This file contains Sprinkler Inspection Certificates for Malcolm Randall VA Medical Center's fire suppression systems, documenting semi-annual NFPA 25 compliance inspections conducted in October 2023 and October 2024 across five buildings and associated facilities. The inspections cover Malcolm Randall VAMC Fisher House (inspected October 5, 2023), CLC Building (October 23, 2024), Liberty Parking Garage (October 23, 2024), and Main Building (October 22-23, 2024). Each inspection report includes detailed testing results for wet pipe and standpipe systems, documenting performance measurements for alarms, devices, drains, gauges, hoses, isolation valves, and other fire suppression components tested to NFPA 25 standards.

The inspection results show overall high compliance rates across the facilities. Fisher House achieved 100% pass rate on all 10 items inspected. CLC Building passed 31 of 33 items (93.94%), with two failed gauges requiring replacement per NFPA25 13.2.5.2 due to expired calibration dates. Liberty Parking Garage achieved 100% pass rate on all 27 items inspected (devices, hoses, and valves). Main Building passed 434 of 438 items (99.09%), with four failed components: one tamper switch and three waterflow switches that failed reporting to the fire alarm control panel. All inspection work was performed by certified inspectors from Wilmington, North Carolina, with proposed solutions provided on a time and materials basis for identified deficiencies. The reports document inventory classifications, warranty information, zone/address configurations, and comprehensive device specifications including manufacturer models, sizes, pressures, and service dates.

View the file

Other files

File Type Posted
Backflow Preventers.xlsx XLSX spreadsheet
RFQ 36C24827Q0038 Amendment.pdf PDF
36C24827Q0038_2.docx DOCX document
36C24827Q0038_1.docx DOCX document
36C24827Q0038.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sprinkler Inspection Certificate For

Malcolm Randall VAMC Fisher House

Fisher House Gainesville, FL 32608

Tested to NFPA 25 Standards

This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.

Semi-Annual Inspection Inspection Date Oct 5, 2023

Building: Malcolm Randall VAMC Fisher House

Title: Title:

Page: 2

Sprinkler Inspection Report

Page: 3

Executive Summary Generated by: BuildingReports.com

Building Information Building: Malcolm Randall VAMC Fisher House Address: Fisher House Address: Fax:

City/State/ZIP Code: Gainesville, FL 32608 Mobile:

Country: United States of America

Inspection Performed By

Address: 2622 New Village Way Address: Fax:

City/State/ZIP Code: Wilmington, North Carolina

28405 Mobile:

Country: United States of America

System Control Unit System Type System Location Protected Area Devices Wet Pipe Building-Fisher House 10

Inspection Summary Category:

Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %

Alarm 2 20.00% 2 100.00% 2 100.00% 0 0.00%

Device 3 30.00% 3 100.00% 3 100.00% 0 0.00%

Sprinkler 3 30.00% 3 100.00% 3 100.00% 0 0.00%

Valve 2 20.00% 2 100.00% 2 100.00% 0 0.00%

Totals 10 100% 10 100.00% 10 100.00% 0 0.00%

Certification ilding: Malcolm Randall VAMC Fisher House

Page: 4

Inspection & Testing Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Fisher House The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or

. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.

Device Type Location Service Time Date

Passed Wet Pipe, Building-Fisher House

Tamper Switch Outside Mechanical Rm Semi-Annual 11:15:41 AM 10/05/2023

Waterflow Switch Outside Mechanical Rm Semi-Annual 11:15:49 AM 10/05/2023

Drain Outside Mechanical Rm Semi-Annual 11:14:55 AM 10/05/2023

Gauge Outside Mechanical Rm Semi-Annual 11:15:11 AM 10/05/2023

Gauge Outside Mechanical Rm Semi-Annual 11:15:18 AM 10/05/2023

Fast Response Outside Mechanical Rm Semi-Annual 11:15:03 AM 10/05/2023

Sprinkler Box Outside Mechanical Rm Semi-Annual 11:15:27 AM 10/05/2023

Standard Response Outside Mechanical Rm Semi-Annual 11:15:34 AM 10/05/2023

Alarm Valve Outside Mechanical Rm Semi-Annual 11:14:40 AM 10/05/2023

Control Valve Outside Mechanical Rm Semi-Annual 11:14:47 AM 10/05/2023

Page: 5

Wet Pipe Fire Sprinkler Systems Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Fisher House Building-Fisher House

This section lists out all the devices and components that have been associated with a Wet Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.

Alarms Tamper Switch

Type Description Location Number of Turns

Zone /Address

OK ScanID

Lever Alarm Outside Mechanical Rm 2 1-1M071 63243039 Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Lever Potter Electric VSR 28.51000 2” 1-1M070 63243040

Components Alarm Valve

Type Manufacturer Model # Position Status Size OK ScanID Grooved Tyco CV-1F Closed Supervised 2" 63243044

Internal Date 05/11/2020

Control Valve Type Manufacturer Model Location Size Position Status OK ScanID

Butterfly Milwaukee BB-3CS Outside Mechanical Rm

2" Open Supervised 63243038

Description Main Control

Devices Drain

Type Location Size Supply psi Restored psi

Residual psi Sec OK ScanID

Combination Outside Mechanical Rm 1" 85 80 65 21 63243041 Fast Response Qty Type Size KFactor Finish Temperature OK ScanID 2 Pendant 1/2” 4.2 White 200 63243046 Location Description Outside Mechanical Rm Quick Response

Gauge Location Service Date Outside Mechanical Rm 05/11/2020

Page: 6

Type Manufacturer Model # Static psi Fill Type Size OK ScanID System Pressure Wika 2020 87 1/4 63243042

Gauge Location Service Date Outside Mechanical Rm 05/11/2020

Type Manufacturer Model # Static psi Fill Type Size OK ScanID Supply Pressure Wika 2020 80 1/4 63243043

Sprinkler Box

Qty Tool Available?

SIN List? Size Manufacturer Location OK ScanID

6 No Yes 6 unit Potter Electric Outside Mechanical Rm

63243045

Standard Response Qty Type Size KFactor Finish Temperature OK ScanID 120 Concealed Pendant 1/2” 4.2 White 165 63243047

Location Description Application Orientation Outside Mechanical Rm Concealed Concealed Concealed Pendant

Page: 7

Inventory & Warranty Report Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Fisher House The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.

Device or Type Category % of Inventory Quantity Alarm Valve Valve 10.00% 1

Control Valve Valve 10.00% 1

Drain Device 10.00% 1

Fast Response Sprinkler 10.00% 1

Gauge Device 20.00% 2

Sprinkler Box Sprinkler 10.00% 1

Standard Response Sprinkler 10.00% 1

Tamper Switch Alarm 10.00% 1

Waterflow Switch Alarm 10.00% 1

Device Type Qty Model # Type Description Install Date

In Service - 3 Years to 5 Years Wet Pipe, Building-Fisher House

Control Valve 1 BB-3CS Butterfly Main Control 05/11/2020

In Service - 10 Years to 15 Years Wet Pipe, Building-Fisher House

Fast Response 1 GB Pendant Quick Response 05/29/2013 Tamper Switch 1 built in Lever Alarm 05/29/2013 Sprinkler Box 1 VSR 05/29/2013 Waterflow Switch 1 VSR Lever Alarm 05/29/2013 Standard Response 1 RFC49 Concealed Pendant Concealed 05/29/2013 Drain 1 Combination 05/29/2013 Alarm Valve 1 CV-1F Grooved 05/29/2013 Gauge 1 2020 Supply Pressure 05/29/2013 Gauge 1 2020 System Pressure 05/29/2013

Page: 8

Zone Address Report Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Fisher House The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.

Address Device Type Location Type ScanID

Control Panel 1 1M070 Waterflow Switch Outside Mechanical Rm Lever 63243040 1M071 Control Valve Outside Mechanical Rm Butterfly 63243038 1M071 Tamper Switch Outside Mechanical Rm Lever 63243039

Page: 9

Notes & Recommendations Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Fisher House The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by SystemID.

Note Device Type Location Comment ScanID Wet Pipe, Building-Fisher House

1 Sprinkler Box Outside Mechanical Rm Passed 63243045 No head wrench

Malcolm Randall VAMC CLC Building

CLC Building Gainesville, FL 32608

Tested to NFPA 25 Standards

This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.

Inspection Date Oct 23, 2024

Building: Malcolm Randall VAMC CLC Building

Generated by: BuildingReports.com

Building Information Building: Malcolm Randall VAMC CLC Building Address: CLC Building Address: Fax:

City/State/ZIP Code: Gainesville, FL 32608 Mobile:

Country: United States of America

Inspection Performed By

Address: 2622 New Village Way Address: Fax:

City/State/ZIP Code: Wilmington, North Carolina

28405 Mobile:

Country: United States of America

System Control Unit System Type System Location Protected Area Devices Wet Pipe Building-CLC 33

Inspection Summary Category:

Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %

Alarm 13 39.39% 13 100.00% 13 100.00% 0 0.00%

Device 11 33.33% 11 100.00% 9 81.82% 2 18.18%

Hose 1 3.03% 1 100.00% 1 100.00% 0 0.00%

Valve 8 24.24% 8 100.00% 8 100.00% 0 0.00%

Totals 33 100% 33 100.00% 31 93.94% 2 6.06% ilding: Malcolm Randall VAMC CLC Building

Discrepancy Report Generated by: BuildingReports.com

Building: Malcolm Randall VAMC CLC Building The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.

Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer’s replacement/upgrade program is included.

Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade

No items found during this inspection.

ScanID Location Problem Reference

Wet Pipe, Building-CLC Gauge

1 63242905 1st In Mechanical Rm 127 Date Expired NFPA25 13.2.5.2

1 63242906 1st In Mechanical Rm 127 Date Expired NFPA25 13.2.5.2

Code References NFPA25 13.2.5.2 Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge.

Proposed Solutions Report Generated by: BuildingReports.com

Building: Malcolm Randall VAMC CLC Building The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.

ScanID Location Solution Model # Cost Fix

Wet Pipe, Building-CLC Gauge

63242905 1st In Mechanical Rm 127 Replace 2020 T/M 63242906 1st In Mechanical Rm 127 Replace 2020 T/M

PO #: (none) T/M

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC CLC Building The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by SystemID.

Note Device Type Location Comment ScanID Wet Pipe, Building-CLC

1 Drain 2nd In Mechanical Rm 209-12 Right System Passed 63243069 No system pressure gauge installed cannot get main drain static and residual readings

2 Drain 2nd In Mechanical Rm 209-12 Left System Passed 63243073 No system pressure gauge installed cannot get main drain static and residual readings

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC CLC Building The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or

. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.

Device Type Location Service Time Date

Passed Wet Pipe, Building-CLC

Tamper Switch 1st PIV behind CLC building Semi-Annual 1:57:26 PM 10/23/2024

Tamper Switch 1st In Mechanical Rm 127 Left System Semi-Annual 2:00:46 PM 10/23/2024

Tamper Switch 1st In Mechanical Rm 127 Right System Semi-Annual 2:01:06 PM 10/23/2024

Tamper Switch 2nd In Mechanical Rm 209-12 Right System

Semi-Annual 2:08:43 PM 10/23/2024

Tamper Switch 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:09:46 PM 10/23/2024

Tamper Switch 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:16:58 PM 10/23/2024

Tamper Switch 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:17:22 PM 10/23/2024

Waterflow Switch 1st In Mechanical Rm 127 Right System Semi-Annual 1:58:31 PM 10/23/2024

Waterflow Switch 1st In Mechanical Rm 127 Left System Semi-Annual 2:04:29 PM 10/23/2024

Waterflow Switch 2nd In Mechanical Rm 209-12 Right System

Semi-Annual 2:13:33 PM 10/23/2024

Waterflow Switch 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:13:42 PM 10/23/2024

Waterflow Switch 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:22:06 PM 10/23/2024

Waterflow Switch 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:22:43 PM 10/23/2024

Drain 1st In Mechanical Rm 127 Semi-Annual 1:55:07 PM 10/23/2024

Drain 2nd In Mechanical Rm 209-12 Right System

Semi-Annual 2:12:57 PM 10/23/2024

Drain 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:13:04 PM 10/23/2024

Drain 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:19:09 PM 10/23/2024

Drain 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:20:02 PM 10/23/2024

Gauge 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:21:59 PM 10/23/2024

Gauge 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:22:35 PM 10/23/2024

Retard Chamber 1st In Mechanical Rm 127 Semi-Annual 2:01:26 PM 10/23/2024

Watermotor Gong 1st In Mechanical Rm 127 Semi-Annual 1:57:41 PM 10/23/2024

Fire Dep't Connection

1st In Mechanical Rm 127 Semi-Annual 1:57:45 PM 10/23/2024

Alarm Valve 1st In Mechanical Rm 127 Semi-Annual 1:55:01 PM 10/23/2024

Isolation Valve 1st In Mechanical Rm 127 Left System Semi-Annual 2:00:42 PM 10/23/2024

Isolation Valve 1st In Mechanical Rm 127 Right System Semi-Annual 2:01:18 PM 10/23/2024

Device Type Location Service Time Date

Isolation Valve 2nd In Mechanical Rm 209-12 Right System

Semi-Annual 2:08:30 PM 10/23/2024

Isolation Valve 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:09:58 PM 10/23/2024

Isolation Valve 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:17:35 PM 10/23/2024

Isolation Valve 3rd In Mechanical Rm 309-12 Right System Semi-Annual 2:17:44 PM 10/23/2024

Post Indicator Valve Outside in garden front of trailer T11 Semi-Annual 1:50:42 PM 10/23/2024

Failed/Other Wet Pipe, Building-CLC

1 Gauge 1st In Mechanical Rm 127 Semi-Annual 1:56:34 PM 10/23/2024

1 Gauge 1st In Mechanical Rm 127 Semi-Annual 1:56:54 PM 10/23/2024

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC CLC Building Building-CLC

This section lists out all the devices and components that have been associated with a Wet Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.

