546-22-121 Miami VA CLC 1st and 2nd Floor Addendum 1.pdf
PDF 12 MB Posted
- Solicitation number
- 36C24825R0033
About this file
This is Addendum No. 1 for the Community Living Center (CLC) 1st and 2nd Floor Renovation project at the Miami VA Medical Center (TOPR 546-22-121). The addendum modifies the original drawings and specifications with several key changes, including the addition of specification 02 82 13.19 for Asbestos Floor Tile and Mastic Abatement, an environmental report containing asbestos survey and lead paint findings, and multiple drawing revisions.
The drawing revisions include updates to the Bid Item Plan (G101), modifications to demolition plans (AD101/AD102) with revised keynote 2.40, changes to note plans (A101-N/A102-N) including a new column closure detail and revised keynotes, and updates to interior elevations (A401) with the addition of missing tag HR-1. The addendum provides detailed specifications across multiple divisions including general requirements, existing conditions, concrete, wood/plastics/composites, thermal/moisture protection, openings, finishes, specialties, plumbing, electrical, and communications. The drawings show extensive interior renovations to patient rooms, corridors, and support spaces on both floors of the CLC facility.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
524 Fernwood Drive, Altamonte Springs, Florida 32701 | rdcjpa.com | 800.362.1523
DATE: 2/19/2025
Addendum No. 1
CLC Renovation 1st & 2nd Floors TOPR 546-22-121
Miami VA
This Addendum supplements and amends the original Drawings and Specifications for the above referenced project. This Addendum shall be forwarded to all Prime Bidders and all appropriate building code authorities. This Addendum shall be taken into account in the preparation of bids and shall become a part of the Contract
Documents.
Receipt of this Addendum must be acknowledged on the Form of Proposal.
This addendum consists of 7 Drawing sheets, revised TOC, responses to RFI’s, and the environmental report.
General:
1. Responses to “Requests for Information” (RFI’s)
2. Environmental report containing Asbestos Survey and Lead Paint. See attached H8227090 - VA Hospital - CLC 1st and 2nd Floor document.
Specifications:
1. Revised TOC.
a. Specification 02 82 13 .19 Asbestos Floor Tile and Mastic Abatement added to the Table of Contents.
Drawings:
1. G101 – BID ITEM PLAN
2. AD101 - DEMOLITION PLAN & AD102 - DEMOLITION PLAN
a. Revised keynote 2.40
3. A101-N – NOTE PLAN & A102-N – NOTE PLAN
a. Column closure detail added.
b. Keynote 9.43 revised.
524 Fernwood Drive, Altamonte Springs, Florida 32701 | rdcjpa.com | 800.362.1523
c. Keynotes 9.05, 9.2, and 9.44 added.
4. A401 – INTERIOR ELEVATIONS & AF101-P WALL PROTECTION PLAN – L – 1
a. Missing tag (HR-1) added.
End of Addendum No. [1]
CLC Renovation 1st and 2nd Floors TOPR 02-01-23 VAMC Miami, Florida 546-22-121
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 31 00.01 Project Management and Coordination 09-19
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21
01 33 23 Shop Drawings, Product Data, and Samples 02-23
01 35 26 Safety Requirements 10-22
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 13 .19 Asbestos Floor Tile and Mastic Abatement 01-21
DIVISION 03 – CONCRETE
03 54 16 Moisture Mitigation System
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 20 00 Finish Carpentry 01-21
06 41 16 Plastic Laminate Clad Architectural Cabinets 06-20
Division 07 – Thermal and Moisture Protection
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 14 00 Interior Wood Doors 01-21
08 71 00 Door Hardware 05-22
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
CLC Renovation 1st and 2nd Floors TOPR 02-01-23 VAMC Miami, Florida 546-22-121
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 16 Resilient Sheet Flooring 06-22
09 65 19 Resilient Tile Flooring 05-18
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
10 30 90 Manufactured Electric Fireplaces and Mantles 01-21
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23
22 11 00 Facility Water Distribution 05-21
22 40 00 Plumbing Fixtures 12-22
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 27 26 Wiring Devices 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 15 00 Communications Structured Cabling 01-16
SRQPN
LJGEC M OKHFDBA
M.1
9.1
9.3
K.1
7.1
9.2
T
1.A
D.1 F.1
12.1
BID ITEM 2
BID ITEM 3 Excludes doors and hardware
BID ITEM 1 (BASE BID)
Area not in scope
AREAS IN BID ITEM 3
AREAS IN BID ITEM 2
SRQPN
LJGEC M OKHFDBA
M.1
9.1
9.3
K.1
7.1
9.2
T
1.A
D.1 F.1
12.1
BID ITEM 2
BID ITEM 3 Excludes doors and hardware
BID ITEM 1 (BASE BID)
Area not in scope
AREAS IN BID ITEM 3
AREAS IN BID ITEM 2
ST
AT
E O
F MICHIGA
LICENSED ARCH
IT
EC
T
NROGER
A.
