This file contains Sprinkler Inspection Certificates for Malcolm Randall VA Medical Center's fire suppression systems, documenting semi-annual NFPA 25 compliance inspections conducted in October 2023 and October 2024 across five buildings and associated facilities. The inspections cover Malcolm Randall VAMC Fisher House (inspected October 5, 2023), CLC Building (October 23, 2024), Liberty Parking Garage (October 23, 2024), and Main Building (October 22-23, 2024). Each inspection report includes detailed testing results for wet pipe and standpipe systems, documenting performance measurements for alarms, devices, drains, gauges, hoses, isolation valves, and other fire suppression components tested to NFPA 25 standards.
The inspection results show overall high compliance rates across the facilities. Fisher House achieved 100% pass rate on all 10 items inspected. CLC Building passed 31 of 33 items (93.94%), with two failed gauges requiring replacement per NFPA25 13.2.5.2 due to expired calibration dates. Liberty Parking Garage achieved 100% pass rate on all 27 items inspected (devices, hoses, and valves). Main Building passed 434 of 438 items (99.09%), with four failed components: one tamper switch and three waterflow switches that failed reporting to the fire alarm control panel. All inspection work was performed by certified inspectors from Wilmington, North Carolina, with proposed solutions provided on a time and materials basis for identified deficiencies. The reports document inventory classifications, warranty information, zone/address configurations, and comprehensive device specifications including manufacturer models, sizes, pressures, and service dates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Backflow Preventers.xlsx | XLSX spreadsheet | |
| RFQ 36C24827Q0038 Amendment.pdf | ||
| 36C24827Q0038_2.docx | DOCX document | |
| 36C24827Q0038_1.docx | DOCX document | |
| 36C24827Q0038.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sprinkler Inspection Certificate For
Malcolm Randall VAMC Fisher House
Fisher House Gainesville, FL 32608
Tested to NFPA 25 Standards
This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Semi-Annual Inspection Inspection Date Oct 5, 2023
Building: Malcolm Randall VAMC Fisher House
Title: Title:
Page: 2
Sprinkler Inspection Report
Page: 3
Executive Summary Generated by: BuildingReports.com
Building Information Building: Malcolm Randall VAMC Fisher House Address: Fisher House Address: Fax:
City/State/ZIP Code: Gainesville, FL 32608 Mobile:
Country: United States of America
Inspection Performed By
Address: 2622 New Village Way Address: Fax:
City/State/ZIP Code: Wilmington, North Carolina
28405 Mobile:
Country: United States of America
System Control Unit System Type System Location Protected Area Devices Wet Pipe Building-Fisher House 10
Inspection Summary Category:
Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %
Alarm 2 20.00% 2 100.00% 2 100.00% 0 0.00%
Device 3 30.00% 3 100.00% 3 100.00% 0 0.00%
Sprinkler 3 30.00% 3 100.00% 3 100.00% 0 0.00%
Valve 2 20.00% 2 100.00% 2 100.00% 0 0.00%
Totals 10 100% 10 100.00% 10 100.00% 0 0.00%
Certification ilding: Malcolm Randall VAMC Fisher House
Page: 4
Inspection & Testing Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Fisher House The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Wet Pipe, Building-Fisher House
Tamper Switch Outside Mechanical Rm Semi-Annual 11:15:41 AM 10/05/2023
Waterflow Switch Outside Mechanical Rm Semi-Annual 11:15:49 AM 10/05/2023
Drain Outside Mechanical Rm Semi-Annual 11:14:55 AM 10/05/2023
Gauge Outside Mechanical Rm Semi-Annual 11:15:11 AM 10/05/2023
Gauge Outside Mechanical Rm Semi-Annual 11:15:18 AM 10/05/2023
Fast Response Outside Mechanical Rm Semi-Annual 11:15:03 AM 10/05/2023
Sprinkler Box Outside Mechanical Rm Semi-Annual 11:15:27 AM 10/05/2023
Standard Response Outside Mechanical Rm Semi-Annual 11:15:34 AM 10/05/2023
Alarm Valve Outside Mechanical Rm Semi-Annual 11:14:40 AM 10/05/2023
Control Valve Outside Mechanical Rm Semi-Annual 11:14:47 AM 10/05/2023
Page: 5
Wet Pipe Fire Sprinkler Systems Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Fisher House Building-Fisher House
This section lists out all the devices and components that have been associated with a Wet Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Tamper Switch
Type Description Location Number of Turns
Zone /Address
OK ScanID
Lever Alarm Outside Mechanical Rm 2 1-1M071 63243039 Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Lever Potter Electric VSR 28.51000 2” 1-1M070 63243040
Components Alarm Valve
Type Manufacturer Model # Position Status Size OK ScanID Grooved Tyco CV-1F Closed Supervised 2" 63243044
Internal Date 05/11/2020
Control Valve Type Manufacturer Model Location Size Position Status OK ScanID
Butterfly Milwaukee BB-3CS Outside Mechanical Rm
2" Open Supervised 63243038
Description Main Control
Devices Drain
Type Location Size Supply psi Restored psi
Residual psi Sec OK ScanID
Combination Outside Mechanical Rm 1" 85 80 65 21 63243041 Fast Response Qty Type Size KFactor Finish Temperature OK ScanID 2 Pendant 1/2” 4.2 White 200 63243046 Location Description Outside Mechanical Rm Quick Response
Gauge Location Service Date Outside Mechanical Rm 05/11/2020
Page: 6
Type Manufacturer Model # Static psi Fill Type Size OK ScanID System Pressure Wika 2020 87 1/4 63243042
Gauge Location Service Date Outside Mechanical Rm 05/11/2020
Type Manufacturer Model # Static psi Fill Type Size OK ScanID Supply Pressure Wika 2020 80 1/4 63243043
Sprinkler Box
Qty Tool Available?
SIN List? Size Manufacturer Location OK ScanID
6 No Yes 6 unit Potter Electric Outside Mechanical Rm
63243045
Standard Response Qty Type Size KFactor Finish Temperature OK ScanID 120 Concealed Pendant 1/2” 4.2 White 165 63243047
Location Description Application Orientation Outside Mechanical Rm Concealed Concealed Concealed Pendant
Page: 7
Inventory & Warranty Report Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Fisher House The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Alarm Valve Valve 10.00% 1
Control Valve Valve 10.00% 1
Drain Device 10.00% 1
Fast Response Sprinkler 10.00% 1
Gauge Device 20.00% 2
Sprinkler Box Sprinkler 10.00% 1
Standard Response Sprinkler 10.00% 1
Tamper Switch Alarm 10.00% 1
Waterflow Switch Alarm 10.00% 1
Device Type Qty Model # Type Description Install Date
In Service - 3 Years to 5 Years Wet Pipe, Building-Fisher House
Control Valve 1 BB-3CS Butterfly Main Control 05/11/2020
In Service - 10 Years to 15 Years Wet Pipe, Building-Fisher House
Fast Response 1 GB Pendant Quick Response 05/29/2013 Tamper Switch 1 built in Lever Alarm 05/29/2013 Sprinkler Box 1 VSR 05/29/2013 Waterflow Switch 1 VSR Lever Alarm 05/29/2013 Standard Response 1 RFC49 Concealed Pendant Concealed 05/29/2013 Drain 1 Combination 05/29/2013 Alarm Valve 1 CV-1F Grooved 05/29/2013 Gauge 1 2020 Supply Pressure 05/29/2013 Gauge 1 2020 System Pressure 05/29/2013
Page: 8
Zone Address Report Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Fisher House The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.
