This document is a Request for Information (RFI) matrix containing detailed questions and responses for a VA Medical Center structural repair project at Building 1 in Bay Pines, Florida. The project involves installing temporary shoring in the crawl and basement spaces, with critical structural repairs needed for columns, joists, and concrete elements. The solicitation (Solicitation Number 36C24825R0168) is for a Bid Build (BB) contract with a firm fixed price, and the period of performance is 90 days from Notice to Proceed, with an estimated project value between $500,000 and $1,000,000.
The RFI document includes 31 detailed questions and responses covering technical specifications, site conditions, safety requirements, and project logistics. Key highlights include mandatory site visits on 9/15/25, RFIs due by 9/17/25, and proposals originally due 10/03/25 (later extended to 10/31/25). The project requires temporary shoring, structural repairs, special inspections from a Florida PE Certified Special Inspector, and work in confined spaces. The procurement was initially set aside for Service-Disabled Veteran-Owned Small Businesses but was later amended to be unrestricted. The project is located at the C.W. Bill Young VA Medical Center in Bay Pines, Florida.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIRECTIONS
TAILORED COMMENT MATRIX
THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.
| Directions & Explanation of TAILORED COMMENT MATRIX |
| This Tailored Comment Matrix is provided in order for potential offerors to provide feedback, comments, and ask questions with regard to the released RFP. |
The sheet labeled "DIRECTIONS" explains this document, and provides directions for its use.
The sheet labeled "MATRIX" contains a table with all labeled and numbered elements from the RFP. This table is where potential offerors may respond to the Government with feedback, comments, or ask questions.
| Directions and explanation of sheet labeled "MATRIX" |
| The MATRIX sheet can be reached by clicking the "MATRIX" Tab at the bottom of this spreadsheet. Add rows as necessary under the applicable item. |
| MATRIX COLUMN DESCRIPTIONS: | |
| Column A: | Contains the Item reference number for this item. This number is used for organizational purposes, when referring to this document only. |
Column B: Contains the section number that each element is labeled, within their respective documents. The section number relates directly to the item's location in the RFP.
Column C: Contains the written title for the corresponding item/section number.
| Column D: | Contains a drop down box for selecting the type of comment. Available options are "Critical" "Substantive" or "Administrative". |
| Critical: Violations of law -or- Unnecessary risks to safety, life & limb, or VA Material; waste or abuse of VHA appropriations; unreasonable burden on resources. | |
| Substantive: Appears or is potentially unnecessary, incorrect, misleading, confusing, or inconsistent with other sections; disagree with proposed responsibilities, requirements, and/or procedures. | |
| Administrative: Address typographical, grammatical, and formatting errors (grammar, punctuation, style, etc.) |
Column E: Contains recieved date of offerors' comments/questions/responses.
Column F: Contains space for potential offerors' comments/questions/responses.
Column G: Contains space for VHA comments/questions/responses.
Column H: Contains response date for VHA comments/questions/responses.
Column I: Contains VHA Section/ POC shop comments/questions/response
Column J: Contains Contractor Name requesting /questions/responses.
THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.
MATRIX
| ITEM # | SECTION or ATTACHMENT # | DOCUMENT NAME | COMMENT TYPE | |
| (Select from drop down) | Received Date | QUESTIONS / COMMENTS | ||
| (With justification of why considered source selection sensitive if applicable) | VA Response | Response Date | VA |
Response From
| 1 | 9/22/25 | Please confirm that specification section 030130.2.1.C.1 & 3 stated minimum FRP properties are the "Dry Properties" and not the "Laminate Properties". The listed manufactures do not have a product meeting these laminate properties. | Correct. 18oz/sqyd is acceptable. Products such as Sika HEX-103 C, Mapei MapeWrap C Uni-Ax 600, or similar are acceptable. | A/E |
| 2 | 9/22/25 | The specification section 030130.2.1.C.2 & 4 stated minimum FRP properties for Tensile Modulus and Dry fabric Weight corresponds to a Unidirectional Glass fabric, Please confirm it is acceptable to use the V-wrap EG50 Unidirectional glass fabric by Structural Technologies. This product exceeds the minimum Tensile Modulus listed and this product line carries an ICC approval. | 18oz/sqyd is acceptable. Products such as Sika HEX-103 C, Mapei MapeWrap C Uni-Ax 600, or similar are acceptable. | A/E |
| 3 | 9/22/25 | At the site visit, it was discussed that for this project, the air exchange currently in place from the mechanical contractor, Robbins and Morton, working in the same area will be utilized for that area for the awarded contractor to utilize for this project. Will we have access to air exchange for the full duration of this project, and if not, how long will the mechanical contractor keep their air exchange on site? | The contractor should plan to provide the equipment for the air exchange requirements for the duration of the period of performance, as required. | VA |
| 4 | 9/22/25 | If the means and methods provided to us in details on drawings disrupt the canteen/kitchen overhead, will we be provided additional means and methods to complete the work, or will the kitchen/canteen be moved to a temporary location? | The contractor will be required to adjust their schedule to off-hours work for actions that will be too disruptive and interfere with operations. Expect up to 25% of the work to occur after hours or weekends. The contractor shall provide a daily cost for 25% after hours/weekend work as a line item in the proposal. | VA |