REPSTIEN
1301066948 No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
2/
/2
9:
:0
AM
VA Miami - CLC Renovation 1st and 2nd floors TOPR
05/12/2023
BID ITEM PLAN
G101 DesignerApprover
546-22-121
MIAMI VA
ALBINO WISELL
CONSTRUCTION
DOCUMENTS
22015.00
N.T.S.Scale:
BID ITEM PLAN FIRST FLOOR
N.T.S.Scale:
BID ITEM PLAN SECOND FLOOR
Revisions Date
2 100% CONSTRUCTION DOCUMENT SET 05/12/2023
3 Addendum #1 02/19/2025
L
J
J
G
G
E
E
C
C M OKHFDBA
M.1
9.1
9.3
K.1
7.1
9.2
T
1.A
D.1 F.1
12.1
TOILET
125A
PATIENT
BATH
CLEAN
UTILITY
TOILET
122A
TOILET
123A
RESTROOM
MALE
Room
Mechanical Room
MEA-2
MALE
TOILETS
STAFF
107A
FEMALE
TOILETS
STAFF
TOILET
FEMALE
PATIENT
RESTROOMS
TOILET
141A
E1-1 E1-1
T1-1 T1-1
TOILET
159A
TOILET
143A
TOILET
146A
TOILET
147A
TOILET
148A
TOILET
155A
TOILET
151A
TOILET
153A
GERIATRICS
AND
EXTENDED
CARE
GENERAL
STORAGE
100A
CONTROL
ROOM
GERIATRIC
DIRECTOR'S
OFFICE
SOCIAL
WORKER
PSYCHOLOGY
SERVICE
BARBER
SHOP
RECREATION
THERAPY
DINING ROOM
RECREATION
THERAPY
110B
STAIR
S1-1
MECH. ROOM
MEA-3A
SWITCH GEAR
MEA-2B ELEVATOR
MACHINE RM.
MEA-2C
CORRIDOR
C1-3-10
HORTICULTURAL
THERAPY
110A
VENDING
111A
NFS
111B
HOUSEKEEPING
CORRIDOR
C1-2A-10
CORRIDOR
C1-5A-10
MECHANICAL
ROOM
EMS
STORAGE
EMS
STORAGE
MED ROOM
NURSE
MANAGER
RECEPTION /
LOUNGE
3 BED ROOM
3 BED ROOM
3 BED ROOM
2 BED ROOM
2 BED RM.
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
H.A.C.
STAFF TOILET
CLEAN
SUPPLY
TOILET
128A
TOILET
126A
CONG. TOILET
137A
TOILET
132A
TOILET
130A
MECH./OXYGEN
ROOM
MEA-1
CORRIDOR
C1-4-10
LAUNDRY
MULTIPURPOSE
ROOM
EMS
LIBRARY
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
159SOILED
UTILITY
ATTENDING
PHYSICIAN
CORRIDOR
C1-7-10
CORRIDOR
C1-6-10
TOILET
145A
TOILET
150A
TOILET
149A
TOILET
157A
STAIR
S1-2
STAIR
S1-3
CORRIDOR
C1-5-10
2 BED ROOM
1 BED ROOM
2 BED ROOM
CLEAN
SUPPLY
121A
CORRIDOR
C1-2-10
AD101
1BED TYPICAL
AD101
3BED TYPICAL
AD101
2BED TYPICAL
2.07 2.10
2.162.16
2.07 2.10
2.16
2.07 2.10
2.16
2.07 2.10
2.16
2.07 2.10
2.09 2.10
2.07
2.10 2.122.12
2.22
2.22
2.22
2.232.23 2.22
2.07 2.10
2.242.242.22
2.09 2.10
2.16
2.22
2.22
2.10 2.25
2.25
2.23
2.22
2.28
2.07 2.10
2.05
2.05
2.09 2.10
2.12
2.26 2.26
2.04
2.05
2.05
2.05
2.052.05 2.07
2.10 2.13
2.27
2.05 2.06 2.072.10
2.13 2.20
2.16
2.28 2.23
2.05
2.05 2.25 2.31 2.10
2.05 2.05
2.16
2.07 2.102.04
2.05
2.16
2.09 2.10
2.28 2.25
2.22 2.10
2.05
2.05
2.05
2.05
2.05
2.04
2.04
2.07
2.10
2.30
2.042.04 2.042.04
2.09 2.09
2.09 2.10
2.04 2.10
2.10 2.10
2.04
2.09 2.10
2.09 2.10
2.09 2.102.04
2.04
2.09 2.10
2.04
2.09 2.10
2.25
2.28
2.13
2.05
2.13 2.09
2.10
2.10
2.16
2.04
2.09 2.10
2.09 2.09 2.09
2.32
2.28 2.25
2.10
2.22 2.07
2.10
2.05
2.25
2.28
2.10
2.50 2.50 2.50 2.50
2.50
2.51 2.51 2.51 2.51 2.51
2.512.512.512.512.512.512.512.512.51
2.52
2.52
2.51
2.51
2.51
2.51 2.51
2.51
2.51
2.51
2.07
2.10
2.07 2.10
2.10 2.07
2.25 2.11
2.07
2.10 2.10
2.10 2.07 2.102.11
2.11
2.12
2.38
2.14
2.15
2.37
2.37
2.40
2.40
2.40
2.40 Typ.
Typ.
Typ.
2.40
2.40
2.40
2.40
Typ.
Typ.
Typ.
Typ.
2.40
Typ.
Typ.
2.16
2.16
2.05
2.05 2.072.07
2.17
2.21
2.12
2.52 2.13
2.18
2.06
2.31
2.04
2.40 Typ.
2.05
2.16
2.17
2.21
2.06
2.18
2.12
2.05
2.072.07
2.51 2.13
2.04
2.12
2.31
2.40 Typ.
2.05
2.50 2.13
2.16
2.06
2.06
2.07
2.05
2.18
2.04
2.13
2.07
2.40 Typ.
DEMOLITION LEGEND
Existing wall to remain Door slab to be demolished, frame to remain.
No work unless otherwise noted.
ST
AT
E O
F MICHIGA
LICENSED ARCH
IT
EC
T
NROGER
A.
REPSTIEN
1301066948 No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
2/
/2
:1 5:
P
M
VA Miami - CLC Renovation 1st and 2nd floors TOPR
05/12/2023
DEMOLITION PLAN
AD101
JWSO
546-22-121
MIAMI VA
ALBINO WISELL
CONSTRUCTION
DOCUMENTS
22015.00
A. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.
C. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
D. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
E. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
F. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.