Address Device Type Location Type ScanID
Control Panel 1 1M070 Waterflow Switch Outside Mechanical Rm Lever 63243040 1M071 Control Valve Outside Mechanical Rm Butterfly 63243038 1M071 Tamper Switch Outside Mechanical Rm Lever 63243039
Page: 9
Notes & Recommendations Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Fisher House The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by SystemID.
Note Device Type Location Comment ScanID Wet Pipe, Building-Fisher House
1 Sprinkler Box Outside Mechanical Rm Passed 63243045 No head wrench
Malcolm Randall VAMC CLC Building
CLC Building Gainesville, FL 32608
Tested to NFPA 25 Standards
This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Inspection Date Oct 23, 2024
Building: Malcolm Randall VAMC CLC Building
Generated by: BuildingReports.com
Building Information Building: Malcolm Randall VAMC CLC Building Address: CLC Building Address: Fax:
City/State/ZIP Code: Gainesville, FL 32608 Mobile:
Country: United States of America
Inspection Performed By
Address: 2622 New Village Way Address: Fax:
City/State/ZIP Code: Wilmington, North Carolina
28405 Mobile:
Country: United States of America
System Control Unit System Type System Location Protected Area Devices Wet Pipe Building-CLC 33
Inspection Summary Category:
Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %
Alarm 13 39.39% 13 100.00% 13 100.00% 0 0.00%
Device 11 33.33% 11 100.00% 9 81.82% 2 18.18%
Hose 1 3.03% 1 100.00% 1 100.00% 0 0.00%
Valve 8 24.24% 8 100.00% 8 100.00% 0 0.00%
Totals 33 100% 33 100.00% 31 93.94% 2 6.06% ilding: Malcolm Randall VAMC CLC Building
Discrepancy Report Generated by: BuildingReports.com
Building: Malcolm Randall VAMC CLC Building The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.
Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer’s replacement/upgrade program is included.
Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade
No items found during this inspection.
ScanID Location Problem Reference
Wet Pipe, Building-CLC Gauge
1 63242905 1st In Mechanical Rm 127 Date Expired NFPA25 13.2.5.2
1 63242906 1st In Mechanical Rm 127 Date Expired NFPA25 13.2.5.2
Code References NFPA25 13.2.5.2 Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge.
Proposed Solutions Report Generated by: BuildingReports.com
Building: Malcolm Randall VAMC CLC Building The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.
ScanID Location Solution Model # Cost Fix
Wet Pipe, Building-CLC Gauge
63242905 1st In Mechanical Rm 127 Replace 2020 T/M 63242906 1st In Mechanical Rm 127 Replace 2020 T/M
PO #: (none) T/M
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC CLC Building The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by SystemID.
Note Device Type Location Comment ScanID Wet Pipe, Building-CLC
1 Drain 2nd In Mechanical Rm 209-12 Right System Passed 63243069 No system pressure gauge installed cannot get main drain static and residual readings
2 Drain 2nd In Mechanical Rm 209-12 Left System Passed 63243073 No system pressure gauge installed cannot get main drain static and residual readings
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC CLC Building The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Wet Pipe, Building-CLC
Tamper Switch 1st PIV behind CLC building Semi-Annual 1:57:26 PM 10/23/2024
Tamper Switch 1st In Mechanical Rm 127 Left System Semi-Annual 2:00:46 PM 10/23/2024
Tamper Switch 1st In Mechanical Rm 127 Right System Semi-Annual 2:01:06 PM 10/23/2024
Tamper Switch 2nd In Mechanical Rm 209-12 Right System
Semi-Annual 2:08:43 PM 10/23/2024
Tamper Switch 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:09:46 PM 10/23/2024
Tamper Switch 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:16:58 PM 10/23/2024
Tamper Switch 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:17:22 PM 10/23/2024
Waterflow Switch 1st In Mechanical Rm 127 Right System Semi-Annual 1:58:31 PM 10/23/2024
Waterflow Switch 1st In Mechanical Rm 127 Left System Semi-Annual 2:04:29 PM 10/23/2024
Waterflow Switch 2nd In Mechanical Rm 209-12 Right System
Semi-Annual 2:13:33 PM 10/23/2024
Waterflow Switch 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:13:42 PM 10/23/2024
Waterflow Switch 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:22:06 PM 10/23/2024
Waterflow Switch 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:22:43 PM 10/23/2024
Drain 1st In Mechanical Rm 127 Semi-Annual 1:55:07 PM 10/23/2024
Drain 2nd In Mechanical Rm 209-12 Right System
Semi-Annual 2:12:57 PM 10/23/2024
Drain 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:13:04 PM 10/23/2024
Drain 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:19:09 PM 10/23/2024
Drain 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:20:02 PM 10/23/2024
Gauge 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:21:59 PM 10/23/2024
Gauge 3rd In Mechanical Rm SP 309 Right System Semi-Annual 2:22:35 PM 10/23/2024
Retard Chamber 1st In Mechanical Rm 127 Semi-Annual 2:01:26 PM 10/23/2024
Watermotor Gong 1st In Mechanical Rm 127 Semi-Annual 1:57:41 PM 10/23/2024
Fire Dep't Connection
1st In Mechanical Rm 127 Semi-Annual 1:57:45 PM 10/23/2024
Alarm Valve 1st In Mechanical Rm 127 Semi-Annual 1:55:01 PM 10/23/2024
Isolation Valve 1st In Mechanical Rm 127 Left System Semi-Annual 2:00:42 PM 10/23/2024
Isolation Valve 1st In Mechanical Rm 127 Right System Semi-Annual 2:01:18 PM 10/23/2024
Device Type Location Service Time Date
Isolation Valve 2nd In Mechanical Rm 209-12 Right System
Semi-Annual 2:08:30 PM 10/23/2024
Isolation Valve 2nd In Mechanical Rm 209-12 Left System Semi-Annual 2:09:58 PM 10/23/2024
Isolation Valve 3rd In Mechanical Rm SP 309 Left System Semi-Annual 2:17:35 PM 10/23/2024
Isolation Valve 3rd In Mechanical Rm 309-12 Right System Semi-Annual 2:17:44 PM 10/23/2024
Post Indicator Valve Outside in garden front of trailer T11 Semi-Annual 1:50:42 PM 10/23/2024
Failed/Other Wet Pipe, Building-CLC
1 Gauge 1st In Mechanical Rm 127 Semi-Annual 1:56:34 PM 10/23/2024
1 Gauge 1st In Mechanical Rm 127 Semi-Annual 1:56:54 PM 10/23/2024
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC CLC Building Building-CLC
This section lists out all the devices and components that have been associated with a Wet Pipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Alarms Tamper Switch
