100 Construction Drawings Renovate CLC 1 and 2nd Floor.pdf

PDF 25 MB Posted

Attached to
Renovate Community Living Center (CLC) - 1st & 2nd Floor
Solicitation number
36C24825R0033
Issued by

About this file

This file contains construction drawings for renovating the 1st and 2nd floors of the Community Living Center (CLC) at the Miami VA Medical Center. The drawings detail architectural, plumbing, electrical, and telecommunications work required for the renovation project.

The drawings include demolition plans, new construction details, reflected ceiling plans, interior elevations, casework specifications, door schedules, and finish schedules. Key components include new wall protection, flooring materials (LVT, WSF, porcelain tile), painting, electrical receptacles and data outlets, plumbing fixtures (water closets, lavatories), and telecommunications infrastructure. The work must be completed in multiple phases while maintaining operations, with at least two elevators functional at all times and corridor work performed after hours to maintain CLC access. The project is divided into three bid items, with Base Bid covering most areas and Bid Items 2-3 covering additional zones. Detailed mounting heights, finish specifications, and coordination requirements between trades are provided throughout the drawing set.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

XX

X

1/A101

X

A101

XX

TOILET ACCESSORY TAGX SIGNAGE TAG

A101

SIM

X

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Department of Veterans Affairs Medical Center

TERRACON CONSULTING, INC.

ENVIRONMENTAL

611 LUNKEN PARK DRIVE

CINCINNATI, OH 45226

513.321.5816

ARCHITECTURE PLANNING INTERIOR DESIGN

524 FERNWOOD AVENUE

ALTAMONTE SPRINGS, FLORIDA 32701

407.830.6522 P

RDC / JOHN POE ARCHITECTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

ABOVE GROUP, INC.

ENGINEERING MECHANICAL

305 EAST DRIVE STE. H

MELBOURNE, FL 32904

321.345.90266

/7 /2

:3

:4

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

COVER SHEET

G001

JWSO

546-22-121

MIAMI VA

VA Miami - CLC Renovation 1st and 2nd floors

TOPR

1201 NW 16th St, Miami, FL 33125 PROJECT #: 546-22-121

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

G001 COVER SHEET

G100 PHASING PLAN

G101 BID ITEM PLAN

AD101 DEMOLITION PLAN

AD102 DEMOLITION PLAN

A101-N NOTE PLAN

A102-N NOTE PLAN

A121 REFLECTED CEILING PLAN - FIRST FLOOR

A122 REFLECTED CEILING PLAN - SECOND FLOOR

A401 INTERIOR ELEVATIONS

A402 INTERIOR ELEVATIONS

A403 INTERIOR ELEVATIONS

A404 INTERIOR ELEVATIONS

A405 INTERIOR ELEVATIONS

A511 CASEWORK SECTIONS & DETAILS

A512 CASEWORK SECTIONS & DETAILS

A513 CASEWORK SECTIONS & DETAILS

A601 DOOR SCHEDULE & DETAILS

AF101-F FLOOR FINISH PLAN - L-1

AF101-P WALL PROTECTION PLAN - L-1

AF101-W WALL FINISH PLAN - L-1

AF102-F FLOOR FINISH PLAN - L-2

AF102-P WALL PROTECTION PLAN - L-2

AF102-W WALL FINISH PLAN - L-2

AF603 FINISH LEGEND

GENERAL CONSTRUCTION NOTES

* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE

CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,

INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA

PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE

ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,

TECHNICAL INFORMATION LIBRRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND

DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13

WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS

TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT

EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED

WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH

ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT

ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF

NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO

REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT

SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND

DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW

MATERIALS.

DRAWING INDEXVICINITY MAP

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO

BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE

SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT

THROUGH FINISHED OPENINGS.

8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,

HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS

AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT

DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL

WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.

9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS

SPECIFICALLY NOTED OTHERWISE. iF NO FINISH IS INDICATED AT A

PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS

INDICATED AT SIMILAR CONDITIONS.

10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL

SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE

THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE

NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR

SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED

WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF

THE WALL.

N

PROJECT AREA

P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS

PP-111 PLUMBING PIPING PLANS - DEMO & NEW WORK

P-501 PLUMBING DETAILS AND SCHEDULES

E-001 ELECTRICAL LEGENDS & SYMBOLS

E-002 ELECTRICAL GENERAL NOTES

ED-101 1ST FLOOR ELECTRICAL ENLARGED PLANS - DEMO

ED-102 2ND FLOOR ELECTRICAL ENLARGED PLANS - DEMO

EN-101 1ST FLOOR ELECTRICAL ENLARGED PLANS - NEW WORK

EN-102 2ND FLOOR ELECTRICAL ENLARGED PLANS - NEW WORK

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL DIAGRAMS

E-801 ELECTRICAL SCHEDULES

E-802 ELECTRICAL SCHEDULES

E-803 ELECTRICAL SCHEDULES

E-804 ELECTRICAL SCHEDULES

T-001 TELECOM LEGENDS & SYMBOLS

TD-101 FIRST FLOOR TELECOM ENLARGED PLANS - DEMO

TD-102 SECOND FLOOR TELECOM ENLARGED PLANS - DEMO

TN-101 FIRST FLOOR TELECOM ENLARGED PLANS - NEW WORK

TN-102 SECOND FLOOR TELECOM ENLARGED PLANS - NEW WORK

T-501 TELECOM DETAILS

Revisions Date

1 95% CONSTRUCTION DRAWINGS 03/08/2023

2 100% CONSTRUCTION DOCUMENT SET 05/12/2023

SRQPN

LJGEC M OKHFDBA

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

PHASE 1

PHASE 2

PHASE 3

AT LEAST TWO

ELEVATORS HAVE

TO BE FUNCTIONAL

AT ALL TIMES

LOBBY AND CORRIDOR

WORK AFTER HOURS TO

MAINTAIN ACCESS TO CLC

PHASE 1

T1.0

T1.0

T1.0

SRQPN

LJGEC M OKHFDBA

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

PHASE 4

PHASE 6

AT LEAST TWO

ELEVATORS HAVE

TO BE FUNCTIONAL

AT ALL TIMES

LOBBY AND CORRIDOR

WORK AFTER HOURS TO

MAINTAIN ACCESS TO CLC

PHASE 5

T1.0

T1.0

T1.0

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:5

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

PHASING PLAN

G100 DesignerApprover

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

N N.T.S.Scale:

PHASING PLAN FIRST FLOOR

N

N.T.S.Scale:

PHASING PLAN SECOND FLOOR

A. For temporay partition locations see Demolition Plans. Temporary partitions are suggested locations. Coordinate final location in field with C.O.R.

B. Verify all conditions in the field prior to fabrication, erection and construction.

C. All asbestos containing material (ACM) must be abated per the direction of the C.O.R. and project specification 017419 and local state and federal regulations. Required abatement is to be scheduled in appropriate sequence with demolition, new construction and project phasing.

D. Coordinate phase completion and start-up with requirements as set forth by the C.O.R. to maintain daily operations to near as normal as possible.

E. Coordinate location of job dumpster with the C.O.R. so as to disrupt daily operations as little as possible.

F. Coordinate access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.

G. Temporary door locations and sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with the C.O.R.

H. Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction. See MEP Drawings.

J. Provide and maintain negative air pressure at all construction.

Coordinate with HVAC contractor.