G. Remove existing corner guards.
H. Existing lights, diffusers, sprinkler heads, and other MEPFS items to remain. Protect during construction.
J. Remove and reinstall existing signage.
N Scale: 3/32" = 1'-0"
DEMOLITION PLAN - FIRST FLOOR
2.04 Remove existing half height wall protection, handrail, chairrail, and wood door casing. Reskim wall and prepare surfaces.
2.05 Existing door slab and existing vinyl door frame protection product to be removed. Existing HM frame to remain. Prep frame as required for new vinyl frame protection product.
2.06 Remove existing ceiling tiles, grid to remain. Paint grid P-6. Install new ceiling tiles in existing grid.
2.07 Remove existing VCT and rubber base. Prepare slab for new finishes.
2.09 Remove existing welded sheet vinyl flooring and integral base.
Prepare slab for new finishes.
2.10 Remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accessories, corner protection, and equipment.
2.11 Remove existing wall protection.
2.12 Remove existing casework. Prepare for new installation.
2.13 Remove existing half height wall protection and upper wall covering. Reskim wall and prep surface.
2.14 Existing fire extinguisher cabinet to remain.
2.15 Remove existing fire extinguisher cabinet. Patch wall as required to match adjacent finish.
2.16 Remove and reinstall existing window covering.
2.17 Existing wall tile to remain. Protect during construction.
2.18 Existing patient lift and cubicle curtains to remain. Protect in place during construction.
2.20 Existing ACT ceiling to remain.
2.21 Existing gypsum ceiling to remain.
2.22 Existing casework to remain. Protect in place during construction.
2.23 Existing plumbing fixture to remain. Protect in place during construction.
2.24 Remove and reinstall existing lockers.
2.25 Remove existing ceramic tile flooring and base. Prepare slab for new finishes.
2.26 Remove existing column furring walls.
2.27 Existing wall mounted equipment to remain. Protect in place during construction.
2.28 Remove existing wall tile. Prepare wall for new finishes.
2.30 Remove and reinstall existing water fountain as required to install new finishes.
2.31 Remove existing plumbing fixtures. See plumbing drawings.
2.32 Remove wood trim at elevators. Remove and reinstall floor indicator as required for removal and installation of finishes.
2.37 Remove existing wall mounted nurse workstations. Prepare for installation of new stations.
2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,
2.40 Remove existing interior gypsum board at exterior walls. Existing framing and window trim to remain. Protect during construction.
2.50 Typical 1-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See detail 5 & 6 on sheet a405.
2.51 Typical 2-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See deatil 3 & 4 sheet a405
2.52 Typical 3-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See details 1 & 2 sheet a405
PLAN NOTES
GENERAL DEMOLITION NOTES
Scale: 1/4" = 1'-0"
TYPICAL 3 BED ROOM
Scale: 1/4" = 1'-0"
TYPICAL 2 BED ROOM
Scale: 1/4" = 1'-0"
TYPICAL 1 BED ROOM
Revisions Date
1 95% CONSTRUCTION DRAWINGS 03/08/2023
2 100% CONSTRUCTION DOCUMENT SET 05/12/2023
3 Addendum #1 02/19/2025
L
J
J
G
G
E
E
C
C M OKHFDBA
M.1
9.1
9.3
K.1
7.1
9.2
T
1.A
D.1 F.1
12.1
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
1 BED ROOM
W/C.B.
246A
W/C.B.
247A
W/C.B.
248A
W/C.T.
243A
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
LOUNGE
NURSE
MANAGER
OXYGEN
STORE
240A W/C.T.
241A
CORRIDOR
C2-7-10
CORRIDOR
C2-4-10
ELECTRICAL
CLOSET
E2-1
TELEPHONE
CLOSET
T2-1 W/C.B.
259A
W/C.T.
257A
W/C.T.
255A
W/C.T.
253A
W/C.T.
251A
1 BED ROOM
W/C.B.
250A
W/C.B.
249A
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
CORRIDOR
C2-6-10
SOILED UTIL
MD/ARNP
STAIR
S2-2HOUSEKEEPING
NOUR. KIT
263A
COPY
221A
LAUNDRY
RECEPTION /
LOUNGE
CORRIDOR
C2-2-10
W/C.T.
222A
W/C.T.
223A
MED
STORAGE
SOIL LINEN
218EMS STORE
3 BED ROOM
3 BED ROOM
3 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
W/C.T.
228A
W/C.T.
230A
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
W/C.T.
232A
W/C.T.
226A
W/C.T.
225A
HOUSEKEEPING
CLOSET
STAFF TOILET
LOUNGE
LINEN
STORAGE
PATIENT
BATH
CONG. TOILET
237A
CLEAN
SUPPLY
MECHANICAL
ROOM
MEA-8
REEF CAFE
LOUNGE
MECHANICAL
ROOM
MECHANICAL
ROOM
MEA-9
CORRIDOR
C2-5-10
CORRIDOR
C2-5A-10
OFFICE
207A4
DIRECTORY
GRECC
207A3
PROGRAM
ASSISTANT
207A2
ADMINISTRATIVE
OFFICER
207A1
CLINICAL
CENTER
207A
OFFICE
207C1
OFFICE
207C2
OFFICE
207C3
OFFICE
207C
DIRECTOR
A.G.U.
207B
CORRIDOR
207-10
RESEARCH
DIRECTOR,
GRECC
207H
STAFF TOILET
LABORATORY
#1
205B
CORRIDOR
205-10
LABORATORY
#2
205A
LAB
205A2
LAB
205A1
LABORATORY
#3
DARK ROOM
204A
GENERAL
STORAGE
SECRETARY
207G
STAIR
S2-1
CORRIDOR
C2-3-10
DOCTOR'S
OFFICE
207F
SENIOR
STAFF
ASSISTANT
207E
CONFERENCE
ROOM
207D
2.28
2.09
2.05
2.05
2.05
2.05
2.05
2.05
2.22 2.10
2.25 2.29
2.05
2.05
2.05
2.05 2.05
2.05
2.05
2.05
2.05 2.05 2.05
2.05 2.05
2.05
2.05
2.12
2.10
2.262.26 2.04
2.09
2.22 2.23
2.07
2.10
AD102
1BED TYPICAL
AD102
3BED TYPICAL
AD102
2BED TYPICAL
2.16 2.07
2.10 2.13
2.31 2.25
2.29
2.07 2.10
2.34
2.05
2.16
2.07
2.13 2.10
2.23 2.12
2.07
2.28 2.10
2.16
2.09 2.10
2.34
2.22 2.23
2.07
2.10
2.09 2.09 2.09
2.322.32
2.09 2.04
2.10
2.13 2.10
2.28 2.30
2.10
2.04
2.09 2.10
2.35
2.05
2.04 2.09
2.10
2.34
2.10
2.04
2.10 2.07
2.04
2.25 2.28
2.10
2.50
2.51
2.51
2.51
2.51
2.51
2.51
2.51
2.52
2.52
2.52
2.50 2.50 2.50 2.50
2.50 2.51 2.51 2.51 2.51
2.50
2.512.512.512.512.512.512.512.512.51
2.29 2.25
2.10
2.08 2.04
2.34
2.07 2.10
2.10
2.25
2.29
2.15
2.15
2.37
2.37
2.38
2.38
2.40 Typ.
2.40 Typ.
2.40 Typ.
2.40 Typ.
2.40 Typ.
2.40 Typ.
2.40 Typ.
2.40
2.40
2.40 3
Typ.
Typ.
Typ.
2.312.05
2.122.12
2.17
2.21 2.072.07
2.16
2.16
2.52 2.13
2.06
2.18 2.05
2.042.04
2.40 Typ.
2.05
2.05
2.31
2.17
2.21
2.51 2.13
2.18
2.12
2.12 2.16
2.042.04
2.06
2.072.07
2.40 Typ.
2.05
2.05
2.042.04
2.06
2.13
2.072.07
2.16
2.06 2.50
2.13 2.18
2.40 Typ.
DEMOLITION LEGEND
Existing wall to remain Door slab to be demolished, frame to remain.
No work unless otherwise noted.
ST
AT
E O
F MICHIGA
LICENSED ARCH
IT
EC
T
NROGER
A.
REPSTIEN
1301066948 No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
2/
/2
:1 5:
P
M
VA Miami - CLC Renovation 1st and 2nd floors TOPR
05/12/2023
DEMOLITION PLAN
AD102
JWSO
546-22-121
MIAMI VA
ALBINO WISELL
CONSTRUCTION
DOCUMENTS
22015.00
N Scale: 3/32" = 1'-0"
DEMOLITION PLAN - SECOND FLOOR
2.04 Remove existing half height wall protection, handrail, chairrail, and wood door casing. Reskim wall and prepare surfaces.
2.05 Existing door slab and existing vinyl door frame protection product to be removed. Existing HM frame to remain. Prep frame as required for new vinyl frame protection product.
2.06 Remove existing ceiling tiles, grid to remain. Paint grid P-6. Install new ceiling tiles in existing grid.
2.07 Remove existing VCT and rubber base. Prepare slab for new finishes.
2.08 Remove existing LVT flooring and rubber base. Prepare slab for new finishes.
2.09 Remove existing welded sheet vinyl flooring and integral base.
Prepare slab for new finishes.
2.10 Remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accessories, corner protection, and equipment.
2.12 Remove existing casework. Prepare for new installation.
2.13 Remove existing half height wall protection and upper wall covering.
Reskim wall and prep surface.
2.15 Remove existing fire extinguisher cabinet. Patch wall as required to match adjacent finish.
2.16 Remove and reinstall existing window covering.
2.17 Existing wall tile to remain. Protect during construction.
2.18 Existing patient lift and cubicle curtains to remain. Protect in place during construction.
2.21 Existing gypsum ceiling to remain.
2.22 Existing casework to remain. Protect in place during construction.
2.23 Existing plumbing fixture to remain. Protect in place during construction.
2.25 Remove existing ceramic tile flooring and base. Prepare slab for new finishes.
2.26 Remove existing column furring walls.
2.28 Remove existing wall tile. Prepare wall for new finishes.
2.29 Remove existing half height wall tile and cove base. Prepare wall for new finishes.
2.30 Remove and reinstall existing water fountain as required to install new finishes.
2.31 Remove existing plumbing fixtures. See plumbing drawings.
2.32 Remove wood trim at elevators. Remove and reinstall floor indicator as required for removal and installation of finishes.
2.34 Remove existing wall covering. Reskim wall and prep surface.
2.35 Remove existing handrail. Prepare for new installation.
2.37 Remove existing wall mounted nurse workstations. Prepare for installation of new stations.
2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,
2.40 Remove existing interior gypsum board at exterior walls. Existing framing and window trim to remain. Protect during construction.
2.50 Typical 1-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See detail 5 & 6 on sheet a405.
2.51 Typical 2-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See deatil 3 & 4 sheet a405
2.52 Typical 3-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See details 1 & 2 sheet a405
A. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.
C. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
D. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
E. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
F. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.