Type Description Location # of Turns Zone/Address OK ScanID Lever Supervisory 1st PIV behind CLC building 2 1 63242903
Plug Supervisory 1st In Mechanical Rm 127 Left System
2 1-L2M17 63242912
Lever Supervisory 1st In Mechanical Rm 127 Right System
2 1-L2M19 63242910
Lever Supervisory 2nd In Mechanical Rm 209-12 Right System
1-L2M27 63243068
Lever Supervisory 2nd In Mechanical Rm 209-12 Left System
1-L2M29 63243072
Lever Supervisory 3rd In Mechanical Rm SP 309 Right System
2 1-L2M36 63243063
Lever Supervisory 3rd In Mechanical Rm SP 309 Left System
2 1-L2M38 63243058
Waterflow Switch Type Manufacturer Model # Sec Size Zone/Address OK ScanID Vane Potter Electric VSR 43.84999 2” 1-L2M18 63242913 Vane Potter Electric VSR 34.04000 2” 1-L2M16 63242914 Lever Notifier WFD2.5 21 2-1/2” 1-L1M26 63243070 Lever Notifier WFD2 35 2-1/2” 1-L1M29 63243074 Lever Notifier 2020 25 2-1/2” 1-L2M39 63243061 Lever Notifier WFD2 30 2” 1-L2M37 63243066
Components Alarm Valve
Type Location Manufacturer Model # OK ScanID Flanged 1st In Mechanical Rm 127 Central G 63242904
Position Status Size Internal Date Open Supervised 4" 05/07/2020
Isolation Valve Manufacturer Model Location Position Status Size OK ScanID
NIBCO OS&Y
1st In Mechanical Rm 127 Left System
Open Supervised 2" 63242908
NIBCO OS&Y
1st In Mechanical Rm 127 Right System
Open Supervised 2" 63242909
Kennedy OS&Y 2nd In Mechanical Rm 209- 12 Right System
Open Supervised 2.5" 63243067
NIBCO OS&Y
2nd In Mechanical Rm 209- 12 Left System
Open Supervised 2" 63243071
Kennedy OS&Y 3rd In Mechanical Rm SP 309 Left System
Open Supervised 2.5" 63243057
NIBCO OS&Y
3rd In Mechanical Rm 309- 12 Right System
Open Supervised 2" 63243062
Post Indicator Valve Location Manufacturer Model # OK ScanID Outside in garden front of trailer T11 Stockham B 63242902
Type Size Position Status # of Turns Ground 4" Open Locked & Supervised 2
Devices Drain
Current Inspection
Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main 1st In Mechanical Rm 127 2" 80 80 70 63242907
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main 1st In Mechanical Rm 127 2" 80 80 70 90 63242907
October 5, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main 1st In Mechanical Rm 127 2" 75 80 60 63242907
Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID
Main 2nd In Mechanical Rm 209-12 Right System
1" 63243069
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 2nd In Mechanical Rm 209-12 Right System
1" 63243069
October 5, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 2nd In Mechanical Rm 209-12 Right System
1" 21 63243069
Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID
Page: 10
Main 2nd In Mechanical Rm 209-12 Left System
1" 63243073
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 2nd In Mechanical Rm 209-12 Left System
1" 63243073
October 5, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 2nd In Mechanical Rm 209-12 Left System
1" 22 63243073
Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID
Main 3rd In Mechanical Rm SP 309 Right System
1" 80 80 60 24 63243064
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 3rd In Mechanical Rm SP 309 Right System
1" 80 80 60 90 63243064
October 5, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 3rd In Mechanical Rm SP 309 Right System
1" 80 70 60 21 63243064
Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID
Main 3rd In Mechanical Rm SP 309 Left System
1" 80 80 60 63243059
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 3rd In Mechanical Rm SP 309 Left System
1" 80 80 60 90 63243059
October 5, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main 3rd In Mechanical Rm SP 309 Left System
1" 80 70 60 23 63243059
Fire Dep't Connection Location Type Size Qty BallDrip Rotating Swivels 5-Year Hydro OK ScanID 1st In Mechanical Rm
Wall 4" 2 Yes Yes 05/07/2020 63242916
Gauge Type Manufacturer Model # Size Fill Type OK ScanID
Page: 11
System Pressure Wika 2020 1/4 Air/Water 63243060
Location Service Date Static psi Min. Range Max. Range 3rd In Mechanical Rm SP 309 Left System 05/15/2025 70 0 300
Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63243065
Location Service Date Static psi Min. Range Max. Range 3rd In Mechanical Rm SP 309 Right System 05/15/2025 35 0 300
Gauge Type Manufacturer Model # Size Fill Type OK ScanID Supply Pressure Wika 2020 1/4 Air/Water 63242906
Location Service Date Static psi Min. Range Max. Range 1st In Mechanical Rm 127 05/07/2020 75 0 300
Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 63242905
Location Service Date Static psi Min. Range Max. Range 1st In Mechanical Rm 127 05/07/2025 0 300
Retard Chamber Manufacturer Model # Location OK ScanID Central F 1st In Mechanical Rm 127 63242917
Watermotor Gong Location Manufacturer Model # Size OK ScanID 1st In Mechanical Rm 127 Tyco WMA-1 63242915
Page: 12
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC CLC Building The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Alarm Valve Valve 3.03% 1
Drain Device 15.15% 5
Fire Dep't Connection Hose 3.03% 1
Gauge Device 12.12% 4
Isolation Valve Valve 18.18% 6
Post Indicator Valve Valve 3.03% 1
Retard Chamber Device 3.03% 1
Tamper Switch Alarm 21.21% 7
Waterflow Switch Alarm 18.18% 6
Watermotor Gong Device 3.03% 1
Device Type Qty Model # Type Description Install Date
In Service - 3 Years to 5 Years Wet Pipe, Building-CLC
Fire Dep't Connection 1 Wall 05/07/2020 Tamper Switch 1 Lever Supervisory 05/07/2020 Drain 1 Angle Main 05/07/2020 Isolation Valve 2 OS&Y 05/07/2020 Tamper Switch 1 NGV Lever Supervisory 05/07/2020 Tamper Switch 1 PTS-C Plug Supervisory 05/07/2020 Waterflow Switch 2 VSR Vane Alarm 05/07/2020 Post Indicator Valve 1 B Ground 05/07/2020 Watermotor Gong 1 WMA-1 05/07/2020 Gauge 1 2020 Supply Pressure 05/07/2020 Gauge 3 2020 System Pressure 05/07/2020
In Service - 25 Years or Older Wet Pipe, Building-CLC
Alarm Valve 1 G Flanged 05/07/1997 Retard Chamber 1 F 05/07/1997 Isolation Valve 2 OS&Y 05/07/1980 Isolation Valve 2 OS&Y 05/07/1980 Tamper Switch 4 NGV Lever Supervisory 05/07/1980 Waterflow Switch 1 2020 Lever Alarm 05/07/1980 Waterflow Switch 2 WFD2 Lever Alarm 05/07/1980 Waterflow Switch 1 WFD2.5 Lever Alarm 05/07/1980
Page: 13
Drain 4 Main 05/07/1980
Page: 14
Zone Address Report Generated by: BuildingReports.com
Building: Malcolm Randall VAMC CLC Building The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.
