This document is an amendment to a federal solicitation for renovation work. The solicitation is for furnishing all labor, materials, supervision, equipment, and other necessary items to renovate the variable air volume controls and add a new VAV box with reheat and direct digital controls in Building 200 wing B, second floor at a Veterans Affairs medical center, as outlined in the statement of work, drawings, and specifications. The amendment provides answers to questions from offerors, clarifying that the scope of work is limited to the specified area and does not include other areas or work mentioned in the specifications sections. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. No other plans will be issued and the statement of work takes precedence over specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002-36C24922B0015-QA_final.pdf | ||
| Drawing Attachment - 4 - SITE MAP Update 5.pdf | ||
| Specification_Rev2- 621-22-133 Bldg 200 Wing B2 Renovate VAV Controls.pdf | ||
| SOLICITATION-36C24922B0015-IFB_RenovateVAVcontrols_Bld200.pdf | ||
| Contractor_EMR_Certification_Form.pdf | ||
| Drawings Attachment-5 - Mechanical Building 200 Section B and C Second Floor.pdf | ||
| Drawings Attachment -3- VAV Box Schedule.pdf | ||
| Davis_BaconAct-POSTER.pdf | ||
| DB_WageDetermination-TN20210111_2-25-2022.pdf | ||
| RFI_Form-Project_621-22-133.pdf | ||
| Drawings Attachment-6 - Bldg 200 Section B and C-Heating_WaterPiping.pdf | ||
| Drawings Attachment -2 - Bldg 200 Wing B2 Electrical.pdf | ||
| Drawings Attachment -1 - Overview-Bldg 200 Wing B2-VAV_locations.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
621-22-133
90C
Department of Veterans Affairs Network Contracting Office (NCO) 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs c/o Sascha Hertslet 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
To all Offerors/Bidders
36C24922B0015
03-18-2022
X
X X x 1
This amendment is to post all answers to questions posted.
Question 1: Good afternoon. The Plans (6 pages) show work on the 2nd floor of one wing of the building, but the Specs include demolition of roads, walks, curbs, slabs.... disconnect utilities before demo... barricades, temp fence, temp lights..... Plumbing, HVAC, Electrical....We're wondering if there are any more Plans coming? Or are some of these Spec Sections unnecessary?
Answer 1: The work is limited to the 2nd floor B-wing of Bldg. 200 with the possibility of accessing 120V electrical electrical power from first floor or ground floor. Demolition will consist of the existing HVAC controls, the HVAC control pneumatic tubing, HVAC control valves, piping where the new control valves are to be located, thermostats in the
Craig Ziegemeier Contracting Officer
PAGE NO.
CONTRACT NO. ORDER NO. MODIFICATION NO.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)
STANDARD FORM 30 (CONTINUATION)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTINUATION PAGE
controlled areas, and some areas above ceiling to install the new VAV box and HVAC controls. The demolition is not limited to above ceiling but most of the work is above ceiling. The scope does not mention work involving of roads, walks, curbs, and slabs but does mention plumbing, HVAC, and electrical as part of the defined project.
In short, no other plans are forthcoming. The Statement of Work is the basis for the scope of work and takes precedence over the Specs Sections.