| 5 | 9/22/25 | In the event shoring is brought in to the below grade areas, are we allowed to modify the opening around the existing air exchange on the East Side of the building to bring shoring in and return the area to the existing finish once completed? | More detail on the proposed modifications is required for approval. The contractor shall submit detailed information on proposed work post-bid. Any modifications to openings shall be designed by the contractor's engineer of record. | A/E |
| 6 | 9/22/25 | Is there any coordination that will be required that we need to be aware of to accommodate the mechanical contractor or will we have full access as needed for this project throughout the area? | The contractor will have full access to the space to complete the work. | VA |
| 7 | 9/22/25 | If Robbins and Morton is in the same working space that we are, will dance floors (platforms) set up over the ground level MEP to facilitate access for overhead repairs prohibit their work from being completed? | The structural repair contractor will have full access to the space during concrete repair activities. Structural repair work will have priority. Well-defined work plans, 3-week lookahead schedules, and work execution plans will be required and shall be shared to coordinate activities. | VA |
| 8 | 9/22/25 | During the site visit, there were areas that were pointed out of which asbestos insulation has been encapsulated. For the encapsulated asbestos areas, there are multiple locations where the encapsulation has already failed. To avoid further risk of exposure, will the areas where work is to be completed by this project be abated prior to mobilization for this project by the VAMC (or others) under a separate contract, or will it be contractor responsibility to include this abatement in our proposal? | The successful bidder shall be responsible for installing containment they feel is necessary for the safe execution of this project. | VA |
| 9 | 9/22/25 | Are there additional documents available for this project? On the site visit on 9/18/2025 there were drawings outlining column locations that have not been provided on sam.gov. | See S104 of Bid Documents. This sheet is provided to aid in wayfinding in the crawlspace. Note that the majority of the columns in the space have markings of either grid coordinates or column numbers corresponding to the information on S104 on them. | A/E & VA |
| 10 | 9/22/25 | Will we have access to all current structural/consultant reports on the location of repairs? | The contract documents are sufficient for the implementation of the work under this project. The JS Held report information is provided as an adjunct to the repair drawings and not all of the deficiencies identified by the previous assessment are being repaired. | VA |
| 11 | 9/22/25 | Will the current lighting plan in the basement remain during construction or are we responsible for providing our own lighting? | The Contractor must determine if the available lighting is sufficient to complete the work. If additional lighting is required, the Contractor must provide it. | VA |
| 12 | 9/22/25 | There are conflicting concrete coverage acceptance rates. What is the true column and joist concrete coverage? | 3/4" Minimum. See updated S105. | A/E |
| 13 | 9/22/25 | When it comes to conflicts between the JS Held Report and some of the drawings seen during the site visit on 9/18/2025, which are we to defer to when building our proposal? | The Bid Documents take precedence over the JS Held Information. The JS Held report information is provided for reference only and as an adjunct to the repair drawings and not all of the deficiencies identified by the previous assessment are being repaired. | A/E |
| 14 | 9/22/25 | On the documents provided to us in the Enlarged Repair Notes, 4 states that the quantities are to be verified and determined by the contractor (see photo below). Will there be base quantities provided for the initial bid and all the work discovered will be qualified as change orders during the work? | Base quantities are indicated on the tags. See the Deficiency Legend for the location of the quantities on the tag. | A/E |
| 15 | 9/22/25 | Is this work area considered confined space? | Yes. A daily permit will be required. Safety will provide this permit. They are located in Building 24, 2nd floor. The instructions and forms are located in the Attachment 10 of the solicitation SOP 516-138S-010 - Confined Space Program. | VA |
| 16 | 9/22/25 | What are the SSHO Requirements for this project? Is there certain certifications or experience? Can the SSHO be dual hat of other responsibilities? If not, is it required to be a full-time position? We want to price it to meet the staffing requirements of the VAMC for this project. | Refer to pages 7 and 8 of the RFP of this solicitation and the safety specifications. No, the SSHO cannot dual-hat. This project has a confined space component. | A/E & VA |
| 17 | 9/22/25 | During the site visit on 9/18/2025 it was stated that daily safety permits will be required for this project. What does this process consist of and how many workers does one permit cover? And can the VA provide more clarification on what is involved in the daily safety permits required for work? | Daily confined space permit. See response in item 15. | VA |
| 18 | 9/22/25 | Are there defined work hours for this project? If so, are the hours flexibility to allow for evening and weekend work hours at the discretion of the contractor? | Generally, this project's work hours will be 0700 to 1700 M-F, excluding Federal Holidays. Any work outside these hours shall be coordinated with the COR 14 calendar days in advance. | VA |
| 19 | 9/22/25 | There are notes outlining potential special inspections for this project. What specific special inspections are required and is there a preferred or required vendor for these 3rd party inspections? | See section L of the "Schedule of Special Inspections" in the specification manual for specific special inspection requirements (section 01 45 35). Note that "concrete" refers to a material with cement-based binders and both large and small aggregates. "Repair Mortar" is a specialized material lacking large aggregate. Requirements for repair mortar quality control can be found in 03 32 00. Refer to page 8 of the RFP of this solicitation for qualifications. | A/E & VA |