Address Device Type Location Type ScanID
Control Panel 1 L1M26 Waterflow Switch 2nd In Mechanical Rm 209-12 Right
System Lever 63243070
L1M29 Waterflow Switch 2nd In Mechanical Rm 209-12 Left System Lever 63243074 L2M16 Waterflow Switch 1st In Mechanical Rm 127 Left System Vane 63242914 L2M17 Tamper Switch 1st In Mechanical Rm 127 Left System Plug 63242912 L2M18 Waterflow Switch 1st In Mechanical Rm 127 Right System Vane 63242913 L2M19 Tamper Switch 1st In Mechanical Rm 127 Right System Lever 63242910 L2M27 Tamper Switch 2nd In Mechanical Rm 209-12 Right
System Lever 63243068
L2M29 Tamper Switch 2nd In Mechanical Rm 209-12 Left System Lever 63243072 L2M36 Tamper Switch 3rd In Mechanical Rm SP 309 Right
System Lever 63243063
L2M37 Waterflow Switch 3rd In Mechanical Rm SP 309 Right System
Lever 63243066
L2M38 Tamper Switch 3rd In Mechanical Rm SP 309 Left System Lever 63243058 L2M39 Waterflow Switch 3rd In Mechanical Rm SP 309 Left System Lever 63243061
Malcolm Randall VAMC Liberty Parking Garage
Liberty Parking Garage Gainesville, FL 32608
Tested to NFPA 25 Standards
This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Inspection Date Oct 23, 2024
Building: Malcolm Randall VAMC Liberty Parking Garage
Generated by: BuildingReports.com
Building Information Building: Malcolm Randall VAMC Liberty Parking
Garage Address: Liberty Parking Garage Address: Fax:
City/State/ZIP Code: Gainesville, FL 32608 Mobile:
Country: United States of America
Inspection Performed By
Address: 2622 New Village Way Address: Fax:
City/State/ZIP Code: Wilmington, North Carolina
28405 Mobile:
Country: United States of America
System Control Unit System Type System Location Protected Area Devices Standpipe Floors-Middle 1 through 7 6
Standpipe Floors-North 1 through 7 7
Standpipe Floors-South 1 through 7 14
Inspection Summary Category:
Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %
Device 8 29.63% 8 100.00% 8 100.00% 0 0.00%
Hose 16 59.26% 16 100.00% 16 100.00% 0 0.00%
Valve 3 11.11% 3 100.00% 3 100.00% 0 0.00%
Totals 27 100% 27 100.00% 27 100.00% 0 0.00%
Certification ilding: Malcolm Randall VAMC Liberty Parking
Garage
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Liberty Parking Garage The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Standpipe, Floors-Middle 1 through 7
Drain Garage East Middle Maintence Area Semi-Annual 1:30:26 PM 10/23/2024
Gauge 7th West Middle Top of Riser Semi-Annual 1:13:28 PM 10/23/2024
Hose Connection 7th West Middle Top of Riser Semi-Annual 1:12:37 PM 10/23/2024
Hose Connection Garage East Middle Maintence Area Semi-Annual 1:26:40 PM 10/23/2024
Hose Connection Garage West Middle Semi-Annual 1:30:10 PM 10/23/2024
Standpipe Ground East Middle Maintenance Area Semi-Annual 1:27:12 PM 10/23/2024
Standpipe, Floors-North 1 through 7 Drain Ground North Front Semi-Annual 1:32:09 PM 10/23/2024
Gauge 7th North Front Top of Riser Semi-Annual 1:16:59 PM 10/23/2024
Fire Dep't Connection
Ground North Front Semi-Annual 1:28:25 PM 10/23/2024
Hose Connection 7th North Front Top of Riser Semi-Annual 1:17:03 PM 10/23/2024
Hose Connection Ground North Front Semi-Annual 1:29:16 PM 10/23/2024
Standpipe Ground North Front Semi-Annual 1:29:07 PM 10/23/2024
Check Valve Ground North Front Semi-Annual 1:32:12 PM 10/23/2024
Standpipe, Floors-South 1 through 7 Drain Ground South Front Semi-Annual 1:24:48 PM 10/23/2024
Drain Ground South Back Semi-Annual 1:31:26 PM 10/23/2024
Gauge 7th South Back Top of Riser Semi-Annual 1:14:29 PM 10/23/2024
Gauge 7th South Front Top of Riser Semi-Annual 1:15:26 PM 10/23/2024
Fire Dep't Connection
Ground South Front Semi-Annual 1:25:33 PM 10/23/2024
Fire Dep't Connection
Ground South Back Semi-Annual 1:32:00 PM 10/23/2024
Hose Connection 7th South Back Top of Riser Semi-Annual 1:14:36 PM 10/23/2024
Hose Connection 7th South Front Top of Riser Semi-Annual 1:15:29 PM 10/23/2024
Hose Connection Garage South Back Semi-Annual 1:30:37 PM 10/23/2024
Hose Connection Ground South Front Semi-Annual 1:31:43 PM 10/23/2024
Standpipe Garage South Back Semi-Annual 1:31:03 PM 10/23/2024
Standpipe Ground South Front Semi-Annual 1:24:44 PM 10/23/2024
Check Valve Ground South Back Semi-Annual 1:31:21 PM 10/23/2024
Check Valve Ground South Front Semi-Annual 1:31:41 PM 10/23/2024
Standpipe Systems Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Liberty Parking Garage Floors-Middle 1 through 7
This section lists out all the devices and components that have been associated with a Standpipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Devices Drain
Current Inspection
Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID
Main Garage East Middle Maintence Area
2" 0 0 0 63241634
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main Garage East Middle Maintence Area
2" 0 0 0 63241634
October 4, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID
Main Garage East Middle Maintence Area
2" 0 0 0 63241634
Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63241656
Location Service Date Static psi Min. Range Max. Range 7th West Middle Top of Riser 04/01/2025 0 0 300
Hose Connection Location Size Manufacturer Model # OK ScanID 7th West Middle Top of Riser Class I - 2.5" BH Angle 63241655 Garage East Middle Maintence Area
Class I - 2.5" FPPI Angle 63241650
Garage West Middle Class I - 2.5" BH Angle 63241652
Standpipe Wet System Dry System