Alarms Tamper Switch

Type Description Location # of Turns Zone/Address OK ScanID Lever Supervisory 1st PIV behind CLC building 2 1 63242903

Plug Supervisory 1st In Mechanical Rm 127 Left System

2 1-L2M17 63242912

Lever Supervisory 1st In Mechanical Rm 127 Right System

2 1-L2M19 63242910

Lever Supervisory 2nd In Mechanical Rm 209-12 Right System

1-L2M27 63243068

Lever Supervisory 2nd In Mechanical Rm 209-12 Left System

1-L2M29 63243072

Lever Supervisory 3rd In Mechanical Rm SP 309 Right System

2 1-L2M36 63243063

Lever Supervisory 3rd In Mechanical Rm SP 309 Left System

2 1-L2M38 63243058

Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Vane Potter Electric VSR 43.84999 2” 1-L2M18 63242913 Vane Potter Electric VSR 34.04000 2” 1-L2M16 63242914 Lever Notifier WFD2.5 21 2-1/2” 1-L1M26 63243070 Lever Notifier WFD2 35 2-1/2” 1-L1M29 63243074 Lever Notifier 2020 25 2-1/2” 1-L2M39 63243061 Lever Notifier WFD2 30 2” 1-L2M37 63243066

Components Alarm Valve

Type Location Manufacturer Model # OK ScanID Flanged 1st In Mechanical Rm 127 Central G 63242904

Position Status Size Internal Date Open Supervised 4" 05/07/2020

Isolation Valve Manufacturer Model Location Position Status Size OK ScanID

NIBCO OS&Y

1st In Mechanical Rm 127 Left System

Open Supervised 2" 63242908

NIBCO OS&Y

1st In Mechanical Rm 127 Right System

Open Supervised 2" 63242909

Kennedy OS&Y 2nd In Mechanical Rm 209- 12 Right System

Open Supervised 2.5" 63243067

NIBCO OS&Y

2nd In Mechanical Rm 209- 12 Left System

Open Supervised 2" 63243071

Kennedy OS&Y 3rd In Mechanical Rm SP 309 Left System

Open Supervised 2.5" 63243057

NIBCO OS&Y

3rd In Mechanical Rm 309- 12 Right System

Open Supervised 2" 63243062

Post Indicator Valve Location Manufacturer Model # OK ScanID Outside in garden front of trailer T11 Stockham B 63242902

Type Size Position Status # of Turns Ground 4" Open Locked & Supervised 2

Devices Drain

Current Inspection

Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main 1st In Mechanical Rm 127 2" 80 80 70 63242907

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main 1st In Mechanical Rm 127 2" 80 80 70 90 63242907

October 5, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main 1st In Mechanical Rm 127 2" 75 80 60 63242907

Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID

Main 2nd In Mechanical Rm 209-12 Right System

1" 63243069

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 2nd In Mechanical Rm 209-12 Right System

1" 63243069

October 5, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 2nd In Mechanical Rm 209-12 Right System

1" 21 63243069

Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID

Page: 10

Main 2nd In Mechanical Rm 209-12 Left System

1" 63243073

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 2nd In Mechanical Rm 209-12 Left System

1" 63243073

October 5, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 2nd In Mechanical Rm 209-12 Left System

1" 22 63243073

Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID

Main 3rd In Mechanical Rm SP 309 Right System

1" 80 80 60 24 63243064

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 3rd In Mechanical Rm SP 309 Right System

1" 80 80 60 90 63243064

October 5, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 3rd In Mechanical Rm SP 309 Right System

1" 80 70 60 21 63243064

Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID

Main 3rd In Mechanical Rm SP 309 Left System

1" 80 80 60 63243059

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 3rd In Mechanical Rm SP 309 Left System

1" 80 80 60 90 63243059

October 5, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main 3rd In Mechanical Rm SP 309 Left System

1" 80 70 60 23 63243059

Fire Dep't Connection Location Type Size Qty BallDrip Rotating Swivels 5-Year Hydro OK ScanID 1st In Mechanical Rm

Wall 4" 2 Yes Yes 05/07/2020 63242916

Gauge Type Manufacturer Model # Size Fill Type OK ScanID

Page: 11

System Pressure Wika 2020 1/4 Air/Water 63243060

Location Service Date Static psi Min. Range Max. Range 3rd In Mechanical Rm SP 309 Left System 05/15/2025 70 0 300

Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63243065

Location Service Date Static psi Min. Range Max. Range 3rd In Mechanical Rm SP 309 Right System 05/15/2025 35 0 300

Gauge Type Manufacturer Model # Size Fill Type OK ScanID Supply Pressure Wika 2020 1/4 Air/Water 63242906

Location Service Date Static psi Min. Range Max. Range 1st In Mechanical Rm 127 05/07/2020 75 0 300

Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 63242905

Location Service Date Static psi Min. Range Max. Range 1st In Mechanical Rm 127 05/07/2025 0 300

Retard Chamber Manufacturer Model # Location OK ScanID Central F 1st In Mechanical Rm 127 63242917

Watermotor Gong Location Manufacturer Model # Size OK ScanID 1st In Mechanical Rm 127 Tyco WMA-1 63242915

Page: 12

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC CLC Building The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.

