36C24920R0020-0004001.pdf

PDF Posted

Attached to
Z2DA--36C249-20-AP-0092 - 626A4-18-105 - Renovate Ward 1A
Solicitation number
36C24920R0020
Issued by

About this file

This document contains a pre-solicitation notice and related federal contract opportunity for renovations to Ward 1A at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The renovation project has an estimated value between $5 million and $10 million, requires furnishings, construction services, mechanical and electrical systems work. The solicitation is anticipated to be posted on January 24, 2020 on SAM.gov. The contract will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The contractor must complete all work within 425 calendar days. Eligible SDVOSB concerns must be verified through the VA's Center for Veterans Enterprise prior to proposal submission. The renovation work includes demolition, new construction, general trades as well as mechanical, electrical and low voltage systems.

36C24920R0020 0004 Answers to RFIs Renovate Ward 1A Part 1.pdf

View the file

Other files

File Type Posted
36C24920R0020-0005000.docx DOCX document
36C24920R0020-0005001.pdf PDF
36C24920R0020-0004003.pdf PDF
36C24920R0020-0004000.docx DOCX document
36C24920R0020-0004002.pdf PDF
36C24920R0020-0003000.docx DOCX document
36C24920R0020-0002001.pdf PDF
36C24920R0020-0002000.docx DOCX document
36C24920R0020-0001001.docx DOCX document
36C24920R0020-0001000.docx DOCX document
36C24920R0020-059.pdf PDF
36C24920R0020-057.pdf PDF
36C24920R0020-051.docx DOCX document
36C24920R0020-062.docx DOCX document
36C24920R0020-055.pdf PDF
36C24920R0020-054.pdf PDF
36C24920R0020-056.pdf PDF
36C24920R0020-053.pdf PDF
36C24920R0020-061.pdf PDF
36C24920R0020-052.pdf PDF
36C24920R0020-058.pdf PDF
36C24920R0020-060.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Spec Section 01 00 00, 1.5, C Guards, states the contractor is required to provide unarmed security guards at the project site 24 hours a day, 7 days a week after construction hours. Is this correct? Not required

2. Spec Section 01 00 00,1.24 Tests, states the contractor shall provide a written testing and commissioning plan. Spec Section 01 91 00 states the VA hires the Commissioning Agent. Is it not the responsibility of the Commissioning Agent to write the commissioning Plan? No commissioning required – provide testing and documentation for individual systems per specs.

3. Spec Section 01 00 00, 1.31 Photographic Documentation, states the contractor is to hire a commercial photographer. We have done this on several projects, but it is costly. Is this a requirement for this project? No – Superintendent creating a photo log on approved construction management software will be sufficient.

4. Spec Section 01 33 23, 1.13 Electronic Submittal Procedure states the contractor is to include the full cost of Procore Project Subscription in the proposal. This project is 425 days which will require a 2-year subscription. Procore can cost $20,000 or more per year. Should we include the $25,000 in our proposal? Procore is used as the basis of design other options are available and should be approved by VA. It is contractor’s prerogative to include it as a bid item or not.

5. Spec Section 01 35 26, 1.7 States the contractor is to designate one SSHO at each project Site. It then goes on to state the CP can have collateral duties but does not state if the SSHO can have collateral duties. Can the Superintendent be the SSHO or does this need to be two separate people? You may designate the Superintendent as the SSHO as long the super meets the training requirements per section 1.8 of the same spec.

6. Spec Section 01 35 23, 1.12 Infection Control states that the ICRA be a Class IV. This is the most stringent and costly. Is the entire area a class IV? No – The entire space will be turned over to the contractor. Consider the entire area a type 3 with the additional requirement of “Seal, holes pipes, conduits and punctures appropriately”. Also – All doors entering the end stairwell being provided to the contractor will require heavy duty fireproof zipper walls (These will be used in case of emergency only)

7. Spec Section 01 35 23,1.13 Tuberculosis Screening requires all workers to have a TB screening 90 days prior to assignment. This has been waved on many projects. Can this be waived on this project?

8. Spec Section 01 45 00 looks like it has not been edited from Specs in Tact. There are still spaces throughout the section, and it talks about a Design Quality Control Plan. It is also requiring the CQC System Manager to be a graduate engineer, graduate architect or graduate construction manager but does not give any years’ experience as an alternative to these degrees. Is the CQC Manager required to have these degrees? No

9. The Staging Plan drawing shows an area for the Buck Hoist Elevator. Can you give us an elevation drawing showing the actual location and floor heights? Where would the contractor tie in the electrical for this elevator? For 480V – Ground floor electrical Equip Room G25 – Contractor must provide compatible breaker and appropriately sized and protect conductors.

