Attachment 8 Project Price Breakdown.pdf
PDF 88 KB Posted
- Solicitation number
- 36C24825R0168
About this file
This document is a Project Price Breakdown template designed for a construction or renovation project. The template provides a comprehensive cost breakdown across 34 different construction divisions, including categories such as General Requirements, Concrete, Masonry, Electrical, HVAC, and Exterior Improvements. The form is structured to capture labor costs, material costs, and total costs for each division, with additional sections for overhead percentage, profit percentage, and bonding percentage. Although the template is currently blank with no specific project details filled in, it is prepared to comprehensively track and analyze project expenses across multiple construction and infrastructure domains, allowing for detailed financial tracking and cost management.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: Date:
Project Title Project Location Offeror Name Offeror Street Offeror City State Zip
Item Labor Cost Material Cost Total Cost Division 1 $ - $ - $ - Division 2 - - - Division 3 - - - Division 4 - - - Division 5 - - - Division 6 - - - Division 7 - - - Division 8 - - - Division 9 - - - Division 10 - - - Division 11 - - - Division 12 - - - Division 13 - - - Division 14 - - - Division 21 - - - Division 22 - - - Division 23 - - - Division 26 - - -
Description
Project Price Breakdown
Masonry Metals Wood and Plastic
General Requirements Existing Conditions Concrete
Specialties Equipment Furnishings
Thermal & Moisture Protect Doors and Windows Finishes
Plumbing
HVAC
Electrical
Special Construction Conveying Equipment Fire Suppression
Division 27 - - - Division 28 - - - Division 31 - - - Division 32 - - - Division 33 - - - Division 34 - - -
Overhead % - Profit % - Bond % -
Exterior Improvements Utilities Transportation Subtotal
Communications Electronic Safety & Security Earthwork
Total Base Offer Cost
Overhead/Profit Subtotals :
Division Subtotals :
0.00% 0.00% 0.00%
Base Offer
File details come from the government source that posted it. Updated .