Location Type Flow Test GPM Flow Test PSI Hydro PSI OK ScanID Ground East Middle Maintenance Area
Class I 63241633
Building: Malcolm Randall VAMC Liberty Parking Garage Floors-North 1 through 7
This section lists out all the devices and components that have been associated with a Standpipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Components Check Valve
Type Location Manufacturer Model # Internal Date Size OK ScanID Grooved Ground North Front Anvil 78FP 04/01/2021 4" 63241645
Devices Drain
Current Inspection
Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main Ground North Front 2" 0 0 0 63241646
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground North Front 2" 0 0 0 63241646
October 4, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground North Front 2" 0 0 0 63241646
Fire Dep't Connection Location Type Size Qty BallDrip Rotating Swivels 5-Year Hydro OK ScanID Ground North Front Wall 4" 2 No Yes 12/31/1969 63241647
Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63241653
Location Service Date Static psi Min. Range Max. Range 7th North Front Top of Riser 04/01/2025 0 0 300
Hose Connection Location Size Manufacturer Model # OK ScanID 7th North Front Top of Riser Class I - 2.5" BH 63241654 Ground North Front Class I - 2.5" BH 63241649
Standpipe Wet System Dry System
Location Type Flow Test GPM Flow Test PSI Hydro PSI OK ScanID Ground North Front Class I 63241648
Building: Malcolm Randall VAMC Liberty Parking Garage Floors-South 1 through 7
This section lists out all the devices and components that have been associated with a Standpipe System and provides details as to type of component, pressure readings, response time, etc. If a component has an OK checkbox that is checked, then that component was actually tested. However, for Pass/Fail test results, see the Inspection and Testing section.
Components
Check Valve Type Location Manufacturer Model # Internal Date Size OK ScanID Grooved Ground South Back Anvil 78FP 04/01/2021 4" 63241643 Grooved Ground South Front Anvil 78FP 04/01/2021 4" 63241637
Devices Drain
Current Inspection
Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main Ground South Front 2" 0 0 0 63241638
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Front 2" 0 0 0 63241638
October 4, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Front 2" 0 0 0 63241638
Current Inspection Type Location Size Supply psi Restored psi Residual psi Sec OK ScanID Main Ground South Back 2" 0 0 0 63241641
Previous Inspections
May 14, 2024
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Back 2" 0 0 0 63241641
October 4, 2023
Type Location Size Supply psi Static psi Residual psi Sec OK ScanID Main Ground South Back 2" 0 0 0 63241641
Fire Dep't Connection Location Type Size Qty BallDrip Rotating Swivels 5-Year Hydro OK ScanID Ground South Front Wall 4" 2 No Yes 12/31/1969 63241639 Ground South Back Wall 4" 2 No Yes 12/31/1969 63241644
Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 63241658
Location Service Date Static psi Min. Range Max. Range 7th South Back Top of Riser 04/01/2025 0 300
Gauge Type Manufacturer Model # Size Fill Type OK ScanID System Pressure Wika 2020 1/4 Air/Water 63241660
Location Service Date Static psi Min. Range Max. Range 7th South Front Top of Riser 04/01/2025 0 0 300
Hose Connection
Location Size Manufacturer Model # OK ScanID 7th South Back Top of Riser Class I - 2.5" BH 63241657 7th South Front Top of Riser Class I - 2.5" BH Angle 63241659 Garage South Back Class I - 2.5" BH 63241642 Ground South Front Class I - 2.5" BH 63241636
Standpipe Wet System Dry System
Location Type Flow Test GPM Flow Test PSI Hydro PSI OK ScanID Garage South Back Class I 63241640 Ground South Front Class I 63241635
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Liberty Parking Garage The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Device or Type Category % of Inventory Quantity Check Valve Valve 11.11% 3
Drain Device 14.81% 4
Fire Dep't Connection Hose 11.11% 3
Gauge Device 14.81% 4
Hose Connection Hose 33.33% 9
Standpipe Hose 14.81% 4
Device Type Qty Model # Type Description Install Date
In Service - 3 Years to 5 Years Standpipe, Floors-Middle 1 through 7
Gauge 1 2020 System Pressure 07/01/2020
Standpipe, Floors-North 1 through 7 Gauge 1 2020 System Pressure 07/01/2020
Standpipe, Floors-South 1 through 7 Gauge 2 2020 System Pressure 07/01/2020
In Service - 5 Years to 10 Years Standpipe, Floors-Middle 1 through 7
Standpipe 1 Class I 07/01/2015 Hose Connection 2 Angle 07/01/2015 Drain 1 Angle Main 07/01/2015 Hose Connection 1 Angle 07/01/2015
Standpipe, Floors-North 1 through 7 Standpipe 1 Class I 07/01/2015 Check Valve 1 78FP Grooved 07/01/2015 Hose Connection 2 07/01/2015 Drain 1 Angle Main 07/01/2015 Fire Dep't Connection 1 Wall 07/01/2015
Standpipe, Floors-South 1 through 7 Standpipe 2 Class I 07/01/2015 Check Valve 2 78FP Grooved 07/01/2015 Hose Connection 3 07/01/2015 Hose Connection 1 Angle 07/01/2015 Drain 2 Angle Main 07/01/2015 Fire Dep't Connection 2 Wall 07/01/2015
Malcolm Randall VAMC Main Bldg.
Main Bldg.
Gainesville, FL 32608
Tested to NFPA 25 Standards
This Inspection was performed in ac dance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Inspection Date Oct 23, 2024
Building: Malcolm Randall VAMC Main Bldg.
Generated by: BuildingReports.com
Building Information Building: Malcolm Randall VAMC Main Bldg.
Address: Main Bldg.
Address: Fax:
City/State/ZIP Code: Gainesville, FL 32608 Mobile:
Country: United States of America
Inspection Performed By
Address: 2622 New Village Way Address: Fax:
City/State/ZIP Code: Wilmington, North Carolina
28405 Mobile:
Country: United States of America
System Control Unit System Type System Location Protected Area Devices Fire Pump Building-E Main Bldg 36
Service Main Zone- 5
Standpipe Area-H 6
Standpipe Area-J 3
Standpipe Building-E Main Bldg 5
Standpipe Zone-1-1A 2
Standpipe Zone-1-1B 2
Standpipe Zone-G-1B 1
Wet Pipe Area-H 27
Wet Pipe Area-J 32
Wet Pipe Area-K 31
Wet Pipe Zone B-F 1
Wet Pipe Zone B-G 1
Wet Pipe Zone- B-F 1
Wet Pipe Zone- B-G 1
Wet Pipe Zone-1-1A 5
Wet Pipe Zone-1-1B 5
Wet Pipe Zone-1-A 5
Wet Pipe Zone-1-B 6
Wet Pipe Zone-1-C 5
Wet Pipe Zone-1-D 7
Wet Pipe Zone-1-E 7
Wet Pipe Zone-1-G 6
Wet Pipe Zone-1-H 6
Wet Pipe Zone-1-I 6
System Type System Location Protected Area Devices Wet Pipe Zone-2-A 7
Wet Pipe Zone-2-B 8
Wet Pipe Zone-2-C 7
Wet Pipe Zone-2-D 6
Wet Pipe Zone-2-E 6
Wet Pipe Zone-2-F 6
Wet Pipe Zone-3-A 7
Wet Pipe Zone-3-B 5
Wet Pipe Zone-3-C 7
Wet Pipe Zone-3-D 6
Wet Pipe Zone-3-E 6
Wet Pipe Zone-4-A 6
Wet Pipe Zone-4-B 7
Wet Pipe Zone-4-C 10
Wet Pipe Zone-4-D 6
Wet Pipe Zone-4-E 6
Wet Pipe Zone-4-F 6
Wet Pipe Zone-5-A 11
Wet Pipe Zone-5-B 10
Wet Pipe Zone-5-C 8
Wet Pipe Zone-5-D 7
Wet Pipe Zone-6-F Mech Rm 6
Wet Pipe Zone-B&D 14
Wet Pipe Zone-B&H 4
Wet Pipe Zone-B-A 4
Wet Pipe Zone-B-B 5
Wet Pipe Zone-B-C 1
Wet Pipe Zone-B-D 4
Wet Pipe Zone-B-F 5
Wet Pipe Zone-B-G 3
Wet Pipe Zone-B-I 2
Wet Pipe Zone-G-1A 2
Wet Pipe Zone-G-1B 4
Wet Pipe Zone-G-A 1
Wet Pipe Zone1-B 2
Wet Pipe Basement Area-J 1
Wet Pipe Basement Zone-B&C 5
Wet Pipe Basement Zone-B&D 9
Wet Pipe Basement Zone-B&H 2
Wet Pipe Basement Zone-B-I 4
Wet Pipe Basement Zone-G-1A 5
Inspection Summary Category:
Total Items Serviced Passed Failed/Other Qty % Qty % Qty % Qty %
Alarm 141 31.83% 141 100.00% 137 97.16% 4 2.84%
Device 139 31.38% 139 100.00% 139 100.00% 0 0.00%
Hose 26 5.87% 21 80.77% 21 100.00% 0 0.00%
Pump 7 1.58% 7 100.00% 7 100.00% 0 0.00%
Sprinkler 14 3.16% 14 100.00% 14 100.00% 0 0.00%
Valve 116 26.19% 116 100.00% 116 100.00% 0 0.00%
Totals 443 100% 438 98.87% 434 99.09% 4 0.91% ilding: Malcolm Randall VAMC Main Bldg.
Discrepancy Report Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Main Bldg.
The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.
Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer’s replacement/upgrade program is included.
Device Type Manufacturer ModelNumber Date Qty Items listed for Recall or Replacement/Upgrade
No items found during this inspection.
ScanID Location Problem Reference
Wet Pipe, Zone-1-1B Tamper Switch
1 63242797 1st Stairway 8. 1-1B. E Bldg Failed Test NFPA25 13.3.3.5.2
Waterflow Switch 1 63242800 1st Stairway 8. 1-1-B. E Bldg Failed Test NFPA25 4.1.5.1
Wet Pipe, Zone-5-C Waterflow Switch
1 63242693 5th Stairway 6 5-C. E Bldg Failed Test NFPA25 4.1.5.1
Basement Wet Pipe, Zone-G-1A Waterflow Switch
2 63242794 Basement Stairway 7 G-1A. E Bldg Damaged/Worn NFPA25 5.2.4
Code References NFPA25 13.3.3.5.2 A distinctive signal shall indicate movement from the valve's normal position during either the first two revolutions of a hand wheel or when the stem of the valve has moved one-fifth of the distance from its normal position.
NFPA25 4.1.5.1 The property owner or designated representative shall rect or repair deficiencies or impairments.
NFPA25 5.2.4 Waterflow alarm and supervisory signal initiating devices shall be inspected quarterly to verify that they are free of physical damage.
Proposed Solutions Report Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Main Bldg.
The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.
ScanID Location Solution Model # Cost Fix
Wet Pipe, Zone-1-1B Tamper Switch
63242797 1st Stairway 8. 1-1B. E Bldg rect built in T/M
Waterflow Switch 63242800 1st Stairway 8. 1-1-B. E Bldg Replace/Test VSR T/M
Wet Pipe, Zone-5-C Waterflow Switch
63242693 5th Stairway 6 5-C. E Bldg Replace/Test VSR T/M
Basement Wet Pipe, Zone-G-1A Waterflow Switch
63242794 Basement Stairway 7 G-1A. E Bldg Replace/Test VSR T/M
PO #: (none) T/M
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Main Bldg.
The Notes & Recommendations Report details additional inspection notes made by the Inspectors during the course of the building inspection. Notes are grouped by SystemID.
Note Device Type Location Comment ScanID Wet Pipe, Zone-1-1B
1 Tamper Switch 1st Stairway 8. 1-1B. E Bldg Failed Test 63242797 Never sent the supervisory to the panel
2 Waterflow Switch 1st Stairway 8. 1-1-B. E Bldg Failed Test 63242800 Did not report signal to FACP
Wet Pipe, Zone-1-G 3 Drain 1st Stairway 6. 1-G E Bldg Passed 63242717
Drain leaks on 1” nipple (0-3”) only when draping system Wet Pipe, Zone-5-C
4 Check Valve 5th Stairway 6. 5-C E Bldg Passed 63242692 5yr inspection performed in 2020’
5 Waterflow Switch 5th Stairway 6 5-C. E Bldg Failed Test 63242693 Water flow never reported to the panel
Basement Wet Pipe, Zone-G-1A 6 Waterflow Switch Basement Stairway 7 G-1A. E Bldg Damaged/Worn 63242794
Water flow did not report to panel
Generated by: BuildingReports.com
Building: Malcolm Randall VAMC Main Bldg.
The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or
. Items are listed by Category. Each item includes the services performed, and the time & date at which testing Failed/Other occurred.
