1PG SS FM200 (AS)(D).pdf

PDF 195 KB Posted

Attached to
H912--FY23 Multi-Campus Fire Protection Inspection, Monitoring, and Testing SVC
Solicitation number
36C24823Q0040
Issued by

About this file

This document contains a fire protection system inspection report and a related federal contract opportunity notice. The inspection report details the results of evaluating a fire protection system in a VA facility, noting the system components, their status, and any recommendations. The related federal contract opportunity is for multi-campus fire protection inspection, monitoring, and testing services at VA medical centers. It will be a five-year contract with one base year and four option years, set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will be issued for these services at the Orlando VA Healthcare System campus located in Orlando, Florida. The estimated value is under $22 million.

View the file

Other files

File Type Posted
Lake Baldwin _ Lakemont Fire alarm and suppression reports - Part 1.zip ZIP file
Viera Fire Alarm and Suppression Reports.zip ZIP file
Lake Baldwin _ Lakemont Fire alarm and suppression reports - Part 2.zip ZIP file
Lake Nona Fire alarm and suppression reports - Part 3.zip ZIP file
36C24823Q0040 0003.pdf PDF
Lake Nona - All Detectors _ All Modules_NFS2-3030V27.0_Notifier VeriFire Tools 11.90 build 26_11292022_190150.pdf PDF
36C24823Q0040_6.docx DOCX document
Lake Baldwin _ Lakemont Fire alarm and suppression reports - Part 3.zip ZIP file
Lake Nona Fire alarm and suppression reports - part 2.zip ZIP file
Lake Nona Fire alarm and suppression reports - part 1.zip ZIP file
REPORTS.zip ZIP file
36C24823Q0040 0002.pdf PDF
36C24823Q0040_5.docx DOCX document
Amendment attachment.pdf PDF
36C24823Q0040_4.docx DOCX document
36C24823Q0040 0001.pdf PDF
36C24823Q0040_3.docx DOCX document
LN25 SS FM200 (SA)(D) 4K907 -.pdf PDF
36C24823Q0040.docx DOCX document
36C24823Q0040_2.docx DOCX document
Superstructure July21 FM200.pdf PDF
LN25 SS FM200 (SA)(D) 4K307B.pdf PDF
LN25 SS FM200 (SA)(D) 4K907.pdf PDF
LN25 SS FM200 (A) 4K307B.pdf PDF
4PG SS FM200 (AS)(D).pdf PDF
LN17 SimLearn FM200 (SA).pdf PDF
2PG SS FM200 (AS)(D).pdf PDF
SimLearn July21 FM200.pdf PDF
3PG SS FM200 (AS)(D).pdf PDF
36C24823Q0040_1.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Hazards Inspection Report

Customer: Date of Service:

Contact: Time:

Address: SR#:

Task#:

Phone: Inspector:

Email or Fax:

Voltage Serial # Ceiling Type Normal

Ambient Temp.

Nozzle Qty. Nozzle Type

120 hard 72 1 180

Date Last Tested:

Number of Exits

Altitude

10/21/2019 1.00

YES NO N/A

Notified

Notified

Notified

YES NO N/A

YES NO N/A YES NO N/A

Photo Ion Thermal

YES NO N/A 0

YES NO N/A

YES NO N/A

YES NO N/A

N/A

YES NO N/A

YES NO N/A

27x21

Room Integrity Visually Inspected

Have there been any changes in the occupancy classification, machinery or operations since the last inspection?

Have there been any changes or repairs to the fire protection systems since the last inspection?

Have you requested updated MSDS sheets for Class B Flammables and are they readily available?

2. General (To be answered by Customer)

1. Pre-Inspection

Dalton Allison

JCI

If a fire has occurred since the last inspection, have all damaged system components been replaced?

Are Class B Flammables stored in the hazard area?

New in 04-20, 13.5Vdc 100%, 100%

Release Devices Operable

Qty. Of Releasing Control(s)

Type Of Releasing Control

MANUAL PULL STATION

List addl. special layout info: (Time Delay, Cross-Zone etc.) below:

ELECTRIC ACTUATOR

Type Of Release

Qty. Of Release(s)

Qty. Of Release(s) Tested Normal

10. Releasing Controls

Solenoids Tested Normal

Pneumatic Actuators Tested Normal

Manual Cylinder Actuators Tested Normal

Initiator Circuits Tested Normal

*Expiration Dates of Solenoids or Initiators

5. Control Panel Status

Input Alarm Circuits Tested Normal

7. Manual Release Stations

Type Of Equipment Shutdown

Type Of HVAC Shutdown

11. Post Inspection

System Reset For Normal Operation

System Tagged

System Tagged (Red/Green/Other)

Pressure Switches Installed

Dampers Installed & Operable

Qty. Of Abort Switches

Notification Devices Operate. As Designed

Instructional Signs Installed at Each Device

Quantity Of Notification Devices

Alarms Reported To Monitoring Co.

Function Of Pressure Switch:

Break Rods Intact

Abort Switches Tested Normal

Battery Load Tested Normal

Record Battery Voltage & Amp Hours

Time Delay In Seconds

Manual Release Overides Abort Tested

Design Concentration %

9. Auxillary Controls

Equipment Power Shutdown Installed

HVAC Shutdown Installed

30 seconds

Qty. Detectors Sensitivity Tested this Inspection

Scott.Reed@va.gov, Dalton.Allison@va.gov

Date Of Last Sensitivity Test ukn ukn

Detectors Cleaned

Date Of Last Detector Cleaning

Other: (Air Sampling, Fus. Links, Pneumatic etc.)Output Alarm Circuits Tested Normal

Supervisory Circuits Tested Normal

Time Delay Tested Normal

Battery Back-up Voltage Normal

Charge Circuit Tested Normal

Active Zones Indicated

Inactive Zones Indicated

Battery Back-up Present

Qty. Of Detectors Tested At Last Inspection

Semi-Annual (per EP14 and NFPA2001 ver.2014)

Manufacturer

Fike

Model

Job Site Contact Name:

Fire Marshall/AHJ Name:

Monitoring Company Name:

Proper Signage

Room Integrity Tested Main & ReserveDeck to DeckSubfloor Volume of Hazard (LxWxH)

27x21x12

SYSTEM TYPE

Cheetah

Area of Hazard (LxW)

Ecaro-25

03/26/21

Warren H. Shipley

Are Sequence of Operations Available and On-Site

Are As-Builts Available and On-Site

Address

City, State, Zip

Phone#

48545126

11:30

VA -Lake Nona - Superstructure - rm4K907

Scott Reed

13800 Veterans' Way

Orlando, FL 32827

Additional Comments:

Indicator Lights Operational

Trouble Light Operable

75891089

6. Detection

Qty. Of Detectors

Johnson Controls Fire Protection LP

1(321)689-7924 / (407)646-5128

3. Control Panel Status (pre-test)

Panel Monitored

Power Light Operable

Panel Indicator On Normal

Tank pressure monitor

GREEN

Type Of Damper servers shutdown-controlled by bldg FACP controlled by bldg FACP electric

8. Notification Devices

Notification Devices Tested Normal

Qty. Detectors Tested Normal This Inspection

Silence Switch Operable

4. Piping/distribution System

Hazard Area Clean / Orderly

As-built Drawings On Site

Piping Secure & Clear of Debris

Hoses Inspected

Date Of Last Hose Test:

Yes No

AM PM

CO2 FM200 Sapphire Inergen Halon Other: (Indicate) Inspection Renovations Recharge

Yes No Yes No Yes No Yes No N/A

Yes No N/A

RECOMMENDATIONS