
2. SPACE SUPPORTS AT 10'-0" OC MAX.
3. FINAL ELEVATIONS AND DIMENSIONS SHALL BE FIELD COORDINATED w/ CONTRACTORS.
4. INSTALL HORIZ BRACES BETWEEN SUPPORTS AT EVERY OTHER SUPPORT, AT PIPE RUN ENDS, AND AT PIPE RUN TURNS.
HORIZ BRACE:
L3X3X1/4, SEE NOTE 4 (TYP.)
T/EXIST ROOF
HORIZ SUPPORT:
C8x11.5
R A
C K
H E
IG
H
T S
E E
N O
T E
V A
R
IE
S
M
A X
MECH PIPING - SEE
MECH DWGS FOR
MORE INFO (TYP.)
3/16
AFTER WELD,
REPAIR
DAMAGED
GALVANIZING
S103
SEE 93/S103 FOR
HORIZ SUPPORT,
POST, AND POST
BASE INFO (TYP.)
SEE 93/S103 FOR
HORIZ SUPPORT INFO
MECH PIPING - SEE
MECH DWGS FOR
MORE INFO (TYP.)
3/16
(TYP.) AFTER
WELD,
REPAIR
DAMAGED
GALVANIZING
NOTES:
1. INSTALL CROSS BRACING IN PAIRS ON EACH SIDE OF PIPE RUN.
2. INSTALL CROSS BRACING AT 40'-0" OC MAX ALONG PIPE RUNS (RUN = STRIGHT SEGMENT OF PIPING) AND AT RACKS JUST
BEFORE AND JUST AFTER PIPE TURNS.
L3X3X1/4 CROSS
BRACE (TYP.)
6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
A u to d e s k D o c s /N a s h v ill e V
A
U p g ra d e C o o lin g
T o w e r a n d
C h ill e r/
F F
E N a s h v ill e
C o o lin g T o w e r a n d
C h ill e r_ B rv t
/1
/2
:0
:4
P
M
S103
SECTIONS
02/13/2026 EMO KES
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: Owner
3/4" = 1'-0"
PLATFORM POST
3/4" = 1'-0"
PLATFORM POST WITH CANTILEVERED BEAM
3/4" = 1'-0"
PLATFORM BEAM ON EXISTING BEAM
3/4" = 1'-0"
SECTION
1 1/2" = 1'-0"
HORIZ ROD BRACING DETAILS
1 1/2" = 1'-0"
SAG SUPPORT AND (2) BRG MECH UNITS DETAIL
3/4" = 1'-0"
PIPE PENETRATION THRU EXIST ROOF
SCHEMATIC DESIGN 35% REVISION 05/28/2025
DESIGN DEVELOPMENT 10/20/2025
CONSTRUCTION DOCUMENTS 95% 02/13/2026
1 1/2" = 1'-0"
STACKED BEAM SECTION
3/4" = 1'-0"
PLATFORM POST WITH CANTILEVERED BEAM
3/4" = 1'-0"
INTERIOR EQUIPMENT PAD DETAIL
3/4" = 1'-0"
ROOFTOP PIPE SUPPORT
3/4" = 1'-0"
ROOFTOP PIPE SUPPORT BRACING
VARIES
VA
R
IE
S
9"
9"
3'
6"
3'
6"
CLEAR LENGTH
C
LE
AR
H
EI
G
H T
14 GA. STEEL POWDERCOATED YELLOW SAFETY
RAILING AT GUARD HEIGHT OF 42", TYP.
10 GA. GALVANIZED STEEL STRINGERS
12 GA. GALVANIZED STEEL TREADS WITH
PERFERATED HOLES AND ANTI SLIP TREAD
12 GA. GALVANIZED STEEL PLATFORM WITH
PERFERATED HOLES AND ANTI SLIP TREAD - 10 GA.
GALVANIZED STELL SIDE FRAME SUPPORTS
NEW/ EXISTING ROOF PIPES - SEE MEP PLANS FOR
CORDINATION ON HEIGHT AND SPACING, TYP.
EXISTING ROOF STRUCTURE AND ROOFING - SLOPE
AND SLOPE DIRECTION VARIES
WEIGHTED SPREAD SUPPORTS AT ROOF
EXISTING ROOF STRUCTURE
EXISTING ROOF INSULATION AND ROOFING -
SLOPE AND SLOPE DIRECTION VARIES
NEW ROOF INSULATION AROUND NEW
SUPPORT - ALIGN TO EXISTING
NEW COVERBOARD TO BRIDGE NEW AND
EXITING ROOF INSULATION 4" MIN. ALL
DIRECTIONS
NEW ROOF HEAT WELDED LAP SEAL WITM
MIN. 6" OF LAP BETWEEN NEW AND EXISTING
ROOFING
NEW ROOFING TO TURNUP AND WRAP NEW
SUPPORT POST - HEAT WELDED TO STEEL
STRUCTURE ALL SIDES.
NEW MECHANICAL ROOF STRUCTURE - SEE
STRUCTURAL AND MEP DRAWINGS
6" 6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
Au to de sk
D oc s:
//N as hv ille V
A
- U pg ra de C oo lin g To w er a nd
C hi lle r/F
FE
_N as hv ille
C oo lin g
To w er a nd C hi lle r_ B1
(2
4) .rv t 2/
/2
1:
:3
PM
AE401
ENLARGED DETAILS
02/13/2026 SPS SPS
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: Owner
CONSTRUCTION DOCUMENTS 95% 02/13/2026
3/4" = 1'-0"1 TYPICAL STAIR CROSSOVER - SECTION DETAIL
3/4" = 1'-0"2 WALL SECTION
3/4" = 1'-0"3 PLATFORM POST - ENLARGED DETAIL
NOTE:
ALL SYMBOLS AND ABBREVIATIONS ARE
SUBJECT TO MODIFICATIONS ON OTHER
DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT
NOT NECESSARILY BE USED ON THIS
PROJECT.
A. ALL PIPING IS ABOVE THE CEILING (AT THE UNDERSIDE OF STRUCTURE IN EXPOSED
STRUCTURE AREAS), UNLESS OTHERWISE NOTED.
B. REFER TO SCHEDULES, DETAILS AND DIAGRAMS FOR PIPING, PIPE SIZES AND
PIPELINE DEVICES NOT INDICATED ON THE FLOOR PLAN.
C. ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES
IS CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.
D. LOCATIONS AND SIZES OF EXISTING PIPING HAVE BEEN DETERMINED FROM A
REVIEW OF EXISTING DRAWINGS AND/ OR SITE INSPECTION, WHERE POSSIBLE.
FIELD VERIFICATION OF EXACT LOCATIONS, ELEVATIONS, INVERTS, SIZES,
DIRECTION OF FLOW, ETC. SHALL BE REQUIRED PRIOR TO BEGINNING
NEW WORK.
E. ALL PIPING NOTED TO BE DEMOLISHED SHALL BE REMOVED BACK TO ACTIVE
MAINS AND CAPPED, OR REMOVED BACK TO POINTS OF CONNECTION IN NEW
WORK. INACCESSIBLE PIPING, WHERE SO NOTED, TO BE ABANDONED SHALL
BE DISCONNECTED FROM ACTIVE SYSTEMS AND CAPPED OR PLUGGED IN
CONCEALED LOCATIONS.
F. ALL ABANDONED PIPING SHALL BE CAPPED AT INLET AND OUTLET. DOMESTIC
WATER PIPING SHALL BE CAPPED WITHIN TWO (2) PIPE DIAMETERS OF ACTIVE
BRANCH/ MAIN. NO DEAD LEGS WILL BE PERMITTED.
G. NEW CONNECTIONS TO EXISTING PIPING SHALL BE WITH THE SAME SIZE AS
THE EXISTING PIPING, UNLESS OTHERWISE NOTED.
H. ALL REMOVED MATERIAL AND EQUIPMENT, SO DESIGNATED BY THE OWNER,
SHALL BE TURNED OVER AND PLACED WHERE DIRECTED. ALL MATERIAL
AND EQUIPMENT, WHICH THE OWNER DOES NOT WISH TO RETAIN, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR RESPONSIBLE FOR THE
REMOVAL.
I. REFER TO THE HVAC PLANS FOR PROJECT PHASING REQUIREMENTS.
GENERAL NOTES
A1
P1 P1OR
A1
OH
P2
B P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND
HAZARD CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION
VARIES. REFER TO SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.