G. Remove existing corner guards.
H. Existing lights, diffusers, sprinkler heads, and other MEPFS items to remain. Protect during construction.
J. Remove and reinstall existing signage.
GENERAL DEMOLITION NOTES
PLAN NOTES
Scale: 1/4" = 1'-0"
TYPICAL 3 BED ROOM DEMO
Scale: 1/4" = 1'-0"
TYPICAL 2 BED ROOM DEMO
Scale: 1/4" = 1'-0"
TYPICAL 1 BED ROOM DEMO
Revisions Date
1 95% CONSTRUCTION DRAWINGS 03/08/2023
2 100% CONSTRUCTION DOCUMENT SET 05/12/2023
M.1
9.1
9.3
K.1
7.1
9.2
T
1.A
D.1 F.1
12.1
A401
A402
TOILET
125A
PATIENT
BATH
CLEAN
UTILITY
TOILET
122A
TOILET
123A
RESTROOM
MALE
Room
Mechanical Room
MEA-2
MALE
TOILETS
STAFF
107A
FEMALE
TOILETS
STAFF
TOILET
FEMALE
PATIENT
RESTROOMS
TOILET
141A
E1-1 E1-1
T1-1
T1-1 TOILET
159A
TOILET
143A TOILET
146A
TOILET
147A
TOILET
148A
TOILET
155A
TOILET
151A
TOILET
153A
GERIATRICS
AND
EXTENDED
CARE
GENERAL
STORAGE
100A
CONTROL
ROOM
GERIATRIC
DIRECTOR'S
OFFICE
SOCIAL
WORKER
PSYCHOLOGY
SERVICE
BARBER
SHOP
RECREATION
THERAPY
110 DINING ROOM
RECREATION
THERAPY
110B
STAIR
S1-1
MECH. ROOM
MEA-3A
SWITCH GEAR
MEA-2B
ELEVATOR
MACHINE RM.
MEA-2C
CORRIDOR
C1-3-10
HORTICULTURAL
THERAPY
110A
VENDING
111A
NFS
111BHOUSEKEEPING
CORRIDOR
C1-2A-10
CORRIDOR
C1-5A-10
MECHANICAL
ROOM
EMS
STORAGE
EMS
STORAGE
MED ROOM
NURSE
MANAGER
RECEPTION /
LOUNGE
3 BED ROOM
3 BED ROOM
3 BED ROOM
2 BED ROOM
2 BED RM.
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
H.A.C.
STAFF TOILET
CLEAN
SUPPLY
TOILET
128A
TOILET
126A
CONG. TOILET
137A
TOILET
132A
TOILET
130A
MECH./OXYGEN
ROOM
MEA-1
CORRIDOR
C1-4-10
LAUNDRY
MULTIPURPOSE
ROOM
EMS
LIBRARY
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
147 2 BED ROOM
2 BED ROOM
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
SOILED
UTILITY
ATTENDING
PHYSICIAN
CORRIDOR
C1-7-10
CORRIDOR
C1-6-10
TOILET
145A
TOILET
150A
TOILET
149A
TOILET
157A
STAIR
S1-2
STAIR
S1-3
CORRIDOR
C1-5-10
2 BED ROOM
1 BED ROOM
2 BED ROOM
CLEAN
SUPPLY
121A
CORRIDOR
C1-2-10
C1-7
142 146 147145144143141 148
151152153154155156157158
150149
121A
129 130
128 131
132127
126 133
1-MEA
A4 02 11 A4
A4011-T1
4A4
3 A4
A405
A405
A402
A402
141A 142A 144A143A
145A
147A 148A
149A
150A
151A152A153A154A155A156A157A158A
123A
122A
125A
126A
127A
128A
129A 130A
131A
132A
133A
137A
146A
159A
A404 A
3 A4
5A4
4 A4
A403
A403
A403
2A4
A403
9.20 Typ.
9.20 Typ.
9.20 Typ.
9.20 Typ.
9.20 Typ.
9.20 Typ.
9.20 Typ.
A513
A513
6.10 Typ.
6.10 Typ.
6.10 Typ.
6.10 Typ.
6.10 Typ.
6.10 Typ.
6.10 Typ.
1-E1-1
6 A4
4A4
2.38
2.38
5 A4
6A4
4 A4
2.38
10.18
137B
9.1
A404
10.23
10.23
3A4
5A4
9.43
9.43
9.43
9.43 Typ.
Typ.
Typ.
9.43
9.43
Typ.
Typ.
Typ.
9.43 Typ.
9.43 Typ.
A101-N
TYP.
A101-N
Sim
9.43
9.43
9.43 Typ.
Typ.
Typ.
2.42
9.05
9.21
9.44
ST
AT
E O
F MICHIGA
LICENSED ARCH
IT
EC
T
NROGER
A.
REPSTIEN
1301066948 No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
2/
/2
:1 4:
P
M
VA Miami - CLC Renovation 1st and 2nd floors TOPR
05/12/2023
NOTE PLAN
A101-N
SOSO
546-22-121
MIAMI VA
ALBINO WISELL
CONSTRUCTION
DOCUMENTS
22015.00
N Scale: 3/32" = 1'-0"
NOTE PLAN - FIRST FLOOR
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. All wood blocking to be fire retardent treated.
2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,
2.42 Existing concrete column to remain.
6.10 Patient Closet Casework.
9.05 7/8ing furring channel @ 16" o.C.
9.20 Moisture mitigiation system. Install throughout first floor where new finishes are being located.
9.21 5/8" Type X gypsum board.
9.43 Install new 5/8" water resistant gypsum board with level 4 finish over existing metal studs at all interior sides of exterior walls.
9.44 WP-5 adhered to gypsum board substrate on all sides.
10.18 Semi-recessed Fire Extinguisher Cabinet. Align with new finish.
10.23 Wall mounted work station equivalent to SHS-3254-FD-A.
Finish to be selected by architect from manufacturer's full range.
PLAN NOTES
GENERAL NOTES
Revisions Date
1 95% CONSTRUCTION DRAWINGS 03/08/2023
2 100% CONSTRUCTION DOCUMENT SET 05/12/2023
3 Addendum #1 02/19/2025
Scale: 1 1/2" = 1'-0"2 Column Closure - 1st & 2nd Floor
M.1
9.1
9.3
K.1
7.1
9.2
T
1.A
D.1 F.1
12.1
A402
GENERAL
STORAGE
LABORATORY
#3
DARK ROOM
204A
CORRIDOR
205-10
LABORATORY
#2
205A
LAB
205A1
LAB
205A2
LABORATORY
#1
205B
STAFF TOILET
CLINICAL
CENTER
207A
DIRECTOR
A.G.U.
207B
OFFICE
207C
DOCTOR'S
OFFICE
207F
SECRETARY
207G
RESEARCH
DIRECTOR,
GRECC
207H
ADMINISTRATIVE
OFFICER
207A1
PROGRAM
ASSISTANT
207A2
DIRECTORY
GRECC
207A3
OFFICE
207A4
SECRETARY
207A5
OFFICE
207C1
OFFICE
207C2
OFFICE
207C3
CORRIDOR
207-10
CORRIDOR
C2-3-10
STAIR
S2-1
CORRIDOR
C2-5-10
CORRIDOR
C2-5A-10
MECHANICAL
ROOM
MEA-9
MECHANICAL
ROOM
EMS STORE
SOIL LINEN
MED
STORAGE
LAUNDRY
RECEPTION /
LOUNGE
COPY
221A
CORRIDOR
C2-4-10
ELECTRICAL
CLOSET
E2-1
TELEPHONE
CLOSET
T2-1
MECHANICAL
ROOM
MEA-8
3 BED ROOM
3 BED ROOM
LINEN
STORAGE
3 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
LOUNGE
HOUSEKEEPING
CLOSET
STAFF TOILET
PATIENT
BATH
CLEAN
SUPPLY
NURSE
MANAGER
LOUNGE
W/C.T.
222A
W/C.T.
223A
W/C.T.
225A
W/C.T.
226A
W/C.T.
228A
STAIR
S2-3
W/C.T.
230A
W/C.T.
232A
CONG. TOILET
237A
CORRIDOR
C2-2-10
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
1 BED ROOM
OXYGEN
STORE
240A
W/C.T.
241A
W/C.T.
243A
W/C.B.
245A
W/C.B.
246A
W/C.B.
247A
W/C.B.
248A
W/C.B.
250A
W/C.B.
249A
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
SOILED UTIL
MD/ARNP
HOUSEKEEPING
NOUR. KIT
263A
REEF CAFE
LOUNGE
STAIR
S2-2
CORRIDOR
C2-7-10
CORRIDOR
C2-6-10 W/C.T.
251A W/C.T.
253A
W/C.T.
255A
W/C.T.
257A
W/C.B.
259A
CONFERENCE
ROOM
207DSENIOR
STAFF
ASSISTANT
207E
258 257
251252
253254
246 249245
243241240
233226
228 231
230229
244242
MEA-8
C2-7
E2-1 T2-1
221A
259A
258A 257A 256A 255A 254A 253A 252A 251A
241A 242A
240A
243A 244A
245A
246A 247A 248A
250A
249A
225A
226A 233A
232A227A
228A 231A
230A229A
237A
223A
222A
7A4
A404
A404
3A4 04 1 A4
A404
A404
5A4
6.10
TYP.
6.10
TYP.
6.10
TYP.6.10
Typ.
6.10Typ.
6.10
6.10 Typ.
Typ.
10 A4
9 A4
8A4
221A
10.18
A401 sim
A401
3 A4 014A4 sim sim sim 10.18
A404 B
A404 C
10.23
10.23
A402
5 A4
A101-N
Sim
A101-N
Sim
9.43
9.43
9.43
9.43
9.43
9.43
9.43
9.43 9.43
9.43
3 3
Typ.
Typ.
Typ.
Typ.
Typ.
Typ. Typ.
Typ.
Typ.
Typ.
ST
AT
E O
F MICHIGA
LICENSED ARCH
IT
EC
T
NROGER
A.
REPSTIEN
1301066948 No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
2/
/2
:1 5:
P
M
VA Miami - CLC Renovation 1st and 2nd floors TOPR
05/12/2023
NOTE PLAN
A102-N
SOSO
546-22-121
MIAMI VA
ALBINO WISELL
CONSTRUCTION
DOCUMENTS
22015.00
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. All wood blocking to be fire retardent treated.
6.10 Patient Closet Casework.
9.43 Install new 5/8" water resistant gypsum board with level 4 finish over existing metal studs at all interior sides of exterior walls.
10.18 Semi-recessed Fire Extinguisher Cabinet. Align with new finish.
10.23 Wall mounted work station equivalent to SHS-3254-FD-A.
Finish to be selected by architect from manufacturer's full range.
PLAN NOTES
GENERAL NOTES
N Scale: 3/32" = 1'-0"
NOTE PLAN - SECOND FLOOR
Revisions Date
1 95% CONSTRUCTION DRAWINGS 03/08/2023
2 100% CONSTRUCTION DOCUMENT SET 05/12/2023
X
X
Toilet Accessory
Equipment
Keynote
Material Finish
SYMBOL LEGEND
RB-1
RWP-1
HR-1
P-2
P-2
P-2
RWP-1
1'-0" 1'-8"
WP-1
1'-8"1'-0" 1'-8"1'-0"
10.03
HR-1
RWP-1
WP-1 RWP-1
HR-1
RB-1
WP-1WP-1WP-1 WP-1 WP-1
150149148146 147144 145142 143141
1'-8" 1'-0"
RB-1
1'-8"1'-0"
RB-1
WP-1RB-1
10.03 10.03
RB-1 RWP-1
HR-1WP-1
10.03
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.Typ.
Typ.
Typ.
RWP-1
HR-1
RB-1
Typ.
Typ. Typ.
P-1P-1P-2 P-2P-2P-2P-2 Typ.
Typ.
