This solicitation requests proposals for a renovation project at the Bay Pines VA Medical Center in Florida. The project involves renovating a series of restrooms in multiple buildings, including complete demolition and replacement of fixtures, finishes, and infrastructure for plumbing and HVAC systems. The work must be completed within 210 calendar days of the notice to proceed and is estimated to cost between $5 million and $10 million. Proposals are due by November 8, 2021, and the agency intends to award a single firm-fixed price contract. This procurement is set aside entirely for service-disabled veteran-owned small businesses. Offerors must be registered in the System for Award Management and follow submission instructions including providing past performance evaluations, key personnel resumes, and a detailed project schedule with the proposal.

View the file

Other files

File Type Posted
P09_Final Con SOW 516-19-104 revised bldg. 24.docx DOCX document
36C24821R0199 0007.docx DOCX document
P09_24HA100 Drawing.pdf PDF
36C24821R0199 0006.docx DOCX document
DRW_24.PD101.pdf PDF
DRW_100.PD101.pdf PDF
36C24821R0199 0005.docx DOCX document
Drawing_100.PD101.pdf PDF
Drawing_24.PD101.pdf PDF
36C24821R0199 0004.docx DOCX document
S05_Answers_Request for Information 36C24821R0199_Round 2.docx DOCX document
36C24821R0199 0003.docx DOCX document
36C24821R0199 0002.docx DOCX document
S05_Answers_Request for Information 36C24821R0199_Round 1.docx DOCX document
S04_Pre-bid walk thru 10-14-21 sign-in sheets.pdf PDF
36C24821R0199 0001.docx DOCX document
Q_A Template.xlsx XLSX spreadsheet
P07_Wage determination.pdf PDF
Limitations on Subcontracting Certification Renovate Station Restrooms.pdf PDF
Price Matrix.xlsx XLSX spreadsheet
516-19-104 Specifications.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24821R0199 X 09-10-2021 516-19-104 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Suite 560 Tampa FL 33637 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Suite 560 Tampa FL 33637 Ashley Commiso Project Title: Renovate Station Restrooms

Project Magnitude: Between $5,000,000 and $10,000,000.

Site Visit: within 3 days of posting RFP

RFI's Due: October 22, 2021 at 2:00pm

In accordance with VHA Directive 1085, all VHA health care facilities will be smoke-free for patients, visitors, contractors, volunteers, and vendors effective October 1, 2019.

X X 52.211-10 X 1 Email 14:00

EST

11-08-2021 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Tampa FL 33637 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971 Ashley A. Commiso

Page 1 of Page 1 of

Page 1 of Page 1 of Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE5
ITEM INFORMATION5
A.4 DELIVERY SCHEDULE5
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS6
2.1 PROPOSAL PREPARATION6
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)12
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)12
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)12
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)13
2.6 52.228-1 BID GUARANTEE (SEP 1996)14
2.7 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)15

2.8 52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (OCT 2021)……………………………………………………………………………………...15

2.9 52.233-2 SERVICE OF PROTEST (SEP 2006)15
2.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)16
2.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)16
2.12 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)17
2.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)17
REPRESENTATIONS AND CERTIFICATIONS18
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION)18
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)21
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)24
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021)25
GENERAL CONDITIONS28
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (JUN 2020)28
4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)28
4.3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)29
4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)30
4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)31
4.6 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)31
4.7 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)31
4.8 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)35
4.9 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)35
4.10 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)36
4.11 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021)37
4.12 SUPPLEMENTAL INSURANCE REQUIREMENTS41
4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)42
4.14 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)43
4.15 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)45
4.16 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)47
4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)48
4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)49
4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)50
4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)50
4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)50
4.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)52
4.23 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018)53
4.24 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)54
4.25 MANDATORY WRITTEN DISCLOSURES54
4.26 IT CONTRACT SECURITY54
EVALUATION FACTORS FOR AWARD65

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Project 516-19-104 Renovate Station Restrooms PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries

GRAND TOTAL
__________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE
0001
SHIP TO:
Bay Pines VAMC

10,000 Bay Pines Blvd Bay Pines, FL 33744

USA

1.00
210 calendar days after NTP

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 PROPOSAL PREPARATION

Instructions, Conditions, and Notices to Offerors

1. OVERVIEW

1.1 This request for proposal (RFP) seeks proposals from Offerors interested in being selected to renovate a series of restrooms on the Bay Pines VAMC Campus. Offerors responding to this RFP are required to submit their proposals in accordance with the instructions contained in this section.

Bay Pines VAMC has a requirement for the renovation of a series of restrooms in buildings 1, 12,13, 19, 20,24,100, 102. This work involves a complete renovation of areas established since the original construction of these buildings. This renovation will modernize the restroom infrastructure and provide a more pleasant experience for all 100,000 patients serviced by PBVAMC.

1.2 The purpose of these instructions is to establish uniform evaluation procedures for the proposals and the development of the Best Value Decision by the Source Selection Authority using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform the resulting contract, the proposal shall be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

The Government reserves the right to evaluate offers and award a contract without discussions with offerors, however, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

1.3 For this solicitation, the Government will award a single firm-fixed price contract.

2. PROPOSAL PREPARATION INSTRUCTIONS

2.1 Proposals must be complete, self-sufficient, and respond directly to the requirements of the solicitation. Any significant inconsistency, if unexplained, raises a fundamental issue of the offeror’s understanding and/or ability to perform the contract. This may be a basis for rejection of the proposal.

3. SUBMISSION INSTRUCTIONS

3.1 One electronic copy of all Volumes of the proposal (General Information, Technical, Past Performance and Price) shall be submitted to the Contract Specialist Iris.thomas1@va.gov on or before the due date.

3.2 Faxed proposals are not permitted under any circumstances.

3.3 Proposal submission and preparation:

Table 1. Proposal Submission and Preparation

Proposal Submissions
Factor
Electronic Copies
Number of Pages
Volume I - General Information
N/A
1
No Limit
Volume II - Technical
Factor 1
1
30 max
Technical Approach/ Key Personnel
Subfactor 1
Experience
Subfactor 2
Schedule
Subfactor 3
Volume III - Past Performance
Factor 2
1
30 max
Volume IV - Price
Factor 3
1
Completed Price Schedule & Price Matrix (excel file)

3.4 Questions shall be submitted using Q&A Template, via email to iris.thomas1@va.gov entitled “516-19-104 Renovate Station Restrooms”. Prime offerors should consolidate questions from its team members and submit as one submission to the maximum extent practicable. Offerors may submit questions to the Contracting Officer at any time; however, questions received after 22 October 2021 @ 2:00 PM (EST) may not be answered. No telephone questions will be accepted.

3.5 The following must be included in the offeror’s proposal:

3.5.1 General Information

1. Cover Page with: Solicitation Number, Project Title and Project Number, Company Information (Principle points of contact, email, address, phone numbers (including area code), DUNs number, Cage code, etc.)

2. Table of Contents

3. Signed SF 1442, with Blocks 14-20C completed including acknowledgement of any Amendments issued

4. Completed Experience Modification Rate (EMR) Form

5. Completed Bid Bond

6. Limitations on Subcontracting Certification Form (The offeror shall provide documentation as required in order for the Contracting Officer to determine the offeror responsible IAW FAR 9.104-1 and therefore, eligible for contract award)

3.5.2 Factor 1 - Technical

General Instructions: The Technical volume should include necessary information regarding the offeror’s ability to perform complete requirements outlined in the solicitation. Failure to provide a Technical proposal in accordance with the solicitation instructions shall render an offeror’s proposal incomplete and ineligible for award. The Offeror shall submit an approach with a narrative that clearly conveys the Offeror understands the requirements of the RFP.

3.5.2.1 Subfactor 1 - Technical Approach/Key Personnel

The offeror shall summarize its technical/management approach and team’s capability to obtain and retain suitably qualified personnel and maintain project continuity. At a minimum, the offeror shall address the following elements and, when viewed collectively, demonstrate its team’s ability to provide uninterrupted, high-quality work throughout the anticipated period of performance.

a. The offeror shall include a comprehensive narrative describing the construction activities as it relates to the construction work elements. The narrative shall clearly convey the Offeror’s understanding of the requirement and shall describe the work consistent with the schedule proposed. The narrative shall address any construction techniques such as sequencing, dependencies, and phasing.

b. Provide a list of Key Personnel for the proposed Team to be used to execute construction. At a minimum, this should include the project manager, superintendent, quality control manager, safety manager, and provide documentation (3-page limit for resumes) that they have the qualifications and experience to perform under the contract. Experience standards are defined below:

Project manager – 8 years in similar magnitude Superintendent – 8 years in similar magnitude Quality Control Manager – 5 years Safety Manager – 5 years

c. Key subcontractor personnel: Specialized experience in refrigeration installation

3.5.2.2 Subfactor 2 - Experience

a. Offeror must demonstrate relevant experience with three (3) project experience summaries that provide recent and relevant experience as it relates to the size, scope and magnitude of this requirement, such as complete renovation of healthcare or restroom facilities, including any specialized experience in associated HVAC, MEP (coordination of complex electrical and plumbing systems), finishes, demolition, and support equipment.

The Offeror may submit other types of projects but must specifically explain the relevancy of those projects to the project that is being solicited in this RFP.

b. If the Offeror’s submission exceeds the three projects, any excess projects(s) will not be evaluated. The information that is required to be supplied is identified on the form provided below entitled “CONTRACTOR’S RELEVANT EXPERIENCE” (Attachment A). Offerors are not required to use the form itself as part of their proposal, but the information requested on the form must be in the Offeror’s proposal and should be in the same format as the form.

3.5.2.3 Subfactor 3 - Schedule

a. The proposal shall provide a proposed progress schedule. The progress schedule will be in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. Milestones should include such items as material submissions, submittal acceptance, partial and final inspections, punch list completion, testing, etc. All schedule items will show a start date and a completion date, and the critical path shall be clearly identified on the schedule.

b. The detailed schedule will indicate specific tasks with dates for each step of the process including: Mobilization; Demolition; Phasing; Provisions for overtime or shift work; Timing of relocation of existing utilities; Commissioning; Tests and final inspection. Task durations shall be expressed in calendar days.

c. The Offeror shall specify the days of the week and the hours of construction operations during each phase of the work, and the percentage of contract completion that will be achieved at the end of each month of the contract.

3.5.3 Factor 2 - Past Performance

The Offeror shall provide formal performance evaluations from the client on the projects submitted in response to Factor 1. In addition to formal evaluations or if a formal evaluation is unavailable, the Offeror shall obtain the information using the PAST PERFORMANCE QUESTIONNAIRE (PPQ) form (Attachment B) included below. The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 2, Past Performance. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment B), which will provide contract and client information for the respective project(s).

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Iris Thomas via email at Iris.thomas1@va.gov prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Also include performance recognition documents received within the last seven years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

3.5.4 Factor 4 - Price (Price proposal shall be a separate file (clearly separated from the technical and past performance volumes.)

1. Completed Price Schedule on Standard Form (SF) 1442 (Total of Proposed Price of CLIN 0001)

1. Price Proposal Breakdown to support CLIN 0001 Price (Price Matrix)

Price proposals shall be submitted on SF 1442, completed, and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal. The price proposal shall encompass all costs associated with the requirements of the solicitation. The total proposed price for CLIN 0001 shall be rounded to the nearest dollar. Price will not be rated or scored but will be evaluated for fairness and reasonableness through the use of price analysis. In accordance with FAR 15.404-1(b)(2) the government may use various price analysis techniques and procedures to ensure a fair and reasonable price.

Scope of Work 516-19-104 Renovate Station Restrooms

Goals and Needs:

This project includes the renovation of a series of restrooms on the Bay Pines VAMC campus per the provided design documents and specifications.

Site Conditions:

The buildings where the included restrooms are located will be occupied during performance of the work. Construction work must be coordinated not to interfere with patient activities occurring adjacent, above and below the project areas.

In areas where the exterior wall of the rooms are to be renovated, a one-hour fire barrier from deck to deck is required around the project area and is to be constructed with drywall on both sides of metal studs. Doors in the fire barrier will be rated ¾ hour doors and the construction area will be negative to the adjacent space. All specifications and regulations of the VA Safety & Emergency Management Service are to be adhered to at all times on site.

Infection control procedures will follow the VA Infection Control Risk Assessment Matrix of Precautions for Construction and Renovation, including but not limited to the following:

1. Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.

7. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

8. Vacuum work area with HEPA filtered vacuums.

9. Wet mop area with disinfectant.

10. Remove isolation of HVAC system in areas where work is being performed.

11. Additional containment procedures, including the construction of an anteroom and additional PPE and HEPA vacuuming will be required during ACM abatement processes.

12. Consider all ceramic tiling to be lead-containing and follow all required procedures for removal and disposal.

Scope of Demolition:

Demolition is to be performed in accordance with the design drawings and specifications. Abatement will occur at for any materials determined to contain hazardous materials/ACM. Any materials found to be impacted by mold or moisture damage within the project area are to be removed.

The Industrial hygiene consultant (GLE) performed the ACM and lead survey for the project scope areas. Below is a summary of the results by building:

Bldg. 100 IF 107 & IF 108 – No ACM 146 & 139 – No ACM 141, 142, 144, 145 – Floor Tile & Black Mastic positive for asbestos Bldg. 102 134, 135, 110, 111 – No ACM Bldg. 24 109 & 124 – No ACM Bldg. 20 108 & 109 – No ACM Bldg. 1 A222 & A223 – No ACM Bldg. 12 11A, 7, 8 – No ACM Bldg. 19 7 – Ceiling Texture – 5% Chrysotile asbestos, and Joint Compound – 5% Chrysotile asbestos (Drywall Composite = <1% ACM) Bldg. 13 Not surveyed

Construction Schedule:

All work will be completed within 210 days from Notice to Proceed.

Contractor shall be required to work with the VA COR to develop a schedule of phasing dates on which the contractor will accomplish work in each specific area of site, building or portion thereof, in order to coordinate phasing. Only one restroom in each building will be able to be closed at any given time, but it may be possible in some cases to have some restrooms closed concurrently provided that they are in different buildings, so phasing and scheduling will be vital to this project. A three-week lookahead schedule is to be maintained and updated at least weekly with the upcoming work plans for the project. A minimum of 3 weeks’ notice is required before starting work in each location to ensure that proper notices can be sent out regarding the closures.

Utility shutdowns are to be requested via email a minimum of 3 weeks prior to the planned work and requests are to include a detailed work plan, mitigation and contingency options, and lock out / tag out (LOTO) plans.

2.2 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
17.9 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is FL Pinellas

(End of Provision)

2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.6 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3M, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.7 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

(End of Provision)

2.8 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021)

(a) Definition. As used in this clause –

United States or its outlying areas means—

(1) The fifty States;

(2) The District of Columbia;

(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;

(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and

(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.

(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).

(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/.

(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.

(End of clause)

2.9 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Ashley A. Commiso Contracting Officer Hand-Carried Address:

Department of Veterans Affairs Network Contracting Activity 8 (NCA 8)

8875 Hidden River Pkwy Tampa FL 33637 Mailing Address:

Department of Veterans Affairs Network Contracting Activity 8 (NCA 8)

8875 Hidden River Pkwy Tampa FL 33637

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— October 14, 2021 @ 1:00 PM

(c) Participants will meet at— CW Bill Young VAMC, Building 24 (End of Provision)

2.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Provision)

FAR Number
Title
Date
52.204-7
SYSTEM FOR AWARD MANAGEMENT
OCT 2018
52.204-16
COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
AUG 2020
52.204-22
ALTERNATIVE LINE ITEM PROPOSAL
JAN 2017
52.215-1
INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION
JAN 2017
52.236-28
PREPARATION OF PROPOSALS—CONSTRUCTION
OCT 1997

2.12 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

(End of Clause)

2.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:

Deputy Assistant Secretary for Acquisition and Logistics,
Risk Management Team, Department of Veterans Affairs
810 Vermont Avenue, N.W.
Washington, DC 20420

Or for solicitations issued by the Office of Construction and Facilities Management:

Director, Office of Construction and Facilities Management
811 Vermont Avenue, N.W.
Washington, DC 20420
FAR Number
Title
Date
852.223-70
INSTRUCTIONS TO OFFERORS—SUSTAINABLE ACQUISITION PLAN
SEP 2019
852.233-70
PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
OCT 2018

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $39.5 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services—Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American—Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternates II and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $50,000, the basic provision applies.

(B) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.

(C) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan—Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[X](i) 52.204-17, Ownership or Control of Offeror.

[X](ii) 52.204-20, Predecessor of Offeror.

[](iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

[](iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Certification.

[](v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Certification.

[](vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

[](vii) 52.227-6, Royalty Information.

[](A) Basic.

[](B) Alternate I.

[](viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .