Work Plan Submission Form.docx
DOCX document 15 KB Posted
- Attached to
- Z2DA--FY25: NRM (PROJ: 516-25-608) DB Correct Building 100 Sprinkler Deficiencies (VA-25-00004184)
- Solicitation number
- 36C24825R0020
About this file
This is a standard Engineering Work Plan submission form template that contractors must complete prior to performing work that impacts building systems. The form requires details about project timing, location, and systems affected including electrical, water, steam, sewage, medical gases, HVAC, fire suppression/alarm, and network infrastructure.
The form calls for documentation of mitigation plans, contingency procedures, detailed work procedures (before/during/after), parts inventory, and various safety-related comments including ILSM, hot work, fire alarm deactivation, confined spaces, crane operations, lockout/tagout procedures, training certifications, infection control risk assessment (ICRA), and PPE requirements. This template appears to be specifically designed for use at medical facilities given the focus on medical gases, infection control, and fire safety systems. The related contract opportunity is for a $500,000-$1,000,000 design-build project to replace sprinkler heads at the C.W. Bill Young VA Medical Center in Bay Pines, FL, which will be solicited around November 30, 2024 as an SDVOSB set-aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PDF Original As-Builts.zip | ZIP file | |
| CAD files from old project 516-17-103.zip | ZIP file | |
| LOTO - template.docx | DOCX document | |
| B100 FP Sprinkler and Fire Zones.zip | ZIP file | |
| 36C24825R0020 00001 dtd 01.17.25.docx | DOCX document | |
| 36C24825R0020 0001 with Attch.pdf | ||
| 36C24825R0020_1 with Attchs.pdf | ||
| 36C24825R0020.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering Work Plan Submission Form Project Number:
Project Name:
Start Date and Time:
End Date and Time:
Location of Work Being Performed:
Select Which System(s) Are Impacted by the Shutdown:
☐ Electric ☐ Water ☐ Steam ☐ Sewage ☐ Medical Gases
☐ HVAC
☐ Subsurface Work ☐ Fire Suppression ☐ Fire Alarm ☐ Network ☐ Other
Area/Department Impacted:
Description of Work:
Mitigation Plan:
Contingency Plan:
Procedures:
· Before:
· During:
· After:
Inventory of Parts:
ILSM Comments:
Hot Work Comments:
Deactivation of Fire Alarm Devices Comments:
Confined Space Comments:
Crane Lift Plan Comments:
LOTO Comments:
Training Certs Comments:
ICRA Comments:
PPE:
Incident Command Required: ☐Yes or ☐No
Attachments: