About this file

36C24818R0121 00002 36C24818R0121 RFIs_AKEA Design Response.pdf

View the file

Other files

File Type Posted
36C24818R0121-0006002.pdf PDF
36C24818R0121-0006000.docx DOCX document
36C24818R0121-0006001.docx DOCX document
36C24818R0121-0005002.docx DOCX document
36C24818R0121-0005000.docx DOCX document
36C24818R0121-0005001.pdf PDF
36C24818R0121-0004000.docx DOCX document
36C24818R0121-0004001.docx DOCX document
36C24818R0121-00003000.docx DOCX document
36C24818R0121-00003003.pdf PDF
36C24818R0121-00003001.pdf PDF
36C24818R0121-00003002.docx DOCX document
36C24818R0121-00002001.pdf PDF
36C24818R0121-00002000.docx DOCX document
36C24818R0121-00002002.pdf PDF
36C24818R0121-00001001.pdf PDF
36C24818R0121-00001004.xlsx XLSX spreadsheet
36C24818R0121-00001002.docx DOCX document
36C24818R0121-00001000.docx DOCX document
36C24818R0121-00001003.pdf PDF
36C24818R0121-007.pdf PDF
36C24818R0121-003.docx DOCX document
36C24818R0121-015.pdf PDF
36C24818R0121-005.pdf PDF
36C24818R0121-014.pdf PDF
36C24818R0121-009.pdf PDF
36C24818R0121-008.pdf PDF
36C24818R0121-004.pdf PDF
36C24818R0121-001.docx DOCX document
36C24818R0121-012.pdf PDF
36C24818R0121-016.doc DOC document
36C24818R0121-006.pdf PDF
36C24818R0121-011.pdf PDF
36C24818R0121-002.pdf PDF
36C24818R0121-013.pdf PDF
36C24818R0121-010.pdf PDF
36C24818R0121-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAW Contracting, Inc.

2625 Production Rd, Ste A

Virginia Beach, VA 23454 www.sawcontracting.com

2625 Production Rd, Ste A, Virginia Beach, VA 23454

REQUEST FOR INFORMATION

Subject: Prebid RFIs No.

PROJECT: Replacement of Energy Plant Boilers Building 100 DATE: 5/17/18

TO: Department of Veterans Affairs Contract #: 36C24818R0121

STARTED:

ATTN: Thomas Lucas REQUIRED:

REQUEST:

In speaking with the pile manufacturer, the Sheet S205, detail 8 indicates a rebar cage that most likely is not acheivable. They recommend either one center rebar with grout, or just grout. Please advise.

The pile manufacturer also indicates the need for overhead clearance of about 25 feet in order to install the piles.

Please advise if the plant has this clearance.

Request By: SAW Contracting, Inc.

Signed:_____________________________________ Date: 05/17/2018

RESPONSE:

Answered By:

Signed:______________________________________ Date:______________________________________

RHensley Typewritten Text Note 1 on Sheet S201 has been revised. Please refer to the new Sheet Notes, numbers 1-5. It is unlikely there is 25' of clearance above each of the piles to be installed, therefore piling may need to be installed in sections.

RHensley Typewritten Text

RHensley Typewritten Text

RHensley Typewritten Text 5/24/18

RHensley Typewritten Text

RHensley Typewritten Text

RHensley Typewritten Text

RHensley Typewritten Text

RHensley Typewritten Text

RHensley Typewritten Text

RHensley Typewritten Text Richard Wheeler, PE

RHensley Typewritten Text

2018-05-25T14:18:27-0400
Richard G. Wheeler