K. Temporary partition to structural deck above. See A601 for temporary partition type.

L. Existing power must be maintained throughout as required during each phase of construction.Coordinate phasing with Electrical Contractor. Coordinate power turnover with requirements as dictated by the C.O.R. See Electrical Drawings.

M. Coordinate sequence construction with C.O.R. so that only one side of any corridor in use is obstructed at any one time.

N. Coordinate all work involving the generation of excessive noise so as to occur during non-peak operating hours, 1000 to 1600 daily.

Activities to occur during this time include, but are not limited to saw cutting, jack hammering, hammer drilling and core drilling. If there is any question as to whether an operation should occur during this time the Contractor will contact the C.O.R.

GENERAL NOTES

Revisions Date

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

BID ITEM 2

BID ITEM 3 Excludes doors and hardware

BID ITEM 1 (BASE BID)

Area not in scope

SRQPN

LJGEC M OKHFDBA

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

BID ITEM 2

BID ITEM 3 Excludes doors and hardware

BID ITEM 1 (BASE BID)

Area not in scope

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:5

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

BID ITEM PLAN

G101 DesignerApprover

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

N.T.S.Scale:

BID ITEM PLAN FIRST FLOOR

N.T.S.Scale:

BID ITEM PLAN SECOND FLOOR

L

J

J

G

G

E

E

C

C M OKHFDBA

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

TOILET

125A

PATIENT

BATH

CLEAN

UTILITY

TOILET

122A

TOILET

123A

RESTROOM

MALE

Room

Mechanical Room

MEA-2

MALE

TOILETS

STAFF

107A

FEMALE

TOILETS

STAFF

TOILET

FEMALE

PATIENT

RESTROOMS

TOILET

141A

E1-1

E1-1

T1-1

T1-1

TOILET

159A

TOILET

143A

TOILET

146A

TOILET

147A

TOILET

148A

TOILET

155A

TOILET

151A

TOILET

153A

GERIATRICS

AND

EXTENDED

CARE

GENERAL

STORAGE

100A

CONTROL

ROOM

GERIATRIC

DIRECTOR'S

OFFICE

SOCIAL

WORKER

PSYCHOLOGY

SERVICE

BARBER

SHOP

RECREATION

THERAPY

DINING ROOM

RECREATION

THERAPY

110B

STAIR

S1-1

MECH. ROOM

MEA-3A

SWITCH GEAR

MEA-2B ELEVATOR

MACHINE RM.

MEA-2C

CORRIDOR

C1-3-10

HORTICULTURAL

THERAPY

110A

VENDING

111A

NFS

111B

HOUSEKEEPING

CORRIDOR

C1-2A-10

CORRIDOR

C1-5A-10

MECHANICAL

ROOM

EMS

STORAGE

EMS

STORAGE

MED ROOM

NURSE

MANAGER

RECEPTION /

LOUNGE

3 BED ROOM

3 BED ROOM

3 BED ROOM

2 BED ROOM

2 BED RM.

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

H.A.C.

STAFF TOILET

CLEAN

SUPPLY

TOILET

128A

TOILET

126A

CONG. TOILET

137A

TOILET

132A

TOILET

130A

MECH./OXYGEN

ROOM

MEA-1

CORRIDOR

C1-4-10

LAUNDRY

MULTIPURPOSE

ROOM

EMS

LIBRARY

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

1 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

SOILED

UTILITY

ATTENDING

PHYSICIAN

CORRIDOR

C1-7-10

CORRIDOR

C1-6-10

TOILET

145A

TOILET

150A

TOILET

149A

TOILET

157A

STAIR

S1-2

STAIR

S1-3

CORRIDOR

C1-5-10

2 BED ROOM

1 BED ROOM

2 BED ROOM

CLEAN

SUPPLY

121A

CORRIDOR

C1-2-10

AD101

1BED TYPICAL

AD101

3BED TYPICAL

AD101

2BED TYPICAL

2.07 2.10

2.162.16

2.07 2.10

2.16

2.07 2.10

2.16

2.07 2.10

2.16

2.07 2.10

2.09 2.10

2.07

2.10 2.122.12

2.22

2.22

2.22

2.232.23 2.22

2.07 2.10

2.242.242.22

2.09 2.10

2.16

2.22

2.22

2.10 2.25

2.25

2.23

2.22

2.28

2.07 2.10

2.05

2.05

2.09 2.10

2.12

2.26 2.26

2.04

2.05

2.05

2.05

2.052.05 2.07

2.10 2.13

2.27

2.05 2.06 2.072.10

2.13 2.20

2.16

2.28 2.23

2.05

2.05

2.25 2.31

2.10

2.05 2.05

2.16

2.07 2.102.04

2.05

2.16

2.09 2.10

2.28 2.25

2.22 2.10

2.05

2.05

2.05

2.05

2.05

2.04

2.04

2.07

2.10

2.30

2.042.04 2.042.04

2.09 2.09

2.09 2.10

2.04 2.10

2.10 2.10

2.04

2.09 2.10

2.09 2.10

2.09 2.102.04

2.04

2.09 2.10

2.04

2.09 2.10

2.25

2.28

2.13

2.05

2.13 2.09

2.10

2.10

2.16

2.04

2.09 2.10

2.09 2.09 2.09

2.32

2.28 2.25

2.10

2.22 2.07

2.10

2.05

2.25

2.28

2.10

2.50 2.50 2.50 2.50

2.50

2.51 2.51 2.51 2.51 2.51

2.512.512.512.512.512.512.512.512.51

2.52

2.52

2.51

2.51

2.51

2.51 2.51

2.51

2.51

2.51

2.07

2.10

2.07 2.10

2.10 2.07

2.25 2.11

2.07

2.10 2.10

2.10 2.07 2.102.11

2.11

2.12

2.38

2.14

2.15

2.37

2.37

2.40

2.40

2.40

2.40 Typ.

Typ.

Typ.

2.40

2.40

2.40

2.40

Typ.

Typ.

Typ.

Typ.

2.16

2.16

2.05

2.05 2.072.07

2.17

2.21

2.12

2.52 2.13

2.18

2.06

2.31

2.04

2.40 Typ.

2.05

2.16

2.17

2.21

2.06

2.18

2.12

2.05

2.072.07

2.51 2.13

2.04

2.12

2.31

2.40 Typ.

2.05

2.50 2.13

2.16

2.06

2.06

2.07

2.05

2.18

2.04

2.13

2.07

2.40 Typ.

DEMOLITION LEGEND

Existing wall to remain

Door slab to be demolished, frame to remain.

No work unless otherwise noted.

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:0

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

DEMOLITION PLAN

AD101

JWSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

A. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.

B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.

C. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.

D. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.

E. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.

F. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.

G. Remove existing corner guards.

H. Existing lights, diffusers, sprinkler heads, and other MEPFS items to remain. Protect during construction.

J. Remove and reinstall existing signage.

N Scale: 3/32" = 1'-0"

DEMOLITION PLAN - FIRST FLOOR

2.04 Remove existing half height wall protection, handrail, chairrail, and wood door casing. Reskim wall and prepare surfaces.

2.05 Existing door slab and existing vinyl door frame protection product to be removed. Existing HM frame to remain. Prep frame as required for new vinyl frame protection product.

2.06 Remove existing ceiling tiles, grid to remain. Paint grid P-6. Install new ceiling tiles in existing grid.

2.07 Remove existing VCT and rubber base. Prepare slab for new finishes.

2.09 Remove existing welded sheet vinyl flooring and integral base.

Prepare slab for new finishes.

2.10 Remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accessories, corner protection, and equipment.

2.11 Remove existing wall protection.

2.12 Remove existing casework. Prepare for new installation.

2.13 Remove existing half height wall protection and upper wall covering. Reskim wall and prep surface.

2.14 Existing fire extinguisher cabinet to remain.

2.15 Remove existing fire extinguisher cabinet. Patch wall as required to match adjacent finish.

2.16 Remove and reinstall existing window covering.

2.17 Existing wall tile to remain. Protect during construction.

2.18 Existing patient lift and cubicle curtains to remain. Protect in place during construction.

2.20 Existing ACT ceiling to remain.

2.21 Existing gypsum ceiling to remain.

2.22 Existing casework to remain. Protect in place during construction.

2.23 Existing plumbing fixture to remain. Protect in place during construction.

2.24 Remove and reinstall existing lockers.

2.25 Remove existing ceramic tile flooring and base. Prepare slab for new finishes.

2.26 Remove existing column furring walls.

2.27 Existing wall mounted equipment to remain. Protect in place during construction.

2.28 Remove existing wall tile. Prepare wall for new finishes.

2.30 Remove and reinstall existing water fountain as required to install new finishes.

2.31 Remove existing plumbing fixtures. See plumbing drawings.

2.32 Remove wood trim at elevators. Remove and reinstall floor indicator as required for removal and installation of finishes.

2.37 Remove existing wall mounted nurse workstations. Prepare for installation of new stations.

2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,

2.40 Remove existing interior gypsum board at exterior walls. Existing window trim to remain. Protect during construction.

2.50 Typical 1-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See detail 5 & 6 on sheet a405.

2.51 Typical 2-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See deatil 3 & 4 sheet a405

2.52 Typical 3-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See details 1 & 2 sheet a405

PLAN NOTES

GENERAL DEMOLITION NOTES

Scale: 1/4" = 1'-0"

TYPICAL 3 BED ROOM

Scale: 1/4" = 1'-0"

TYPICAL 2 BED ROOM

Scale: 1/4" = 1'-0"

TYPICAL 1 BED ROOM

Revisions Date

L

J

J

G

G

E

E

C

C M OKHFDBA

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

1 BED ROOM

W/C.B.

246A

W/C.B.

247A

W/C.B.

248A

W/C.T.

243A

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM

LOUNGE

NURSE

MANAGER

OXYGEN

STORE

240A

W/C.T.

241A

CORRIDOR

C2-7-10

CORRIDOR

C2-4-10

ELECTRICAL

CLOSET

E2-1

TELEPHONE

CLOSET

T2-1

W/C.B.

259A

W/C.T.

257A

W/C.T.

255A

W/C.T.

253A

W/C.T.

251A

1 BED ROOM

W/C.B.

250A

W/C.B.

249A

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

CORRIDOR

C2-6-10

SOILED UTIL

MD/ARNP

STAIR

S2-2HOUSEKEEPING

NOUR. KIT

263A

COPY

221A

LAUNDRY

RECEPTION /

LOUNGE

CORRIDOR

C2-2-10 W/C.T.

222A

W/C.T.

223A

MED

STORAGE

SOIL LINEN

218EMS STORE

3 BED ROOM

3 BED ROOM

3 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

W/C.T.

228A

W/C.T.

230A

1 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

W/C.T.

232A

W/C.T.

226A

W/C.T.

225A

HOUSEKEEPING

CLOSET

STAFF TOILET

LOUNGE

LINEN

STORAGE

PATIENT

BATH

CONG. TOILET

237A

CLEAN

SUPPLY

MECHANICAL

ROOM

MEA-8

REEF CAFE

LOUNGE

MECHANICAL

ROOM

MECHANICAL

ROOM

MEA-9

CORRIDOR

C2-5-10

CORRIDOR

C2-5A-10

OFFICE

207A4

DIRECTORY

GRECC

207A3

PROGRAM

ASSISTANT

207A2

ADMINISTRATIVE

OFFICER

207A1

CLINICAL

CENTER

207A

OFFICE

207C1

OFFICE

207C2

OFFICE

207C3

OFFICE

207C

DIRECTOR

A.G.U.

207B

CORRIDOR

207-10

RESEARCH

DIRECTOR,

GRECC

207H

STAFF TOILET

LABORATORY

#1

205B

CORRIDOR

205-10

LABORATORY

#2

205A

LAB

205A2

LAB

205A1

LABORATORY

#3

DARK ROOM

204A

GENERAL

STORAGE

SECRETARY

207G

STAIR

S2-1

CORRIDOR

C2-3-10

DOCTOR'S

OFFICE

207F

SENIOR

STAFF

ASSISTANT

207E

CONFERENCE

ROOM

207D

2.28

2.09

2.05

2.05

2.05

2.05

2.05

2.05

2.22 2.10

2.25 2.29

2.05

2.05

2.05

2.05 2.05

2.05

2.05

2.05

2.05 2.05 2.05

2.05

2.05 2.05

2.05

2.12

2.10

2.262.26 2.04

2.09

2.22 2.23

2.07

2.10

AD102

1BED TYPICAL

AD102

3BED TYPICAL

AD102

2BED TYPICAL

2.16 2.07

2.10 2.13

2.31 2.25

2.29

2.07 2.10

2.34

2.05

2.16

2.07

2.13 2.10

2.23 2.12

2.07

2.28 2.10

2.16

2.09 2.10

2.34

2.22 2.23

2.07

2.10

2.09 2.09 2.09

2.322.32

2.09 2.04

2.10

2.13 2.10

2.28

2.30

2.10

2.04

2.09 2.10

2.35

2.05

2.04 2.09

2.10

2.34

2.10

2.04

2.10 2.07

2.04

2.25 2.28

2.10

2.50

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.52

2.52

2.52

2.50 2.50 2.50 2.50

2.50 2.51 2.51 2.51 2.51

2.50

2.512.512.512.512.512.512.512.512.51

2.29 2.25

2.10

2.08 2.04

2.34

2.07 2.10

2.10

2.25

2.29

2.15

2.15

2.37

2.37

2.38

2.38

2.40 Typ.

2.40 Typ.

2.40 Typ.

2.40 Typ.

2.40 Typ.

2.40 Typ.

2.40 Typ.

2.31 2.05

2.122.12

2.17

2.21 2.072.07

2.16

2.16

2.52 2.13

2.06

2.18 2.05

2.042.04

2.40 Typ.

2.05

2.05

2.31

2.17

2.21

2.51 2.13

2.18

2.12

2.12

2.16

2.042.04

2.06

2.072.07

2.40 Typ.

2.05

2.05

2.042.04

2.06

2.13

2.072.07

2.16

2.06 2.50

2.13 2.18

2.40 Typ.

DEMOLITION LEGEND

Existing wall to remain

Door slab to be demolished, frame to remain.

No work unless otherwise noted.

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:1

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

DEMOLITION PLAN

AD102

JWSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

N Scale: 3/32" = 1'-0"

DEMOLITION PLAN - SECOND FLOOR

2.04 Remove existing half height wall protection, handrail, chairrail, and wood door casing. Reskim wall and prepare surfaces.