See attached drawing. What is the rate for the electrical power the contractor will be charged?

None. Are there any utilizes under the base location of the elevator? The utility plan indicates the presence of storm sewer. It is imperative the contractor provide utility locate services prior to setting lift.

10. Drawing E501A calls for panels 2N1T and 2C1AT to be new panels, but there are no Breaker Panel Schedules for these 2 panels. Please provide panel schedules. Drawing E501A depicts the

Answers to RFIs for Renovate Ward 1A Alvin C. York VAMC Part 1 final locations of all panels. Panel 2N1T is a reused 150A 208V Panel. Physically located in ClosetA270, shown on drawing E405, and Panel Schedule, breaker sizes, etc is shown on DrawingE602. Panel 2C1AT (was an existing 100A, 208V panel called 2LC1U) that is being reused as a Spare for future Critical Power circuits. Physically located in Closet A270 and shown on drawing E405. It is feed from Panel 2C1T and limited to 70A. See revised drawing on SK002 attached.

11. Drawing P001/Procedures/Note 10 – Air Chambers or Shock trolls? Per spec 22 11 00

12. Drawing P001/Materials/Note 4 – Is Pro press allowed? No – all solder joints.

13. If any asbestos is encountered during this project, who is responsible for reinsulating?

Contractor

14. What are the off hour work hours? No work from 8pm to 6am unless coordinated with COR –

Work involving other floors shall be coordinated with COR for day and time availability of space.

high noise level work must be coordinated with COR and will typically be conducted between 3PM and 7PM.

15. Will we have access to the elevator on the ground floor during the off work hours? No

16. Will there be additional areas onsite for a Connex or does the VA have any additional buildings onsite suitable for storage of construction materials due to the magnitude of this project? There will be not additional space available outside the laydown area being provided.

17. Who is supplying the headwalls in spec section 10-25-13? The contractor

18. Who is supplying the buck hoist? Contractor

19. Our Med Gas drawings indicate two headwalls per room but the detail #4 on sheet A411 seems to indicate only one headwall per patient room. Please confirm the total number of headwalls needed. There is one (1) headwall per Patient Room with the exception of the partition wall between Patient Rooms A264 and A263 and Patient Rooms A211 and A212 with two (2) headwalls installed back to back. Each headwall is to have Med Gas on both sides of the patient bed as currently shown on Med Gas drawings and on revised drawing SK001 attached.

20. Drawing A102-1 Floor plan – Area 1 indicates a ½ circle item on the patient room walls. Please identify these and if this is to be a contractor supplied Item. This is shelving in Patient Rooms, please refer to Drawing 6/A411 and 11/A511.

21. Drawing I611 Furniture and Equipment Schedule indicates that the contractor shall supply and install 4 person, over/under lockers in the Staff Breakroom and the Staff Locker Room however, in the Residents Room it calls for the VA to provide the lockers and the contractor to install. Is this correct? The VA will provide and install all lockers.

22. Drawing AC102-1 Ceiling Plan Key Notes #6 calls for ceiling mounted patient lift system to be supplied and installed by the VA. Drawing SF101 shows details for steel supports for the patient lifts. Will the VA be providing the supports also? Will they have to be engineered by the lift manufacturer? Supports for the lift system are provided by the lift vendor.

23. Will the VA be providing the WAP’s? VA will provide WAP’s – Contractor will provide infrastructure and installation – includes service loops and all terminations.

24. Will the VA be providing the switches and UPS’s for the IT racks? Data switches and UPS are VA provided.

25. Sheet I606 -Room Finish Legend under Wall Protection calls for Stainless Steel Corner Guards and End wall protectors. Spec Section 10 26 00 Part 3 3.2 states Stainless Steel Corner Guards Not Used. Please clarify. Stainless Steel Corner Guards and end wall protectors are to be used.

Please refer to the attached revised specification 10 26 00

26. Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate? No – Contractors are not exempt.

27. Will the Government provide comprehensive written badging requirements for the project if badging is required? Yes- badging will be performed locally.

28. Where will the designated parking area be for workers accessing the construction site? Parking will be at Building 29 or the overflow lot. There will be no designated spots – Only 2 vehicles will be allowed in laydown area. See map below

29. Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? Yes

30. During construction in an area where the ceilings or fire suppression system will be disrupted, will NFPA 241 apply? Will the government require additional security measures beyond NFPA code such as fire watch, temporary fire alarms, adjustments to sprinkler heads, etc.

The contractor must maintain coverage – by either using a full time 24/7 fire watch. Provide temporary fire/heat alarms tied into the campus master system or maintain the sprinkler systems themselves with only weekday/daytime interruption for 9am to 4 pm with fire watch.

31. Does the Government have a fire alarm servicer that they currently work with? What is the name and contact information of the person or persons that will need to be coordinated with for security and fire alarm and suppression systems work and/or disruptions?

York Campus uses Johnson Controls Fire Protection, formerly Simplex Grinnell for Fire Alarm - Hugh “Darron” Ewing (hugh.ewing@jci.com) and Joshua Jack Morris (joshua.1.morris@jci.com), construction and new installation is Rick Barry (richard.michael.barry@jci.com).

TYCO (Johnson Controls) is the security vendor - POC- Phillip W Williams <phillip.williams@jci.com>

32. What is the Governments’ policy if additional asbestos or hazardous products are encountered during construction? The intent is all hazardous material to be abated. All flooring should be considered to contain mastic and must be abated. Mastic spec will be forthcoming. 0-10% of identified hazardous material quantity above the drawings and specs will be the contractor’s responsibility, above this 10% contingency will be considered differing site conditions.

33. Describe any and all tasks that may be required for this project as it relates to infectious control?

Please see Infection Control Drawings in Plans and Safety specifications in 01 00 00 and 01 35 26 Weekly Infection Control and safety inspections will be performed by the VA to ensure adherence.

34. To clarify the telemetry responsibilities – The Contactor will provide and install Cat5E/6 and conduit as shown in drawings and the cable pull spreadsheet at the end of this document (this will replace the cable pull schedule on sheet ETM 606). Install a pull string in conduit where indicated on spreadsheet.

The VA contracts with Phillips to then provide and install the AP’s, Phillips Remote Cable (pulled through conduit with string GC installed) switches and rack.

mailto:hugh.ewing@jci.com mailto:joshua.1.morris@jci.com mailto:richard.michael.barry@jci.com mailto:phillip.williams@jci.com

RF CABLE PULL

Pull

Cable Name (From)

Cable Name (To)

Cable Type Length FT Equipment

Installed Cable

Length Notes √

Done

1 AP1

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

2 AP2

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

3 AP3

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

4 AP4

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

5 AP5

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

6 AP6

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

7 AP7

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

8 AP8

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

9 AP9

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

10 AP10

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

11 AP11

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

12 AP12

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

12 AP13

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

13 AP14

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

14 AP15

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

15 AP16

2ND FL

NEW

CLOSET

CAT

5E/6_UNshld <290 Core AP

16 AP2 RAP1

Philips

Remote Cable

68 RAP

Install Pull string in conduit- Phillips will provide and pull cable

17 AP2 RAP2

Philips

Remote Cable

68 RAP

Install Pull string in conduit- Phillips will provide and pull cable

18 AP4 RAP3

Philips

Remote Cable

68 RAP

Install Pull string in conduit- Phillips will provide and pull cable

19 AP7 RAP4

Philips

Remote Cable

68 RAP

Install Pull string in conduit- Phillips will provide and pull cable

20 AP10 RAP5

Philips

Remote Cable

68 RAP

Install Pull string in conduit- Phillips will provide and pull cable

21 AP15 RAP6

Philips

Remote Cable

68 RAP

Install Pull string in conduit- Phillips will provide and pull cable

22 AP15 RAP7

Philips

Remote Cable

68 RAP

Install Pull string in conduit- Phillips will provide and pull cable

SYNC CABLE PULL

Pull

Cable Name (From)

Cable Name (To)

Cable Type Length FT Equipment Installed

Cable Length

Notes

1 2ND FL

A236

Bldg. 1

– DBS

Room

CAT 5E/6_UNshld <1500 Sync Unit

NE CABLE PULL

Pull

Cable Name (From)

Cable Name (To)

Cable Type Length FT Equipment

Installed Cable

Length Notes √

Done

1 2ND FL

A236

Bldg. 1

– DBS

Room

CAT

5E/6_UNshld Switch

QTY 2

Access to distribution switch

2 2ND FL

A236

2ND FL

A238

CAT

5E/6_UNshld PC QTY 4

3 2ND FL

A236

2ND FL

A238

CAT

5E/6_UNshld PC QTY 4

SDC CABLE PULL

Pull

Cable Name (From)

Cable Name (To)

Cable Type Length FT Equipment

Installed Cable

Length Notes √

Done

1 2ND FL

A238

A240 Central

CAT

5E/6_UNshld Video

Clone

QTY 4 Cable pulls for

Video Clones on

Nurses station from

Surveillance

2 2rd FL

A259 North

CAT

5E/6_UNshld Video

Clone

QTY 4 Cable pulls for

Video Clones on

Nurses station

3 2rd FL

A216 South

CAT

5E/6_UNshld Video

Clone

QTY 4 Cable pulls for

Video Clones on

Nurses station

B/CEILING

ELEV.9'-00"

T/FLOOR

ELEV.0'-00"

DATA & PHONE

ELECTRICAL OUTLETS LIGHT SWITCHES

VA SUPPLIED EQUIPMENT

SEE EQUIPMENT SCHEDULE

SHEET I611-I612

COVER PLATE

A. 8" HIGH 16 GA. SHEET METAL BACKING PLATES BEHIND ALL WALL MOUNTED EQUIPMENT - SEE

DETAIL 6/A511.

B. REFER TO SHEET GI004 FOR STANDARD MOUNTING HEIGHTS.

C. REFER TO SHEET IQ102-1 THROUGH IQ102-3 FOR FURNITURE AND EQUIPMENT PLANS.

D. REFER TO SHEET SERIES IG FOR SIGNAGE TYPES AND DETAILS.

D. REFER TO SHEET SERIES A600 FOR DOOR TYPES AND DETAILS.

X

WINDOW TYPE- SEE SHEETS AXXX

(INTERIOR WINDOWS)

AND AXXX (EXTERIOR WINDOWS)

1. MEDICAL GAS OUTLET. V=VACUUM, A=AIR, O=OXYGEN.

2. SUCTION CANISTER.

3. POWER AND DATA PROVISION. REFER TO ELECTRICAL DRAWINGS.

4. MONITOR CHANNEL.

5. NURSE CALL PROVISION.

6. ACCESSORY CHANNEL.

7. ELAPSED TIME CLOCK PROVISION / CODE BLUE.

8. UP-DOWN WALL MOUNTED EXAM LIGHT.

9. PREFABRICATED HEADWALL PANELS.

10. ACCENT ACRYLIC PANELS AC-1. REFER TO ROOM FINISH LEGEND.

11. WALL PROTECTION PL-2. REFER TO ROOM FINISH LEGEND.

12. HEIGHT OF BACKSPLASH MAY VARY DUE TO LOCATION OF WINDOW OPENING.

CONTRACTOR TO VERIFY IN FIELD PRIOR TO FABRICATION.

13. PILLOW SPEAKER CONNECTION.

14. 3-WAY SWITCH TO OVER-RIDE PATIENT BED LIGHT CONTROLLED FROM PILLOW

SPEAKER.

15. BED CONNECTOR.

A5075

P9050

A5200

A5109

A1066

P5040 A5170

P3100

A5108

A5082

A5107 A5077M7040

M1110

A1015

F0400

F0260

M0500

F3050

A5110

PATIENT RM.

A252

PATIENT

TOILET

RM.

A252A

F2017

A252

A252A

BUILT-IN WARDROBE

W/ SHELF & HOOKS

CT020

A5075

A5080

S

K

A5075

M4255

0 1' 2' 4'

1/2"=1'-0"

T: F:

www.bancroft-ae.com Bancroft-AE Project No. 18-111 www.bancroft-ae.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked DrawnFULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP

RENOVATE WARD 1A

3400 LEBANON RD, MURFREESBORO, TN 37129

626A4-18-105

03/25/20

0 1' 2' 4'

1/2"=1'-0"

AutoCAD SHX Text

VAC

AutoCAD SHX Text

AIR

AutoCAD SHX Text

OXY

AutoCAD SHX Text

OXY

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text

VAC

AutoCAD SHX Text

PAINT(P-3)

AutoCAD SHX Text

WALL BASE(VB-1)

AutoCAD SHX Text

PS

AutoCAD SHX Text

AutoCAD SHX Text

VAC

AutoCAD SHX Text

AIR

AutoCAD SHX Text

OXY

AutoCAD SHX Text

OXY

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text

VAC

AutoCAD SHX Text N/C

AutoCAD SHX Text C/B

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

ELEVATION GENERAL NOTES

AutoCAD SHX Text

CP

AutoCAD SHX Text

CP

AutoCAD SHX Text

INTERIOR ELEVATION LEGEND

AutoCAD SHX Text

ELEVATION KEY NOTES

AutoCAD SHX Text

ARCHITECTURAL- INTERIOR ELEVATIONS & ENLARGED PLANS

AutoCAD SHX Text

CZ

AutoCAD SHX Text

II

AutoCAD SHX Text

SK001

AutoCAD SHX Text

AutoCAD SHX Text

PATIENT RM. MED.HEADWALL A252 TYP.

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ARCHITECT & ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONSULTANT:

AutoCAD SHX Text

VA CONTRACT NO: 36C24918C0198

AutoCAD SHX Text

AutoCAD SHX Text

ENLARGED FLOOR PLAN PATIENT ROOM AND TOILET TYP.

AutoCAD SHX Text A252, A252A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked DrawnFULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP

35% SCHEMATIC DESIGN SUBMITTAL 01/04/19

RENOVATE WARD 1A

3400 LEBANON RD, MURFREESBORO, TN 37129

626A4-18-105

03/25/20

45% SCHEMATIC DESIGN SUBMITTAL 03/21/19

65% DESIGN DEVELOPMENT SUBMITTAL 04/29/19

95% CONSTRUCTION DOCUMENT SUBMITTAL 06/19/19

100% CONSTRUCTION DOCUMENT- IN PROGRESS 08/05/19

100% CONSTRUCTION DOCUMENT SUBMITTAL 08/22/19

Alvin C. York VA Medical Center

Murfreesboro, TN 37129

Renovate Ward 1A Building 1

Bancroft Architects + Engineers

10-01-15

Contract No. 36C24918C0198

Station Project No. 626A4-18-105

Bancroft-AE Project No. 18-111 10 26 00-1 03/25/2020

SECTION 10 26 00

WALL AND DOOR PROTECTION

PART 1 - GENERAL

1.1 DESCRIPTION

A. This Section specifies handrail, corner guards, door protectors and high impact wall covering .

1.2 RELATED WORK

A. Sustainable Design Requirements: Section 01 81 13, SUSTAINABLE

CONSTRUCTION REQUIREMENTS.

B. Armor plates and kick plates not specified in this section: Section 08

71 00, DOOR HARDWARE.

1.3 QUALITY ASSURANCE

A. Manufacturer’s Qualifications: Manufacturer with a minimum of three (3) years’ experience in providing items of type specified.

1. Obtain wall and door protection from single manufacturer.

B. Installer’s Qualifications: Installers are to have a minimum of three

(3) years’ experience in the installation of units required for this project.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Sustainable Design Submittals, as described below:

1. Volatile organic compounds per volume as specified in PART 2 -

PRODUCTS.

C. Shop Drawings: Show design and installation details.

D. Manufacturer's Literature and Data:

1. Handrail.

2. Corner Guards.

3. Door Protectors.

4. High Impact Wall covering.

E. Test Report: Showing that resilient material complies with specified fire and safety code requirements.

F. Manufacturer’s qualifications.

G. Installer’s qualifications.

H. Manufacturer’s warranty.

Renovate Ward 1A Building 1

Bancroft-AE Project No. 18-111 10 26 00-2 03/25/2020

1.5 DELIVERY AND STORAGE

A. Deliver materials to the site in original sealed packages or containers marked with the name and brand, or trademark of the manufacturer.

B. Protect from damage from handling and construction operations before, during and after installation.

C. Store in a dry environment of approximately 21 degrees C (70 degrees F) for at least 48 hours prior to installation.

1.6 WARRANTY

A. Construction Warranty: Comply with FAR clause 52.246-21 “Warranty of

Construction”.

B. Manufacturer Warranty: Manufacturer shall warranty their wall and door protection for a minimum of five (5) years from date of installation and final acceptance by the Government. Submit manufacturer warranty.

1.7 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.

B. ASTM International (ASTM):

A240/A240M-14...........Chromium and Chromium-Nickel Stainless Steel

Plate, Sheet, and Strip for Pressure Vessels and For General Applications

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes (Metric)

D256-10.................Impact Resistance of Plastics

D635-10.................Rate of Burning and/or Extent and Time of

Burning of Self-Supporting Plastics in a

Horizontal Position

E84-14..................Surface Burning Characteristics of Building

Materials

C. Aluminum Association (AA):

DAF 45-09...............Designation System for Aluminum Finishes

D. American Architectural Manufacturers Association (AAMA):

611-14..................Anodized Architectural Aluminum

E. Code of Federal Regulation (CFR):

Renovate Ward 1A Building 1

Bancroft-AE Project No. 18-111 10 26 00-3 03/25/2020

40 CFR 59...............Determination of Volatile Matter Content, Water

Content, Density Volume Solids, and Weight

Solids of Surface Coating

F. The National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-06..............Metal Finishes Manual

G. National Fire Protection Association (NFPA):

80-13...................Standard for Fire Doors and Windows

H. SAE International (SAE):

J 1545-05(R2014)........Instrumental Color Difference Measurement for

Exterior Finishes.

I. Underwriters Laboratories Inc. (UL):

Annual Issue............Building Materials Directory

PART 2 - PRODUCTS

2.1 MATERIALS

A. Stainless Steel: A240/A240M, Type 304.

B. Aluminum Extruded: ASTM B221M (B221), Alloy 6063, Temper T5 or T6.

C. Resilient Material:

1. Provide resilient material consisting of high impact resistant extruded acrylic vinyl, polyvinyl chloride, or injection molded thermal plastic conforming to the following:

a. Minimum impact resistance of 960.8 N-m/m (18 ft.-lbs./sq. inch) when tested in accordance with ASTM D256 (Izod impact, ft.-lbs.

per inch notched).

b. Class 1 fire rating when tested in accordance with ASTM E84, having a maximum flame spread of 25 and a smoke developed rating of 450 or less.

c. Rated self-extinguishing when tested in accordance with

ASTM D635.

d. Provide material labeled and tested by Underwriters Laboratories or other approved independent testing laboratory.

e. Provide resilient material for protection on fire rated doors and frames assemblies that is listed by the testing laboratory performing the tests.

f. Provide resilient material installed on fire rated wood/steel door and frame assemblies that have been tested on similar type

Renovate Ward 1A Building 1

Bancroft-AE Project No. 18-111 10 26 00-4 03/25/2020 assemblies. Test results of material tested on any other combination of door and frame assembly are not acceptable.

g. Provide integral color with colored components matched in accordance with SAE J 1545 to within plus or minus 1.0 on the

CIE-LCH scales.

2.2 CORNER GUARDS AND END WALL PROTECTORS

B. Fabricate stainless steel corner guards and end wall protectors of

1.27 mm (.05 inch) thick material conforming to ASTM A240/A240M, Type

304. Install corner guards and end wall protectors as indicated on construction documents. Form corner guard to dimensions shown on construction documents.

2.3 WALL GUARDS AND HANDRAILS:

A. Resilient Handrails:

1. Handrail:

aFree-floating on a continuous, extruded aluminum retainer, minimum

1.82 mm (0.072-inch) thick.

b. Anchor to wall at maximum 762 mm (30 inches) on center.

2. Provide handrails with prefabricated end closure caps, inside and outside corners, concealed splices, cushions, mounting hardware and other accessories as required. End caps and corners to be field adjustable to assure close alignment with handrails. Screw or bolt closure caps to aluminum retainer in a concealed manner.

2.4 DOOR PROTECTION

A. Fabricate door protection items from vinyl acrylic or polyvinyl chloride resilient material, minimum 0.060 inch thick, for doors and

0.035 inch thick for door frames.

B. Provide adhesive as recommended by resilient material manufacturer.

2.5 HIGH IMPACT WALL COVERING:

A. Provide wall covering/panels consisting of high impact rigid acrylic vinyl or polyvinyl chloride resilient material.

B. Panel sizes to be 4’-0” width and height based on interior elevations and product specified. Seam locations identified in shop drawings.

C. Submit fire rating and extinguishing test results for resilient material.

D. Submit statements attesting that the items comply with specified fire and safety code requirements.

kahluwalia Polygon

Renovate Ward 1A Building 1

Bancroft-AE Project No. 18-111 10 26 00-5 03/25/2020

E. Rigid Vinyl Acrylic Wall Covering: Wall covering thickness to be 0.060 inch.

F. High Impact Wall Panels: Wall panel face and edge thickness to be 0.56 mm (0.022 inch) . Panel face to be factory banded to a 9.53 mm (0.375 inch) thick fiberboard core. The backside of the panel is to be laminated with a moisture resistant vapor barrier.

G. Provide adhesive as recommended by the wall covering manufacturer.

Provide adhesive with VOC content of250 g/L or less when calculated according to 40 CFR 59, (EPA Method 24).

2.6 FASTENERS AND ANCHORS

A. Provide fasteners and anchors as required for each specific type of installation.

B. Where type, size, spacing or method of fastening is not shown or specified in construction documents, submit shop drawings showing proposed installation details.

2.7 FINISH

A. Aluminum: In accordance with AA DAF-45.

1. Exposed aluminum: AAMA 611 AA-M12C22A31 chemically etched medium matte, with clear anodic coating, Class II Architectural, 0.4 mil thick.

2. Concealed aluminum: Mill finish as fabricated, uniform in color and free from surface blemishes.

B. Stainless Steel: In accordance with NAAMM AMP 500 finish Number 4.

C. Resilient Material: Embossed textures and color in accordance with

SAE J1545.

PART 3 - INSTALLATION

3.1 RESILIENT CORNER GUARDS (NOT USED)

3.2 STAINLESS STEEL CORNER GUARDS AND END WALL PROTECTORS

A. Mount corner guards and end wall protectors on external corners of interior walls, partitions and columns as shown on construction documents.

B. Where corner guards and end wall protectors are installed on walls, partitions or columns finished with plaster or ceramic tile, provide continuous 16 gauge perforated, galvanized Z-shape steel anchors welded

Renovate Ward 1A Building 1

Bancroft Architects + Engineers

10-01-15

Contract No. 36C24918C0198

Station Project No. 626A4-18-105

Bancroft-AE Project No. 18-111 10 26 00-6 03/25/2020 to back edges of corner guards and end wall protectors and spaced 406 mm (16 inches) on centers. Coat back surfaces of corner guards and end wall protectors, where shown on construction documents, with a non-flammable, sound deadening material. Corner guards and end wall protectors to overlap finish plaster surfaces.

C. Where corner guards and end wall protectors are installed on exposed structural glazed facing tile units or masonry wall, partitions or columns, anchor corner guards and end wall protectors to existing walls with 6.35 mm (1/4-inch) oval head stainless steel countersunk expansion or toggle bolts. Grout spaces solid between guards and backing with

Portland cement and sand mortar.

D. Where corner guards and end wall protectors are installed on gypsum board, clean surface and anchor guards with a neoprene solvent-type contact adhesive specifically manufactured for use on gypsum board construction. Remove excess adhesive from around edge of guard and allow curing undisturbed for 24 hours.

3.3 RESILIENT HANDRAILS

A. Secure guards to walls with mounting cushions, brackets and fasteners in accordance with manufacturer's details and instructions.

3.4 ALUMINUM WALL GUARDS (NOT USED)

3.5 STAINLESS STEEL WALL GUARDS (NOT USED)

3.6 DOOR AND HIGH IMPACT WALL COVERING

A. Surfaces to receive protection to be clean, smooth and free of obstructions.

B. Install protectors after frames are in place but preceding installation of doors in accordance with approved shop drawings and manufacturer’s specific instructions.

C. Apply with adhesive in controlled environment according to manufacturer’s recommendations.

D. Protection installed on fire rated doors to be installed according to

NFPA 80 and installation procedures listed in UL Building Materials

Directory; or, equal listing by other approved independent testing laboratory establishing the procedures.

- - - E N D - - -

RFI Renovate Ward 1A
RFI _03.24.2020_BAE_Response_Drawing SK001
SK001.pdf (p.5)
A411
RFI _03.24.2020_BAE_Response_Drawing SK002
SK002.pdf (p.6)
Updated Spec 10 26 00
RFI _03.24.2020_BAE_Response 7
RFI _03.24.2020_BAE_Response 8
RFI _03.24.2020_BAE_Response 9
RFI _03.24.2020_BAE_Response 10
RFI _03.24.2020_BAE_Response 11
RFI _03.24.2020_BAE_Response 12