UPDATED B.2 Price Cost Schedule 122925.docx
DOCX document 43 KB Posted
- Solicitation number
- 36C24825R0029
About this file
This document is a Price/Cost Schedule for a Veterans Affairs Home Oxygen Services contract for VISN 8 (North Florida/South Georgia Healthcare System). The solicitation (36C24825R0029) is set aside for service-disabled veteran-owned small businesses in the Home Health Equipment Rental industry (NAICS 532283), with a base period from 04-01-2026 to 03-31-2027 and four additional one-year option periods extending through 03-31-2031. The pricing schedule includes 19 line items for each contract period, covering services such as H/M Tank Setup, Portable System Rental, Cylinder Rentals (E, C/D, M6), Liquid Oxygen Base Rental, Emergency RCP Follow-up, Equipment Maintenance, and various support services. The most recent amendment extends the proposal submission deadline to February 9th, 2026, at 4 pm EST, following a GAO protest and multiple previous deadline extensions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24825R0029 0008_1.docx | DOCX document | |
| 36C24825R0029 0007.docx | DOCX document | |
| 36C24825R0029 0007_1.docx | DOCX document | |
| D.7 Revised Vendor Questions and Answers_091125.docx | DOCX document | |
| D.4 Revised WAGE DETERMINATION_NFSG Home Oxygen_091125.docx | DOCX document | |
| B.4 Revised Statement of Work NFSG Home Oxygen_091125 02.docx | DOCX document | |
| B.1 Revised Contract Administration Data_091125.docx | DOCX document | |
| 36C24825R0029 0006_1.docx | DOCX document | |
| 36C24825R0029 0005_1.docx | DOCX document | |
| 36C24825R0029 0004_1.docx | DOCX document | |
| 36C24825R0029 0003 02.docx | DOCX document | |
| 36C24825R0029 0003_1.docx | DOCX document | |
| 36C24825R0029 0002_1.docx | DOCX document | |
| B.4 Revised Statement of Work NFSG Home Oxygen 7-14-25.pdf | ||
| 36C24825R0029 0001_1.docx | DOCX document | |
| D.7 Vendor Questions and Answers.pdf | ||
| 36C24825R0029_2.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPDATED B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| ESTIMATED |
QUANTITY
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 322.00 |
| EA |
| ________________ |
| ________________ |
H/M Tank Setup Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 532283 - Home Health Equipment Rental PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Equipment, and Supplies
| 267.00 |
| EA |
| ________________ |
| ________________ |
H/M Refills/Switchouts
POP Begin: 04-01-2026 POP End: 03-31-2027
| 460.00 |
| EA |
| ________________ |
| ________________ |
Setups/Restarts
POP Begin: 04-01-2026 POP End: 03-31-2027
| 11,633.00 |
| EA |
| ________________ |
| ________________ |
Portable System Rental
POP Begin: 04-01-2026 POP End: 03-31-2027
| 10,240.00 |
| EA |
| ________________ |
| ________________ |
E Cylinder (4-ft tall)
POP Begin: 04-01-2026 POP End: 03-31-2027
| 1,706.00 |
| EA |
| ________________ |
| ________________ |
C/D Cylinder (2-ft tall)
POP Begin: 04-01-2026 POP End: 03-31-2027
| 12,640.00 |
| EA |
| ________________ |
| ________________ |
M6 Cylinder (1-ft tall)
POP Begin: 04-01-2026 POP End: 03-31-2027
| 53.00 |
| EA |
| ________________ |
| ________________ |
Conserver Cannula
POP Begin: 04-01-2026 POP End: 03-31-2027
| 3,003.00 |
| EA |
| ________________ |
| ________________ |
Liquid Oxygen Base Rental
POP Begin: 04-01-2026 POP End: 03-31-2027
| 4,402.00 |
| EA |
| ________________ |
| ________________ |
Liquid Portable Unit Rental
POP Begin: 04-01-2026 POP End: 03-31-2027
| 355,580 |
| LB |
| ________________ |
| ________________ |
Lox lbs
POP Begin: 04-01-2026 POP End: 03-31-2027
| 88.00 |