Device or Type Category % of Inventory Quantity Alarm Valve Valve 3.03% 1

Drain Device 15.15% 5

Fire Dep't Connection Hose 3.03% 1

Gauge Device 12.12% 4

Isolation Valve Valve 18.18% 6

Post Indicator Valve Valve 3.03% 1

Retard Chamber Device 3.03% 1

Tamper Switch Alarm 21.21% 7

Waterflow Switch Alarm 18.18% 6

Watermotor Gong Device 3.03% 1

Device Type Qty Model # Type Description Install Date

In Service - 3 Years to 5 Years Wet Pipe, Building-CLC

Fire Dep't Connection 1 Wall 05/07/2020 Tamper Switch 1 Lever Supervisory 05/07/2020 Drain 1 Angle Main 05/07/2020 Isolation Valve 2 OS&Y 05/07/2020 Tamper Switch 1 NGV Lever Supervisory 05/07/2020 Tamper Switch 1 PTS-C Plug Supervisory 05/07/2020 Waterflow Switch 2 VSR Vane Alarm 05/07/2020 Post Indicator Valve 1 B Ground 05/07/2020 Watermotor Gong 1 WMA-1 05/07/2020 Gauge 1 2020 Supply Pressure 05/07/2020 Gauge 3 2020 System Pressure 05/07/2020

In Service - 25 Years or Older Wet Pipe, Building-CLC

Alarm Valve 1 G Flanged 05/07/1997 Retard Chamber 1 F 05/07/1997 Isolation Valve 2 OS&Y 05/07/1980 Isolation Valve 2 OS&Y 05/07/1980 Tamper Switch 4 NGV Lever Supervisory 05/07/1980 Waterflow Switch 1 2020 Lever Alarm 05/07/1980 Waterflow Switch 2 WFD2 Lever Alarm 05/07/1980 Waterflow Switch 1 WFD2.5 Lever Alarm 05/07/1980

Page: 13

Drain 4 Main 05/07/1980

Page: 14

Zone Address Report Generated by: BuildingReports.com

Building: Malcolm Randall VAMC CLC Building The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.

Address Device Type Location Type ScanID

Control Panel 1 L1M26 Waterflow Switch 2nd In Mechanical Rm 209-12 Right

System Lever 63243070

L1M29 Waterflow Switch 2nd In Mechanical Rm 209-12 Left System Lever 63243074 L2M16 Waterflow Switch 1st In Mechanical Rm 127 Left System Vane 63242914 L2M17 Tamper Switch 1st In Mechanical Rm 127 Left System Plug 63242912 L2M18 Waterflow Switch 1st In Mechanical Rm 127 Right System Vane 63242913 L2M19 Tamper Switch 1st In Mechanical Rm 127 Right System Lever 63242910 L2M27 Tamper Switch 2nd In Mechanical Rm 209-12 Right

System Lever 63243068

L2M29 Tamper Switch 2nd In Mechanical Rm 209-12 Left System Lever 63243072 L2M36 Tamper Switch 3rd In Mechanical Rm SP 309 Right

System Lever 63243063

L2M37 Waterflow Switch 3rd In Mechanical Rm SP 309 Right System

Lever 63243066

L2M38 Tamper Switch 3rd In Mechanical Rm SP 309 Left System Lever 63243058 L2M39 Waterflow Switch 3rd In Mechanical Rm SP 309 Left System Lever 63243061

Malcolm Randall VAMC Liberty Parking Garage

Liberty Parking Garage Gainesville, FL 32608

Tested to NFPA 25 Standards

This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.

Inspection Date Oct 23, 2024

Building: Malcolm Randall VAMC Liberty Parking Garage

Generated by: BuildingReports.com

Building Information Building: Malcolm Randall VAMC Liberty Parking

Garage Address: Liberty Parking Garage Address: Fax:

City/State/ZIP Code: Gainesville, FL 32608 Mobile:

Country: United States of America

Inspection Performed By

Address: 2622 New Village Way Address: Fax:

City/State/ZIP Code: Wilmington, North Carolina

28405 Mobile:

Country: United States of America

System Control Unit System Type System Location Protected Area Devices Standpipe Floors-Middle 1 through 7 6

Standpipe Floors-North 1 through 7 7

Standpipe Floors-South 1 through 7 14

Inspection Summary Category:

Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %

Device 8 29.63% 8 100.00% 8 100.00% 0 0.00%

Hose 16 59.26% 16 100.00% 16 100.00% 0 0.00%

Valve 3 11.11% 3 100.00% 3 100.00% 0 0.00%

Totals 27 100% 27 100.00% 27 100.00% 0 0.00%

Certification ilding: Malcolm Randall VAMC Liberty Parking

Garage

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Liberty Parking Garage The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or

. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.

Device Type Location Service Time Date

Passed Standpipe, Floors-Middle 1 through 7

Drain Garage East Middle Maintence Area Semi-Annual 1:30:26 PM 10/23/2024

Gauge 7th West Middle Top of Riser Semi-Annual 1:13:28 PM 10/23/2024

Hose Connection 7th West Middle Top of Riser Semi-Annual 1:12:37 PM 10/23/2024

Hose Connection Garage East Middle Maintence Area Semi-Annual 1:26:40 PM 10/23/2024

Hose Connection Garage West Middle Semi-Annual 1:30:10 PM 10/23/2024

Standpipe Ground East Middle Maintenance Area Semi-Annual 1:27:12 PM 10/23/2024

Standpipe, Floors-North 1 through 7 Drain Ground North Front Semi-Annual 1:32:09 PM 10/23/2024

Gauge 7th North Front Top of Riser Semi-Annual 1:16:59 PM 10/23/2024

Fire Dep't Connection

Ground North Front Semi-Annual 1:28:25 PM 10/23/2024

Hose Connection 7th North Front Top of Riser Semi-Annual 1:17:03 PM 10/23/2024

Hose Connection Ground North Front Semi-Annual 1:29:16 PM 10/23/2024

Standpipe Ground North Front Semi-Annual 1:29:07 PM 10/23/2024

Check Valve Ground North Front Semi-Annual 1:32:12 PM 10/23/2024

Standpipe, Floors-South 1 through 7 Drain Ground South Front Semi-Annual 1:24:48 PM 10/23/2024

Drain Ground South Back Semi-Annual 1:31:26 PM 10/23/2024

Gauge 7th South Back Top of Riser Semi-Annual 1:14:29 PM 10/23/2024

Gauge 7th South Front Top of Riser Semi-Annual 1:15:26 PM 10/23/2024

Fire Dep't Connection

Ground South Front Semi-Annual 1:25:33 PM 10/23/2024

Fire Dep't Connection

Ground South Back Semi-Annual 1:32:00 PM 10/23/2024

Hose Connection 7th South Back Top of Riser Semi-Annual 1:14:36 PM 10/23/2024

Hose Connection 7th South Front Top of Riser Semi-Annual 1:15:29 PM 10/23/2024

Hose Connection Garage South Back Semi-Annual 1:30:37 PM 10/23/2024

Hose Connection Ground South Front Semi-Annual 1:31:43 PM 10/23/2024

Standpipe Garage South Back Semi-Annual 1:31:03 PM 10/23/2024

Standpipe Ground South Front Semi-Annual 1:24:44 PM 10/23/2024

Check Valve Ground South Back Semi-Annual 1:31:21 PM 10/23/2024

Check Valve Ground South Front Semi-Annual 1:31:41 PM 10/23/2024

Standpipe Systems Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Liberty Parking Garage Floors-Middle 1 through 7

This section lists out all the devices and components that have been associated with a Standpipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.