2.05 Existing door slab and existing vinyl door frame protection product to be removed. Existing HM frame to remain. Prep frame as required for new vinyl frame protection product.

2.06 Remove existing ceiling tiles, grid to remain. Paint grid P-6. Install new ceiling tiles in existing grid.

2.07 Remove existing VCT and rubber base. Prepare slab for new finishes.

2.08 Remove existing LVT flooring and rubber base. Prepare slab for new finishes.

2.09 Remove existing welded sheet vinyl flooring and integral base.

Prepare slab for new finishes.

2.10 Remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accessories, corner protection, and equipment.

2.12 Remove existing casework. Prepare for new installation.

2.13 Remove existing half height wall protection and upper wall covering.

Reskim wall and prep surface.

2.15 Remove existing fire extinguisher cabinet. Patch wall as required to match adjacent finish.

2.16 Remove and reinstall existing window covering.

2.17 Existing wall tile to remain. Protect during construction.

2.18 Existing patient lift and cubicle curtains to remain. Protect in place during construction.

2.21 Existing gypsum ceiling to remain.

2.22 Existing casework to remain. Protect in place during construction.

2.23 Existing plumbing fixture to remain. Protect in place during construction.

2.25 Remove existing ceramic tile flooring and base. Prepare slab for new finishes.

2.26 Remove existing column furring walls.

2.28 Remove existing wall tile. Prepare wall for new finishes.

2.29 Remove existing half height wall tile and cove base. Prepare wall for new finishes.

2.30 Remove and reinstall existing water fountain as required to install new finishes.

2.31 Remove existing plumbing fixtures. See plumbing drawings.

2.32 Remove wood trim at elevators. Remove and reinstall floor indicator as required for removal and installation of finishes.

2.34 Remove existing wall covering. Reskim wall and prep surface.

2.35 Remove existing handrail. Prepare for new installation.

2.37 Remove existing wall mounted nurse workstations. Prepare for installation of new stations.

2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,

2.40 Remove existing interior gypsum board at exterior walls. Existing window trim to remain. Protect during construction.

2.50 Typical 1-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See detail 5 & 6 on sheet a405.

2.51 Typical 2-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See deatil 3 & 4 sheet a405

2.52 Typical 3-bed room: remove and reinstall existing wall mounted lights, light switches, receptacles, device covers, accesories, corner protection, and equipment. See details 1 & 2 sheet a405

A. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.

B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.

C. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.

D. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.

E. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.

F. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.

G. Remove existing corner guards.

H. Existing lights, diffusers, sprinkler heads, and other MEPFS items to remain. Protect during construction.

J. Remove and reinstall existing signage.

GENERAL DEMOLITION NOTES

PLAN NOTES

Scale: 1/4" = 1'-0"

TYPICAL 3 BED ROOM DEMO

Scale: 1/4" = 1'-0"

TYPICAL 2 BED ROOM DEMO

Scale: 1/4" = 1'-0"

TYPICAL 1 BED ROOM DEMO

Revisions Date

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

A401

A402

TOILET

125A

PATIENT

BATH

CLEAN

UTILITY

TOILET

122A

TOILET

123A

RESTROOM

MALE

Room

Mechanical Room

MEA-2

MALE

TOILETS

STAFF

107A

FEMALE

TOILETS

STAFF

TOILET

FEMALE

PATIENT

RESTROOMS

TOILET

141A

E1-1

E1-1

T1-1

T1-1 TOILET

159A

TOILET

143A TOILET

146A

TOILET

147A

TOILET

148A

TOILET

155A

TOILET

151A

TOILET

153A

GERIATRICS

AND

EXTENDED

CARE

GENERAL

STORAGE

100A

CONTROL

ROOM

GERIATRIC

DIRECTOR'S

OFFICE

SOCIAL

WORKER

PSYCHOLOGY

SERVICE

BARBER

SHOP

RECREATION

THERAPY

110 DINING ROOM

RECREATION

THERAPY

110B

STAIR

S1-1

MECH. ROOM

MEA-3A

SWITCH GEAR

MEA-2B

ELEVATOR

MACHINE RM.

MEA-2C

CORRIDOR

C1-3-10

HORTICULTURAL

THERAPY

110A

VENDING

111A

NFS

111B

HOUSEKEEPING

CORRIDOR

C1-2A-10

CORRIDOR

C1-5A-10

MECHANICAL

ROOM

EMS

STORAGE

EMS

STORAGE

MED ROOM

NURSE

MANAGER

RECEPTION /

LOUNGE

3 BED ROOM

3 BED ROOM

3 BED ROOM

2 BED ROOM

2 BED RM.

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

H.A.C.

STAFF TOILET

CLEAN

SUPPLY

TOILET

128A

TOILET

126A

CONG. TOILET

137A

TOILET

132A

TOILET

130A

MECH./OXYGEN

ROOM

MEA-1

CORRIDOR

C1-4-10

LAUNDRY

MULTIPURPOSE

ROOM

EMS

LIBRARY

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

1 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

SOILED

UTILITY

ATTENDING

PHYSICIAN

CORRIDOR

C1-7-10

CORRIDOR

C1-6-10

TOILET

145A

TOILET

150A

TOILET

149A

TOILET

157A

STAIR

S1-2

STAIR

S1-3

CORRIDOR

C1-5-10

2 BED ROOM

1 BED ROOM

2 BED ROOM

CLEAN

SUPPLY

121A

CORRIDOR

C1-2-10

C1-7

142 146 147145144143141 148

151152153154155156157158

150149

121A

129 130

128 131

132127

126 133

1-MEA

A

A

A4011-T1

A

A

A405

A405

A402

A402

141A 142A 144A143A

145A

147A 148A

149A

150A

151A152A153A154A155A156A157A158A

123A

122A

125A

126A

127A

128A

129A 130A

131A

132A

133A

137A

146A

159A

A404

A

A

A

A

A403

A403

A403

A

A403

9.20 Typ.

9.20 Typ.

9.20 Typ.

9.20 Typ.

9.20 Typ.

9.20 Typ.

9.20 Typ.

A513

A513

6.10

Typ.

6.10 Typ.

6.10 Typ.

6.10 Typ.

6.10 Typ.

6.10 Typ.

6.10 Typ.

1-E1-1

A

A

2.38

2.38

A

A

A

2.38

10.18

137B

9.1

A404

10.23

10.23

A

A

9.43

9.43

9.43

9.43 Typ.

Typ.

Typ.

9.43

9.43

Typ.

Typ.

Typ.

9.43 Typ.

9.43 Typ.

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:0

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

NOTE PLAN

A101-N

SOSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

N Scale: 3/32" = 1'-0"

NOTE PLAN - FIRST FLOOR

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. All wood blocking to be fire retardent treated.

2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,

6.10 Patient Closet Casework.

9.20 Moisture mitigiation system. Install throughout first floor where new finishes are being located.

9.43 Install new gypsum board at existing exterior wall.

10.18 Semi-recessed Fire Extinguisher Cabinet. Align with new finish.

10.23 Wall mounted work station equivalent to SHS-3254-FD-A.

Finish to be selected by architect from manufacturer's full range.

