P09_24HA100 Drawing.pdf
PDF 781 KB Posted
- Solicitation number
- 36C24821R0199
About this file
This document contains a hazardous materials abatement and demolition drawing and related federal contract opportunity notice. The drawing shows notes and a schedule for hazardous material abatement at a VA medical center. The related federal contract opportunity is a solicitation to renovate multiple restrooms at the Bay Pines VA Medical Center campus in Florida. The estimated value of the project is between $5-10 million. Contractors must be registered in SAM and the procurement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The response deadline is September 13, 2021 and the work is expected to be completed within 210 days of notice to proceed. The solicitation will use a trade-off source selection process to provide best value to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P09_Final Con SOW 516-19-104 revised bldg. 24.docx | DOCX document | |
| 36C24821R0199 0007.docx | DOCX document | |
| 36C24821R0199 0006.docx | DOCX document | |
| DRW_24.PD101.pdf | ||
| DRW_100.PD101.pdf | ||
| 36C24821R0199 0005.docx | DOCX document | |
| Drawing_100.PD101.pdf | ||
| Drawing_24.PD101.pdf | ||
| 36C24821R0199 0004.docx | DOCX document | |
| S05_Answers_Request for Information 36C24821R0199_Round 2.docx | DOCX document | |
| 36C24821R0199 0003.docx | DOCX document | |
| 36C24821R0199 0002.docx | DOCX document | |
| S05_Answers_Request for Information 36C24821R0199_Round 1.docx | DOCX document | |
| S04_Pre-bid walk thru 10-14-21 sign-in sheets.pdf | ||
| 36C24821R0199 0001.docx | DOCX document | |
| Q_A Template.xlsx | XLSX spreadsheet | |
| 36C24821R0199.docx | DOCX document | |
| P07_Wage determination.pdf | ||
| Limitations on Subcontracting Certification Renovate Station Restrooms.pdf | ||
| Price Matrix.xlsx | XLSX spreadsheet | |
| 516-19-104 Specifications.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
uu uu u u u u uuuu u u u u uu uu u u u u uuuu u u u u
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
GENERAL HAZARDOUS MATERIALS ABATEMENT AND DEMOLITION NOTES
HAZARDOUS MATERIALS ABATEMENT PLAN NOTES
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
HAC
AutoCAD SHX Text
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
AutoCAD SHX Text
STAIRWELL
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
STAIRWELL
AutoCAD SHX Text
AutoCAD SHX Text
HAC
AutoCAD SHX Text
AutoCAD SHX Text
HAC
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
LEAD ABATEMENT SCHEDULE
AutoCAD SHX Text
SAMPLE #
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
COMPONENT
AutoCAD SHX Text
SUBSTRATE
AutoCAD SHX Text
COLOR
AutoCAD SHX Text
LEAD CONCENTRATION (% BY WEIGHT)
AutoCAD SHX Text PC-20 24 109 Wall Drywall White <0.0080
AutoCAD SHX Text PC-21 24 124 Wall Drywall Blue 0.086
AutoCAD SHX Text PC-22 24 124 Wall Drywall Gray 0.30
AutoCAD SHX Text NOTE; THE REQUIREMENTS OF THE OSHA LEAD IN CONSTRUCTION STANDARD 29CFR 1926.62 ARE INVOKED IF ANY AMOUNT OF LEAD
AutoCAD SHX Text
IS PRESENT IN THE SAMPLE; THERE IS NO MINIMUM CONCENTRATION.
AutoCAD SHX Text LEAD ABATEMENT SHALL CONFORM TO THE CRITERIA SET FORTH IN SPECIFICATION 02 83 33.13.
AutoCAD SHX Text
24.HA100
AutoCAD SHX Text
HAZARDOUS ABATEMENT PLANS
AutoCAD SHX Text
WOS
AutoCAD SHX Text
DML
AutoCAD SHX Text
- BUILDING 24
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/4'' = 1'-0''
AutoCAD SHX Text
BUILDING 24 HAZARDOUS ABATEMENT WORK (ROOM 109)
AutoCAD SHX Text F3
AutoCAD SHX Text
SCALE 1/4'' = 1'-0''
AutoCAD SHX Text
BUILDING 24 HAZARDOUS ABATEMENT WORK (ROOM 124)
AutoCAD SHX Text
PARTIAL FLOOR PLAN
AutoCAD SHX Text
PARTIAL FLOOR PLAN
AutoCAD SHX Text N
AutoCAD SHX Text F1
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - BUILDING 24 - FIRST FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text F3
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text ASBESTOS CONTAINING MATERIALS LEGEND: LOCATION OF ASBESTOS - CONTAINING FLOOR TILE & MASTIC. LOCATION OF ASBESTOS - CONTAINING FLOOR BED AND GROUT
AutoCAD SHX Text
AREA NOT IN CONTRACT
AutoCAD SHX Text 9 Oak Drive, Ocala, FL 34472 - www.paradigmusa.com
AutoCAD SHX Text
BID DOCUMENTS FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
RENOVATE STATION RESTROOMS
AutoCAD SHX Text 516-19-104
AutoCAD SHX Text 06-18-2021
AutoCAD SHX Text
10000 BAY PINES BLVD., BAY PINES, FL 33744
AutoCAD SHX Text
C.W. BILL YOUNG VAMCBILL YOUNG VAMC
AutoCAD SHX Text
ADDENDUM #1 BUILDING 102
AutoCAD SHX Text 06/18/21
AutoCAD SHX Text
REVISION #1 BUILDING 24
AutoCAD SHX Text 11/10/21
AutoCAD SHX Text
AREA IN CONTRACT; NO ACM PRESENT AT LOCATION DURING TIME OF STUDY
AutoCAD SHX Text
1. HAZARDOUS MATERIAL ABATEMENT PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ON THE HAZARDOUS MATERIAL ABATEMENT PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ON THE BASIS OF EXISTING DOCUMENTS, SITE INSPECTIONS AND OVERALL PROJECT INTENT. 2. THE LOCATION OF MATERIALS SCHEDULED FOR ABATEMENT AND DEMOLITION ARE GENERAL IN THE LOCATION OF MATERIALS SCHEDULED FOR ABATEMENT AND DEMOLITION ARE GENERAL IN NATURE. DRAWINGS ARE INTENDED TO PROVIDE AN APPROXIMATE LOCATION OF MATERIALS TO BE REMOVED. ANY AMOUNT LISTED ON THE SPECIFICATIONS ARE ONLY ESTIMATES AND ARE NOT TO BE CONSIDERED FINAL. ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS PRIOR TO BID. 3. THE ABATEMENT CONTRACTOR SHALL PREPARE ITS BID AND COORDINATE ITS WORK WITH THE THE ABATEMENT CONTRACTOR SHALL PREPARE ITS BID AND COORDINATE ITS WORK WITH THE GENERAL CONTRACTOR FOR ALL PHASING, LOCATION AND QUANTIFICATION PURPOSES PRIOR TO BIDDING. 4. ABATEMENT CONTRACTOR IS RESPONSIBLE FOR LOCATING, ACCESSING, AND REMOVING ALL ABATEMENT CONTRACTOR IS RESPONSIBLE FOR LOCATING, ACCESSING, AND REMOVING ALL ASBESTOS CONTAINING MATERIALS, LEAD BASED COMPONENTS, PCB LIGHT BALLASTS, FLUORESCENT LAMPS, TRANSITE PANELS AND OTHER REGULATED MATERIALS THAT ARE SCHEDULED TO BE REMOVED AS IDENTIFIED IN ARCHITECTURAL, ELECTRICAL AND MECHANICAL DEMOLITION PLANS. 5. THE HM DRAWINGS ARE NOT TO BE CONSIDERED A STAND-ALONE DOCUMENT. IN PREPARATION THE HM DRAWINGS ARE NOT TO BE CONSIDERED A STAND-ALONE DOCUMENT. IN PREPARATION OF ITS BID, CONTRACTOR SHALL COORDINATE ALL HAZARDOUS MATERIAL RELATED WORK WITH PARADIGM ARCHITECTURE-ENGINEERING DRAWINGS AND ALL WORK SPECIFIED ELSEWHERE IN THE CONTRACT DOCUMENTS. 6. HAZARDOUS MATERIALS INCLUDING ASBESTOS-CONTAINING MATERIALS, LEAD-CONTAINING SURFACE HAZARDOUS MATERIALS INCLUDING ASBESTOS-CONTAINING MATERIALS, LEAD-CONTAINING SURFACE COATINGS HAVE BEEN IDENTIFIED. THESE MATERIALS SHALL BE HANDLED BY PROPERLY TRAINED THESE MATERIALS SHALL BE HANDLED BY PROPERLY TRAINED PERSONNEL PRIOR TO ANY RENOVATION ACTIVITIES. REFER TO THE "SUMMARY OF WORK" REFER TO THE "SUMMARY OF WORK" SECTION OF THE CORRESPONDING SECTION 02.82.11, 02.82.1319 OR 02.83.3313 FOR LOCATIONS OF KNOWN OR ASSUMED HAZARDOUS MATERIALS. 7. THE ABATEMENT CONTRACTOR SHALL COORDINATE THE REMOVAL OF ALL FURNITURE, FIXTURES, THE ABATEMENT CONTRACTOR SHALL COORDINATE THE REMOVAL OF ALL FURNITURE, FIXTURES, CASEWORK, FIXED AND MOVEABLE OBJECTS, NON-HAZARDOUS PARTITION WALLS, FINISHES, ETC., PRIOR TO HAZARDOUS MATERIAL ABATEMENT. REFER TO THE CONTRACT DOCUMENTS FOR ITEMS SCHEDULED FOR SALVAGE AND REUSE. 8. THE ABATEMENT CONTRACTOR SHALL CAREFULLY SCHEDULE AND COORDINATE ALL PHASES OF THE ABATEMENT CONTRACTOR SHALL CAREFULLY SCHEDULE AND COORDINATE ALL PHASES OF HAZARDOUS MATERIAL RELATED WORK TO ENSURE THAT UNPROTECTED PERSONNEL AND WORK AREAS ARE NOT EXPOSED TO HAZARDOUS SUBSTANCES. THIS INCLUDES THE COORDINATION OF ALL DEBRIS CLEANUP, SOFT DEMOLITION, ABATEMENT AND MODERNIZATION ACTIVITIES. 9. ALL SUBMITTALS REQUIRED BY THE PROJECT SPECIFICATIONS MUST BE APPROVED BY THE ALL SUBMITTALS REQUIRED BY THE PROJECT SPECIFICATIONS MUST BE APPROVED BY THE OWNER'S PRIOR TO THE START OF ANY HAZARDOUS MATERIAL RELATED WORK. REFER TO HAZARDOUS MATERIAL SPECIFICATIONS. 10. PROVIDE, OPERATE AND MAINTAIN MAGNAHELIC GAUGES OR RECORDERS OF APPROPRIATE RANGE PROVIDE, OPERATE AND MAINTAIN MAGNAHELIC GAUGES OR RECORDERS OF APPROPRIATE RANGE AT THE ENTRANCE TO EACH WORK AREA DURING ASBESTOS AND LEAD RELATED ACTIVITIES. NO ASBESTOS OR LEAD WORK SHALL BE CONDUCTED UNLESS THE SYSTEM IS INSTALLED, OPERATING AND RECORDING CORRECTLY. 11. ALL DIFFERENTIAL AIR PRESSURE UNITS AND VACUUMS MUST BE DOP TESTED ON-SITE PRIOR TO ALL DIFFERENTIAL AIR PRESSURE UNITS AND VACUUMS MUST BE DOP TESTED ON-SITE PRIOR TO USE. 12. ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH FAILURE TO ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH FAILURE TO MEET CLEARANCE REQUIREMENTS INCLUDING: LABORATORY COSTS, CONSULTANT COSTS, AND ANY OTHER DIRECT OR INDIRECT COSTS INCURRED BY THE OWNER. 13. ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL LEAD AND ASBESTOS-CONTAINING ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL LEAD AND ASBESTOS-CONTAINING MATERIALS EXPOSED AND/OR IMPACTED AS A RESULT OF RENOVATION ACTIVITIES (I.E., PIPE INSULATION, OR ACM MATERIALS WITHIN CEILING PLENUMS, WALL CAVITIES, INTERIOR PIPE CHASES, EXTERIOR PIPE CHASE, ETC) UNDER THE ARCHITECTURAL DRAWINGS AND ALL WORK SPECIFIED ELSEWHERE IN THE CONTRACT DOCUMENTS. 14. THE REQUIREMENTS OF THE OSHA LEAD IN CONSTRUCTION STANDARD 29CFR 1926.62 ARE THE REQUIREMENTS OF THE OSHA LEAD IN CONSTRUCTION STANDARD 29CFR 1926.62 ARE INVOKED IF ANY AMOUNT OF LEAD IS PRESENT IN THE SAMPLE; THERE IS NO MINIMUM CONCENTRATION. 15. WHERE THE DRAWING INDICATES AREAS OF ASBESTOS-CONTAING MATERIALS TO BE ABATED IN WHERE THE DRAWING INDICATES AREAS OF ASBESTOS-CONTAING MATERIALS TO BE ABATED IN AREAS WHERE THE FLOOR TILE IN NON-ASBESTOS AND THE MASTIC IS ASBESTOS-CONTAINING. HOWEVER, SINCE THE MASTIC IS ADHERED TO THE TILE SURFACE AS WELL AS THE FLOOR, THE CONTRACTOR SHALL REMOVE ALL FLOOR TILE AND MASTIC AND PROPERLY DISPOSE OF AS ASBESTOS-CONTAINING WASTE ACCORDING TO PROJECT SPECIFICATIONS. 16. THE CONTRACTOR SHALL PROVIDE A UNIT PRICE IN ADDITION TO ANY BASE BID AND SHALL FIELD THE CONTRACTOR SHALL PROVIDE A UNIT PRICE IN ADDITION TO ANY BASE BID AND SHALL FIELD VERIFY SITE CONDITIONS AND ESTIMATED QUANTITIES. CONSTRUCTION ACTIVITIES MAY BE PHASED ON THIS PROJECT AND AS SUCH THE CONTRACTOR SHALL COORDINATE ASBESTOS ABATEMENT WITH THE BAYPINES VAMC AND THEIR CONSTRUCTION MANAGEMENT TEAM.
AutoCAD SHX Text
1. ASBESTOS WAS NOT PRESENT IN THESE LOCATIONS AT TIME OF ASBESTOS WAS NOT PRESENT IN THESE LOCATIONS AT TIME OF STUDY. 2. HAZARDOUS MATERIALS FOUND IN CEILING MASTIC TO BE HAZARDOUS MATERIALS FOUND IN CEILING MASTIC TO BE REMOVED. 3. MIRRORS ARE PRESUMED ACM. CONTRACTOR SHALL HAVE MIRRORS ARE PRESUMED ACM. CONTRACTOR SHALL HAVE MIRRORS SAMPLED AND ANALYZED BY A LICENSED ASBESTOS CONTRACTOR PRIOR TO DEMOLITION ABATEMENT ACTIVITIES. 4. DRYWALL JOINT COMPOUND IS AN ACM. EXISTING DRYWALL DRYWALL JOINT COMPOUND IS AN ACM. EXISTING DRYWALL SYSTEM SHALL BE ABATED PRIOR TO CONSTRUCTION. 5. PROVIDE MOLD REMEDIATION AS NECESSARY. COORDINATE PROVIDE MOLD REMEDIATION AS NECESSARY. COORDINATE REMOVAL WITH VAMC AS REQUIRED. 6. THE ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE THE ABATEMENT CONTRACTOR SHALL REMOVE ALL PIPE INSULATION WITHIN SCOPE OF WORK IN BUILDING 24.
AutoCAD SHX Text
| Sheets and Views |
| 516-19-104_24HA100 |
File details come from the government source that posted it. Updated .