| EA |
| ________________ |
| ________________ |
Emergency RCP/RCP Follow-up
POP Begin: 04-01-2026 POP End: 03-31-2027
| 176.00 |
| EA |
| ________________ |
| ________________ |
50 PSI Compressor rental
POP Begin: 04-01-2026 POP End: 03-31-2027
| 6,218.00 |
| EA |
| ________________ |
| ________________ |
Maint of VA Equipment/Quarterly and After Hours
POP Begin: 04-01-2026 POP End: 03-31-2027
| 34.00 |
| EA |
| ________________ |
| ________________ |
Unscheduled Pickup
POP Begin: 04-01-2026 POP End: 03-31-2027
| 532.00 |
| EA |
| ________________ |
| ________________ |
Support for Cough-Assist
POP Begin: 04-01-2026 POP End: 03-31-2027
| 539.00 |
| EA |
| ________________ |
| ________________ |
Initial Setup/Monthly SVC VA- Ventilator
POP Begin: 04-01-2026 POP End: 03-31-2027
| 57.00 |
| EA |
| ________________ |
| ________________ |
"Veteran " Relocate(Coverage/Shipping)
POP Begin: 04-01-2026 POP End: 03-31-2027
| 308.00 |
| EA |
| ________________ |
| ________________ |
"Out of Area" Per Contract Coverage
POP Begin: 04-01-2026 POP End: 03-31-2027
| 322.00 |
| EA |
| ________________ |
| ________________ |
H/M Tank Setup Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 267.00 |
| EA |
| ________________ |
| ________________ |
H/M Refills/Switchouts
POP Begin: 04-01-2027 POP End: 03-31-2028
| 460.00 |
| EA |
| ________________ |
| ________________ |
Setups/Restarts
POP Begin: 04-01-2027 POP End: 03-31-2028
| 11,633.00 |
| EA |
| ________________ |
| ________________ |
Portable System Rental
POP Begin: 04-01-2027 POP End: 03-31-2028
| 10,240.00 |
| EA |
| ________________ |
| ________________ |
E Cylinder (4-ft tall)
POP Begin: 04-01-2027 POP End: 03-31-2028
| 1,706.00 |
| EA |
| ________________ |
| ________________ |
C/D Cylinder (2-ft tall)
POP Begin: 04-01-2027 POP End: 03-31-2028
| 12,640.00 |
| EA |
| ________________ |
| ________________ |
M6 Cylinder (1-ft tall)
POP Begin: 04-01-2027 POP End: 03-31-2028
| 53.00 |
| EA |
| ________________ |
| ________________ |
Conserver Cannula
POP Begin: 04-01-2027 POP End: 03-31-2028
| 3,003.00 |
| EA |
| ________________ |
| ________________ |
Liquid Oxygen Base Rental
POP Begin: 04-01-2027 POP End: 03-31-2028
| 4,402.00 |
| EA |
| ________________ |
| ________________ |
Liquid Portable Unit Rental
POP Begin: 04-01-2027 POP End: 03-31-2028
| 355,580 |
| LB |
| ________________ |
| ________________ |
Lox lbs
POP Begin: 04-01-2027 POP End: 03-31-2028
| 88.00 |
| EA |
| ________________ |
| ________________ |
Emergency RCP/RCP Follow-up
POP Begin: 04-01-2027 POP End: 03-31-2028
| 176.00 |
| EA |
| ________________ |
| ________________ |
50 PSI Compressor rental
POP Begin: 04-01-2027 POP End: 03-31-2028
| 6,218.00 |
| EA |
| ________________ |
| ________________ |
Maint of VA Equipment/Quarterly and After Hours
POP Begin: 04-01-2027 POP End: 03-31-2028
| 34.00 |
| EA |
| ________________ |
| ________________ |
Unscheduled Pickup
POP Begin: 04-01-2027 POP End: 03-31-2028
| 532.00 |
| EA |
| ________________ |
| ________________ |
Support for Cough-Assist
POP Begin: 04-01-2027 POP End: 03-31-2028
| 539.00 |
| EA |
| ________________ |
| ________________ |
Initial Setup/Monthly SVC VA- Ventilator
POP Begin: 04-01-2027 POP End: 03-31-2028
| 57.00 |
| EA |
| ________________ |
| ________________ |
"Veteran " Relocate(Coverage/Shipping)
POP Begin: 04-01-2027 POP End: 03-31-2028
| 308.00 |
| EA |
| ________________ |
| ________________ |
"Out of Area" Per Contract Coverage
POP Begin: 04-01-2027 POP End: 03-31-2028
| 322.00 |
| EA |
| ________________ |
| ________________ |
H/M Tank Setup Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 267.00 |
| EA |
| ________________ |
| ________________ |
H/M Refills/Switchouts
POP Begin: 04-01-2028 POP End: 03-31-2029
| 460.00 |
| EA |
| ________________ |
| ________________ |
Setups/Restarts
POP Begin: 04-01-2028 POP End: 03-31-2029
| 11,633.00 |
| EA |
| ________________ |
| ________________ |
Portable System Rental
POP Begin: 04-01-2028 POP End: 03-31-2029
| 10,240.00 |
| EA |
| ________________ |
| ________________ |
E Cylinder (4-ft tall)
POP Begin: 04-01-2028 POP End: 03-31-2029
| 1,706.00 |
| EA |
| ________________ |
| ________________ |
C/D Cylinder (2-ft tall)
POP Begin: 04-01-2028 POP End: 03-31-2029
| 12,640.00 |
| EA |
| ________________ |
| ________________ |
M6 Cylinder (1-ft tall)
POP Begin: 04-01-2028 POP End: 03-31-2029
| 53.00 |
| EA |
| ________________ |
| ________________ |
Conserver Cannula
POP Begin: 04-01-2028 POP End: 03-31-2029
| 3,003.00 |
| EA |
| ________________ |
| ________________ |
Liquid Oxygen Base Rental
POP Begin: 04-01-2028 POP End: 03-31-2029
| 4,402.00 |
| EA |
| ________________ |
| ________________ |
Liquid Portable Unit Rental
POP Begin: 04-01-2028 POP End: 03-31-2029
| 355,580 |
| LB |
| ________________ |
| ________________ |
Lox lbs
POP Begin: 04-01-2028 POP End: 03-31-2029
| 88.00 |
| EA |
| ________________ |
| ________________ |
Emergency RCP/RCP Follow-up
POP Begin: 04-01-2028 POP End: 03-31-2029
| 176.00 |
| EA |
| ________________ |
| ________________ |
50 PSI Compressor rental
POP Begin: 04-01-2028 POP End: 03-31-2029
| 6,218.00 |
| EA |
| ________________ |
| ________________ |
Maint of VA Equipment/Quarterly and After Hours
POP Begin: 04-01-2028 POP End: 03-31-2029
| 34.00 |
| EA |
| ________________ |
| ________________ |
Unscheduled Pickup
POP Begin: 04-01-2028 POP End: 03-31-2029
| 532.00 |
| EA |
| ________________ |
| ________________ |
Support for Cough-Assist
POP Begin: 04-01-2028 POP End: 03-31-2029
| 539.00 |
| EA |
| ________________ |
| ________________ |
Initial Setup/Monthly SVC VA- Ventilator
POP Begin: 04-01-2028 POP End: 03-31-2029
| 57.00 |
| EA |
| ________________ |
| ________________ |
"Veteran " Relocate(Coverage/Shipping)
POP Begin: 04-01-2028 POP End: 03-31-2029
| 308.00 |
| EA |
| ________________ |
| ________________ |
"Out of Area" Per Contract Coverage
POP Begin: 04-01-2028 POP End: 03-31-2029
| 322.00 |
| EA |
| ________________ |
| ________________ |
H/M Tank Setup Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 267.00 |
| EA |
| ________________ |
| ________________ |
H/M Refills/Switchouts
POP Begin: 04-01-2029 POP End: 03-31-2030
| 460.00 |
| EA |
| ________________ |
| ________________ |
Setups/Restarts
POP Begin: 04-01-2029 POP End: 03-31-2030
| 11,633.00 |
| EA |
| ________________ |
| ________________ |
Portable System Rental
POP Begin: 04-01-2029 POP End: 03-31-2030
| 10,240.00 |
| EA |
| ________________ |
| ________________ |
E Cylinder (4-ft tall)
POP Begin: 04-01-2029 POP End: 03-31-2030
| 1,706.00 |
| EA |
| ________________ |
| ________________ |
C/D Cylinder (2-ft tall)
POP Begin: 04-01-2029 POP End: 03-31-2030
| 12,640.00 |
| EA |
| ________________ |
| ________________ |
M6 Cylinder (1-ft tall)
POP Begin: 04-01-2029 POP End: 03-31-2030
| 53.00 |
| EA |
| ________________ |
| ________________ |
Conserver Cannula
POP Begin: 04-01-2029 POP End: 03-31-2030
| 3,003.00 |
| EA |
| ________________ |
| ________________ |
Liquid Oxygen Base Rental
POP Begin: 04-01-2029 POP End: 03-31-2030
| 4,402.00 |
| EA |
| ________________ |
| ________________ |
Liquid Portable Unit Rental
POP Begin: 04-01-2029 POP End: 03-31-2030
| 355,580 |
| LB |
| ________________ |
| ________________ |
Lox lbs
POP Begin: 04-01-2029 POP End: 03-31-2030
| 88.00 |
| EA |
| ________________ |
| ________________ |
Emergency RCP/RCP Follow-up
POP Begin: 04-01-2029 POP End: 03-31-2030
| 176.00 |
| EA |
| ________________ |
| ________________ |
50 PSI Compressor rental
POP Begin: 04-01-2029 POP End: 03-31-2030
| 6,218.00 |
| EA |
| ________________ |
| ________________ |
Maint of VA Equipment/Quarterly and After Hours
POP Begin: 04-01-2029 POP End: 03-31-2030
| 34.00 |
| EA |
| _______________ |
| ________________ |
Unscheduled Pickup
POP Begin: 04-01-2029 POP End: 03-31-2030
| 532.00 |
| EA |
| ________________ |
| ________________ |
Support for Cough-Assist
POP Begin: 04-01-2029 POP End: 03-31-2030
| 539.00 |
| EA |
| ________________ |
| ________________ |
Initial Setup/Monthly SVC VA- Ventilator
POP Begin: 04-01-2029 POP End: 03-31-2030
| 57.00 |
| EA |
| ________________ |
| ________________ |
"Veteran " Relocate(Coverage/Shipping)
POP Begin: 04-01-2029 POP End: 03-31-2030
| 308.00 |
| EA |
| ________________ |
| ________________ |
"Out of Area" Per Contract Coverage
POP Begin: 04-01-2029 POP End: 03-31-2030
| 322.00 |
| EA |
| ________________ |
| ________________ |
H/M Tank Setup Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 267.00 |
| EA |
| ________________ |
| ________________ |
H/M Refills/Switchouts
POP Begin: 04-01-2030 POP End: 03-31-2031
| 460.00 |
| EA |
| ________________ |
| ________________ |
Setups/Restarts
POP Begin: 04-01-2030 POP End: 03-31-2031
| 11,633.00 |
| EA |
| ________________ |
| ________________ |
Portable System Rental
POP Begin: 04-01-2030 POP End: 03-31-2031
| 10,240.00 |
| EA |
| ________________ |
| ________________ |
E Cylinder (4-ft tall)
POP Begin: 04-01-2030 POP End: 03-31-2031
| 1,706.00 |
| EA |
| ________________ |
| ________________ |
C/D Cylinder (2-ft tall)
POP Begin: 04-01-2030 POP End: 03-31-2031
| 12,640.00 |
| EA |
| ________________ |
| ________________ |
M6 Cylinder (1-ft tall)
POP Begin: 04-01-2030 POP End: 03-31-2031
| 53.00 |
| EA |
| ________________ |
| ________________ |
Conserver Cannula
POP Begin: 04-01-2030 POP End: 03-31-2031
| 3,003.00 |
| EA |
| ________________ |
| ________________ |
Liquid Oxygen Base Rental
POP Begin: 04-01-2030 POP End: 03-31-2031
| 4,402.00 |
| EA |
| ________________ |
| ________________ |
Liquid Portable Unit Rental
POP Begin: 04-01-2030 POP End: 03-31-2031
| 355,580 |
| LB |
| ________________ |
| ________________ |
Lox lbs
POP Begin: 04-01-2030 POP End: 03-31-2031
| 88.00 |
| EA |
| ________________ |
| ________________ |
Emergency RCP/RCP Follow-up
POP Begin: 04-01-2030 POP End: 03-31-2031
| 176.00 |
| EA |
| ________________ |
| ________________ |
50 PSI Compressor rental
POP Begin: 04-01-2030 POP End: 03-31-2031
| 6,218.00 |
| EA |
| ________________ |
| ________________ |
Maint of VA Equipment/Quarterly and After Hours
POP Begin: 04-01-2030 POP End: 03-31-2031
| 34.00 |
| EA |
| ________________ |
| ________________ |
Unscheduled Pickup
POP Begin: 04-01-2030 POP End: 03-31-2031
| 532.00 |
| EA |
| ________________ |
| ________________ |
Support for Cough-Assist
POP Begin: 04-01-2030 POP End: 03-31-2031
| 539.00 |
| EA |
| ________________ |
| ________________ |
Initial Setup/Monthly SVC VA- Ventilator
POP Begin: 04-01-2030 POP End: 03-31-2031
| 57.00 |
| EA |
| ________________ |
| ________________ |
"Veteran " Relocate(Coverage/Shipping)
POP Begin: 04-01-2030 POP End: 03-31-2031
| 308.00 |
| EA |
| __________________ |
| ________________ |
"Out of Area" Per Contract Coverage
POP Begin: 04-01-2030 POP End: 03-31-2031
| GRAND TOTAL |
| _________________ |
File details come from the government source that posted it. Updated .