PLAN NOTES

GENERAL NOTES

Revisions Date

M.1

9.1

9.3

K.1

7.1

9.2

T

1.A

D.1 F.1

12.1

A402

GENERAL

STORAGE

LABORATORY

#3

DARK ROOM

204A

CORRIDOR

205-10

LABORATORY

#2

205A

LAB

205A1

LAB

205A2

LABORATORY

#1

205B

STAFF TOILET

CLINICAL

CENTER

207A

DIRECTOR

A.G.U.

207B

OFFICE

207C

DOCTOR'S

OFFICE

207F

SECRETARY

207G

RESEARCH

DIRECTOR,

GRECC

207H

ADMINISTRATIVE

OFFICER

207A1

PROGRAM

ASSISTANT

207A2

DIRECTORY

GRECC

207A3

OFFICE

207A4

SECRETARY

207A5

OFFICE

207C1

OFFICE

207C2

OFFICE

207C3

CORRIDOR

207-10

CORRIDOR

C2-3-10

STAIR

S2-1

CORRIDOR

C2-5-10

CORRIDOR

C2-5A-10

MECHANICAL

ROOM

MEA-9

MECHANICAL

ROOM

EMS STORE

SOIL LINEN

MED

STORAGE

LAUNDRY

RECEPTION /

LOUNGE

COPY

221A

CORRIDOR

C2-4-10

ELECTRICAL

CLOSET

E2-1

TELEPHONE

CLOSET

T2-1

MECHANICAL

ROOM

MEA-8

3 BED ROOM

3 BED ROOM

LINEN

STORAGE

3 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

1 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

LOUNGE

HOUSEKEEPING

CLOSET

STAFF TOILET

PATIENT

BATH

CLEAN

SUPPLY

NURSE

MANAGER

LOUNGE

W/C.T.

222A

W/C.T.

223A

W/C.T.

225A

W/C.T.

226A

W/C.T.

228A

STAIR

S2-3

W/C.T.

230A

W/C.T.

232A

CONG. TOILET

237A

CORRIDOR

C2-2-10

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM

1 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

1 BED ROOM

OXYGEN

STORE

240A

W/C.T.

241A

W/C.T.

243A

W/C.B.

245A

W/C.B.

246A

W/C.B.

247A

W/C.B.

248A

W/C.B.

250A

W/C.B.

249A

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

2 BED ROOM

SOILED UTIL

MD/ARNP

HOUSEKEEPING

NOUR. KIT

263A

REEF CAFE

LOUNGE

STAIR

S2-2

CORRIDOR

C2-7-10

CORRIDOR

C2-6-10 W/C.T.

251A

W/C.T.

253A

W/C.T.

255A

W/C.T.

257A W/C.B.

259A

CONFERENCE

ROOM

207DSENIOR

STAFF

ASSISTANT

207E

258 257

251252

253254

246 249245

243241240

233226

228 231

230229

244242

MEA-8

C2-7

E2-1 T2-1

221A

259A

258A 257A 256A 255A 254A 253A 252A 251A

241A 242A

240A

243A 244A

245A

246A 247A 248A

250A

249A

225A

226A 233A

232A227A

228A 231A

230A229A

237A

223A

222A

A

A404

A404

A

A

A404

A404

A

6.10

TYP.

6.10

TYP.

6.10

TYP.6.10

Typ.

6.10 Typ.

6.10

6.10 Typ.

Typ.

A

A

A

221A

10.18

A401 sim

A401

A

A sim sim sim 10.18

A404

B

A404

C

10.23

10.23

A402

A

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:0

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

NOTE PLAN

A102-N

SOSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. All wood blocking to be fire retardent treated.

6.10 Patient Closet Casework.

10.18 Semi-recessed Fire Extinguisher Cabinet. Align with new finish.

10.23 Wall mounted work station equivalent to SHS-3254-FD-A.

Finish to be selected by architect from manufacturer's full range.

PLAN NOTES

GENERAL NOTES

N Scale: 3/32" = 1'-0"

NOTE PLAN - SECOND FLOOR

Revisions Date

N

125A

122A

123A

MEA-2

107A 108

141A

E1-1 T1-1 159A

143A 146A 147A 148A

155A 151A153A

100100A101102103104

110 111110B

S1-1

MEA-3A

MEA-2B MEA-2C

C1-3-10

110A

111A 111B112

C1-2A-10

C1-5A-10

117 118

129 130

128A

126A

137A

132A

130A

MEA-1

C1-4-10

140 141 142 143 144

145 146 147 148 149

151152153154155156157158159

C1-7-10

C1-6-10

145A

150A

149A

157A

S1-2

S1-3

C1-5-10

121A

C1-2-10

9.39 9.39

A121

1BED TYPICAL

A121

2BED TYPICAL

A121

3BED TYPICAL

2.062.06

2.06

2.062.06

2.06

2.06 2.06

2.06

2.06

2.062.06

2.06

2.062.06

2.062.06

2.062.062.062.062.06

2.06

2.06

2.06

2.06

2.06 2.06

2.06

2.06

2.21

2.06

2.33

2.36

2.362.06

2.06

ACT-3ACT-3

ACT-3

ACT-3

ACT-3

ACT-3

ACT-1

ACT-1

ACT-1

ACT-1

ACT-1

ACT-1

ACT-2

ACT-2

ACT-2 ACT-1

ACT-1

ACT-2

ACT-1

ACT-1

ACT-1

ACT-1

ACT-1

ACT-1

ACT-2

2.06

2.06

2.06

ACT-1

2.06

ACT-3

ACT-3

ACT-3

ACT-1

ACT-2

ACT-1

ACT-1ACT-1

ACT-1

2.06 2.06

2.06 2.06

2.06

2.06

REFLECTED CEILING PLAN LEGEND

Recessed downlight fixture

Supply Air Diffuser

Return Air Grille2' x 4' light fixture

2' x 2' acoustical tile ceiling

Gypsum board / portland cement plaster ceiling / soffit - painted

Pendant light fixture

Chain-hung light fixture

Access panel

Recessed wall-wash fixture

Surface-mounted strip light fixture

2.06

2.18

2.06

ACT-2

2.21

2.18

2.06

ACT-2

2.212.06

2.18

ACT-2

LEGEND

Existing wall to remain

No work unless otherwise noted.

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:1

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

REFLECTED CEILING PLAN - FIRST

FLOOR

A121

JWSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

N Scale: 3/32" = 1'-0"

REFLECTED CEILING PLAN - FIRST FLOOR

A. All wood blocking shall be fire retardant.

B. Light fixtures, sprinkler heads, communication devices, patient lift, and HVAC devices shall remain. Protect during construction.

C. See Electrical drawings for additional information regarding final information and quantites of devices to be installed in ceiling.

D. Ceiling height to remain as is.

E. All gypsum board ceilings to be painted P-6 unless noted otherwise.

F. Remove and replace all existing ceiling tile within scope of work.

2.06 Remove existing ceiling tiles, grid to remain. Paint grid P-6.

Install new ceiling tiles in existing grid.

2.18 Existing patient lift and cubicle curtains to remain. Protect in place during construction.

2.21 Existing gypsum ceiling to remain.

2.33 Existing ceiling mounted tables to remain.

2.36 Existing metal perimeter trim to remain. Paint grid P-6.

9.39 Modify existing ceiling as required for new column enclosure configuration.

PLAN NOTES

GENERAL NOTES

N.T.S.Scale:

TYPICAL 1 BED ROOM RCP

N.T.S.Scale:

TYPICAL 2 BED ROOM RCP

N.T.S.Scale:

TYPICAL 3 BED ROOM RCP

Revisions Date

BB

N

9.39

C2-5-10

C2-5A-10

217 218

221A

C2-4-10

229 230

239 240

C2-2-10

241 242 243 244

246 247 248 249

240A

250A

249A

251252253254255256257258259

263A

C2-7-10

C2-6-10

9.39

2.06

2.06

A122

1-BED TYPICAL

A122

2-BED TYPICAL

A122

3-BED TYPICAL

2.06

2.06

2.06

2.06 2.06

2.06

2.06

2.33

2.06

2.06

2.06

2.062.06

2.06

2.062.06

2.06

2.21

2.362.06

2.362.06

ACT-1

ACT-1

ACT-1

ACT-1

ACT-1ACT-2 ACT-2

ACT-2

ACT-3

2.06

ACT-2

2.06

ACT-2

ACT-1

ACT-1 ACT-1

2.06

ACT-1

ACT-1

ACT-1

ACT-2

ACT-1

2.06

2.06

9.40

2.06

2.06

REFLECTED CEILING PLAN LEGEND

Recessed downlight fixture

Supply Air Diffuser

Return Air Grille2' x 4' light fixture

2' x 2' acoustical tile ceiling

Gypsum board / portland cement plaster ceiling / soffit - painted

Pendant light fixture

Chain-hung light fixture

Access panel

Recessed wall-wash fixture

Surface-mounted strip light fixture

2.06

2.18

2.06

ACT-2

2.21

2.06

2.18

ACT-2

2.212.06

2.18ACT-2

LEGEND

Existing wall to remain

No work unless otherwise noted.

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:1

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

REFLECTED CEILING PLAN -

SECOND FLOOR

A122

JWSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

N Scale: 3/32" = 1'-0"

REFLECTED CEILING PLAN - SECOND FLOOR

A. All wood blocking shall be fire retardant.

B. Light fixtures, sprinkler heads, communication devices, patient lift, and HVAC devices shall remain. Protect during construction.

C. See Electrical drawings for additional information regarding final information and quantites of devices to be installed in ceiling.

D. Ceiling height to remain as is.

E. All gypsum board ceilings to be painted P-6 unless noted otherwise.

F. Remove and replace all existing ceiling tile within scope of work.

GENERAL NOTES

2.06 Remove existing ceiling tiles, grid to remain. Paint grid P-6.

Install new ceiling tiles in existing grid.

2.18 Existing patient lift and cubicle curtains to remain. Protect in place during construction.

2.21 Existing gypsum ceiling to remain.

2.33 Existing ceiling mounted tables to remain.

2.36 Existing metal perimeter trim to remain. Paint grid P-6.

9.39 Modify existing ceiling as required for new column enclosure configuration.

9.40 Modify existing ceiling grid as required.

PLAN NOTES

Scale: 1/4" = 1'-0"

TYPICAL 1-BED ROOM RCP

Scale: 1/4" = 1'-0"

TYPICAL 2-BED ROOM RCP

Scale: 1/4" = 1'-0"

TYPICAL 3 BED ROOM RCP

Revisions Date

X

X

Toilet Accessory

Equipment

Keynote

Material Finish

SYMBOL LEGEND

RB-1

RWP-1

HR-1

P-2

P-2

P-2

RWP-1

1'-0" 1'-8"

WP-1

1'-8"1'-0" 1'-8"1'-0"

10.03

HR-1

RWP-1

WP-1 RWP-1

HR-1

RB-1

WP-1WP-1WP-1 WP-1 WP-1

150149148146 147144 145142 143141

1'-8" 1'-0"

RB-1

1'-8"1'-0"

RB-1

WP-1RB-1

10.03 10.03

RB-1 RWP-1

HR-1WP-1

10.03

Typ.

Typ.

Typ.

Typ.

Typ.

Typ.Typ.

Typ.

Typ.

RWP-1

HR-1

RB-1

Typ.

Typ. Typ.

P-1P-1P-2 P-2P-2P-2P-2

Typ.

Typ.

P-2P-2 10.03

301130863013030113030301130301130306301 31 6 8 630 325

10.182.38

1'-8" 1'-8"1'-0" 1'-0"1'-8" 1'-8"1'-0"

10.0310.03

HR-1

WP-1

RB-1

HR-1WP-1

P-2 WP-1P-2WP-1WP-1

RB-1

HR-1 CG-2

151 152 153 155154 158157156 1-T1

CG-2

9 11/256" P-2

WP-1

HR-1

RB-1

Typ. Typ.

Typ.

Typ.Typ.Typ.

Typ.

Typ.

Typ.

RWP-1

RB-1

HR-1

RB-1 WP-6

Typ.

Typ.

?WP-6

Typ.

P-2 P-2 P-2

P-2

P-2

OPEN

RWP-2

10.20

Typ.

Typ.

30130

301130103011303030113030

10.20

10.23

Typ.

1'-8" 1'-0" 1'-4 1/2"1'-0" 1'-8" 1'-8" 1'-0" 1'-0"

10.03WP-1 P-2 P-2

HR-1

RWP-1

RB-1

WP-1

WP-1

RWP-1

RWP-1

RWP-1

HR-1WP-1 CG-2

120138133 134 135 136 137131 132130

9 1/4"

HR-1

RWP-1

RB-1

RWP-1RB-1

RB-1

Typ.

Typ.

Typ.

Typ.

Typ.

P-1WP-6

Typ.

WP-6

Typ.

P-2 P-2

1'-0" 1'-4"

OPEN

CG-2

OPEN

WP-5

RB-3

WP-5WP-1 RWP-2 301930

93030303011111 30

RB-1

2530 30 30 10 5

12WP-5

10.23

1'-0" 1'-8"1'-8" 1'-0"

10.03 10.03 WP-1

P-2

HR-1

RWP-1

RB-1

WP-1WP-1 P-2

WP-1HR-1

P-2WP-1

RB-1

HR-1

RB-1

119 122 125124123 126 127 128 129

HR-1

1'-0" 1'-8"1'-8" 1'-0"

RWP-1 RWP-1 RWP-1

8"

10.03WP-1 WP-1P-2 P-2

Typ. Typ.

HR-1

RWP-1

RB-1

Typ.

HR-1

RWP-1

RB-1

WP-6

Typ. Typ.

Typ.

10.03

Typ.

10.20 10.03

Typ.

Typ.

10.03

Typ.

19 30 1 830 30 6 1 30 30 30 1 30 6 8 1 30 30 1 1 30 6 30 1 Typ.

WP-1

4130 30 30 3535 25 2530 25 25 Typ.

2.14 10.18

Typ.

OPEN

HR-1

RWP-1

RB-1

25 30 1

OPEN

HR-1

RWP-1

RB-1

CG-2

306 25

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:2

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

INTERIOR ELEVATIONS

A401

SMSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

A. RWP in corridors to stop at 4' to meet the top of the CG-2.

B. See sheet A511 for Casework Details.

C. See sheet AF603 for Finish Materials Legend.

D. All handrails to stop 2" before wall or door frame. Handrail height to match existing.

2.14 Existing fire extinguisher cabinet to remain.

2.38 Existing fire extinguisher cabinet to be reset as required to be flush flush with new finish face.,

10.03 All existing signages to be removed and reinstalled In the renovated areas.

10.18 Semi-recessed Fire Extinguisher Cabinet. Align with new finish.

10.20 Contractor to remove and reinstall.

10.23 Wall mounted work station equivalent to SHS-3254-FD-A.

Finish to be selected by architect from manufacturer's full range.

ELEVATION NOTES

GENERAL INT. ELEVATION NOTES

Scale: 1/4" = 1'-0"

Typ. Patient Rooms Corridor

Scale: 1/4" = 1'-0"

Corridor - C1-6-10

Wall Mounted Item Schedule

Type Mark Device Name Comments

1 Nurse Call Dome Light Remove. Provide junction box extension and reinstall device.

2 Med Gas Alarm Remove and reinstall device cover.

3 Manual Fire Alarm Pull Remove and reinstall device cover.

4 Fire Alarm Remove and reinstall device cover.

5 Thermostat Remove and reinstall device cover.

6 Fire Alarm Strobe Remove and reinstall device cover.

8 Fire Extinguisher Sign Remove and reinstall.

9 Flatscreen TV Remove and reinstall.

10 Nurse Phone Remove. Provide junction box extension and reinstall device.

11 Telecommunication Outlet Remove and reinstall device cover.

12 Electric Outlet Remove and reinstall device cover.

13 Light Switch Remove and reinstall device cover.

14 Patient Room Light Fixture Remove and reinstall.

15 Intercom - Room to Room Remove. Provide junction box extension and reinstall device.

16 Clock Remove and reinstall.

17 TV Wall Bracket Adjustable Remove and reinstall.

18 Speaker Cover Remove and reinstall device cover.

19 Door Actuator Remove and reinstall device cover.

20 Patient Lift 3-Bed Room To remain.

Wall Mounted Item Schedule

Type Mark Device Name Comments

21 Patient Lift 2-Bed Room To remain.

22 Patient Lift 1-Bed Room To remain.

23 Window Treatment To remain.

24 White Board Remove and reinstall.

25 Artwork Remove and reinstall.

26 Track To remain.

27 Bulletin Board Remove and reinstall.

28 Sharps Container Remove and reinstall.

29 Combo Whiteboard/Bulletin Remove and reinstall.

30 Signage Remove and reinstall.

31 Convex Mirror Remove and reinstall.

32 Key Pad Remove and reinstall device cover.

33 Elevator Call Button Remove and reinstall device cover.

34 Elevator Floor Indicator Remove. Provide junction box extension and reinstall device.

35 Device Remove and reinstall.

36 Control Panel To remain.

37 Wall Sconce Remove and reinstall.

38 Medication Cabinet Remove and reinstall.

39 Glove Dispenser Remove and reinstall.

40 Hand Sanitizer Dispenser Remove and reinstall.

41 Exit Sign Lighted Remove and reinstall.

Revisions Date

P-3

BT-1

WP-4

WP-4

WP-2

10.0610.06

RWP-1

RB-2

WP-3

A513

WP-3

WP-3

RWP-1

SS-2

WP-2

P-3 P-3 95

12 11

14 14

10.21

X

X

Toilet Accessory

Equipment

Keynote

Material Finish

SYMBOL LEGEND

HR-1

RWP-1

WP-5SS-1

SS-1

RB-3 RB-1

6.29

Typ.

10.03 6309 353541 25

HR-1

RWP-1

RB-1

RWP-1

RB-1

P-1

HR-1

OPEN

RWP-1

WP-5

10.0311 3025

RB-4

121A

?RB-2

Typ.

OPEN OPEN

A513 P-3

SS-2SS-2

10.06

SS-2

SS-2

WP-3

WP-4

BT-1

37 37 4 1 63 52 430 3516

?WP-6

RWP-1

10.21

121A

CG-2

RB-1

OPEN OPEN

WP-5WP-5

WP-5

SS-1

WP-5

RB-3

6.29

P-3

RWP-1

SS-2

10.06

Typ.

SS-2

BT-1

RB-2

37 37 4 1 63 542930

?WP-6

1-E1-1

SS-2SS-2

RB-4

RB-4

WP-4

WP-3

?PL-2

SS-1

SS-1

WP-5

OPEN

PL-211

PL-2

RB-5

RB-4

OPEN

HR-1

RWP-1

RB-1

HR-1

RWP-1

RB-1

CG-2

CG-2

3030 306

140 161 162

25 11

OPEN

RB-1

RWP-1

HR-1

1 25

P-3

WP-4

WP-4

WP-3

SS-2

10.0610.06

RB-2

WP-3 9 16

RWP-1

BT-1

WP-2

RWP-1

SS-2

10.21

8"

1' - 0"

3' - 0"

Note: Flush valve located on accessible side

6"

1' - 6"

B

A

M

IN

L

C

Note:

Beginning of reflective surface

MIN.

7"

E

T o D is p e n s e r

O p e n in g

G

I

Finish Floor1

D

1'-9"

T o

O p e ra b le

M e c h a n is m

H

SS-1

PL-2

OPEN

SS-1

PL-2

RB-5

WP-5

SS-1

SS-1

SS-1

WP-5

PL-2

SS-1

SS-1

OPENOPEN

RB-3

11WP-5

RB-4

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:3

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

INTERIOR ELEVATIONS

A402

SMSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

TOILET ACCESSORIES SCHEDULE

MARK ITEM JSN #

PROVIDED

BY

INSTALLED

BY

O W

N E

R

C O

N T

R A

C T

O R

O W

N E

R

C O

N T

R A

C T

O R

A Grab Bar - 18" Length B-6806 X 18 X X

B Grab Bar - 42" Length B-6806 X 42 X X

C Grab Bar - 36" Length B-6806 X 36 X X

D Toilet Tissue Dispenser BY OWNER X X

E Mirror - 24" x 36" B-290 2436 X X

F Trash Can BY OWNER X X

G Paper Towel Dispenser BY OWNER X X

H Soap Dispenser BY OWNER X X

I Sanitary Napkin Dispenser X X

A. RWP in corridors to stop at 4' to meet the top of the CG-2.

B. See sheet A511 for Casework Details.

C. See sheet AF603 for Finish Materials Legend.

D. All handrails to stop 2" before wall or door frame. Handrail height to match existing.

ELEVATION NOTES

GENERAL INT. ELEVATION NOTES

Scale: 1/4" = 1'-0"

Dining Room TV Wall - 111

Scale: 1/4" = 1'-0"

Nurse Station

6.29 Casework Detail On A511 Sheet

10.03 All existing signages to be removed and

reinstalled In the renovated areas.

10.06 Contractor is responsible for

coordinating the layout of the new wall protection with existing wall mounted devices. Contractor to provide layout drawings for aproval prior to installation.

10.21 Electric fireplace. See electrical

drawings.

Scale: 1/4" = 1'-0"

C1-4-10

Wall Mounted Item Schedule

Type Mark Device Name Comments

1 Nurse Call Dome Light Remove. Provide junction box extension and reinstall device.

2 Med Gas Alarm Remove and reinstall device cover.

3 Manual Fire Alarm Pull Remove and reinstall device cover.

4 Fire Alarm Remove and reinstall device cover.

5 Thermostat Remove and reinstall device cover.

6 Fire Alarm Strobe Remove and reinstall device cover.

8 Fire Extinguisher Sign Remove and reinstall.

9 Flatscreen TV Remove and reinstall.

10 Nurse Phone Remove. Provide junction box extension and reinstall device.

11 Telecommunication Outlet Remove and reinstall device cover.

12 Electric Outlet Remove and reinstall device cover.

13 Light Switch Remove and reinstall device cover.

14 Patient Room Light Fixture Remove and reinstall.

15 Intercom - Room to Room Remove. Provide junction box extension and reinstall device.

16 Clock Remove and reinstall.

17 TV Wall Bracket Adjustable Remove and reinstall.

18 Speaker Cover Remove and reinstall device cover.

19 Door Actuator Remove and reinstall device cover.

20 Patient Lift 3-Bed Room To remain.

Wall Mounted Item Schedule

Type Mark Device Name Comments

21 Patient Lift 2-Bed Room To remain.

22 Patient Lift 1-Bed Room To remain.

23 Window Treatment To remain.

24 White Board Remove and reinstall.

25 Artwork Remove and reinstall.

26 Track To remain.

27 Bulletin Board Remove and reinstall.

28 Sharps Container Remove and reinstall.

29 Combo Whiteboard/Bulletin Remove and reinstall.

30 Signage Remove and reinstall.

31 Convex Mirror Remove and reinstall.

32 Key Pad Remove and reinstall device cover.

33 Elevator Call Button Remove and reinstall device cover.

34 Elevator Floor Indicator Remove. Provide junction box extension and reinstall device.

35 Device Remove and reinstall.

36 Control Panel To remain.

37 Wall Sconce Remove and reinstall.

38 Medication Cabinet Remove and reinstall.

39 Glove Dispenser Remove and reinstall.

40 Hand Sanitizer Dispenser Remove and reinstall.

41 Exit Sign Lighted Remove and reinstall.

Scale: 1/4" = 1'-0"

Reef Cafe Lounge - 263

N.T.S.Scale:

01_Typical Mounting Heights - Toilet Accessories

Revisions Date

OPEN

HR-1

RWP-1

RB-1

CG-2

10.03

Typ.

32 32

30 37 37 343434

33 33 3535

RWP-3 WP-1 RWP-3 WP-1 RWP-3 WP-1

RWP-3

RB-1

HR-1

RWP-1

RB-1

363541

OPEN

HR-1

RWP-1

RB-1

HR-1

RWP-1

RB-1

CG-2

Typ.

30 6 37 30 37 30 37 3010.03 10.03

Typ.

30 305

OPEN OPEN

CG-1

CG-2

RB-1RWP-1

RB-1

HR-1

RWP-2

CG-1

10.03

Typ.

30 30 2.3030 30 30 30 30 30 30 30 30 30 25 25 30 3030 8

2.14

OPENOPEN

HR-1

RWP-1

RB-1

CG-2

CG-1

HR-1

RWP-1

RB-1

10.03

Typ.

30 30 30530 30 25

30 30 25

OPEN

CG-2 HR-1

RWP-1

RB-1

CG-1 HR-1

RWP-1

RB-1

HR-1

RWP-1

RB-1

HR-1

RWP-1

RB-1

RWP-1

30 30 6 30 6 32 6 8

307 308

2.14

CG-2

RWP-1CG-1CG-1 HR-1

RWP-1

RB-1

HR-1

RWP-1

RB-1

HR-1

RWP-1

RB-1

HR-1

RWP-1

RB-1

CG-2CG-2

10.03

Typ.

32 30 30 30 3 30 30 30 3232

42 42

312 310

X

X

Toilet Accessory

Equipment

Keynote

Material Finish

SYMBOL LEGEND

OPEN

HR-1

RWP-1

RB-1

CG-2

30 25

63 30

OPEN

RWP-1

RB-1

30 30 30 30 1

CG-2

OPEN

HR-1

RWP-1

RB-1

CG-2

25 30 25

CG-2

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

ROGER

A.

REPSTIEN

1301066948

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/7

/2

:3

:3

A

M

VA Miami - CLC Renovation 1st and 2nd floors TOPR

05/12/2023

INTERIOR ELEVATIONS

A403

SMSO

546-22-121

MIAMI VA

ALBINO WISELL

CONSTRUCTION

DOCUMENTS

22015.00

Scale: 1/4" = 1'-0"

Corridors - C1-5A-10 & C1-5-10 3 2 1

5 4

Scale: 1/4" = 1'-0"

Corridor - C1-2A-10

Scale: 1/4" = 1'-0"

Corridor - C1-3-10

A. RWP in corridors to stop at 4' to meet the top of the CG-2.

B. See sheet A511 for Casework Details.

C. See sheet AF603 for Finish Materials Legend.

D. All handrails to stop 2" before wall or door frame. Handrail height to match existing.

2.14 Existing fire extinguisher cabinet to remain.

2.30 Remove and reinstall existing water fountain as required to install new finishes.

10.03 All existing signages to be removed and reinstalled In the renovated areas.

ELEVATION NOTES

GENERAL INT. ELEVATION NOTES

Wall Mounted Item Schedule

Type Mark Device Name Comments

1 Nurse Call Dome Light Remove. Provide junction box extension and reinstall device.

2 Med Gas Alarm Remove and reinstall device cover.

3 Manual Fire Alarm Pull Remove and reinstall device cover.

4 Fire Alarm Remove and reinstall device cover.

5 Thermostat Remove and reinstall device cover.

6 Fire Alarm Strobe Remove and reinstall device cover.

8 Fire Extinguisher Sign Remove and reinstall.

9 Flatscreen TV Remove and reinstall.

10 Nurse Phone Remove. Provide junction box extension and reinstall device.

11 Telecommunication Outlet Remove and reinstall device cover.

12 Electric Outlet Remove and reinstall device cover.

13 Light Switch Remove and reinstall device cover.

14 Patient Room Light Fixture Remove and reinstall.

15 Intercom - Room to Room Remove. Provide junction box extension and reinstall device.

16 Clock Remove and reinstall.

17 TV Wall Bracket Adjustable Remove and reinstall.

18 Speaker Cover Remove and reinstall device cover.

19 Door Actuator Remove and reinstall device cover.

20 Patient Lift 3-Bed Room To remain.

Wall Mounted Item Schedule

Type Mark Device Name Comments

21 Patient Lift 2-Bed Room To remain.

22 Patient Lift 1-Bed Room To remain.

23 Window Treatment To remain.

24 White Board Remove and reinstall.

25 Artwork Remove and reinstall.

26 Track To remain.

27 Bulletin Board Remove and reinstall.

28 Sharps Container Remove and reinstall.

29 Combo Whiteboard/Bulletin Remove and reinstall.

30 Signage Remove and reinstall.

31 Convex Mirror Remove and reinstall.

32 Key Pad Remove and reinstall device cover.

33 Elevator Call Button Remove and reinstall device cover.

34 Elevator Floor Indicator Remove. Provide junction box extension and reinstall device.

35 Device Remove and reinstall.

36 Control Panel To remain.

37 Wall Sconce Remove and reinstall.

38 Medication Cabinet Remove and reinstall.

39 Glove Dispenser Remove and reinstall.

40 Hand Sanitizer Dispenser Remove and reinstall.

41 Exit Sign Lighted Remove and reinstall.

Scale: 1/4" = 1'-0"

Corridors -…

This is the start of the file's text. The full file is on GovTribe.