| 20 | 9/22/25 | What are the badging requirements at this facility as far as any forms or basic employee info? How far in advance prior to showing up first day is the employee list and information required to be provided to your security/badging office? | The contractor is required to provide a sign-in sheet every day. The information will be shared with CFM's Resident Engineer. | VA |
| 21 | 9/22/25 | Is there a US citizen requirement for all onsite staff of the contractor? | See Clause 52.222-54 in the solicitation. | |
| 22 | 9/23/25 | Could you please provide a copy of the shoring plans detailing the precise locations of the poles? | Shoring during construction is to be performed by contractor. Shoring is required at areas that require an annular space around reinforcement, which may not have been immediately clear during site investigations. The contractor shall provide temporary shoring shop drawings to facilitate the performance of permanent repairs for this project. The project is designed to permanently repair the critical areas in the construction documents. | A/E |
| 23 | 9/23/25 | Could you please provide the critical areas requiring shoring plans for building 1? The plans that the onsite rep had yesterday at the site visit. | We have provided an updated set of drawings as part of these responses that includes the requested information. | A/E |
| 24 | 9/23/25 | Is there a shoring bid sheet available? | No. See response in item 22. | A/E & VA |
| 25 | 9/23/25 | Will all shoring be conducted simultaneously, or will it be performed in sections as work is completed in each area? | The amount of shoring installed at any single point will be determined by the contractor. Because of the congestion, it is anticipated that only the immediate work area will be shored, then those shores relocated after the repairs achieve adequate strength. Repair materials specified have a high early strength to minimize the amount of time any shoring has to remain in place. | A/E |
| 26 | 9/23/25 | While onsite yesterday we noted multiple signs warning of asbestos. Was an asbestos test completed for air quality? | All information regarding hazardous materials has been or will be shared. Ultimately, it is the responsibility of the contractor to provide a safe working environment. Costs associated with environmental conditioning should be noted accordingly in the bidder's proposal. | VA |
| 27 | 9/23/25 | Is there a specific shoring engineer? | No, there is not a specific shoring engineer. See also the response on Item 22. | A/E & VA |
| 28 | 9/24/25 | Will the construction require structural certification after completion? | Yes.The Special Inspector shall certiy all work subject to special inspections. The Special Inspector must be a Registered Professional Engineer in the State of Florida on the state special inspector’s list. Completion of this project is contingent upon results of special inspections, construction materials testing and engineer of record observations. | |
| 29 | Is there a specific phasing plan? | No, however the contractor shall begin with repair work of column #173A first (see sheets S103, S105, and spec section 01 00 00 paragraph H), and then develop their work plan from there. | ||
| 30 | What documents must be submitted prior to NTP? | Contractor shall submit Accident Prevention Plan, insurance, bond, project cost-loaded schedule, confined space training certificates for all workers who will enter the crawlspace, and quality plan within 10 calendar days. Contractor may also submit material submittals immediately after contract award. | ||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 | ||||
| 47 | ||||
| 48 | ||||
| 49 | ||||
| 50 | ||||
| 51 | ||||
| 52 | ||||
| 53 | ||||
| 54 | ||||
| 55 | ||||
| 56 | ||||
| 57 | ||||
| 58 | ||||
| 59 | ||||
| 60 | ||||
| 61 | ||||
| 62 | ||||
| 63 | ||||
| 64 | ||||
| 65 | ||||
| 66 | ||||
| 67 | ||||
| 68 | ||||
| 69 | ||||
| 70 | ||||
| 71 | ||||
| 72 | ||||
| 73 | ||||
| 74 | ||||
| 75 | ||||
| 76 | ||||
| 77 | ||||
| 78 | ||||
| 79 | ||||
| 80 | ||||
| 81 | ||||
| 82 | ||||
| 83 | ||||
| 84 | ||||
| 85 | ||||
| 86 | ||||
| 87 | ||||
| 88 | ||||
| 89 | ||||
| 90 | ||||
| 91 | ||||
| 92 | ||||
| 93 |
516-23-604 Temp Shoring Project (Structural Repairs) - Construction RFIs
&P of &N
Sheet1
| Solicitation 36C24825R0168 |
| 516-23-604, BB - Install Temp Shoring in Crawl Space at Building 1 (Structural Repairs) |
| Requests for Information |
| Question 1. | Please confirm that specification section 030130.2.1.C.1 & 3 stated minimum FRP properties are the "Dry Properties" and not the "Laminate Properties". The listed manufactures do not have a product meeting these laminate properties. |
| Question 2. | The specification section 030130.2.1.C.2 & 4 stated minimum FRP properties for Tensile Modulus and Dry fabric Weight corresponds to a Unidirectional Glass fabric, Please confirm it is acceptable to use the V-wrap EG50 Unidirectional glass fabric by Structural Technologies. This product exceeds the minimum Tensile Modulus listed and this product line carries an ICC approval. |
| Question 3. | At the site visit, it was discussed that for this project, the air exchange currently in place from the mechanical contractor, Robbins and Morton, working in the same area will be utilized for that area for the awarded contractor to utilize for this project. Will we have access to air exchange for the full duration of this project, and if not, how long will the mechanical contractor keep their air exchange on site? |
| Question 4. | If the means and methods provided to us in details on drawings disrupt the canteen/kitchen overhead, will we be provided additional means and methods to complete the work, or will the kitchen/canteen be moved to a temporary location? |
| Question 5. | In the event shoring is brought in to the below grade areas, are we allowed to modify the opening around the existing air exchange on the East Side of the building to bring shoring in and return the area to the existing finish once completed? |
| Question 6. | Is there any coordination that will be required that we need to be aware of to accommodate the mechanical contractor or will we have full access as needed for this project throughout the area? |
| Question 7. | If Robbins and Morton is in the same working space that we are, will dance floors (platforms) set up over the ground level MEP to facilitate access for overhead repairs prohibit their work from being completed? |
| Question 8. | During the site visit, there were areas that were pointed out of which asbestos insulation has been encapsulated. For the encapsulated asbestos areas, there are multiple locations where the encapsulation has already failed. To avoid further risk of exposure, will the areas where work is to be completed by this project be abated prior to mobilization for this project by the VAMC (or others) under a separate contract, or will it be contractor responsibility to include this abatement in our proposal? |
| Question 9. | Are there additional documents available for this project? On the site visit on 9/18/2025 there were drawings outlining column locations that have not been provided on sam.gov. |
| Question 10. | Will we have access to all current structural/consultant reports on the location of repairs? |
| Question 11. | Will the current lighting plan in the basement remain during construction or are we responsible for providing our own lighting? |
| Question 12. | There are conflicting concrete coverage acceptance rates. What is the true column and joist concrete coverage? |
| Question 13. | When it comes to conflicts between the JS Held Report and some of the drawings seen during the site visit on 9/18/2025, which are we to defer to when building our proposal? |
| Question 14. | On the documents provided to us in the Enlarged Repair Notes, 4 states that the quantities are to be verified and determined by the contractor (see photo below). Will there be base quantities provided for the initial bid and all the work discovered will be qualified as change orders during the work? |
| Question 15. | Is this work area considered confined space? |
| Question 16. | What are the SSHO Requirements for this project? Is there certain certifications or experience? Can the SSHO be dual hat of other responsibilities? If not, is it required to be a full-time position? We want to price it to meet the staffing requirements of the VAMC for this project. |
| Question 17. | During the site visit on 9/18/2025 it was stated that daily safety permits will be required for this project. What does this process consist of and how many workers does one permit cover? And can the VA provide more clarification on what is involved in the daily safety permits required for work? |
| Question 18. | Are there defined work hours for this project? If so, are the hours flexibility to allow for evening and weekend work hours at the discretion of the contractor? |
| Question 19. | There are notes outlining potential special inspections for this project. What specific special inspections are required and is there a preferred or required vendor for these 3rd party inspections? |
| Question 20. | What are the badging requirements at this facility as far as any forms or basic employee info? How far in advance prior to showing up first day is the employee list and information required to be provided to your security/badging office? |
| Question 21. | Is there a US citizen requirement for all onsite staff of the contractor? |
| Response: See Clause 52.222-54 in the solicitation. | |
| Question 22. | Could you please provide a copy of the shoring plans detailing the precise locations of the poles? |
| Question 23. | Could you please provide the critical areas requiring shoring plans for building 1? The plans that the onsite rep had yesterday at the site visit. |
| Question 24. | Is there a shoring bid sheet available? |
| Question 25. | Will all shoring be conducted simultaneously, or will it be performed in sections as work is completed in each area? |
| Question 26. | While onsite yesterday we noted multiple signs warning of asbestos. Was an asbestos test completed for air quality? |
| Question 27. | Is there a specific shoring engineer? |
Appendix A JS Held Final
Assessment Report Correct Structural System for
Building 1, Dated 10/14/2022
(Project No. 516-22-120)
FINAL ASSESSMENT
REPORT
PREPARED FOR:
Department of Veterans Affairs Bay Pines VA Healthcare System 10000 Bay Pines Boulevard Bay Pines, FL 33744
Project No. 516-22-120 Correct Structural System for Building 1
J.S. Held, LLC No: 22050462
Bay Pines VA Healthcare System – Building 1 [22050462]
October 14, 2022
2002 North Lois Avenue Suite 505 | Tampa FL 33609 | 800-971-7252 | Find your expert at jsheld.com Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
CCONTENTS
INTRODUCTION AND PURPOSE
EXECUTIVE SUMMARY
SCOPE
EXISTING BUILDING INFORMATION
SITE INSPECTION
SITE INVESTIGATION AND OBSERVATIONS
Basement and Crawlspace
Building Envelope
Infrared Roof Survey
Historical Assessment
CONCLUSIONS
CLOSING
APPENDIX A: REPRESENTATIVE CONDITIONS – BASEMENT AND CRAWLSPACE
APPENDIX B: SHORING OF BASEMENT AND CRAWLSPACE CRITICAL AREAS
APPENDIX C: MATERIAL ANALYSIS
APPENDIX D: VCS CORROSION POTENTIAL SURVEY REPORT
APPENDIX E: AAR CONCRETE CORE COMPRESSIVE STRENGTH REPORT
APPENDIX F: REPRESENTATIVE CONDITIONS – BUILDING ENVELOPE
APPENDIX G: TERMITE INSPECTION REPORTS
APPENDIX H: REPRESENTATIVE CONDITIONS – HISTORICAL ASSESSMENT
APPENDIX I: COST AND SCHEDULE ANALYSIS
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
IINTRODUCTION AND PURPOSE
This report summarizes a condition assessment of Building 1 of the Bay Pines VA Medical Campus in Bay Pines, Florida (Figure 1). Originally constructed circa 1933, Building 1 served as the main hospital on the Bay Pines VA Medical Campus until a larger replacement hospital was constructed in 1983, at which time Building 1 underwent its first restoration and was subsequently transitioned to housing the campus canteen services as well as providing for behavioral health services and space for administration and support. The five-story building encompasses approximately 94,000 square feet and is one of the buildings within the Bay Pines Administration and Hospital Historic District. The district was added to the National Register of Historic Places in June 2012.
In 2021, a renovation of floors two through five for the purpose of providing outpatient services began.
As only the second major renovation in its nearly 90-year history, there are concerns regarding the integrity of the building’s structural elements as well as the condition of the building envelope components.
This assessment report is intended to address the general conditions of the structural elements and building envelope components of Building 1 and provide an opinion of the building’s structural stability for the purpose of immediate occupancy. The findings presented in this assessment report are based on visual observations as well as intrusive and non-destructive testing. Included in this report are repair recommendations and associated cost/schedule analyses.
Figure 1: Aerial image showing Building 1 and connecting buildings
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
EEXECUTIVE SUMMARY
This condition assessment comprised Building 1 of the Bay Pines VA Medical Campus located in Bay Pines, Florida. The areas evaluated in this assessment included the building’s roofs, attic, envelope, the first story, basement, and crawlspace. Evaluation of stories two through five was limited to the historic lobby or the second story and an interior assessment of the building envelope along the exterior walls.
The Bay Pines VA Healthcare System (BPVAHS) commissioned this condition assessment in support of a building renovation and consideration for future repairs. The goal of this study was to evaluate the general condition of Building 1 within the defined areas and identify deficiencies that may affect continued use. The evaluation considered the overall condition of the building, with a focus on identifying existing structural deficiencies and conditions that may develop into future deficiencies, including general recommendations for repair, rehabilitation, demolition, or a combination thereof.
Building Condition
Our assessment revealed the primary structure (slabs, beams, columns, bearing walls, etc.) of Building 1 be in poor-to-fair condition. There were no apparent signs indicative of global instability or impending structural failure. However, the following localized structural deficiencies and conditions (listed in descending order of urgency) should be addressed or are expected to need repair in the estimated timeframes outlined in this report:
Significant spalling or similar displacement of concrete from beams and columns was observed throughout the crawlspace and basement. These conditions were determined to be critical below the kitchen of the cantina and below the mechanical room at the northwest portion of the west building extension and temporary shoring of these areas is recommended prior to the conclusion of the ongoing renovation and return to full building occupancy.
Surface corrosion along steel beams and the underside of the metal floor deck underside was observed from the basement.
Water intrusion through the roof membrane, flashing, and roof framing has allowed water to enter the roof framing system causing deterioration of roof rafters and roof decking within the attic space.
A crack exists along the inside face of the east gable end masonry wall within the attic.
Non-structural elements of Building 1 (roof coverings, façade, interior finishes, etc.) appeared to be in fair-to-good condition and included the following typical conditions.
Exterior: Broken roof tiles, missing gutters and flashings, deterioration of exterior masonry, and failure of sealant joints. Multiple cracks in stucco exterior wall coverings. Ponding water on the loading dock roof.
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Interior: Moisture intrusion at the attic and crawlspace levels, delamination of interior wall, floor, and ceiling finishes, and broken floor tiles
Despite the deficiencies and conditions noted above, it is the opinion of J.S. Held that continued occupancy of the first story of Building 1 is safe and that construction as part of the ongoing renovation need not be limited.
Cost and Schedule Analysis
The construction renovation summary is based on JS Held site inspections and clarification to scopes reviewed in meetings with VA representatives. Quantities are based on elevations from Architectural plans I-29, I-30, & I-31 dated 02/08/1983 and photos/videos documented by JS Held during site inspections and summarized in this final assessment report.
The majority of renovation costs include structural upgrades to the basement and crawl space, including the repair of exposed/corroded rebar, spalling, and cracking in concrete columns, joists, walls, and soffits in the crawlspaces. Remaining costs include upgrades to the Building Facade including, but not limited to;
replacement/fixing decorative terra-cotta, repair to any stucco cracks, repair to wood on the roof overhang, remove/replace sealant at exterior windows and doors, demo/replace tile roof identified on the fifth story, demo/replace built-up roof above the elevator penthouse, new ladder from lower to upper roof, remove/replace copper gutter identified above the fifth-story windows and elevator penthouse, painting the entire exterior building, termite services to the attic, temporary scaffolding to the exterior of the building, and temporary overhead pedestrian walkway for safe entrance/exit to the main entrance of the building.
*The J.S. Held renovation estimate is subject to change based on 100% CD plans and details.
Virtual Walkthrough
As part of the investigation, J.S. Held conducted a HoloBuilder survey to create a virtual walkthrough of Building 1 as is existed at the time of inspection. These conditions are representative of those presented in this assessment report and can be viewed utilizing the following link:
https://app.holobuilder.com/app/?p=c55a059a-c0cf-41e3-a443-be962ac79cee
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
SSCOPE
J.S. Held was engaged by the Bay Pines VA Healthcare System (BPVAHS) to conduct a condition assessment of the building’s roofs, attic, envelope, first story, basement, and crawlspace for:
Determining the conditions of the building components in the aforementioned areas.
Determining the urgency of retrofitting compromised building components in the aforementioned areas.
Determining requirements and providing recommendations to make identified areas in question permanently safe and structurally sound.
Providing temporary solutions to make such areas safer until permanent repairs can be made.
Estimating costs and schedule for the remedial actions proposed in the assessment.
The scope of our investigation was limited to the building’s exterior, first-story, crawlspace, and basement, though portions of stories two through five were also evaluated for historic and building envelope purposes. Our investigation focused on readily visible elements without removing finishes, cladding, coverings, or other obstructions to expose concealed conditions; however, our investigation was supported by the use of infrared drone photography and concrete testing within the basement and crawlspace.
The following items were outside the scope of our assessment and are not included in this report:
Structural building conditions within stories two through five
Hazardous materials sampling, testing, and inspection
Review of existing conditions for building or energy code conformance
Review of existing MEP systems, equipment, or utility services
In general, structural and other building elements assessed for this report were rated using the following qualitative scale:
Good: First signs of light deterioration may be visible but the overall performance of the element is not affected. Repairs are not expected for at least 10-15+ years.
Fair: Average wear for building age. Moderate signs of deterioration. Repairs expected within 10 years.
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Poor: Signs of advanced deterioration. At or near the end of the expected lifecycle.
In addition to the definitions above, some elements may be referred to as:
Unknown: Structural element covered by finishes or otherwise not visible.
Critical: Signs of severe deterioration. Temporary shoring is recommended to be installed in critical areas for the near term and prior to the implementation of permanent repairs, though shoring is not required for continued occupancy of the first-story building or continued work as part of the ongoing construction.
It should be noted that any items identified as Critical have been reported to BPVAHS personnel prior to the issuance of this report as a matter of structural urgency. These included:
Areas of the first-story concrete floor structure are deemed to be in critical condition and for which temporary shoring is recommended.
A roof ladder from a low slope roof to a higher low roof area that has become detached could present a life safety issue where a user to be unaware of its existence.
EEXISTING BUILDING INFORMATION
As part of the investigation, J.S. Held was provided with original construction drawings dated 1931 and renovation drawings dated 1983. The building is generally constructed of exterior masonry bearing walls atop a concrete foundation, interior concrete floor slabs and columns, and wood-framed roofs. The exterior is clad with stucco and the roof covering consists of clay tiles. As part of the 1980’s renovation, structural deficiencies were identified throughout the building and repairs included the jacketing/encasement of multiple concrete structural elements within the crawlspace and basement (e.g.
pile caps, columns, beams, and joists). To the best extent possible, efforts have been made to refer to structural elements in this report with the same nomenclature used in the 1983 renovation drawings.
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
SSITE INSPECTION
J.S. Held was provided access to Building 1 between June 21, 2022, and July 5, 2022. Building conditions were evaluated by the following J.S. Held employees at varying times throughout the inspection period:
Mr. Andrew Lovenstein, P.E.
Mr. Brandon Davis, P.E.
Mr. Gibson M. Jones Jr., R.A.
Mr. Osvaldo Arevalo, P.E.
Mr. Matt Staffeld, P.E.
Mr. Ilan Caballero, P.E.
Mr. Scott Hollingsworth, P.G.
Mr. Andrew Feliciano, E.I.
Mr. Wes Kendrick, E.I.
Mr. Scott Jones, E.I.
In addition, J.S. Held subcontracted All About Pest to conduct a termite inspection for the entirety of Building 1 and VCS, Inc. for conducting a corrosion potential survey within the basement and crawlspace.
All subcontracted work was completed within the inspection period above.
Mr. Lovenstein and Mr. Jones returned to Building 1 on August 11, 2022, to make additional observations regarding moisture intrusion.
SITE INVESTIGATION AND OBSERVATIONS
Basement and Crawlspace J.S. Held inspected the basement and crawlspace areas from June 21-23, 2022. Personnel conducting the basement and crawlspace inspection include Mr. Matthew Staffeld, PE, Mr. Osvaldo Arevalo, PE, Mr.
Wesley Kendrick, EI, and Mr. Scott Jones, EI. Additionally, concrete cores were taken by Mr. Scott Hollingsworth, PG, and Mr. Wesley Kendrick, EI on July 5, 2022, while representatives of VCS, Inc. performed half-cell potential testing.
For this report, “Crawlspace A” will refer to the crawlspace located beneath the five stories located along the east side of Building 1. “Crawlspace B” will refer to the crawlspace located beneath the two stories located on the west end of Building 1, and “Basement” will refer to the below-grade room interconnecting the two crawlspaces.
Concrete elements within the crawlspaces included columns, beams, and floor joists constructed of cast-in-place concrete. The overhead steel beams, girders, and pan deck of the composite metal deck in the basement were constructed on-site and supported by cast-in-place concrete columns. J.S. Held evaluated
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration and categorized these members into ‘good’, ‘fair’, or ‘poor’ conditions. Representative photos of ‘good’, ‘fair’, and ‘poor’ members may be found in Appendix A: Representative Conditions – Basement and Crawlspace attached to this report.
Generally, ‘Good’ condition concrete members evidenced no concrete spalling, exposed rebar, or significant (non-shrinkage) cracks. ‘Fair’ concrete members generally evidenced limited concrete spalling, exposed rebar, or cracks. ‘Poor’ concrete members exhibited significant concrete spalling, exposed and corroded rebar, or cracks. It should be noted that the first-story floor overlying several ‘poor’ members was inspected and no significant distress was observed. An approximate count of ‘fair’ and ‘poor’ concrete members by crawlspace can be found in Tables 1 and 2 below, which are intended to provide an overview of the crawlspace conditions. Please note that the table does not include all structural elements evaluated as many were considered to be in ‘good’ condition. Color-coded maps identifying ‘Good’, ‘Fair’, and ‘Poor’ conditions can be found in Appendix A following the representative conditions photographs.
Crawlspace A
Total number of structural members in fair or poor condition Condition Column Beam/Joist Underside of Slabs within Bays Wall Section within Bays
Fair 22 55 43 14
Poor 33 45 20 12 Table 1: Approximate count of ‘fair’ and ‘poor’ members within Crawlspace A
Crawlspace B
Total number of structural members in fair or poor condition Condition Column Beam/Joist Underside of Slabs within Bays Wall Section within Bays
Fair 9 13 10 7 Poor 9 18 8 0
Table 2: Approximate count of ‘fair’ and ‘poor’ members within Crawlspace B
While the majority of the cast-in-place concrete columns, beams, and floor joists were in fair to poor condition, there were three (3) ‘Critical’ areas identified where temporary shoring should be installed until permanent repairs can be implemented. These areas were identified at the following locations and are shown in the floor plan diagram of Appendix B: Shoring of Basement and Crawlspace Critical Areas.
The floor joists and slab area bound between columns 29-30-50-53-73-91-87-29 below the kitchen (Crawlspace A) are in critical condition. Approximately 30 floor joists exhibited significant concrete cracking and spalling and the rebar was exposed. The steel reinforcement exhibited advanced corrosion and section loss which has resulted in a significant reduction in load capacity in the floor joists.
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Critical Floor Framing Critical Floor Framing
Critical Floor Framing Critical Floor Framing
Figure 1: Critical area bound by columns 29-30-50-53-73-91-87-29 in Crawlspace A
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Columns 169 and 173A (Crawlspace B) are spalling at the corners of areas with previous structural modification where loads were transferred from the steel beams through the bolted connections to the concrete columns. The failed repair resulted in a critical condition. This area is below the equipment room at the northwest corner of the west building extension
Column 169 Column 169
Column 173A Column 173A
Figure 2: Critical columns 169 and 173A in Crawlspace B
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Three floor joists between columns 167-180-181-172-172A-168-167 (Crawlspace B) are in critical condition. The floor joists exhibited significant concrete cracking and spalling and the rebar was exposed. The steel reinforcement exhibited advanced corrosion and section loss which has resulted in a significant reduction in load capacity in the floor joists.
Critical Joist Critical Joists
Critical Joists Critical Joists
Figure 3: Critical joists bound by columns 167-180-181-172-172A-168-167 in Crawlspace B
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Within the basement, approximately ten (10) locations of surface corrosion of the composite metal deck underside were brushed with the use of a steel brush and the claw of a welder’s hammer. The scratched (brushed) surfaces were inspected for pitting or flaking. No instances of pitting or flaking, indicative of potential loss of structural load-bearing capacity were observed during our inspection. The tested areas were thus rated ‘Fair’.
Evidence of prior repairs to the reinforced concrete elements was observed in both Crawlspaces A and B.
The repairs varied in extent and type but were typically limited to epoxy injection within concrete cracks, surface applications of cementitious mortar to cover chipped or spalled concrete, or concrete jackets to the columns, pile caps, and beams. In many cases, the repairs appeared to have been consistent with repairs detailed in the 1983 Renovation and Demolition plans. While most of the repairs were intact and appeared to be functioning as intended, there were several instances where the repairs had failed. Of note, the concrete jacket around column 173 A in Crawlspace B was separated from the original column and was supporting loads imposed by the addition of steel beams and mechanical equipment racks. The locations of failed repairs were accounted for during our assessment of the crawlspace and basement areas.
Ponding water was reported on the surface of the terrace outside the west entrance above Crawlspace B, particularly during periods of heavy rainfall. The finished floor of the terrace was back-pitched toward the doorstep when checked with a hand level. No visible evidence of deformation or vertical displacement was observed on the steel framing joists or concrete slab substrate under the west terrace within Crawlspace B. A slope check of the wide flange (W) steel joists with a hand level indicated that these floor framing components were back-pitched toward the interior, which caused site storm runoff to accumulate near the doorstep. This condition is attributable to the initial improper installation. (See Figure 4 on the next page).
[SPACE INTENTIONALLY LEFT BLANK]
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Back-pitched west terrace (1/8-inch per foot)
Back-pitched west terrace (1/8-inch per foot)
Floor framing under west terrace
Floor framing under west terrace
Level check of floor framing under west terrace
Level check of steel beam under west terrace
(1/8-inch per foot back pitched) Figure 4: West terrace and corresponding area of Crawlspace B below
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
REPAIR RECOMMENDATIONS
Steel Deck
Recommended repairs/maintenance methods include non-abrasive cleaning to remove the surface corrosion and then application of intumescent paint to prevent exposure to the humid environment of the basement as well as restoration of the fireproofing that has been reportedly removed.
West Terrace
It is recommended that the back pitching be corrected by providing a new suitable tapered topping to a new finish flooring that would allow site storm runoff to drain away promptly.
Concrete
J.S. Held recommends that repairs of the observed distressed reinforced concrete elements consist of epoxy injection or partial-depth repairs. Epoxy injection should be utilized for cracks within concrete members that have not induced corrosion of the reinforcement or spalling of the concrete. This type of distress was typically found in members classified as ‘Good’ or ‘Fair’ condition. Epoxy injection restores the integrity of the concrete member when epoxy adhesives are injected within the crack through drilled port holes, filling in the voids between the fractured portions of the concrete. The epoxy also acts as a sealant and prevents moisture penetration along the crack.
