516-15-105 TEMP KITCHEN STREET SITE PICS- ATTACHMENT B.docx
DOCX document 9 MB Posted
- Solicitation number
- 36C24821R0051
About this file
This document outlines a federal contract opportunity for site preparation and installation of a temporary modular kitchen unit. The contract holder will design, fabricate, deliver, prepare the site and install the temporary kitchen at the C.W. Bill Young Medical Center in Bay Pines, Florida. The estimated period of performance is 365 calendar days from notice to proceed. The magnitude of the project is between $1,000,000 and $2,000,000. The solicitation will use a trade-off source selection process and be issued on or around February 3, 2021. The NAICS code is 332311 with a size standard of 750 employees. This is a set-aside for service-disabled veteran-owned small businesses and veteran-owned small businesses, with a tiered evaluation process between those categories. The point of contact is listed as the contracting officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MK - 1 MODULAR KITCHEN ATTACHMENT D Model (1).pdf | ||
| 95 pct Combined Drawings_Temp Kitchen.pdf | ||
| 36C24821R0051 0002.docx | DOCX document | |
| 516-15-105 TEMP KITCHEN-OVER LAY-ATTACHMENT A.docx | DOCX document | |
| Government Responses.pdf | ||
| VA SUPPLIED EQUIP-TEMP KITCHEN-ATTACHMENT C.docx | DOCX document | |
| 36C24821R0051 0001_1.docx | DOCX document | |
| 95 pct Combined Drawings_Temp Kitchen extract.pdf | ||
| 36C24821R0051.docx | DOCX document | |
| Spec 00 11 21 SITE PREP-PROJECT 516-15-105 INSTALL TEMP KITCHEN .pdf | ||
| Spec 13 34 19 -PROJECT 516-15-105 INSTALL TEMP KITCHEN.pdf | ||
| FL20210222 22Jan2021.pdf | ||
| Limitations on Subcontracting Certification Temp Kitchen.pdf | ||
| Q_A Template.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: 516-15-105 Kitchen Renovation – Impact Temp Kitchen Location 23 OCT 2020-KFF Attachment B
NORTH DIRECTION
NORTH EAST DIRECTION
SOUTH DIRECTION
SOUTH DIRECTION
SOUTHWEST DIRECTION
SOUTHEAST DIRECTION
SOUTHWEST DIRECTION
SOUTHEST DIRECTION – STREET LIGHT
SOUTHWEST DIRECTION – PINE TREE-GREASE TRAP ACCESS
CURB HEIGHT
B100 WEST ENTRY FROM PARKING GARAGE
PED-WAY FROM PARKING GARAGE TO B100
T106 & T109
GENERATOR #106
image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg
File details come from the government source that posted it. Updated .