Devices Drain

Current Inspection

Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID

Main Garage East Middle Maintence Area

2" 0 0 0 63241634

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main Garage East Middle Maintence Area

2" 0 0 0 63241634

October 4, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID

Main Garage East Middle Maintence Area

2" 0 0 0 63241634

Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63241656

Location Service Date Static psi Min. Range Max. Range 7th West Middle Top of Riser 04/01/2025 0 0 300

Hose Connection Location Size Manufacturer Model # OK ScanID 7th West Middle Top of Riser Class I - 2.5" BH Angle 63241655 Garage East Middle Maintence Area

Class I - 2.5" FPPI Angle 63241650

Garage West Middle Class I - 2.5" BH Angle 63241652

Standpipe Wet System Dry System

Location Type Flow Test GPM Flow Test PSI Hydro PSI OK ScanID Ground East Middle Maintenance Area

Class I 63241633

Building: Malcolm Randall VAMC Liberty Parking Garage Floors-North 1 through 7

This section lists out all the devices and components that have been associated with a Standpipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.

Components Check Valve

Type Location Manufacturer Model # Internal Date Size OK ScanID Grooved Ground North Front Anvil 78FP 04/01/2021 4" 63241645

Devices Drain

Current Inspection

Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main Ground North Front 2" 0 0 0 63241646

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground North Front 2" 0 0 0 63241646

October 4, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground North Front 2" 0 0 0 63241646

Fire Dep't Connection Location Type Size Qty BallDrip Rotating Swivels 5-Year Hydro OK ScanID Ground North Front Wall 4" 2 No Yes 12/31/1969 63241647

Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63241653

Location Service Date Static psi Min. Range Max. Range 7th North Front Top of Riser 04/01/2025 0 0 300

Hose Connection Location Size Manufacturer Model # OK ScanID 7th North Front Top of Riser Class I - 2.5" BH 63241654 Ground North Front Class I - 2.5" BH 63241649

Standpipe Wet System Dry System

Location Type Flow Test GPM Flow Test PSI Hydro PSI OK ScanID Ground North Front Class I 63241648

Building: Malcolm Randall VAMC Liberty Parking Garage Floors-South 1 through 7

This section lists out all the devices and components that have been associated with a Standpipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.

Components

Check Valve Type Location Manufacturer Model # Internal Date Size OK ScanID Grooved Ground South Back Anvil 78FP 04/01/2021 4" 63241643 Grooved Ground South Front Anvil 78FP 04/01/2021 4" 63241637

Devices Drain

Current Inspection

Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main Ground South Front 2" 0 0 0 63241638

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Front 2" 0 0 0 63241638

October 4, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Front 2" 0 0 0 63241638

Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main Ground South Back 2" 0 0 0 63241641

Previous Inspections

May 14, 2024

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Back 2" 0 0 0 63241641

October 4, 2023

Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Back 2" 0 0 0 63241641

Fire Dep't Connection Location Type Size Qty BallDrip Rotating Swivels 5-Year Hydro OK ScanID Ground South Front Wall 4" 2 No Yes 12/31/1969 63241639 Ground South Back Wall 4" 2 No Yes 12/31/1969 63241644

Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 63241658

Location Service Date Static psi Min. Range Max. Range 7th South Back Top of Riser 04/01/2025 0 300

Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63241660

Location Service Date Static psi Min. Range Max. Range 7th South Front Top of Riser 04/01/2025 0 0 300

Hose Connection

Location Size Manufacturer Model # OK ScanID 7th South Back Top of Riser Class I - 2.5" BH 63241657 7th South Front Top of Riser Class I - 2.5" BH Angle 63241659 Garage South Back Class I - 2.5" BH 63241642 Ground South Front Class I - 2.5" BH 63241636

Standpipe Wet System Dry System

Location Type Flow Test GPM Flow Test PSI Hydro PSI OK ScanID Garage South Back Class I 63241640 Ground South Front Class I 63241635

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Liberty Parking Garage The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.

Device or Type Category % of Inventory Quantity Check Valve Valve 11.11% 3

Drain Device 14.81% 4

Fire Dep't Connection Hose 11.11% 3

Gauge Device 14.81% 4

Hose Connection Hose 33.33% 9

Standpipe Hose 14.81% 4

Device Type Qty Model # Type Description Install Date

In Service - 3 Years to 5 Years Standpipe, Floors-Middle 1 through 7

Gauge 1 2020 System Pressure 07/01/2020

Standpipe, Floors-North 1 through 7 Gauge 1 2020 System Pressure 07/01/2020

Standpipe, Floors-South 1 through 7 Gauge 2 2020 System Pressure 07/01/2020

In Service - 5 Years to 10 Years Standpipe, Floors-Middle 1 through 7

Standpipe 1 Class I 07/01/2015 Hose Connection 2 Angle 07/01/2015 Drain 1 Angle Main 07/01/2015 Hose Connection 1 Angle 07/01/2015

Standpipe, Floors-North 1 through 7 Standpipe 1 Class I 07/01/2015 Check Valve 1 78FP Grooved 07/01/2015 Hose Connection 2 07/01/2015 Drain 1 Angle Main 07/01/2015 Fire Dep't Connection 1 Wall 07/01/2015

Standpipe, Floors-South 1 through 7 Standpipe 2 Class I 07/01/2015 Check Valve 2 78FP Grooved 07/01/2015 Hose Connection 3 07/01/2015 Hose Connection 1 Angle 07/01/2015 Drain 2 Angle Main 07/01/2015 Fire Dep't Connection 2 Wall 07/01/2015

Malcolm Randall VAMC Main Bldg.

Main Bldg.

Gainesville, FL 32608

Tested to NFPA 25 Standards

This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.

Inspection Date Oct 23, 2024

Building: Malcolm Randall VAMC Main Bldg.

Generated by: BuildingReports.com

Building Information Building: Malcolm Randall VAMC Main Bldg.

Address: Main Bldg.

Address: Fax:

City/State/ZIP Code: Gainesville, FL 32608 Mobile:

Country: United States of America

Inspection Performed By

Address: 2622 New Village Way Address: Fax:

City/State/ZIP Code: Wilmington, North Carolina

28405 Mobile:

Country: United States of America

System Control Unit System Type System Location Protected Area Devices Fire Pump Building-E Main Bldg 36

Service Main Zone- 5

Standpipe Area-H 6

Standpipe Area-J 3

Standpipe Building-E Main Bldg 5

Standpipe Zone-1-1A 2

Standpipe Zone-1-1B 2

Standpipe Zone-G-1B 1

Wet Pipe Area-H 27

Wet Pipe Area-J 32

Wet Pipe Area-K 31

Wet Pipe Zone B-F 1

Wet Pipe Zone B-G 1

Wet Pipe Zone- B-F 1

Wet Pipe Zone- B-G 1

Wet Pipe Zone-1-1A 5

Wet Pipe Zone-1-1B 5

Wet Pipe Zone-1-A 5

Wet Pipe Zone-1-B 6

Wet Pipe Zone-1-C 5

Wet Pipe Zone-1-D 7

Wet Pipe Zone-1-E 7

Wet Pipe Zone-1-G 6

Wet Pipe Zone-1-H 6

Wet Pipe Zone-1-I 6

System Type System Location Protected Area Devices Wet Pipe Zone-2-A 7

Wet Pipe Zone-2-B 8

Wet Pipe Zone-2-C 7

Wet Pipe Zone-2-D 6

Wet Pipe Zone-2-E 6

Wet Pipe Zone-2-F 6

Wet Pipe Zone-3-A 7

Wet Pipe Zone-3-B 5

Wet Pipe Zone-3-C 7

Wet Pipe Zone-3-D 6

Wet Pipe Zone-3-E 6

Wet Pipe Zone-4-A 6

Wet Pipe Zone-4-B 7

Wet Pipe Zone-4-C 10

Wet Pipe Zone-4-D 6

Wet Pipe Zone-4-E 6

Wet Pipe Zone-4-F 6

Wet Pipe Zone-5-A 11

Wet Pipe Zone-5-B 10

Wet Pipe Zone-5-C 8

Wet Pipe Zone-5-D 7

Wet Pipe Zone-6-F Mech Rm 6

Wet Pipe Zone-B&D 14

Wet Pipe Zone-B&H 4

Wet Pipe Zone-B-A 4

Wet Pipe Zone-B-B 5

Wet Pipe Zone-B-C 1

Wet Pipe Zone-B-D 4

Wet Pipe Zone-B-F 5

Wet Pipe Zone-B-G 3

Wet Pipe Zone-B-I 2

Wet Pipe Zone-G-1A 2

Wet Pipe Zone-G-1B 4

Wet Pipe Zone-G-A 1

Wet Pipe Zone1-B 2

Wet Pipe Basement Area-J 1

Wet Pipe Basement Zone-B&C 5

Wet Pipe Basement Zone-B&D 9

Wet Pipe Basement Zone-B&H 2

Wet Pipe Basement Zone-B-I 4

Wet Pipe Basement Zone-G-1A 5

Inspection Summary Category:

Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %

Alarm 141 31.83% 141 100.00% 137 97.16% 4 2.84%

Device 139 31.38% 139 100.00% 139 100.00% 0 0.00%

Hose 26 5.87% 21 80.77% 21 100.00% 0 0.00%

Pump 7 1.58% 7 100.00% 7 100.00% 0 0.00%

Sprinkler 14 3.16% 14 100.00% 14 100.00% 0 0.00%

Valve 116 26.19% 116 100.00% 116 100.00% 0 0.00%

Totals 443 100% 438 98.87% 434 99.09% 4 0.91% ilding: Malcolm Randall VAMC Main Bldg.

Discrepancy Report Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Main Bldg.

The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.

Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer’s replacement/upgrade program is included.

Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade

No items found during this inspection.

ScanID Location Problem Reference

Wet Pipe, Zone-1-1B Tamper Switch

1 63242797 1st Stairway 8. 1-1B. E Bldg Failed Test NFPA25 13.3.3.5.2

Waterflow Switch 1 63242800 1st Stairway 8. 1-1-B. E Bldg Failed Test NFPA25 4.1.5.1

Wet Pipe, Zone-5-C Waterflow Switch

1 63242693 5th Stairway 6 5-C. E Bldg Failed Test NFPA25 4.1.5.1

Basement Wet Pipe, Zone-G-1A Waterflow Switch

2 63242794 Basement Stairway 7 G-1A. E Bldg Damaged/Worn NFPA25 5.2.4

Code References NFPA25 13.3.3.5.2 A distinctive signal shall indicate movement from the valve's normal position during either the first two revolutions of a hand wheel or when the stem of the valve has moved one-fifth of the distance from its normal position.

NFPA25 4.1.5.1 The property owner or designated representative shall rect or repair deficiencies or impairments.

NFPA25 5.2.4 Waterflow alarm and supervisory signal initiating devices shall be inspected quarterly to verify that they are free of physical damage.

Proposed Solutions Report Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Main Bldg.

The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.

ScanID Location Solution Model # Cost Fix

Wet Pipe, Zone-1-1B Tamper Switch

63242797 1st Stairway 8. 1-1B. E Bldg rect built in T/M

Waterflow Switch 63242800 1st Stairway 8. 1-1-B. E Bldg Replace/Test VSR T/M

Wet Pipe, Zone-5-C Waterflow Switch

63242693 5th Stairway 6 5-C. E Bldg Replace/Test VSR T/M

Basement Wet Pipe, Zone-G-1A Waterflow Switch

63242794 Basement Stairway 7 G-1A. E Bldg Replace/Test VSR T/M

PO #: (none) T/M

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Main Bldg.

The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by SystemID.

Note Device Type Location Comment ScanID Wet Pipe, Zone-1-1B

1 Tamper Switch 1st Stairway 8. 1-1B. E Bldg Failed Test 63242797 Never sent the supervisory to the panel

2 Waterflow Switch 1st Stairway 8. 1-1-B. E Bldg Failed Test 63242800 Did not report signal to FACP

Wet Pipe, Zone-1-G 3 Drain 1st Stairway 6. 1-G E Bldg Passed 63242717

Drain leaks on 1” nipple (0-3”) only when draping system Wet Pipe, Zone-5-C

4 Check Valve 5th Stairway 6. 5-C E Bldg Passed 63242692 5yr inspection performed in 2020’

5 Waterflow Switch 5th Stairway 6 5-C. E Bldg Failed Test 63242693 Water flow never reported to the panel

Basement Wet Pipe, Zone-G-1A 6 Waterflow Switch Basement Stairway 7 G-1A. E Bldg Damaged/Worn 63242794

Water flow did not report to panel

Generated by: BuildingReports.com

Building: Malcolm Randall VAMC Main Bldg.

The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or

. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.

