03-Plumbing_Bid Docs.pdf

PDF 2 MB Posted

Attached to
Z2DA--36C249-21-AP-4236 - 626A4-18-102 - Renovate Restrooms
Solicitation number
36C24922B0004
Issued by

About this file

This document package includes construction bid documents and information on a related federal contract opportunity. The bid documents provide plans for plumbing renovations in multiple restrooms at a Veterans Affairs medical facility, outlining demolition and new work for fixtures, piping, and drainage. The related solicitation seeks construction services for the renovation of these restrooms, with a project magnitude between $500,000 and $1,000,000. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. Services required include plumbing fixture replacement, piping installation, and drainage work, matching the demolition and new construction details specified in the bid documents.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. Facility Standard-T&S Brass B-1141-2VL15CR4 with Chicago Faucets thermostatic mixing valve 131-CFMABRCF in accessible location. Verify with COR

A

B

C

D

E

F

G

\ RESTROOM

,, I 202 I r-i I I I I I I I I I I '

- - -·- --·- - - L _ _J

CD

f--

E �

-.,:,-�O_O_M_ 2 _02_ -_ D _E _M _OL_IT_IO_ N _ W_A_ T_ER_ PL _A _N

S1

112,.

; RESTROOM

I !i r,;;:;;;-i

: :=_-_ 1!2" -=i-:;. L.=.J,'"'

I II I I

�� �·· 1Ur0

0e---

��-E,�-:,-�O_O_M_ 2 _0_2 _- N_E_W_W_O_R_K_W_A_T _ER_P_ L_A_N

: .::. ;\,_...., LJ

' � .,a--======,>

·. RESTROOM

\,[]QI]

r-7

I I I

I I I I L_J r

�!f---�-;�-.,,!-,�-OO_M_20_2 _ - _D _EM_O_L_IT_IO_ N _W_ A_ S_T _E _AN_D_V_E_N _T _P _LA_N

4"

_______ I f--

E �

-,!,-�O_O_M_ 2_0_2 _- N_E_W _W_O_R_K_W_A_ S _TE_A_ N _D_V _E _NT_ PL_A_N

5 6 7 8 r4)

�e---��-E�-.!,-�O_O _M _1 _04_A_N _D _1 _05_ - _D _EM_O_L _IT_IO _N _W _A _TE_R _P _L _AN_e���-E,�-}-�O_O_M_ 10_4_AN_D_ 1_0_5 _-D_E_M _O _LI _TI _O _N _W _A _ST_E_A_N _D _VE_ N_T_P _LA_N

1 "

• • ,,. __ , ... ,, '·=I· I

0-s-��-E,�-:,-�O_O_M_ 1_0_4 _AN_D_1_0_5 -_ N_E _W _W_O_R _K _W_A _TE_R_P_L _AN_

_J

©-�Jg,:,�OOM 104 ANDJ05- NEW WORK WASTE AND VENT PLAN

9 10

SHEET NOTESf---------···· .. , -------- - -· --- - - - ----------<

1. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS REQUIRED.

2. UNLESS NOTED OTHERWISE, THE SIZE OF FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN-:-HE

PLUMBING FIXTURE SCHEDULE.

3. DOMESTIC WATER AND SANITARY PIP�S ARE e:10w SL/1,B OR IN WALL AI\D VEt-.T PIPES ARE ABOVE

CEILlr\G L;NLESS NOTED OTHERWISE.

4. SEAL NEW AND EXISTING PIPE PENETRATIONS THROUGH FLOOR WATER TIGHT.

0 SHEET KEY NOTES - DEMO.

1. DEMOJSH PLUMBING FIXTURE, CAP SANITARY LINE AN) DEMOLISH WAER LINE TO LOCATION

INDICATED AND CAP.

2, DEMOUSH 1-1.'2' WASTE BACK TO MAIN. VE\JT PIPE NOTTO BE DE".10USHED.

0 SHEET KEY NOTES- NEW

1. PROVIDE FAUCET. ROUTE SANITARY AND �OMESTIC WATER TO FIXTURE.

2. PROVIDE WATER CLOSET AN) HEAVY DUTY CARRIER. CONNECT EXISTI\JG SANITA�Y AN) )01,1ESTIC

WATER TO FIXTURE.

3. PROVIDE URl"JAL. CONNECT NEVI' 2" WASTE LINE ltHQ EXISTING SANITARY AND DOM:'.STIC WATER TO

FIXllJRE.

4. PROVID:: NEW FLOOR DRAIN PIPED TO EXISTING SANITARY AS INDICATED. PROVIDE PRESSURE TRAP

PRIMER

AL TERNA TE DEDUCT

1 All WORK ON THIS SHEET IS TO BE INCLUDED IN ALTERNATE OEDLCT it1.

ASBESTOS NOTE

1. NOTIFY COR Wf-lE:-iJ ACM IS ENCOUNTERED THEN REMOVC: ACC8RDING TO 'v1ETHODS INDICATED IN THE

SPECIFICATIONS.

f------ - - -- -···· -

WALL LEGEND

KEY PLAN

SCALE: N.T.S.

LEVEL 1

1 HOUR FIRE/SMOKEWALL

2 HOUR FIREWALL

NON - FIRE - RATED PARTITION

AREA OF WORK I

KEY PLAN OF BLDG 9

FULLY SPRINKLERED

BID DOCUMENTS

lr------------------.,------,,----------------------------------,,-----------,,------------ir-----------------------.::-,--.:-,----..,.,,--,---------,.,,--,--,,,.,.-----------------------,-----··----"-... --.--.. --� .. ---�----�=��--~·�=-�·�=--�r----------�

Project Number Scale Drawing Title: Project Title VA PROJECT NUMBER CO N SULTANTS:

Revisions: Date rA FORM 08-6231 1 2 3 4

PROJEC T MANAGER:

APOGEE

r:,�n,;.,llinc C,1·0J<, �ngln""'" t Archlt .. c:h

Ralelgh. NC lridionopoli5, JN rithbvrgh, PA

Virginia Beach, VA

A1tanto. GA

Fort Co!Jins, CO

18-031 AS INDICATED BUILDING 9 RESTROOMS PLUMBING RENOVATE RESTROOMS - 626A4-1s-102

DEMOLITION AND NEW WORK PLANS ALVIN C. YORK VA MEDICAL

Location

VAMC MURFREESBORO CAMPUS

3400 LEBANON RD,

MURFREESBORO, TN 37129

CENTER MURFREESBORO, TN

Date Checked

OCTOBER 12, 2018 SPG

Drawn

SMH

Building Number

AS SHOWN

Drawing Number

P-103

Dwg. 4 of 5

Office of Construction and Facilities Management

\IA I � U.S,llcpa,im,mt Vl'I. • nfVet�rnn�Atfr,ir,-, A

B

C

D

E

F

G

File details come from the government source that posted it. Updated .