P-2P-210.03
4' -0
301130863013030113030301130301130306301 31 6 8 630 325
10.182.38
1'-8" 1'-8"1'-0" 1'-0"1'-8" 1'-8"1'-0"
10.0310.03
HR-1
WP-1
RB-1
HR-1WP-1
P-2 WP-1P-2WP-1WP-1
RB-1
HR-1 CG-2
151 152 153 155154 158157156 1-T1
CG-2
9 11/256" P-2
WP-1
HR-1
RB-1
Typ. Typ.
Typ.
Typ.Typ.Typ.
Typ.
Typ.
Typ.
RWP-1
RB-1
HR-1
RB-1 WP-6
Typ.
Typ.
?WP-6
Typ.
P-2 P-2 P-2
P-2
P-2
OPEN
RWP-210.20
Typ.
Typ.
30130
301130103011303030113030
10.20
10.23
Typ.
1'-8" 1'-0" 1'-4 1/2"1'-0" 1'-8" 1'-8" 1'-0" 1'-0"
10.03WP-1 P-2 P-2
HR-1
RWP-1
RB-1
WP-1
WP-1
RWP-1
HR-1
RWP-1
RWP-1
HR-1WP-1 CG-2
120138133 134 135 136 137131 132130
4' -0
4' -0
9 1/4"
HR-1
RWP-1
RB-1
RWP-1RB-1
RB-1
Typ.
Typ.
Typ.
Typ.
Typ.
P-1WP-6
Typ.
WP-6
Typ.
P-2 P-2
1'-0" 1'-4"
OPEN
CG-2
OPEN
WP-5
RB-3
WP-5WP-1 RWP-2 301930 593030303011111 30
RB-1
2530 30 30 10 5
12WP-5
10.23
HR-1
1'-0" 1'-8"1'-8" 1'-0"
10.03 10.03 WP-1P-2
HR-1
RWP-1
RB-1
WP-1WP-1 P-2
WP-1HR-1
P-2WP-1
RB-1
HR-1
RB-1
119 122 125124123 126 127 128 129
4' -0
HR-1
1'-0" 1'-8"1'-8" 1'-0"
RWP-1 RWP-1 RWP-1
8"
10.03WP-1 WP-1P-2 P-2
Typ. Typ.
HR-1
RWP-1
RB-1
Typ.
HR-1
RWP-1
RB-1
WP-6
Typ. Typ.
Typ.
10.03 Typ.
10.20 10.03
Typ.
Typ.
10.03
Typ.
19 30 1 830 30 6 1 30 30 30 1 30 6 8 1 30 30 1 1 30 6 30 1 Typ.
WP-1
4130 30 30 3535 25 2530 25 25 Typ.
2.14 10.18
Typ.
OPEN
HR-1
RWP-1
RB-1
4' -0
25 30 1
4' -0
OPEN
HR-1
RWP-1
RB-1
CG-2
306 25
ST
AT
E O
F MICHIGA
LICENSED ARCH
IT
EC
T
NROGER
A.
REPSTIEN
1301066948 No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
2/
/2
9:
:4
AM
VA Miami - CLC Renovation 1st and 2nd floors TOPR
05/12/2023
INTERIOR ELEVATIONS
A401
SMSO
546-22-121
MIAMI VA
ALBINO WISELL
CONSTRUCTION
DOCUMENTS
22015.00
A. RWP in corridors to stop at 4' to meet the top of the CG-2.
B. See sheet A511 for Casework Details.
C. See sheet AF603 for Finish Materials Legend.
D. All handrails to stop 2" before wall or door frame. Handrail height to match existing.
2.14 Existing fire extinguisher cabinet to remain.
2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,
10.03 All existing signages to be removed and reinstalled In the renovated areas.
10.18 Semi-recessed Fire Extinguisher Cabinet. Align with new finish.
10.20 Contractor to remove and reinstall.
10.23 Wall mounted work station equivalent to SHS-3254-FD-A.
Finish to be selected by architect from manufacturer's full range.
ELEVATION NOTES
GENERAL INT. ELEVATION NOTES
Scale: 1/4" = 1'-0"
Typ. Patient Rooms Corridor
Scale: 1/4" = 1'-0"
Corridor - C1-6-10
Wall Mounted Item Schedule
Type Mark Device Name Comments
1 Nurse Call Dome Light Remove. Provide junction box extension and reinstall device.
2 Med Gas Alarm Remove and reinstall device cover.
3 Manual Fire Alarm Pull Remove and reinstall device cover.
4 Fire Alarm Remove and reinstall device cover.
5 Thermostat Remove and reinstall device cover.
6 Fire Alarm Strobe Remove and reinstall device cover.
8 Fire Extinguisher Sign Remove and reinstall.
9 Flatscreen TV Remove and reinstall.
10 Nurse Phone Remove. Provide junction box extension and reinstall device.
11 Telecommunication Outlet Remove and reinstall device cover.
12 Electric Outlet Remove and reinstall device cover.
13 Light Switch Remove and reinstall device cover.
14 Patient Room Light Fixture Remove and reinstall.
15 Intercom - Room to Room Remove. Provide junction box extension and reinstall device.
16 Clock Remove and reinstall.
17 TV Wall Bracket Adjustable Remove and reinstall.
18 Speaker Cover Remove and reinstall device cover.
19 Door Actuator Remove and reinstall device cover.
20 Patient Lift 3-Bed Room To remain.
Wall Mounted Item Schedule
Type Mark Device Name Comments
21 Patient Lift 2-Bed Room To remain.
22 Patient Lift 1-Bed Room To remain.
23 Window Treatment To remain.
24 White Board Remove and reinstall.
25 Artwork Remove and reinstall.
26 Track To remain.
27 Bulletin Board Remove and reinstall.
28 Sharps Container Remove and reinstall.
29 Combo Whiteboard/Bulletin Remove and reinstall.
30 Signage Remove and reinstall.
31 Convex Mirror Remove and reinstall.
32 Key Pad Remove and reinstall device cover.
33 Elevator Call Button Remove and reinstall device cover.
34 Elevator Floor Indicator Remove. Provide junction box extension and reinstall device.
35 Device Remove and reinstall.
36 Control Panel To remain.
37 Wall Sconce Remove and reinstall.
38 Medication Cabinet Remove and reinstall.
39 Glove Dispenser Remove and reinstall.
40 Hand Sanitizer Dispenser Remove and reinstall.
41 Exit Sign Lighted Remove and reinstall.
Revisions Date
1 95% CONSTRUCTION DRAWINGS 03/08/2023
2 100% CONSTRUCTION DOCUMENT SET 05/12/2023
RWP-1 RWP-1 RWP-1 RWP-1RWP-1 RWP-1 RWP-1 RWP-1RWP-1
RWP-1RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1 RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1
RWP-1 RWP-1
RWP-1
RWP-1
CORRIDOR
C1-5-10
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED RM.
2 BED ROOM
3 BED ROOM
3 BED ROOM
3 BED ROOM
LIBRARY
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
1 BED ROOM
H.A.C.
STAFF TOILET
CLEAN
SUPPLY
MECH./OXYGEN
ROOM
MEA-1
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
156 2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
CORRIDOR
C1-7-10
CORRIDOR
C1-6-10
SOILED
UTILITY
MULTIPURPOSE
ROOM
NFS
111B
VENDING
111A
HOUSEKEEPING
DINING ROOM
RECREATION
THERAPY
110B
RECREATION
THERAPY
BARBER
SHOP
HORTICULTURAL
THERAPY
110A
CORRIDOR
C1-2A-10
CORRIDOR
C1-3-10
PSYCHOLOGY
SERVICE
SOCIAL
WORKER
GERIATRIC
DIRECTOR'S
OFFICE
GERIATRICS
AND
EXTENDED
CARE
GENERAL
STORAGE
100A
CONTROL
ROOM
CORRIDOR
C1-5A-10
LAUNDRY
164NURSE
MANAGER
EMS
STORAGE
EMS
STORAGE
CLEAN
SUPPLY
121A
CORRIDOR
C1-4-10
RECEPTION /
LOUNGE
ATTENDING
PHYSICIAN
EMS
1 BED ROOM
1 BED ROOM
1 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
2 BED ROOM
1 BED ROOM
RWP-1
CLEAN
UTILITY
RWP-1
CG-2
CG-2 CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2 CG-2
CG-2
CG-2 CG-2 CG-2 CG-2 CG-2
CG-2
CG-2
CG-2
CG-1
CG-2
CG-2
CG-2
CG-2
CG-2CG-2 CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-1
CG-2
CG-2
HR-1HR-1HR-1HR-1HR-1HR-1HR-1HR-1HR-1
HR-1
HR-1HR-1HR-1
HR-1
HR-1
HR-1HR-1HR-1
HR-1HR-1
?HR-1
HR-1
CORRIDOR
C1-2-10
CG-2
CG-2
CG-1
CG-1
HR-1HR-1HR-1
HR-1
HR-1Sign
HR-1
HR-1
HR-1HR-1
HR-1HR-1
HR-1HR-1HR-1
HR-1
HR-1
HR-1HR-1HR-1
HR-1HR-1HR-1
HR-1 HR-1HR-1
HR-1HR-1
HR-1
CG-2
CG-2
HR-1
RWP-1
?HR-1HR-1HR-1
HR-1HR-1HR-1
CG-2
CG-2
CG-2
CG-3
RWP-1
RWP-1
CG-2
CG-2
CG-2CG-2
CG-2
CG-2CG-2
CG-2CG-2
CG-2
RWP-1
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2CG-2
CG-2CG-2CG-2
HR-1HR-1
CG-2 CG-2HR-1
RWP-1
CG-2
CG-2
CG-2
RWP-2
RWP-3
HR-1
CG-2
RWP-2
RWP-2CG-2
WP-7
RWP-1
RWP-1
RWP-1
RWP-1 RWP-1
RWP-1
RWP-1
RWP-1
HR-1
HR-1
HR-1
HR-1
HR-1HR-1
HR-1
HR-1
HR-1HR-1
HR-1
ST
AT
E O
F MICHIGA
LICENSED ARCH
IT
EC
T
NROGER
A.
REPSTIEN
1301066948 No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
2/
/2
9:
:0
AM
VA Miami - CLC Renovation 1st and 2nd floors TOPR
05/12/2023
WALL PROTECTION PLAN - L-1
AF101-P
SMSO
546-22-121
MIAMI VA
ALBINO WISELL
CONSTRUCTION
DOCUMENTS
22015.00
Scale: 3/32" = 1'-0"1 WALL PROTECTION PLAN - FIRST FLOOR
A. All walls to be painted P-1 unless notes otherwise.
B. All handrails to stop at 2" before wall or door frame. Refer to Wall
Protection Plan.
C. RB-1 to be installed at all walls and RB-2 to be installed at BT-1 in wainscoting walls unless noted otherwise. See Interior Elevations for further details
D. Patient Room walls, Nurse Station, Dining room, and Reef Cafe tagged with RWP-1 are to also have the BT-1, WP-2, WP-3, and WP-4 applied as well. See Interior Elevations for further details.
E. All new doors to have P-5 finish unless noted otherwise.
F. All door frames to be painted P-4 unless noted otherwise.
PLAN NOTES
GENERAL FINISH PLAN NOTES
RWP-1
Revisions Date
1 95% CONSTRUCTION DRAWINGS 03/08/2023
2 100% CONSTRUCTION DOCUMENT SET 05/12/2023
File details come from the government source that posted it. Updated .