For concrete members that exhibit spalled concrete and exposed rebar, a partial-depth repair is required.
A partial-depth repair involves the removal of the corroded steel reinforcement and the surrounding concrete past the affected area until sound steel reinforcement and concrete are identified. Minimally, if corroded reinforcement in the repair is exposed and found to have loose oxidation products or is not bonded to the surrounding concrete, it is recommended that the concrete be removed from around the bar. The clear space behind the reinforcing steel should be not less than ¼ inch plus the dimension of the maximum size aggregate in the repair material (typically a total of three inches or more). In addition, concrete removal along the reinforcing bar shall continue until the bar is essentially free from corrosion products. In some cases of advanced corrosion, it may be appropriate to replace the affected reinforcement and concrete along the entire length of the member. Once the affected concrete and rebar are removed, new reinforcement steel should be spliced with the existing steel by doweling into the existing concrete adjacent to the existing steel. Appropriate epoxy adhesives and bonding agents should be used to complete a proper partial-depth repair.
The repairs should be performed in accordance with the ICRI, “Guide for Surface Preparation for the Repair of Deteriorated Concrete Resulting from Reinforcing Steel Corrosion (ICRI 310.1R-2008) [formerly No. 03730],” International Concrete Repair Institute, Rosemont, IL, 2008
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Estimated quantities of concrete repairs used for the development of a cost estimate and schedule are included in Tables 3 through 5. These tables include estimated quantities for all concrete members recommended for any type of repair (i.e. epoxy injection and partial-depth repairs) but does not distinguish between the type of repair.
Crawlspace A
Member
Columns Joists Slab Walls Beams # Members 49 134 32 27 15
Quantity 570 877 317 157 43 Dimensions Square Feet Linear Feet Square Feet Square Feet Linear Feet
Table 3: Estimated quantities of repairs in Crawlspace A
Crawlspace B
Columns Joists Slab Walls Beams # Members 15 17 12 5 8
Quantity 100 98 131 20 22 Dimensions Square Feet Linear Feet Square Feet Square Feet Linear Feet
Table 4: Estimated quantity of repairs in Crawlspace B
Basement
Concrete Columns Steel Beams Steel Deck # Members 3 21 N/A
Quantity 3 600 3100 Dimensions Square Feet Linear Feet Square Feet
Table 5: Estimated quantity of repairs in Basement
Information regarding concrete materials testing performed as part of this investigation and considered for the recommendations made herein can be found in Appendix C: Materials Analysis, Appendix D: VCS Corrosion Potential Survey Report, and Appendix E: AAR Concrete Core Compressive Strength Report.
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
Building Envelope J.S. Held conducted a building envelope survey of the exterior facades, roof surfaces, and interior windows for stories one through five on June 28-29, 2022. Personnel attending the building envelope survey included Mr. Andrew Lovenstein, PE, Mr. Gibson Jones, RA, Mr. Ilan Caballero, PE, and Mr. Andrew Feliciano, EI. The building envelope survey included walking the flat roofs, the exterior, and the interiors of all floors and attic, and conducting both traditional and drone photography. J.S. Held categorized these observations into ‘Good’, ‘Fair’, or ‘Poor’ conditions. Representative photos of ‘good’, ‘fair’, and ‘poor’ members may be found in Appendix F: Representative Conditions – Building Envelope attached to this report.
1. Low-Sloped Membrane Roofs
a. Good—the general condition of the low-sloped membrane roofs was free from tears/gouges, uplifted/displaced sections, and openings that were not for plumbing or drainage. Alligator cracking was observed at the curbed portions near metal flashing, and roof patches were observed sporadically.
b. Fair—some instances of ponding water and raised membrane seams were observed.
These conditions could potentially result in long-term deterioration of the roofing system if they are unaddressed.
c. Poor – a heavily corroded and deteriorated fixed ladder located between two adjacent roofs was observed. This fixed ladder evidenced multiple loose connections and it was found to be in an unsafe condition to use.
2. Sloped Tile Roof
a. Good—the general condition of the tile roofing system was serviceable and capable of performing as intended for several more years despite sporadic cracked and broken tiles.
Previous repair activity was observed in the form of a sealant to try and re-bond the cracked and broken tiles.
b. Fair—one slipped hip cap was observed at the southwestern most turret. Sporadic cracked tiles, most of them which had been repaired in the past, were observed.
3. Attic
a. Good—generally speaking, the typical condition of the attic space above the fifth story of Building 1 was consistent with wooden rafters and the wooden plank decking being free from discoloration or deterioration. A history of repair activity indicated general upkeep of the attic space including instances of plywood decking replacement and sistering of rafters. There was one instance of a replaced rafter along the north end of the attic space.
Construction | Environmental, Health & Safety | Equipment | Forensic Accounting | Forensic Architecture & Engineering | Water & Fire Restoration
b. Fair—some instances of wear were observed within the attic space. Specifically, 1/4-inch stairstep cracks were observed in the masonry wall situated on the central east wall of the attic. Approximately 28 square feet of stained plank decking was observed throughout the attic space. Three instances of a missing bolt from an L-bracket were observed along the south end of the attic space.
c. Poor—approximately 50 square feet of deteriorated plank decking was observed throughout the attic space. One deteriorated rafter tail was observed near the northeast side of the attic. We recommend removing and replacing the approximate 50 square feet of deteriorated plank decking and spraying the repaired areas with a borate solution to prevent any wood rot from termites and other insects.