Device Type Location Service Time Date

Passed Fire Pump, Building-E Main Bldg

Fire Pump Off Ground Mechanical Fire Pump Rm Semi-Annual 8:33:14 AM 10/23/2024

Fire Pump Running Ground Mechanical Fire Pump Rm Semi-Annual 8:32:52 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm Discharge Control Valve

Semi-Annual 8:47:50 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm Test Header #2 Control Valve

Semi-Annual 8:48:07 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm Bypass Control Valve

Semi-Annual 8:48:22 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm Jockey Discharge Control Valve

Semi-Annual 8:48:41 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm #1 Backflow Valve

Semi-Annual 8:50:02 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm #2 Backflow Valve

Semi-Annual 8:50:33 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm Suction Control Valve

Semi-Annual 8:51:24 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm #2 Test Header Tamper Control

Semi-Annual 8:52:22 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm #1 Bypass Tamper Control

Semi-Annual 8:52:53 AM 10/23/2024

Tamper Switch Ground Mechanical Fire Pump Rm Jockey Suction Control Valve

Semi-Annual 9:02:47 AM 10/23/2024

Gauge Ground Mechanical Fire Pump Rm Jockey Pump Test connection

Semi-Annual 8:35:48 AM 10/23/2024

Gauge Ground Mechanical Fire Pump Rm Suction Semi-Annual 8:36:38 AM 10/23/2024

Gauge Ground Mechanical Fire Pump Rm Suction Semi-Annual 8:37:20 AM 10/23/2024

Gauge Ground Mechanical Fire Pump Rm Fire Pump Test connection

Semi-Annual 9:04:12 AM 10/23/2024

Controller Ground Mechanical Fire Pump Rm Circuit Breaker

Semi-Annual 8:32:29 AM 10/23/2024

Electrical Driver Ground Mechanical Fire Pump Rm Semi-Annual 8:34:49 AM 10/23/2024

Jockey Controller Ground Mechanical Fire Pump Rm Jockey Pump Controller

Semi-Annual 8:33:22 AM 10/23/2024

Jockey Pump Ground Mechanical Fire Pump Rm Jockey Pump

Semi-Annual 8:52:36 AM 10/23/2024

Pump Ground Mechanical Fire Pump Rm Semi-Annual 8:35:10 AM 10/23/2024

Test Header Ground Outside Mechanical Fire Pump Rm Semi-Annual 8:22:40 AM 10/23/2024

Transfer Switch Ground Mechanical Fire Pump Rm Circuit Breaker

Semi-Annual 8:32:38 AM 10/23/2024

Check Valve Ground Mechanical Fire Pump Rm Discharge Check Valve

Semi-Annual 9:03:20 AM 10/23/2024

Check Valve Ground Mechanical Fire Pump Rm Check Valve

Semi-Annual 9:03:28 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Discharge Control Valve

Semi-Annual 8:47:47 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Test Header #2 Control Valve

Semi-Annual 8:48:03 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Bypass Control Valve

Semi-Annual 8:48:19 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Jockey Discharge Control Valve

Semi-Annual 8:48:35 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm #1 Backflow Valve

Semi-Annual 8:50:17 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm #2 Backflow Valve

Semi-Annual 8:50:29 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Bypass #1 Control Valve

Semi-Annual 8:50:53 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Suction Control Valve

Semi-Annual 8:51:44 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Test Header #2 Control Valve

Semi-Annual 8:52:17 AM 10/23/2024

Control Valve Ground Mechanical Fire Pump Rm Jockey Suction Control Valve

Semi-Annual 9:02:40 AM 10/23/2024

Post Indicator Valve Ground Outside Mechanical Fire Pump Rm Semi-Annual 11:40:38 AM 10/23/2024

Standpipe, Area-H Gauge 5th Stairway 9. Bedtower Top of Standpipe Semi-Annual 1:28:04 PM 10/22/2024

Gauge 5th Stairway 11. Bed Tower Top of Standpipe

Semi-Annual 1:50:47 PM 10/22/2024

Hose Connection 5th Stairway 9. Bedtower Semi-Annual 1:28:28 PM 10/22/2024

Hose Connection 5th Stairway 11. Bed Tower Semi-Annual 1:50:36 PM 10/22/2024

Standpipe 5th Stairway 9 Bed Tower Semi-Annual 1:27:59 PM 10/22/2024

Standpipe 5th Stairway 11 Bed Tower Semi-Annual 1:50:30 PM 10/22/2024

Standpipe, Area-J Gauge 5th Stairway 10 Bedtower Top of Standpipe Semi-Annual 12:46:51 PM 10/22/2024

Hose Connection 5th Stairway 10. Bedtower Semi-Annual 12:46:38 PM 10/22/2024

Standpipe 5th Stairway 10. Bedtower Semi-Annual 12:46:58 PM 10/22/2024

Standpipe, Building-E Main Bldg Fire Dep't

Connection Outside Front of Bed Tower West end Semi-Annual 10:37:08 AM 10/23/2024

Page: 10

Fire Dep't Connection

Outside Front of Bed Tower East end Semi-Annual 10:37:11 AM 10/23/2024

Fire Dep't Connection

Ground Outside Back of Old Hospital Receiving Dock

Semi-Annual 10:19:47 AM 10/23/2024

Fire Dep't Connection

Ground Outside Back of Old Hospital Loading Dock

Semi-Annual 10:37:00 AM 10/23/2024

Fire Dep't Connection

Ground Outside Front of Old Main Hospital & back of Bed Tower

Semi-Annual 10:37:03 AM 10/23/2024

Standpipe, Zone-1-1A Gauge 1st Stairway 7. 1-1A. E Bldg Top of

Standpipe Semi-Annual 9:18:25 AM 10/23/2024

Standpipe 1st Stairway 7 1-1A E Bldg Semi-Annual 9:18:08 AM 10/23/2024

Standpipe, Zone-1-1B Gauge 1st Stairway 8. 1-1B. E Bldg Top of

Standpipe Semi-Annual 10:36:25 AM 10/23/2024

Gauge 1st Stairway 8. 1-1B. E Bldg Semi-Annual 10:36:37 AM 10/23/2024

Standpipe, Zone-G-1B Gauge Basement Stairway 8. G-1B. E Bldg Semi-Annual 10:29:05 AM 10/23/2024

Wet Pipe, Area-H Tamper Switch 1st Stairway 9 Bedtower Semi-Annual 1:38:40 PM 10/22/2024

Tamper Switch 2nd Stairway 9 Bedtower Semi-Annual 1:34:40 PM 10/22/2024

Tamper Switch 3rd Stairway 9 Bedtower Semi-Annual 1:31:48 PM 10/22/2024

Tamper Switch 4th Stairway 9 Bedtower Semi-Annual 1:29:11 PM 10/22/2024

Tamper Switch 5th Stairway 9 Bedtower Semi-Annual 1:27:27 PM 10/22/2024

Waterflow Switch 1st Stairway 9 Bed Tower Semi-Annual 1:40:13 PM 10/22/2024

Waterflow Switch 2nd Stairway 9 Bed Tower Semi-Annual 1:34:48 PM 10/22/2024

Waterflow Switch 3rd Stairway 9 Bed Tower Semi-Annual 1:33:45 PM 10/22/2024

Waterflow Switch 4th Stairway 9 Bed Tower Semi-Annual 1:30:30 PM 10/22/2024

Waterflow Switch 5th Stairway 9 Bed Tower Semi-Annual 1:25:34 PM 10/22/2024

Drain 1st Stairway 9 Bed Tower Semi-Annual 1:38:52 PM 10/22/2024

Drain 2nd Stairway 9 Bed Tower Semi-Annual 1:36:03 PM 10/22/2024

Drain 3rd Stairway 9 Bed Tower Semi-Annual 1:31:56 PM 10/22/2024

Drain 4th Stairway 9 Bed Tower Semi-Annual 1:29:26 PM 10/22/2024

Drain 5th Stairway 9 Bed Tower Semi-Annual 1:26:42 PM 10/22/2024

Drain 6th Stairway 11 Bed Tower Semi-Annual 1:47:56 PM 10/22/2024

Gauge 1st Stairway 9 Bed Tower Semi-Annual 1:40:09 PM 10/22/2024

Gauge 2nd Stairway 9 Bed Tower Semi-Annual 1:35:26 PM 10/22/2024

Gauge 3rd Stairway 9 Bed Tower Semi-Annual 1:33:37 PM 10/22/2024

Gauge 4th Stairway 9 Bed Tower Semi-Annual 1:30:24 PM 10/22/2024

Gauge 5th Stairway 9 Bed Tower Semi-Annual 1:27:07 PM 10/22/2024

Gauge 5th Stairway 9 Bed Tower Semi-Annual 1:27:15 PM 10/22/2024

Page: 11

Isolation Valve 1st Stairway 9 Bed Tower Semi-Annual 1:38:28 PM 10/22/2024

Isolation Valve 2nd Stairway 9 Bed Tower Semi-Annual 1:36:13 PM 10/22/2024

Isolation Valve 3rd Stairway 9 Bed Tower Semi-Annual 1:31:41 PM 10/22/2024

Isolation Valve 4th Stairway 9 Bed Tower Semi-Annual 1:29:03 PM 10/22/2024

Isolation Valve 5th Stairway 9 Bed Tower Semi-Annual 1:25:24 PM 10/22/2024

Wet Pipe, Area-J Tamper Switch Basement Stairway 10 Bed Tower Semi-Annual 1:16:33 PM 10/22/2024

Tamper Switch 1st Stairway 10 Bed Tower Semi-Annual 1:11:08 PM 10/22/2024

Tamper Switch 1st Stairway 10 Bed Tower Semi-Annual 1:11:47 PM 10/22/2024

Tamper Switch 2nd Stairway 10 Bed Tower Semi-Annual 1:09:50 PM 10/22/2024

Tamper Switch 3rd Stairway 10 Bed Tower Semi-Annual 1:06:04 PM 10/22/2024

Tamper Switch 4th Stairway 10 Bed Tower Semi-Annual 1:03:10 PM 10/22/2024

Tamper Switch 5th Stairway 10 Bedtower Semi-Annual 12:45:06 PM 10/22/2024

Waterflow Switch Basement Stairway 10 Bed Tower Semi-Annual 1:18:30 PM 10/22/2024

Waterflow Switch 1st Stairway 10 Bed Tower Semi-Annual 1:13:05 PM 10/22/2024

Waterflow Switch 1st Stairway 10 Bed Tower Semi-Annual 1:13:37 PM 10/22/2024

Waterflow Switch 2nd Stairway 10 Bed Tower Semi-Annual 1:10:03 PM 10/22/2024

Waterflow Switch 3rd Stairway 10 Bed Tower Semi-Annual 1:06:27 PM 10/22/2024

Waterflow Switch 4th Stairway 10 Bed Tower Semi-Annual 1:01:28 PM 10/22/2024

Waterflow Switch 5th Stairway 10 Bed Tower Semi-Annual 12:44:55 PM 10/22/2024

Drain Basement Stairway 10 Bed Tower Semi-Annual 1:17:26 PM 10/22/2024

Drain 1st Stairway 10 Bed Tower Semi-Annual 1:15:06 PM 10/22/2024

Drain 2nd Stairway 10 Bed Tower Semi-Annual 1:07:33 PM 10/22/2024

Drain 3rd Stairway 10 Bed Tower Semi-Annual 1:04:42 PM 10/22/2024

Drain 4th Stairway 10 Bed Tower Semi-Annual 1:02:49 PM 10/22/2024

Drain 5th Stairway 10 Bedtower Semi-Annual 12:43:48 PM 10/22/2024

Gauge Basement Stairway 10 Bed Tower Semi-Annual 1:17:01 PM 10/22/2024

Gauge 1st Stairway 10 Bed Tower Semi-Annual 1:14:56 PM 10/22/2024

Gauge 2nd Stairway 10 Bed Tower Semi-Annual 1:09:59 PM 10/22/2024

Gauge 3rd Stairway 10 Bedtower Semi-Annual 1:06:46 PM 10/22/2024

Gauge 4th Stairway 10 Bedtower Semi-Annual 1:02:44 PM 10/22/2024

Gauge 5th Stairway 10 Bedtower Semi-Annual 12:43:37 PM 10/22/2024

Isolation Valve 1st Stairway 10 Bed Tower Semi-Annual 1:11:40 PM 10/22/2024

Isolation Valve 1st Stairway 10 Bed Tower Semi-Annual 1:11:59 PM 10/22/2024

Isolation Valve 2nd Stairway 10 Bedtower Semi-Annual 1:36:39 PM 10/22/2024

Isolation Valve 3rd Stairway 10 Bed Tower Semi-Annual 1:06:16 PM 10/22/2024

Isolation Valve 4th Stairway 10 Bed Tower Semi-Annual 1:01:24 PM 10/22/2024

Isolation Valve 5th Stairway 10 Bed Tower Semi-Annual 12:45:20 PM 10/22/2024

Page: 12

Wet Pipe, Area-K

Tamper Switch 1st Stairway 11 Bed Tower Semi-Annual 2:00:49 PM 10/22/2024

Tamper Switch 1st Stairway 11 Bed Tower Semi-Annual 2:01:42 PM 10/22/2024

Tamper Switch 2nd Stairway 11 Bed Tower Semi-Annual 1:58:08 PM 10/22/2024

Tamper Switch 3rd Stairway 11 Bed Tower Semi-Annual 1:55:45 PM 10/22/2024

Tamper Switch 4th Stairway 11 Bed Tower Semi-Annual 1:53:37 PM 10/22/2024

Tamper Switch 5th…