36C24825R0020 00001 dtd 01.17.25.docx

DOCX document 121 KB Posted

Attached to
Z2DA--FY25: NRM (PROJ: 516-25-608) DB Correct Building 100 Sprinkler Deficiencies (VA-25-00004184)
Solicitation number
36C24825R0020
Issued by

About this file

This is Amendment 0002 to solicitation 36C24825R0020 containing responses to 22 RFI questions for a Design-Build project to correct sprinkler deficiencies in Building 100 at the C.W. Bill Young VA Medical Center in Bay Pines, FL. The amendment maintains the Phase 1 proposal due date of February 5, 2025 at 10:00 AM EST.

Key clarifications from the RFI responses include: NICET level III or IV certification is required; contractor is responsible for moving furniture to access sprinkler heads; CAD files and Revit models are available for reference only but their use is not required for deliverables; a third-party CITP is required; shutdown requests must be submitted 21 days in advance; and the project involves replacing non-quick response sprinkler heads throughout Building 100 with quick response heads meeting NFPA codes and VA Directives. The original solicitation is a 100% SDVOSB set-aside with an estimated value between $500,000-$1,000,000.

View the file

Other files

File Type Posted
Work Plan Submission Form.docx DOCX document
PDF Original As-Builts.zip ZIP file
CAD files from old project 516-17-103.zip ZIP file
LOTO - template.docx DOCX document
B100 FP Sprinkler and Fire Zones.zip ZIP file
36C24825R0020 0001 with Attch.pdf PDF
36C24825R0020_1 with Attchs.pdf PDF
36C24825R0020.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

01-17-2025

516-25-608 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)

To all Offerors/Bidders

36C24825R0020

X

This Amendment provides the following:

The RFI responses are attached.

The due date for Phase 1 Proposals remains 02/05/2025 at 10:00 AM EST.

Stacy Figlinski Contracting Officer

FY25: NRM (PROJ: 516-25-608) DB Correct Building 100 Sprinkler Deficiencies Solicitation 36C24825R0020 RFIs, Phase 1

Question 1: Please confirm whether a NICET IV certification will be added as a requirement to the solicitation, to ensure the fire alarm system meets all required local, national, government, and industry standards, codes, and regulations.

NICET level III or IV is required.

Question 2: In order to ensure effective implementation and compliance with federal access control standards (FIPS-201 and FICAM), please confirm if a Registered CSEIP will be added as a key personnel requirement to the solicitation.

No, this project does not involve an electronic physical access system.

Question 3: Please confirm if an RCDD will be added as a requirement to ensure standards, compliance, and allow a detailed review by the ISO (Information Security Officer) prior to deployment and installation.

No.

Question 4: Please provide the required Shutdown and LOTO paperwork.

See attached “Work Plan Submission Form” and “LOTO – template.”

Question 5: Will the contractor be responsible for moving the furniture to gain access to the sprinkler heads in occupied areas?

Yes

Question 6: Please provide an approved vendor for the required "Quick Response (QR) Type of Heads" for this project.

The VA does not dictate vendors for materials.

Question 7: Please provide the current fire protection drawings in CAD format.

CAD files from the original fire sprinkler project are included, but are for REFERENCE ONLY.

Question 8: Please provide all supplied water locations for this project to provide hydraulic calculations.

See CAD files “B100 FP Sprinkler and Fire Zones” CAD files. These files are for REFERENCE ONLY.

Question 9: Please provide room numbers for the following identified locations within the VA SOW Paragraph I. General Requirements, B. Project Scope, 3. e)(2) Install additional sprinklers or replace them with QR type heads, provide proper spacing/coverage, and correct/avoid obstructions in the following rooms:

(c) 6th floor outside antenna room (3x) – Penthouse or “PH”
(e) Add sprinkler to SPS decontamination closet adjacent to dumbwaiter – closet on the north side of the dumbwaiter in SPS decontamination (1C103 or 1C111)
(p) 6th floor elevator machine room - Penthouse or “PH”
(r) 4A mechanical room install sprinkler under ductwork greater than 4-feet wide. – SB4-1
(u) Relocate sprinkler in blood draw care. – 1A103H
(z) Smoking shelter (west of Service Bay 2) – between Building 100 and service bay SB1-2 located in the outdoor area

Question 10: Is an architectural revit model available?

Yes. See attached. It is FOR REFERENCE ONLY AND WILL LIKELY HAVE INCORRECT LAYOUTS WITHIN BUILDING 100. The user of this Revit model shall be responsible for any and all updates and its accuracy.

Question 11: Are CAD architectural backgrounds available?

Yes. However, there may be small discrepancies as to the accuracy of the drawings. All VA-provided drawings and information is for reference only.

Question 12: Is an architectural revit model required? Or is just the sprinkler design provided in Revit format sufficient?

Revit is not required.

Question 13: Do contractor shop drawings need to be provided in Revit?

No.

Question 14: What is the level of detail required in the areas that are not part of hydraulically remote areas?

Drawings shall show all sprinkler drops and sprinkler lines, as well as any risers and associated flow and tamper switches. The drawings shall show hydraulic calculations and remote areas. Also include hangers and pipe heights, etc.

Question 15: Will every pipe on every part of the system be required to be shown on engineering drawings or the shop drawings?

Every pipe shall be shown on both engineering drawings and shop drawings.

Question 16: Will maintenance/inspection reports be made available to winning contractor?

Yes, inspection reports can be made available.

Question 17: Does the scope include full inspection and addressing of deficiencies for the fire alarm system or only to address the issues as noted in the RFP document?

The scope requires the contractor to address the FIRE ALARM deficiencies identified in the RFP document. A full inspection of the FIRE ALARM system is not required. This RFI response applies to the FIRE ALARM system only.

Question 18: Are existing shop drawings available for our review?

Only drawings showing locations of sprinkler heads are available. There are no hydraulic calculations available. Any and all drawings provided by the VA to a contractor shall be considered as for reference only.

Question 19: Can we serve as the EOR and the CITP over the sprinkler contractor? Or is another 3rd party required to fulfil the CITP role?

A third-party CITP is required.

Question 20: Please confirm that there is a 2-week shutdown process. This is specified in the solicitation SOW: 8. In the need for shutdowns for site investigation, the D/B Team must provide the request 21 calendar days in advance for the VAMC approval.

Question 21. Answers to the below questions can be found in the Statement of Work under Hours of Work.

Please confirm that the project working days are only Tuesday through Thursday.

Please confirm that this project does not require nights and/or weekends.

Please confirm the working hours for this project can be from 7:00 am to 5:00 pm.

Question 22. Please provide the latest wage determination for this project's county. Attached.