About this file

36C24818R0121 VA 516-15-107 - Replace Boilers at Bay Pines VAMC - Approved Construction Drawings_Part3.pdf

View the file

Other files

File Type Posted
36C24818R0121-0006002.pdf PDF
36C24818R0121-0006000.docx DOCX document
36C24818R0121-0006001.docx DOCX document
36C24818R0121-0005002.docx DOCX document
36C24818R0121-0005000.docx DOCX document
36C24818R0121-0005001.pdf PDF
36C24818R0121-0004000.docx DOCX document
36C24818R0121-0004001.docx DOCX document
36C24818R0121-00003000.docx DOCX document
36C24818R0121-00003003.pdf PDF
36C24818R0121-00003001.pdf PDF
36C24818R0121-00003002.docx DOCX document
36C24818R0121-00002001.pdf PDF
36C24818R0121-00002003.pdf PDF
36C24818R0121-00002000.docx DOCX document
36C24818R0121-00002002.pdf PDF
36C24818R0121-00001001.pdf PDF
36C24818R0121-00001004.xlsx XLSX spreadsheet
36C24818R0121-00001002.docx DOCX document
36C24818R0121-00001000.docx DOCX document
36C24818R0121-00001003.pdf PDF
36C24818R0121-007.pdf PDF
36C24818R0121-003.docx DOCX document
36C24818R0121-005.pdf PDF
36C24818R0121-014.pdf PDF
36C24818R0121-009.pdf PDF
36C24818R0121-008.pdf PDF
36C24818R0121-004.pdf PDF
36C24818R0121-001.docx DOCX document
36C24818R0121-012.pdf PDF
36C24818R0121-016.doc DOC document
36C24818R0121-006.pdf PDF
36C24818R0121-011.pdf PDF
36C24818R0121-002.pdf PDF
36C24818R0121-013.pdf PDF
36C24818R0121-010.pdf PDF
36C24818R0121-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17.716.715.814.914.113.313

M

N

M.7

M.8

18171615

L

MP301

MP301

CARBON MONOXIDE

SENSOR

EMERGENCY GAS SHUT-OFF

VALVE SWITCH

EMERGENCY GAS SHUT-OFF

VALVE SWITCH

CARBON MONOXIDE SENSOR

CARBON MONOXIDE SENSOR

CARBON MONOXIDE

SENSOR

COMBUTIBLE GAS SENSOR

6" H

PS

6" H

PS H

PS

H

PS

HPS

HPS

HPS

2 2

1 NG

"Ø

ID

"Ø

ID

30"Ø ID 30"Ø ID

28"Ø ID

"Ø

ID

30"Ø ID

28"Ø ID

"Ø

ID

SH

SH

SH

SH

SH

SH

SH

SH

FSAFSA

FSA

HBA

HBA

HBAHBAHBAHBAHBAHBAHBAHBA

HBA

FSA

FSA

HBA

HBA

HBA

HBA

HBA

FSA

FSA

30"Ø ID UP

COMBUTIBLE GAS SENSOR 3

3/4" DRAIN BOTTOM

OF STACK TO EXISTING

FLOOR DRAIN

5" N

G

100-B-1

NEW

100-B-2

NEW

100-B-3

NEW

100-CST-1

4"V UP

2- 1/

2" F

W P

D

1 1/2" FOS

1 1/2" FOR

2 1/2" HPR

2 1/2" FWPD

2" FWPD

BOILER CONTROL PANEL

CONCRETE PAD

VFD

2 1/2" FWPD

3/4" SW

16.715.8

N

N.5

NEW BOILER

PLANT MASTER

CONTROL PANEL

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

PHASE 3 - NEW WORK

MAY 15, 2017 JSN RWD

MP206

1/4" = 1'-0"

PHASE 3 - NEW WORK

KEY NOTES

1 CONDUIT JUNCTION BOXES (TYP. OF 6).

SEE ELECTRICAL FOR CONDUIT ROUTING.

CARBON MONOXIDE SENSORS MOUNTED AT

BREATHING HEIGHT.

COMBUSTION GAS SENSOR MOUNTED NEAR

CEILING AND ACCESSIBLE FROM CATWALKS/

MEZZANIE/ PLATFORMS.

BREECHING EXPANSION JOINT.

(2) 4" VENTS, (1) 3" VENT THRU ROOF. PROVIDE

VENT DRIP PAN ELBOWS. SIZED BY BOILER

MANUFACTURER.

NO 90° ELBOWS ALLOWED IN BOILER SAFETY

RELIEF VALVE VENT PIPING. MAXIMUM BENDS

ALLOWED: (2) 45° ELBOWS.

1/8" = 1'-0"

PHASE 3 - NEW BOILER CONTROL PANEL

M

N

M.7

M.8

18171615

L

MP301

3/4" BBD2" BBD

2" BBD

2" BBD2" BBD

2" B

BD

3/ 4"

B

BD

3/ 4"

B

BD

2" B

BD

2" B

BD

3/4" BBD2" BBD2" BBD

100-BDS-1

3" CW

?2"

2" B

BD

2" B

BD

?5"

2 1/2" PC

?2"

6" N

G

2" PC

1/

2" P

C

EXISTING

FOR

FOS

IN TRENCH

3/4"FOR

3/4"FOS UP

TO BOILER B-1

ABOVE FLOOR

EXISTING FUEL

OIL PUMP SET

3/4"FOS

3/4"FOR UP

TO BOILER B-2

3/4"FOS

3/4"FOR UP

TO BOILER B-3

3/4" FOR

3/4"FOS

IN TRENCH

1-1/2" FOR

1-1/2"FOS

IN TRENCH

3/4" FOR

3/4"FOS

IN TRENCH

ABOVE

FLOOR1-1/2" FOS

1-1/2" FOR

ABOVE GRADE

1-1/2"D

IN TRENCH

2"BBD ABOVE FLOOR

2"BBD ABOVE FLOOR

3" CTPD

2"BBD ABOVE FLOOR

1/ 2"

3" C

T P

D

3/4" D

IN TRENCH

3/4" D

IN TRENCH

3/4" D ABOVE FLOOR

SOFT WATER DRAIN

PIPE DOWN FROM

SAMPLE COOLER

SOFT WATER DRAIN

PIPE DOWN FROM

SAMPLE COOLER

3/4" D

IN TRENCH

3/4" D ABOVE FLOOR

SOFT WATER DRAIN

PIPE DOWN FROM

SAMPLE COOLER

3/4" D

IN TRENCH

1" D

IN TRENCH

1" D

IN TRENCH

3/4" D

IN TRENCH

3/4" D

IN TRENCH

3/4" D

1" D

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

BOILER PLANT - UNDERFLOOR PIPING

MAY 15, 2017 JSN RWD

MP207

1/4" = 1'-0"

BOILER PLANT - UNDERFLOOR PIPING

KEY NOTES

1 USE SCHEDULE 80 PIPE, SEWER TEES AND LONG

RADIUS ELBOWS FOR ALL BLOWDOWN PIPING.

HARD 90° ELBOWS AND SHORT 90° ELBOWS ARE

NOT ALLOWED FOR ANY BLOWDOWN PIPING.

18.6

M

N

M.7

M.8

18171615

L

MP301

30" (TYP. OF 3)

MP301

MP305

33" Ø (6 typ.)

33" Ø (2 typ.)

100-SF-3

100-SF-2

100-SF-1

100-B-3

NEW

100-B-2

NEW

100-B-1

NEW

100-SF-6

100-SF-5

100-SF-4

100-SF-7 100-SF-8

6"MPS PRV

SAFETY VALVE

VENT

2 2

5"V FROM

BLOWDOWN

4"V FROM

CONDENSATE

TANK

M1 M1 M1 M1

M1 M1 M1 M1

M1 M1 M1 M1

M1M1M1M1

M1

M1

M1

M1 M1

M1

M1

M1

M1 M1 M1 M1 M1M1M1M1

DRUM LOUVER (TYP)

REFER TO SCHEDULE

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

BOILER PLANT - VENTILATION PLAN NEW

MAY 15, 2017 JSN RWD

MP212

1/4" = 1'-0"

BOILER PLANT - VENTILATION PLAN NEW

KEY NOTES

1 DEMO EXISTING FAN ON ROOF/ CLERESTORY.

(2) 4" VENTS, (1) 3" VENT THRU ROOF. SIZED BY

BOILER MANUFECTURER.

44"Ø ID 40"Ø ID 30"Ø ID

"Ø

ID

48"Ø ID

"Ø

ID

100-B-3 100-B-2

30"Ø ID

100-B-1

30"Ø ID

"Ø

ID

CAP

17.716.715.814.914.113.313

M

N

M.7

M.8

18171615

L

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

DEDUCT ALTERNATE #2 - REUSE EXISTING

STACK

MAY 15, 2017 JSN RWD

MP221

1/4" = 1'-0"

DEDUCT ALTERNATE #2 - REUSE EXISTING STACK

Boiler Plant FFE 0' - 0"

Underside of main deck

26' - 7 1/4"

Mezzanine 12' - 0"

M NM.8L

3/4" DRAIN BOTTOM OF STACK

TO EXISTING FLOOR DRAIN.

VALVES SHALL BE LOCKED

OPEN (TYP OF 3)

DRAIN TEE CAP (TYP OF 3)

100-B-3

SECOND 6" STOP

VALVE IN HORIZONTAL

6" NON-RETURN STOP

VALVE

8"BOILER CONNECTION,

8x6 REDUCER/ FLANGE

SPOOL PIECE

1 1/2" PC

2 1/2" HPR

2" BBD

8" HPS

4" 4"

2 1/2" PC

2 1/2" HPR

6" H

PS

4" C

W

3" SW

6" NG

4" S

W 4"

C W

1 1/2" CW

1 1/2" SW

3" SW

3" SW

Boiler Plant FFE 0' - 0"

Underside of main deck

26' - 7 1/4"

Mezzanine 12' - 0"

16.715.814.914.113.3

24"X26" DUCT

(TYPICAL)

6" HPS

6" HPS

100-SF-2 100-SF-5

100-B-3 100-B-2 100-B-1

100-SF-7

6" HPS

3" HPS 6" HPS

8" DCW

5" NG6" NG

EXISTING CONDUITS

EXISTING FIRE MAIN

EXISTING CONDUITS

6" NG

2" C

W

5"

5" N

G

5" N

G

5" N

G

2" CW

2" FWPD

3" SW

4" CW

4" SW

3" SW

3" SW

1 1/2" SW

3" D

1 1/2" CW

1 1/2" CW

Boiler Plant FFE 0' - 0"

Underside of main deck

26' - 7 1/4"

Mezzanine 12' - 0"

Top of Stacks 110' - 0"

Top of Stacks 110' - 0"

FSA (FIXED SUPPORT

ASSEMBLY)

WALL GUIDE

EXPANSION

JOINT

FSA (FIXED SUPPORT

ASSEMBLY)

WALL GUIDE

WALL GUIDE

WALL GUIDE

EXPANSION

JOINT

FSA (FIXED SUPPORT

ASSEMBLY)

WALL GUIDE

WALL GUIDE

EXPANSION

JOINT

FSA (FIXED SUPPORT

ASSEMBLY)

FSA (FIXED SUPPORT

ASSEMBLY)

3/4" DRAIN BOTTOM OF STACK

TO EXISTING FLOOR DRAIN.

VALVES SHALL BE LOCKED

OPEN (TYP OF 3).

DRAIN TEE CAP (TYP OF 3)

Top of Roof 100' - 0"

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

BOILER PLANT - SECTIONS - MECHANICAL

MAY 15, 2017 JSN RWD

MP301

1/4" = 1'-0"

BOILER PLANT - SECTION LOOKING EAST - MECHANICAL

1/4" = 1'-0"

BOILER PLANT - SECTION LOOKING NORTH - MECHANICAL

3/16" = 1'-0"

BOILER STACKS

DEAERATOR CONDENSATE BYPASS

NOT TO SCALE

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

BOILER PLANT - 3D VIEW

MAY 15, 2017 JSN RWD

MP302

BOILER PLANT - 3D VIEW

PC2" PC

2 1/2" PC

PC2" PC

V4" V

DOMIC

BLDG 100

PC3" PC

PC3" PC

PC2 1/2" PC

4" D

LPS1" LPS

LPS1" LPS

CR3" CR

SW2" SW

CTPD3" CTPD

D3/4" DD3/4" D

2" HPR

2 1/2" PC

2" PC

3"CTPD3" CTPD

CR3" CRCR3" CR

DCW2" DCWDCW2" DCW

PC4" PC

PC2 1/2" PC

OD1" OD

HPR2" HPR

DCW1" DCW

HPR2 1/2" HPR

HPR2" HPR

2"PC2" PC

6" NG

PC2 1/2" PC

NG6" NG

3/4"

3/4" D

OFL4" OFL

6" NG

PC3" PC

HPR2" HPR

LAUNDRY

PC2 1/2" PC

PC3" PC

LPS1" LPS

HPR2 1/2" HPR

2 1/2" PC

CR2" CR

DCW2" DCW

SW2" SW

SV4" SV

D4" D

DCW2" DCW

SW2" SW

CTPD3" CTPD

NG6" NG

HPR2" HPR

3/4"

3/4"

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

BOILER PLANT - DEMO 3D VIEWS

MAY 15, 2017 JSN RWD

MP303

Condensate Pit - Demo View 1

Condensate Pit - Demo View 2

N

N

3" SW

3" CW

3" CW

4" HPC

1 1/2"

2 1/2" HPC

2" BBD

3" CTPD

4" CTPS4" CTPS

3" CTPD3" CTPD

2" D

5" D

2" CW

3" CW

3" SW

2 1/2" PC

2" FWPD

2" FWPD

2" CW

3" CW

3" SW

2" CW

2" D

4" D

6" NG

6" NG

4" HPC

1 1/2"

3" CW

4" V

1 1/2"1 1/2"

8" HPS

2 1/2" PC

2" BBD

2" BBD

5"

2" PC

2 1/2" HPC

2 1/2" HPR

2 1/2" PC

1 1/2" FOS

1 1/2" FOR

3" LPC

CTP-1

CTP-2

100-CST-1

100-BDS-1

V

2" HPC

6" NG

6" NG

2 1/2" PC

3" CW

3" CW

4" PC

5"

2 1/2" HPC

3/4" LPC

3" SW

3" CW

2" CW

2" FWPD

2" FWPD

2" BBD

2"

2"

2" D

2" HPR

2 1/2" PC

8" HPS

2 1/2" HPR

6" NG

1 1/2" FOS

2" HPC

2 1/2" HPR

3" D

2" CW

V

100-CST-1

100-BDS-1

4" HPC

FROM B-1

BBD FROM B-3

BBD FROM B-2

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

BOILER PLANT - NEW 3D VIEWS

MAY 15, 2017 JSN RWD

MP304

Condensate Pit - New View 1

Condensate Pit - New View 2

KEY NOTES

1 BLOWDOWN SEPARATOR DRAIN

DISCHARGES INTO AN EXISTING 6" HUB

DRAIN AT APPROXIMATELY 3'-0" ABOVE PIT

FLOOR. ADJUST ELEVATION OF BDS-1 AS

REQUIRED FOR PROPER DRAINAGE.

N

Underside of main deck

26' - 7 1/4"

M NL

100-SF-6100-SF-5100-SF-4

33" Make-Up Air System

33" Make-Up Air System

33" Make-Up Air System

Existing 4" Vent

Existing Pedestrian Bridge

M1 - DRUM LOUVER

(TYP) REFER TO SCHEDULE

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

BOILER PLANT - ROOF - 3D VIEW

MAY 15, 2017 JSN RWD

MP305

ROOF PLAN - 3D VIEW

1/8" = 1'-0"

NEW ROOF - SECTION

BOILER B-3 - 3D VIEW

BOILER B-2 - 3D VIEW

BOILER B-1 - 3D VIEW

3" CW

3" SW

2 1/2" PC

6" NG

3/4" LPC

4" CW

3" SW

2 1/2" PC

2 1/2" HPR

1 1/2" CW

3" SW

3" CW

2" CW

4" CW

2" BBD

2"

2"

1" PC

2"

5" NG

2" BBD

2" BBD

3" SW

1 1/2" CW

DEALKALIZER SKID

BRINE PUMP SKID

WATER SOFTENER SKID

DEALKALIZER BRINE TANK

SOFTENER BRINE TANK

DEALKALIZER CAUSTIC TANK

1-1/2" ED

6" NG

1" CA

1" FOR

1" FOS

2" CW

2" FWPD

2" FWPD

5" V

2 1/2" HPR

2" CW

4" SW TO EXISTING

6" HPS

3/4" BBD

1 1/2" D

1 1/2" D

3/4" BBD

3/4" FOS

3/4" FOR

2" BBD

1 1/2" FOS

1 1/2" FOR

28"Ø ID

3" SW

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

WATER TREATMENT - NEW 3D VIEW

MAY 15, 2017 JSN RWD

MP306

Water Treatment 3D View

File details come from the government source that posted it.