LETTER DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH
IT IS SHOWN UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
FIRE SUPPRESSION SYMBOLS
SPRINKLER - CONCEALED PENDENT
FS
PIV
S
FIRE HYDRANT
FLOW SWITCH
VALVE - GATE OS&Y
SPRINKLER - INSTITUTIONAL PENDENT
SPRINKLER - PENDENT
VALVE - POST INDICATOR
SPRINKLER - RECESSED PENDENT
SPRINKLER - SIDE WALL
VALVE - SUPERVISED
SPRINKLER - UPRIGHT
SPECIALTY GAS SYMBOLS
AIR OUTLET - LAB TYPE
VC
VC
NATURAL GAS OUTLET - LAB TYPE
VACUUM OUTLET - LAB TYPE
VACUUM CLEANING STATION - WALL
VACUUM CLEANING STATION - FLOOR
PIPING DESIGNATIONS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
HOT WATER PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (180 DEGS. F.)
140R
180R
EXPANSION JOINT
VALVE - FIRE DEPARTMENT
WATER METERM
ABBREVIATIONS
AAP - AREA ALARM PANEL (MEDICAL GAS)
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACC - ACCESS
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
AR - AIR RECEIVER OR ARGON
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
AV - ACID VENT
AW - ACID WASTE
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BT - BATHTUB
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
BTWN - BETWEEN
CA - COMPRESSED AIR
CB - CATCH BASIN
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CI - CAST IRON
CK - CLINICAL SINK
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - MEDICAL CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CORR - CORRIDOR
CS - CLINICAL SINK OR COLD SOFT WATER
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWS - COMBINATION WATER SERVICE
OR CONDENSER WATER SUPPLY
CWR - CONDENSER WATER RETURN
D - DEPTH OR DRAIN LINE
DD - DECK DRAIN
DCW - DOMESTIC COLD WATER
DET - DETAIL
DF - DRINKING FOUNTAIN OR WATER COOLER
OR DIESEL FUEL
DFU - DRAINAGE FIXTURE UNIT
DHW - DOMESTIC HOT WATER
DHWR - DOMESTIC HOT WATER RETURN
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - DOWN SPOUT OR SPRINKLER (DRY)
DT - PERFORATED DRAIN TILE
DWG - DRAWING
DWH - DOMESTIC WATER HEATER
EA - EACH
EEW - EMERGENCY EYE WASH
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUAL
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
ES - EMERGENCY SHOWER
EQS - EQUIPMENT SUPPLIER
EWC - ELECTRICAL WATER COOLER
EXH - EXHAUST AIR
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)
FCE - FIRE CONTROL EQUIPMENT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FINISHED FLOOR ELEVATION
FHC - FIRE HOSE CABINET
FLR - FLOOR
FM - FORCE MAIN
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FLOOR SINK OR FIRE SERVICE
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GD - GARAGE DRAINAGE
GPM - GALLONS PER MINUTE
GS - GAS SERVICE
GW - GREASE WASTE
H2 - HYDROGEN
HB - HOSE BIBB
HD - HUB DRAIN
HE - HELIUM
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER OR HIGH POINT
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HPW - HIGH PURITY WATER
HPWR - HIGH PURITY WATER RETURN
HR - HOSE REEL
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR
CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
IA - MEDICAL INSTRUMENT AIR
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
IV - INDIRECT VENT
IW - INDIRECT WASTE
JS - JANITOR SINK
K - KITCHEN WASTE
L - LENGTH
LA - LABORATORY COMPRESSED AIR
LAV - LAVATORY
LBS - POUNDS
LCW - LABORATORY COLD WATER
LHW - LABORATORY HOT WATER
LHWR - LABORATORY HOT WATER RETURN
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LV - LABORATORY VACUUM OR LABORATORY VENT
LW - LABORATORY WASTE
MA - MEDICAL COMPRESSED AIR
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MB - MOP BASIN
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
MV - MEDICAL SURGICAL VACUUM
N2 - MEDICAL NITROGEN
N/C - NORMALLY CLOSED
NG - GASOLINE (NON-LEAD)
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NO - MEDICAL NITROUS OXIDE
NOM - NOMINAL
NPW - NON-POTABLE WATER
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
02 - MEDICAL OXYGEN
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER OR OVERFLOW DRAIN
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
OR PUMPED CONDENSATE RETURN
PD - PUMP DISCHARGE OR PARAPET DRAIN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
PW - PURE WATER
RA - RETURN AIR
RAD - RADIUS
RCP - REINFORCED CONCRETE PIPE
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
RV - RELIEF VALVE
S - SPRINKLER (WET)
SA - SHOCK ARRESTOR OR SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SD - SPRINKLER DRAIN OR SUBSOIL DRAIN
SH - SHOWER
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SS - SANITARY STACK (SOIL OR WASTE) OR
STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
T - FUEL TANK VENT
TD - TRENCH DRAIN
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TF - TRAP FILLER
TP - TRAP PRIMER OR TRAP PRIMER DISCHARGE
TW - TEMPERED WATER
TYP - TYPICAL
UR - URINAL
UNO - UNLESS NOTED OTHERWISE
V - VENT OR SANITARY SEWER VENT
VAC - VACUUM
VC - VACUUM CLEANING
VCV - VACUUM CLEANING VALVE
VE - VACUUM EXHAUST
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VP - VACUUM PUMP
VS - VENT STACK
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/O - WITHOUT
W - WASTE
WAGD - WASTE ANESTHESIA GAS DISPOSAL
WC - WATER CLOSET
WCO - WALL CLEANOUT
WH - WALL HYDRANT OR WATER HEATER
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
YCO - YARD CLEANOUT
ZVC - ZONE VALVE CABINET
PIPING SYMBOLS
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
D
R
PIPE RISER
HOT WATER PIPE (180 DEGS. F.)
ARGON PIPE
COMPRESSED AIR PIPE
DIESEL FUEL PIPE
SPRINKLER PIPE (DRY)
FIRE SUPPRESSION (STANDPIPE / SPRINKLER MAIN)
FIRE SERVICE
FUEL OIL FLOW LINE
FUEL OIL GAUGE LINE
FUEL OIL RETURN LINE
FUEL OIL SUPPLY LINE
NATURAL GAS PIPE
GARAGE DRAINAGE PIPE
GAS SERVICE
HYDROGEN PIPE
HELIUM PIPE
KITCHEN WASTE PIPE
LABORATORY COMPRESSED AIR PIPE
LABORATORY VENT PIPE
LABORATORY VACUUM PIPE
LABORATORY WASTE PIPE
GASOLINE PIPE (NON-LEAD)
NON-POTABLE
(OVERFLOW) SECONDARY STORM DRAINAGE PIPE
PROPANE GAS PIPE
PUMP DISCHARGE PIPE
PRE-ACTION / DELUGE SPRINKLER PIPE
PURE WATER PIPE
SPRINKLER PIPE (WET)
SANITARY DRAINAGE PIPE
SOFT COLD WATER
SPRINKLER DRAIN PIPE
STORM DRAINAGE PIPE
FUEL TANK VENT PIPE
TRAP PRIMER DISCHARGE PIPE
TEMPERED WATER PIPE
SANITARY SEWER VENT
WATER SERVICE
LV
AR
CA
DF
DS
F
FS
FOF
FOG
FOR
FOS
G
GD
GS
H2
HE
IV
IW
LA
LV
LW
NG
NPW
OD
P
PD
PS
PW
S
SAN
SCW
SD
STM
T
TP
TW
V
WS
INDIRECT VENT PIPE
INDIRECT WASTE PIPE
K
ACID VENT PIPEAV
ACID WASTE PIPEAW
BC
TC
COMBINATION FIRE SUPPRESSION &
DOMESTIC WATER SERVICECWS
FLEX PIPING
CARBON DIOXIDE OUTLET - HOSPITAL TYPE
MEDICAL AIR OUTLET - HOSPITAL TYPE
MEDICAL VACUUM INLET - HOSPITAL TYPE
NITROGEN OUTLET - HOSPITAL TYPE
NITROUS OXIDE OUTLET - HOSPITAL TYPE
OXYGEN OUTLET - HOSPITAL TYPE
WAGD INLET - HOSPITAL TYPE
MEDICAL INSTRUMENT AIR PIPE
MEDICAL NITROGEN PIPE
MEDICAL COMPRESSED AIR PIPE
MEDICAL SURGICAL VACUUM-EXHAUST PIPE
MEDICAL NITROUS OXIDE PIPE
MEDICAL OXYGEN PIPE
WASTE ANESTHESIA GAS DISPOSAL PIPE
IA
N2
MA
MV
NO
O2
WAGD
MEDICAL CARBON DIOXIDE PIPECO2
MEDICAL SURGICAL VACUUM PIPE
MEDICAL COMPRESSED AIR-INTAKE PIPEMA-IN
MV-EX
VALVES AND FITTINGS
T
P
FOB
FOT
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
GAUGE - PRESSURE
GAUGE - TEMPERATURE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER - WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
VALVE - DRAIN WITH HOSE END CONNECTION
VALVE - PRESSURE REGULATING
VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PLUG - PRESSURE AND TEMPERATURE TEST
TRAP PRIMER
GAUGE - VACUUM WITH STOP
CLEANOUT - TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
VALVE - PLUG
VALVE - SHUTOFF AND BOX
VALVE - SHUTOFF ON RISER
V
VB
TP
CO
VALVE - SOLENOID S
P/T VALVE - PRESSURE AND TEMPERATURE SAFETY
RELIEF. PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE.
VALVE - CHECK
VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE
(REFER TO SPECIFICATIONS FOR REQUIRED TYPE
BASED ON APPLICATIONS)
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN
AND OUT
VALVE - COMBINATION SHUTOFF AND
BALANCING (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
END OF DEMOLITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
Au to de sk
D oc s:
//N as hv ille V
A
- U pg ra de C oo lin g To w er a nd
C hi lle r/2
4-
4- M
EP
-C en tra l.r vt
2/
/2
2:
:0
PM
P001
LEGEND & DRAWING INDEX
02/13/2026 WJS CCL
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: VMAC
PLUMBING SHEET INDEX
SHEET NUMBER SHEET NAME
P001 LEGEND & DRAWING INDEX
P101 BASEMENT & FIRST FLOOR PLAN
P102 SECOND FLOOR PLAN
CONSTRUCTION DOCUMENTS 95% 02/13/2026
45 KVA
STAIR
F2
STAIR
F1
STAIR
NO. 3
STAIR
NO. 2
STAIR
NO. 4
STAIR
NO. 6
STAIR
NO. 7
STAIR
NO. 1
STAIR
NO. 10
STAIR
NO. 9
STAIR
NO. 8
CORRIDOR
C2-29A
NURSE STATION
UP
NEG. ISOLATION
214L BARIATRIC PATIENT
ROOM
214M
BARIATRIC PATIENT
ROOM
214N
POS. ISOLATION
214P
SPD STORAGE
SOILED UTILITY W/ BED
PAN WASH
MEDICINES
NEG. ISOLATION
214I
ANTE
214J
ANTE
214K
PATIENT ROOM
214H
PATIENT ROOM
214E
PATIENT ROOM
214D
PATIENT ROOM
214C
PATIENT ROOM
214B
PATIENT ROOM
214A
ELECTRICAL
CONFERENCE ROOM
208B
DATA
FAMILY CONSULT.
LOUNGE
OFFICE
STAFF LOCKER ROOM
TOILET
TOILET
EQUIPMENT STORAGE
STAFF OFFICE
208A
ACCESS
DOOR
JANITOR'S
WORK
STATION
ACCESS
DOOR
SOILED UTILITY W/
BEDPAN WASH
214F
PATIENT ROOM
214G
STORAGE
F.E.C.
F.E.C.
PATIENT NUTRITION
STATION
CONSULTANT ROOM
208A
P.T.S. VACUUM PUMP
ROOM
214Q
POS. ISOLATION
LOBBY
SERVICE ELEVATOR
CORRIDOR
ANTE ENTRANCE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
WHEELCHAIR
STORAGE
CA
RT
ST
OR
AG
ECORRIDOR
CORRIDOR
EXISTING ADMIN
EXISTING CORRIDOR
NEW CORRIDOR
EXISTING PULMINARY
ANALYSIS LAB
P T S
OFFICE
MULTI-PURPOSE
CLERICAL
OFFICE
OFFICE
TOIL.
OFFICEOFFICE OFFICE
OFFICE
OFFICE OFFICE OFFICEOFFICE OFFICE
PHARMACY
WAITING
OFFICE
DATA CL.
EXAM
EL.CLO.
C-221
C-221A
C-221C C-221EC-221D C-221F C-221G C-221H
C-221K
C-221I
C-221M
C-221J
C-221N C-221LC-221O
C-221Q
C-221P
C-221R
C-222
C-222BC-222A
VESTIBULE
C-221B
OFFICE
TRANSPLANT
45 KVA
30 KVA
(2)30 KVA
30 KVA
45 KVA
(3)30 KVA
(2)45 KVA
30 KVA
15 KVA
SOILED
UTILITY
LINEN
2G129
MED
2G128
NURSES
STATION
NS
BATH
2G137A
2-BED 2G1372-BED 2G136
BATH
2G136A
2-BED
2G135
2-BED 2G134
BATH 2G133A
OFFICE
2A202B
REPORT
2A204
BATH
2G138ACLINICAL
NURSE MGR.
2A202
BATH 2A208A
OFFICE
2G132
NOURISH
2G131
CLEAN
LINEN
2A203
NURSE
MGR.
2G130
ISOLATION
2-BED 2G138
BATH
2G135A
BATH
2G134A
PRIVATE
2G127A
CORRIDOR
C2-11A
TWO BED
2G127
CORRIDOR
C2-11B
ONE BED
2G126
ONE BED
2G123
SHARED
2G123A
ONE BED
2G122
SHARED
2G120A
ONE BED
2G120
CORRIDOR
C2-11
MED TEAM
2A207
CONSULT
MEDITATION
PATIENT ED
2A206
CORRIDOR
C2-3A
DAYROOM
2G125 EQUIPMENT
2G140
CORRIDOR
C2-10A
C-221B
EXAM
C-244
F TOILET
C-224
M TOILET
C-243
GI
MICU
BF
P
BF
P
BF
P
FD
4" - SAN
2" - SAN
CO
4" - SAN
FD-S
4" - SAN
2221.521 E
F
G
H
Ga
Fb
E-103
DINING
AREA MEZZANINE
SHAFT
STAIR NO. 8
C-214
HAC
C-212
HEART STA
SUPER
(EX)
3 4" - DCW
4" - MU
24232221.521
B
C
D
E
23.5
4" - DCW E-25E
BOILER
OPERATOR
E-25B
A/C
OPERATIONS
SHOP
E-25C
OFFICE
E-24
FIRE EXIT
FLAM
STORAGE E-25D
GROUNDS
& TRANS
E-25
GROUNDS
EQUIP
E-26
SVC RM
E-25F
BOILER RM
E-26A
ELECTRICAL
CLOSET
2" - M U
2" - MU
2"
MU
4" - MU
4" - D
CW
4" - M U
2" - M U
2" - MU
2"
MU 2" - D
CW
2" - M U
2" - MU
2" - MU
24232221.521
B
C
D
E
23.5
E-25E
BOILER
OPERATOR
E-25B
A/C
OPERATIONS
SHOP
E-25C
OFFICE
E-24
FIRE EXIT
FLAM
STORAGE E-25D
GROUNDS
& TRANS
E-25
GROUNDS
EQUIP
E-26
SVC RM
E-25F
BOILER RM
E-26A
ELECTRICAL
CLOSET
2" - DCW
3 2" - DCW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
Au to de sk
D oc s:
//N as hv ille V
A
- U pg ra de C oo lin g To w er a nd
C hi lle r/2
4-
4- M
EP
-C en tra l.r vt
2/
/2
2:
:1
PM
P101
BASEMENT & FIRST FLOOR PLAN
02/13/2026 WJS CCL
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: VMAC
1.
2.
3.
4.
EXISTING PIPING OR FIXTURE (TYPE AS INDICATED) TO REMAIN. PIPING
SERVING EXISTING EQUIPMENT THAT IS NOT PART OF THE SCOPE SHALL
BE EXISTING TO REMAIN. PROVIDE A TEMPORARY CONNECTION, IF
NEEDED, TO MAINTAIN NORMAL EQUIPMENT FUNCTION.
REMOVE EXISTING BACKFLOW PREVENTER(S) SERVING EXISTING
COOLING TOWER AND UPSTREAM PIPING BACK TO ACTIVE MAIN TO BE
UPSIZED. DOWNSTREAM OF BACKFLOW PREVENTER(S) SHALL BE
MECHANICAL SCOPE FOR DEMOLITION. COORDINATE WITH FACILITIES
PRIOR TO ANY WORK COMMENCING.
ENTIRE BRANCH SHALL BE UPSIZED TO A 4" PIPE AND BACKFLOW
PREVENTER TO ACCOMMODATE NEW COOLING TOWERS. PROVIDE A
SHUTOFF VALVE DOWNSTREAM OF NEW BACKFLOW PREVENTER.
PROVIDE TEMPORARY CONNECTION TO EXISTING COOLING TOWER,
COORDINATE WITH FACILITIES PRIOR TO ANY WORK COMMENCING.
REFER TO MECHANICAL DRAWINGS.
ALL ASSOCIATED PIPING, VALVES, ETC. DOWNSTREAM OF BACKFLOW
PREVENTER SHALL BE MECHANICAL SCOPE FOR NEW WORK. PLUMBING
CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR
FOR POINT OF NEW CONNECTION AT THE BACKFLOW PREVENTER.
REFER TO MECHANICAL DRAWINGS.
PLAN NOTES
SCALE: 1/8" = 1'-0"
FIRST FLOOR - PLUMBING NEW WORK5
CONSTRUCTION DOCUMENTS 95% 02/13/2026
SCALE: 1/8" = 1'-0"
BASEMENT PLAN - NEW WORK2
SCALE: NONE
BACKFLOW PREVENTER - NEW WORK4SCALE: NONE
BACKFLOW PREVENTER - DEMOLITION3
SCALE: 1/8" = 1'-0"
PLUMBING BASEMENT PLAN - DEMOLITION1
0 248 164
N
0 248 164
N
0 248 164
N
MM
M
M
M
MM
M
M
M
(EX)
FD
FD-S
2221.521
B
C
D
E
F
G
H
Ga
Fb
NOT IN SCOPE
FAN RM 2
C-212
HEART STA
SUPER
C-214
HAC
2019181716151413
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
Date:Revisions:No.
Au to de sk
D oc s:
//N as hv ille V
A
- U pg ra de C oo lin g To w er a nd
C hi lle r/2
4-
4- M
EP
-C en tra l.r vt
2/
/2
2:
:1
PM
P102
SECOND FLOOR PLAN
02/13/2026 WJS CCL
UPGRADE COOLING TOWER AND
CHILLER
626-24-203
1310 24TH AVENUE SOUTH NASHVILLE, TN
95% CONSTRUCTION
DOCUMENTS 1
VA TVHS
NASHVILLE
CAMPUS Approved: VMAC
CONSTRUCTION DOCUMENTS 95% 02/13/2026
1.
2.
EXTEND NEW COOLING TOWER(S) DRAINS TO FLOOR SINK. REFER TO
MECHANICAL PLANS FOR FURTHER COORDINATION.
FOR REFERENCE ONLY. REFER TO MECHANICAL PLANS FOR FURTHER
COORDINATION.
PLAN NOTES
SCALE: 1/8" = 1'-0"
SECOND FLOOR FAN ROOM #2 & ROOF - NEW WORK1
DRAIN SCHEDULE
SYMBOL COUNT DESCRIPTION
BODY STRAINER / GRATE TOP FINISH
C.I. S.S. C.R. BRASS ADJUST. FLAT RECESS DOME
NICKLE
BRONZE C.I. C.R. S.S.
FD-S 1 4" MEDIUM DUTY/ DOUBLE DRAINAGE/ 12" X 12" X 8" FLOOR SINK/ TRAP SEALS ● ● ●
NOTE:
ALL SYMBOLS AND ABBREVIATIONS ARE
SUBJECT TO MODIFICATIONS ON OTHER
DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT
NOT NECESSARILY BE USED ON THIS
PROJECT.
ABBREVIATIONS
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AFMS - AIR FLOW MEASURING STATION
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATC - AUTOMATIC TEMPERATURE CONTROL
(SYNONYMOUS WITH BAS)
BAS - BUILDING AUTOMATION SYSTEM
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BS - BASIN SWEEPER
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CHGR - CHILLED WATER GLYCOL SOLUTION RETURN
CHGS - CHILLED WATER GLYCOL SOLUTION SUPPLY
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWE - CONDENSER WATER EQUALIZER
CWR - CONDENSER WATER RETURN
CWS - CONDENSER WATER SUPPLY
D - DRAIN LINE
DB - DRY BULB
DDC - DIRECT DIGITAL CONTROLS
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DWG - DRAWING
EA - EACH OR EXHAUST AIR
EAT - ENTERING AIR TEMPERATURE
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
EF - EXHAUST FAN
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EWT - ENTERING WATER TEMPERATURE
EXH - EXHAUST
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
FD - FLOOR DRAIN
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GPM - GALLONS PER MINUTE
HB - HOSE BIBB
HC - HVAC (DIVISION 23)
HD - HUB DRAIN
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HR - HOUR
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LAV - LAVATORY
LBS - POUNDS
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LWT - LEAVING WATER TEMPERATURE
MAX - MAXIMUM
MDD - MOTORIZED DAMPER
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE
RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OBD - OPPOSED BLADE DAMPER
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .