Q_A 36C24821Q1731 00002.docx
DOCX document 47 KB Posted
- Attached to
- J065--FY22: Chiller Preventative Maintenance Federal contract opportunity
- Solicitation number
- 36C24821Q1731
About this file
This document includes a modification to a request for quote for chiller preventative maintenance services. The modification answers vendor questions, corrects pricing and statement of work details, and extends the response date.
The modification clarifies that 17 oil analyses will be performed annually on each chiller, provides scheduling details for 8 eddy current tests to be conducted annually on water-cooled chillers, and confirms quarterly preventative maintenance inspections. It also addresses questions around cooling season startups, refrigerant and oil sampling, and the applicability of maintenance requirements to new chillers covered by a one-year warranty. Pricing was updated to reflect 10 eddy current tests being conducted in the first year. The response date for the request for quote was extended to October 4, 2021 for maintenance of 17 chillers at the James A. Haley Veterans Hospital. Awards will be made to a responsible small business offeror in accordance with FAR part 13.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24821Q1731 0002.docx | DOCX document | |
| P09 Chiller Maintenance PWS09-29-2021 141.docx | DOCX document | |
| 36C24821Q1731 0002_1.docx | DOCX document | |
| 36C24821Q1731 0001_1.docx | DOCX document | |
| P09 PWS Chiller maintenance 09-29-2021.docx | DOCX document | |
| Q_A 36C24821Q1731.docx | DOCX document | |
| C03 36C24821Q1731 0001.docx | DOCX document | |
| 36C24821Q1731_1.docx | DOCX document | |
| RFQ 36C24821Q1731.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24821Q1731
The purpose of this modification is to:
1. Answer questions posed by Vendors.
2. Correct the price schedule to reflect the correct number of EDDY CURRENTS.
3. Correct the PWS to reflect corrected deficiencies. (Please see attached modified PWS)
4. Extend the solicitation response date from 10-01-2021 5:00 pm EST to 10-04-2021 11:00 am EST.
5. All Clauses, Provisions and required documents remains unchanged.
Questions
1. On page 12, II. Scope, it states that there will be 17 oil analysis done on each chiller annually. That doesn’t make sense. Once a year on each one of the chillers would be more like it. There should be two oil analysis per centrifugal chiller.
Answer: That will be a total 17 analysis to be performed every six months. One is performed during the annuals and the second will be performed during one of the quarterly’s six months later.
2. On page 12, II. Scope, the 8 eddy currents to be done on the water-cooled chillers, alternating between odd and even and every other year on the evaporators. Can this please just be broken down to what machines each year that will be due and if it’s the condensers and evaporators? The number system between all the chillers just doesn’t match up well and this will make things easier. Like Year 1, chiller 2,4,6 eddy current on condensers and chiller 1,2,3 on evaporators only. Something like this.
Answer: The eddy current should start with chillers 1,3, & 5 in building 39. That will be on both the evaporator and condenser. It will alternate every year from odd to even numbers. Once we take over the chiller on building 100, we will match the even and odd numbers with building 39. So, when building 100 is added 1,3 & 5 in 39 and 1 & 3 in building 100. The next year it would be 2, 4, & 6 in 39 and 2 in building 100.
3. 3.On page 13, Preventive maintenance (PM), A, Reads provide running inspections of the 17 chillers in the following months: OCT, NOV, DEC, etc.…. This would be considered a monthly inspection on the chillers, not quarterly.????
Answer: Quarterly is correct, work with the COR on which month/time during the quarter works and annotate on the end of day documentation.
4. On page 13, Preventive maintenance (PM), B, provide cooling season start up, we are in Florida so there really isn’t a need per the chillers always run. No winterization is done on them. Answer: Startup is referring to the annual PM’s that must be performed between January and March.
5. On page 14, Preventive maintenance, A, states chiller is to be serviced four times each year. As with the note above on 3., you can see how this is off??
Answer: There is one annual and three quarterly PMs per chiller.
6. On page 14, Preventive maintenance, C, states sample and analysis on refrigerant and oil. This is not spelled out in the scope on page 12. No refrigerant samples are noted.
Answer: Scope is an overview, continue to pay particular attention as you continue on with the different units…
7. On page 14, Preventive maintenance D, ARROW 5, states perform oil analysis twice a year on each chiller. You can see the confusion with this….
Answer:Correct, change made and returned to CO to match section 2 PWS
8. On page 15, Centrifugal Chillers, it states brushing the evaporators every two years starting with even number chillers in year one of contract. Again, labels on the chiller need to be identified better with the amount of them.
Answer: This is the same as performing the eddy currents. You will perform tube brushing on the same chillers you are performing eddy currents on. Punch tubes first and then move into the eddy current with the same schedule as question 2 above.
9. Page 12, II Scope: The paragraph states that there should be 17 oil analysis performed on each chiller annually. Typically, a full spectrum oil analysis is only recommended by equipment manufacturers to performed annually on water cooled chillers. Does the VA want to do this testing on the on the eight air cooled chillers also or is this a mistake?
Answer: VA would like to have them all accomplished.
10. Page 12, II Scope: The paragraph states that there should be “(8) eddy currents per year on water cooled chillers, alternating between even and odd chillers every other year.”
Answer: Can be worked out with the COR as far as scheduling and annotated on the end of day documentation.
11. I assume that this means that we would perform eddy current testing on chillers 2, 4 and 6 in building 39 and chiller 2 in building 100. If this is what is intended, then there will have to be (10) eddy current tests performed the following year as it will include chillers 1,3 and 5 in building 39 and chillers 1 and 3 in building 100. Also, the pricing sheet will have to be updated to include the extra testing of the chillers in building 100. Building 100 has a warranty for a year after we receive.
Answer: Updates/changes will be made when VA takes ownership.
12. Page 13, Item A at the top of the page. Provide running inspections of the 17 chillers in the following months: October, November, December, January, February, March, April, May, June, July, August and September. Other pages of the specification indicate that inspections are to be performed quarterly. Does the VA want quarterly inspections or monthly inspections?
Answer:Quarterly is correct, work with the COR on which month/time during the quarter works and annotate on the end of day documentation.
13. Page 13, Item B. Provide once-a-year factory Cooling Season Start Up Preparation and Inspection under Chiller Service, on 17 chillers during the November – February time frame. This doesn’t apply to chillers in Florida as the cooling season is year around and there is not seasonal shutdown (winterization) of the equipment. Typically, the annual inspection of the chillers are performed during the November – February time frame.
Answer:Startup is referring to the annual PM’s that must be performed between January and March.
14. I was informed by one of the VA personnel during the walkthrough today that the chillers in building 100 will be covered under a factory warranty during the first year of operation. Does the VA want these chillers to be covered under the maintenance agreement in this solicitation also?
Answer: The warranty does not cover preventative maintenance. We are still responsible for PM’s.
15. There are currently 9 out of 17 chillers that are water cooled chillers and receive Eddy current testing (ECT). It was stated in the SOW that there are to be eight (8) ECT’s per year although the price schedule states the contractor shall preform three (3) ECT’s per year. Can you please clarify how many ECT’s shall be performed per year on each chiller?
Answer: There will be a total of 8 performed on year and 10 performed on the next year. We require eddy currents on the evaporator. and condenser on each centrifugal chiller. So, this year it will be 1, 3, & 5, which means a total of six if we incorporate building 100, that will add chiller 1 & 3 and the total would be a total of 10. Next year it will be 2, 4, & 6 in building 39 and 2 in building 100 for a total of 8.
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3.00 |
| QT |
| _____________ |
| ________________ |
Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Base POP Begin: 10-15-2021 POP End: 10-14-2022
| 1.00 |
| JB |
| _____________ |
| ________________ |
Contractor shall perform annual preventative maintenance procedures and oil analysis on each referenced in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Base
| 6.00 |
| EA |
| _____________ |
| ________________ |
Contractor shall perform two (2) Eddy Currents per year per Chiller or a total of 6 Eddy Currents alternating between even and odd numbered chillers every other year on both evaporator and condenser in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Base
| 1.00 |
| JB |
| _____________ |
| ________________ |
Contractor shall perform 10-year tear downs maintenance procedures on chiller 2 in accordance with manufacture's recommendations and SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Base
| 3.00 |
| QT |
| _____________ |
| _____________ |
Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 1 POP Begin: 10-15-2022 POP End: 10-14-2023
| 1.00 |
| JB |
| _____________ |
| _____________ |
Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 1
| 6.00 |
| EA |
| _____________ |
| ________________ |
Contractor shall perform two (2) Eddy Currents per year per Chiller or a total of 6 Eddy Currents alternating between even and odd numbered chillers every other year on both evaporator and condenser in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 1
| 1.00 |
| EA |
| _____________ |
| _____________ |
Contractor shall perform 10-year tear downs maintenance procedures on chiller 1 on in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 1
| 3.00 |
| QT |
| ____________ |
| _____________ |
Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 2 POP Begin: 10-15-2023 POP End: 10-14-2024
| 1.00 |
| JB |
| _____________ |
| _____________ |
Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 2
| 6.00 |
| EA |
| _____________ |
| _____________ |
Contractor shall perform two (2) Eddy Currents per year per Chiller or a total of 6 Eddy Currents alternating between even and odd numbered chillers every other year on both evaporator and condenser in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 2
| 1.00 |
| EA |
| _____________ |
| _____________ |
Contractor shall perform 10-year tear downs maintenance procedures on chiller 3 in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 2
| 3.00 |
| QT |
| _____________ |
| _____________ |
Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 3 POP Begin: 10-15-2024 POP End: 10-14-2025
| 1.00 |
| JB |
| _____________ |
| _____________ |
Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 3
| 6.00 |
| EA |
| _____________ |
| ________________ |
Contractor shall perform two (2) Eddy Currents per year per Chiller or a total of 6 Eddy Currents alternating between even and odd numbered chillers every other year on both evaporator and condenser in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 3
| 1.00 |
| EA |
| _____________ |
| ________________ |
Contractor shall perform 10-year tear downs maintenance procedures on chiller 4 in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 3
| 3.00 |
| QT |
| _____________ |
| ________________ |
Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 4 POP Begin: 10-15-2025 POP End: 10-14-2026
| 1.00 |
| JB |
| _____________ |
| ________________ |
Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in accordance with manufacture's recommendations IAW to the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 4
| 6.00 |
| EA |
| _____________ |
| _____________ |
Contractor shall perform two (2) Eddy Currents per year per Chiller or a total of 6 Eddy Currents alternating between even and odd numbered chillers every other year on both evaporator and condenser in accordance with manufacture's recommendations and the SOW.
J065 - Maintenance, Repair and Rebuilding of Equipment: Medical, Dental, and Veterinary Equipment and Supplies Contract Period: Option 4
| GRAND TOTAL |
| _____________ |
1. On page 12, II. Scope, it states that there will be 17 oil analysis done on each chiller annually. That doesn’t make sense. Once a year on each one of the chillers would be more like it.
Answer: there shall be 17 oil analysis preformed on each chiller annually, that is in the scope…
1. On page 12, II. Scope, the 8 eddy currents to be done on the water-cooled chillers, alternating between odd and even and every other year on the evaporators. Can this please just be broken down to what machines each year that will be due and if it’s the condensers and evaporators? The number system between all the chillers just doesn’t match up well and this will make things easier. Like Year 1, chiller 2,4,6 eddy current on condensers and chiller 1,2,3 on evaporators only. Something like this.
Answer: Can be worked out with the COR as far as scheduling and annotated on the end of day documentation.
1. 3.On page 13, Preventive maintenance (PM), A, Reads provide running inspections of the 17 chillers in the following months: OCT, NOV, DEC, etc.…. This would be considered a monthly inspection on the chillers, not quarterly.????
Answer: Quarterly is correct, work with the COR on which month/time during the quarter works and annotate on the end of day documentation.
1. On page 13, Preventive maintenance (PM), B, provide cooling season start up, we are in Florida so there really isn’t a need per the chillers always run. No winterization is done on them. Answer: Understood, provide break down/cost withing the proposal as requested
1. On page 14, Preventive maintenance, A, states chiller is to be serviced four times each year. As with the note above on 3., you can see how this is off?
Answer: See above 3 answer
1. On page 14, Preventive maintenance, C, states sample and analysis on refrigerant and oil. This is not spelled out in the scope on page 12. No refrigerant samples are noted.
Answer: Scope is an overview, continue to pay particular attention as you continue on with the different units…
1. On page 14, Preventive maintenance D, ARROW 5, states perform oil analysis twice a year on each chiller. You can see the confusion with this….
Answer: Correct, change made and returned to CO to match section 2 PWS
1. On page 15, Centrifugal Chillers, it states brushing the evaporators every two years starting with even number chillers in year one of contract. Again, labels on the chiller need to be identified better with the amount of them.
Answer: Can be worked out with the COR as far as scheduling and annotated on the end of day documentation.
1. Page 12, II Scope: The paragraph states that there should be 17 oil analysis performed on each chiller annually. Typically, a full spectrum oil analysis is only recommended by equipment manufacturers to performed annually on water cooled chillers. Does the VA want to do this testing on the on the eight air cooled chillers also or is this a mistake?
Answer: VA would like to have them all accomplished.
1. Page 12, II Scope: The paragraph states that there should be “(8) eddy currents per year on water cooled chillers, alternating between even and odd chillers every other year.”
Answer: Can be worked out with the COR as far as scheduling and annotated on the end of day documentation.
1. I assume that this means that we would perform eddy current testing on chillers 2, 4 and 6 in building 39 and chiller 2 in building 100. If this is what is intended, then there will have to be (10) eddy current tests performed the following year as it will include chillers 1,3 and 5 in building 39 and chillers 1 and 3 in building 100. Also, the pricing sheet will have to be updated to include the extra testing of the chillers in building 100. Building 100 has a warranty for a year after we receive.
Answer: Updates/changes will be made when VA takes ownership.
1. Page 13, Item A at the top of the page. Provide running inspections of the 17 chillers in the following months: October, November, December, January, February, March, April, May, June, July, August and September. Other pages of the specification indicate that inspections are to be performed quarterly. Does the VA want quarterly inspections or monthly inspections?
Answer: Quarterly is correct, work with the COR on which month/time during the quarter works and annotate on the end of day documentation.
1. Page 13, Item B. Provide once-a-year factory Cooling Season Start Up Preparation and Inspection under Chiller Service, on 17 chillers during the November – February time frame. This doesn’t apply to chillers in Florida as the cooling season is year around and there is not seasonal shutdown (winterization) of the equipment. Typically, the annual inspection of the chillers are performed during the November – February time frame.
Answer: Understood, provide break down/cost withing the proposal as requested
1. I was informed by one of the VA personnel during the walkthrough today that the chillers in building 100 will be covered under a factory warranty during the first year of operation. Does the VA want these chillers to be covered under the maintenance agreement in this solicitation also?
Answer: Yes, PWS has multiple CLINs, after the one-year warranty expires they will be added to the successive years left
1. There are currently 9 out of 17 chillers that are water cooled chillers and receive Eddy current testing (ECT). It was stated in the SOW that there are to be eight (8) ECT’s per year although the price schedule states the contractor shall preform three (3) ECT’s per year. Can you please clarify how many ECT’s shall be performed per year on each chiller?
Answer: Correct, the number of Eddy current tests has been updated to reflect ten (10) and will be conducted annually. “(ten (10) EDDY currents per year on water-cooled chillers”)