Device Type Location Service Time Date
Passed Fire Pump, Building-E Main Bldg
Fire Pump Off Ground Mechanical Fire Pump Rm Semi-Annual 8:33:14 AM 10/23/2024
Fire Pump Running Ground Mechanical Fire Pump Rm Semi-Annual 8:32:52 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm Discharge Control Valve
Semi-Annual 8:47:50 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm Test Header #2 Control Valve
Semi-Annual 8:48:07 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm Bypass Control Valve
Semi-Annual 8:48:22 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm Jockey Discharge Control Valve
Semi-Annual 8:48:41 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm #1 Backflow Valve
Semi-Annual 8:50:02 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm #2 Backflow Valve
Semi-Annual 8:50:33 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm Suction Control Valve
Semi-Annual 8:51:24 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm #2 Test Header Tamper Control
Semi-Annual 8:52:22 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm #1 Bypass Tamper Control
Semi-Annual 8:52:53 AM 10/23/2024
Tamper Switch Ground Mechanical Fire Pump Rm Jockey Suction Control Valve
Semi-Annual 9:02:47 AM 10/23/2024
Gauge Ground Mechanical Fire Pump Rm Jockey Pump Test connection
Semi-Annual 8:35:48 AM 10/23/2024
Gauge Ground Mechanical Fire Pump Rm Suction Semi-Annual 8:36:38 AM 10/23/2024
Gauge Ground Mechanical Fire Pump Rm Suction Semi-Annual 8:37:20 AM 10/23/2024
Gauge Ground Mechanical Fire Pump Rm Fire Pump Test connection
Semi-Annual 9:04:12 AM 10/23/2024
Controller Ground Mechanical Fire Pump Rm Circuit Breaker
Semi-Annual 8:32:29 AM 10/23/2024
Electrical Driver Ground Mechanical Fire Pump Rm Semi-Annual 8:34:49 AM 10/23/2024
Jockey Controller Ground Mechanical Fire Pump Rm Jockey Pump Controller
Semi-Annual 8:33:22 AM 10/23/2024
Jockey Pump Ground Mechanical Fire Pump Rm Jockey Pump
Semi-Annual 8:52:36 AM 10/23/2024
Pump Ground Mechanical Fire Pump Rm Semi-Annual 8:35:10 AM 10/23/2024
Test Header Ground Outside Mechanical Fire Pump Rm Semi-Annual 8:22:40 AM 10/23/2024
Transfer Switch Ground Mechanical Fire Pump Rm Circuit Breaker
Semi-Annual 8:32:38 AM 10/23/2024
Check Valve Ground Mechanical Fire Pump Rm Discharge Check Valve
Semi-Annual 9:03:20 AM 10/23/2024
Check Valve Ground Mechanical Fire Pump Rm Check Valve
Semi-Annual 9:03:28 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Discharge Control Valve
Semi-Annual 8:47:47 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Test Header #2 Control Valve
Semi-Annual 8:48:03 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Bypass Control Valve
Semi-Annual 8:48:19 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Jockey Discharge Control Valve
Semi-Annual 8:48:35 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm #1 Backflow Valve
Semi-Annual 8:50:17 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm #2 Backflow Valve
Semi-Annual 8:50:29 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Bypass #1 Control Valve
Semi-Annual 8:50:53 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Suction Control Valve
Semi-Annual 8:51:44 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Test Header #2 Control Valve
Semi-Annual 8:52:17 AM 10/23/2024
Control Valve Ground Mechanical Fire Pump Rm Jockey Suction Control Valve
Semi-Annual 9:02:40 AM 10/23/2024
Post Indicator Valve Ground Outside Mechanical Fire Pump Rm Semi-Annual 11:40:38 AM 10/23/2024
Standpipe, Area-H Gauge 5th Stairway 9. Bedtower Top of Standpipe Semi-Annual 1:28:04 PM 10/22/2024
Gauge 5th Stairway 11. Bed Tower Top of Standpipe
Semi-Annual 1:50:47 PM 10/22/2024
Hose Connection 5th Stairway 9. Bedtower Semi-Annual 1:28:28 PM 10/22/2024
Hose Connection 5th Stairway 11. Bed Tower Semi-Annual 1:50:36 PM 10/22/2024
Standpipe 5th Stairway 9 Bed Tower Semi-Annual 1:27:59 PM 10/22/2024
Standpipe 5th Stairway 11 Bed Tower Semi-Annual 1:50:30 PM 10/22/2024
Standpipe, Area-J Gauge 5th Stairway 10 Bedtower Top of Standpipe Semi-Annual 12:46:51 PM 10/22/2024
Hose Connection 5th Stairway 10. Bedtower Semi-Annual 12:46:38 PM 10/22/2024
Standpipe 5th Stairway 10. Bedtower Semi-Annual 12:46:58 PM 10/22/2024
Standpipe, Building-E Main Bldg Fire Dep't
Connection Outside Front of Bed Tower West end Semi-Annual 10:37:08 AM 10/23/2024
Page: 10
Fire Dep't Connection
Outside Front of Bed Tower East end Semi-Annual 10:37:11 AM 10/23/2024
Fire Dep't Connection
Ground Outside Back of Old Hospital Receiving Dock
Semi-Annual 10:19:47 AM 10/23/2024
Fire Dep't Connection
Ground Outside Back of Old Hospital Loading Dock
Semi-Annual 10:37:00 AM 10/23/2024
Fire Dep't Connection
Ground Outside Front of Old Main Hospital & back of Bed Tower
Semi-Annual 10:37:03 AM 10/23/2024
Standpipe, Zone-1-1A Gauge 1st Stairway 7. 1-1A. E Bldg Top of
Standpipe Semi-Annual 9:18:25 AM 10/23/2024
Standpipe 1st Stairway 7 1-1A E Bldg Semi-Annual 9:18:08 AM 10/23/2024
Standpipe, Zone-1-1B Gauge 1st Stairway 8. 1-1B. E Bldg Top of
Standpipe Semi-Annual 10:36:25 AM 10/23/2024
Gauge 1st Stairway 8. 1-1B. E Bldg Semi-Annual 10:36:37 AM 10/23/2024
Standpipe, Zone-G-1B Gauge Basement Stairway 8. G-1B. E Bldg Semi-Annual 10:29:05 AM 10/23/2024
Wet Pipe, Area-H Tamper Switch 1st Stairway 9 Bedtower Semi-Annual 1:38:40 PM 10/22/2024
Tamper Switch 2nd Stairway 9 Bedtower Semi-Annual 1:34:40 PM 10/22/2024
Tamper Switch 3rd Stairway 9 Bedtower Semi-Annual 1:31:48 PM 10/22/2024
Tamper Switch 4th Stairway 9 Bedtower Semi-Annual 1:29:11 PM 10/22/2024
Tamper Switch 5th Stairway 9 Bedtower Semi-Annual 1:27:27 PM 10/22/2024
Waterflow Switch 1st Stairway 9 Bed Tower Semi-Annual 1:40:13 PM 10/22/2024
Waterflow Switch 2nd Stairway 9 Bed Tower Semi-Annual 1:34:48 PM 10/22/2024
Waterflow Switch 3rd Stairway 9 Bed Tower Semi-Annual 1:33:45 PM 10/22/2024
Waterflow Switch 4th Stairway 9 Bed Tower Semi-Annual 1:30:30 PM 10/22/2024
Waterflow Switch 5th Stairway 9 Bed Tower Semi-Annual 1:25:34 PM 10/22/2024
Drain 1st Stairway 9 Bed Tower Semi-Annual 1:38:52 PM 10/22/2024
Drain 2nd Stairway 9 Bed Tower Semi-Annual 1:36:03 PM 10/22/2024
Drain 3rd Stairway 9 Bed Tower Semi-Annual 1:31:56 PM 10/22/2024
Drain 4th Stairway 9 Bed Tower Semi-Annual 1:29:26 PM 10/22/2024
Drain 5th Stairway 9 Bed Tower Semi-Annual 1:26:42 PM 10/22/2024
Drain 6th Stairway 11 Bed Tower Semi-Annual 1:47:56 PM 10/22/2024
Gauge 1st Stairway 9 Bed Tower Semi-Annual 1:40:09 PM 10/22/2024
Gauge 2nd Stairway 9 Bed Tower Semi-Annual 1:35:26 PM 10/22/2024
Gauge 3rd Stairway 9 Bed Tower Semi-Annual 1:33:37 PM 10/22/2024
Gauge 4th Stairway 9 Bed Tower Semi-Annual 1:30:24 PM 10/22/2024
Gauge 5th Stairway 9 Bed Tower Semi-Annual 1:27:07 PM 10/22/2024
Gauge 5th Stairway 9 Bed Tower Semi-Annual 1:27:15 PM 10/22/2024
Page: 11
Isolation Valve 1st Stairway 9 Bed Tower Semi-Annual 1:38:28 PM 10/22/2024
Isolation Valve 2nd Stairway 9 Bed Tower Semi-Annual 1:36:13 PM 10/22/2024
Isolation Valve 3rd Stairway 9 Bed Tower Semi-Annual 1:31:41 PM 10/22/2024
Isolation Valve 4th Stairway 9 Bed Tower Semi-Annual 1:29:03 PM 10/22/2024
Isolation Valve 5th Stairway 9 Bed Tower Semi-Annual 1:25:24 PM 10/22/2024
Wet Pipe, Area-J Tamper Switch Basement Stairway 10 Bed Tower Semi-Annual 1:16:33 PM 10/22/2024
Tamper Switch 1st Stairway 10 Bed Tower Semi-Annual 1:11:08 PM 10/22/2024
Tamper Switch 1st Stairway 10 Bed Tower Semi-Annual 1:11:47 PM 10/22/2024
Tamper Switch 2nd Stairway 10 Bed Tower Semi-Annual 1:09:50 PM 10/22/2024
Tamper Switch 3rd Stairway 10 Bed Tower Semi-Annual 1:06:04 PM 10/22/2024
Tamper Switch 4th Stairway 10 Bed Tower Semi-Annual 1:03:10 PM 10/22/2024
Tamper Switch 5th Stairway 10 Bedtower Semi-Annual 12:45:06 PM 10/22/2024
Waterflow Switch Basement Stairway 10 Bed Tower Semi-Annual 1:18:30 PM 10/22/2024
Waterflow Switch 1st Stairway 10 Bed Tower Semi-Annual 1:13:05 PM 10/22/2024
Waterflow Switch 1st Stairway 10 Bed Tower Semi-Annual 1:13:37 PM 10/22/2024
Waterflow Switch 2nd Stairway 10 Bed Tower Semi-Annual 1:10:03 PM 10/22/2024
Waterflow Switch 3rd Stairway 10 Bed Tower Semi-Annual 1:06:27 PM 10/22/2024
Waterflow Switch 4th Stairway 10 Bed Tower Semi-Annual 1:01:28 PM 10/22/2024
Waterflow Switch 5th Stairway 10 Bed Tower Semi-Annual 12:44:55 PM 10/22/2024
Drain Basement Stairway 10 Bed Tower Semi-Annual 1:17:26 PM 10/22/2024
Drain 1st Stairway 10 Bed Tower Semi-Annual 1:15:06 PM 10/22/2024
Drain 2nd Stairway 10 Bed Tower Semi-Annual 1:07:33 PM 10/22/2024
Drain 3rd Stairway 10 Bed Tower Semi-Annual 1:04:42 PM 10/22/2024
Drain 4th Stairway 10 Bed Tower Semi-Annual 1:02:49 PM 10/22/2024
Drain 5th Stairway 10 Bedtower Semi-Annual 12:43:48 PM 10/22/2024
Gauge Basement Stairway 10 Bed Tower Semi-Annual 1:17:01 PM 10/22/2024
Gauge 1st Stairway 10 Bed Tower Semi-Annual 1:14:56 PM 10/22/2024
Gauge 2nd Stairway 10 Bed Tower Semi-Annual 1:09:59 PM 10/22/2024
Gauge 3rd Stairway 10 Bedtower Semi-Annual 1:06:46 PM 10/22/2024
Gauge 4th Stairway 10 Bedtower Semi-Annual 1:02:44 PM 10/22/2024
Gauge 5th Stairway 10 Bedtower Semi-Annual 12:43:37 PM 10/22/2024
Isolation Valve 1st Stairway 10 Bed Tower Semi-Annual 1:11:40 PM 10/22/2024
Isolation Valve 1st Stairway 10 Bed Tower Semi-Annual 1:11:59 PM 10/22/2024
Isolation Valve 2nd Stairway 10 Bedtower Semi-Annual 1:36:39 PM 10/22/2024
Isolation Valve 3rd Stairway 10 Bed Tower Semi-Annual 1:06:16 PM 10/22/2024
Isolation Valve 4th Stairway 10 Bed Tower Semi-Annual 1:01:24 PM 10/22/2024
Isolation Valve 5th Stairway 10 Bed Tower Semi-Annual 12:45:20 PM 10/22/2024
Page: 12
Wet Pipe, Area-K
Tamper Switch 1st Stairway 11 Bed Tower Semi-Annual 2:00:49 PM 10/22/2024
Tamper Switch 1st Stairway 11 Bed Tower Semi-Annual 2:01:42 PM 10/22/2024
Tamper Switch 2nd Stairway 11 Bed Tower Semi-Annual 1:58:08 PM 10/22/2024
Tamper Switch 3rd Stairway 11 Bed Tower Semi-Annual 1:55:45 PM 10/22/2024
Tamper Switch 4th Stairway 11 Bed Tower Semi-Annual 1:53:37 PM 10/22/2024
Tamper Switch 5th…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .