36C24818R0121-011.pdf
PDF 4 MB Posted
- Attached to
- Replace Boilers Bldg. 100 (Construction) TIERED EVALUATIONS C. W. Bill Young VA Medical Center
- Solicitation number
- 36C24818R0121
About this file
36C24818R0121 VA 516-15-107 - Replace Boilers at Bay Pines VAMC - Approved Construction Drawings_Part2.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING SYMBOLS
PIPING SYMBOLS
MECHANICAL ABBREVIATIONS
PIPING SYSTEM LABELS
BF
S
MP101
A
26-SF 3
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SYMBOL DESCRIPTION
DPS
CST
CHS
VENT THROUGH ROOF
POUNDS PER SQUARE INCHPOUNDS PER SQUARE INCH - GAUGE
PUMPED CONDENSATE
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAM
MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS
MPR
LPS
HIGH PRESSURE RETURN (STEAM CONDENSATE)
HIGH PRESSURE SUPPLY (STEAM)
INSIDE DIAMETER
HORSEPOWER
CONDENSATE SURGE TANK
DIFFERENTIAL PRESSURE SENSOR
CHILLED WATER SUPPLY
ID
HP
HPR
HPS
TOTALLY ENCLOSED FAN COOLED
VTR
TEFC
SUPPLY FAN
STANDARD CUBIC FEET PER MINUTE
SCFM
SF
PSI
PSIG
PC
NATURAL GASNG
REVOLUTIONS PER MINUTERPM
BTUH BRITISH THERMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
BTU BRITISH THERMAL UNITS
STEAM TRAPT
EQUIPMENT DRAINED
INCHESIN
FAHRENHEITF
VARIABLE SPEED DRIVEVSD
NORMALLY OPENNO
B BOILER
BHP BRAKE HORSEPOWER
CHILLED WATER RETURNCHR
GPM GALLONS PER MINUTE
FUEL OIL PUMPFOP
INCHES WATER COLUMNIN WC
NOT TO SCALENTS
PRESSURE REGULATING VALVE
PRV
SYMBOL DESCRIPTION
CONNECT TO EXISTING
DEMOLITION
EXISTING
NEW WORK
INSTRUMENTATION DESCRIPTION TABLE
FIRST LETTER
ANALYSIS
BURNER FLAME
A
B
SUCCEEDING LETTER
MODIFIERMEASURED OR
INITIATED VARIABLE OUTPUT FUNCTION MODIFIERREADOUT OR PASSIVE
FUNCTION
USER'S CHOICE
ALARM
USER'S CHOICE
ALARM/AUTOMATIC
BY-PASS
CONDUCTIVITYC CONTROL CLOSED
S
FLOW RATE
VOLTAGE (EMF)
F
E
RATIO (FRACTION)
SENSOR (PRIMARY ELEMENT)
GLASS, VIEWING DEVICEGAUGING (DIMENSIONAL)G
HAND (MANUALLY INITIATED)H HIGH
CURRENT (ELECTRICAL)I INDICATE
SCANPOWERJ
TIME OR TIME SCHEDULEK CONTROL STATION
LEVELL LIGHT (PILOT) LOW
MOISTURE, HUMIDITYM MIDDLE OR INTERMEDIATE
CONSISTENCYN USER'S CHOICE USER'S CHOICE USER'S CHOICE
USER'S CHOICEO OPENORIFICE (RESTRICTION)
POINT (TEST) CONNECTIONPRESSURE OR VACUUMP
INTEGRATE OR TOTALIZEQUALITY OR EVENTQ
RECORD OR PRINTRADIOACTIVITYR
SAFETY SWITCHSPEED OR SOLENOID
FREQUENCY
TRANSMIT
MULTIVARIABLE
TEMPERATURE
U
T
MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION
DENSITY (MASS) OR SPECIFIC
GRAVITYD DIFFERENTIAL
V VISCOSITY OR VIBRATION VALVE, DAMPER, OR LOUVER
WEIGHT OR FORCEW
UNCLASSIFIEDX
WELL
UNCLASSIFIEDUNCLASSIFIED
USER'S CHOICEY RELAY OR COMPUTE
POSITIONZ
DRIVE, ACTUATE, OR
UNCLASSIFIED FINAL CONTROL
ELEMENT
UNCLASSIFIED
MOMENTARY
TIME RATE OF CHANGE
FULL
CONTROL INSTRUMENTATION LEGEND
SYMBOL
BASIC INSTRUMENTATION SYMBOL LOCAL MOUNTED
DESCRIPTION
XXX
XXX
XXX
XXX
FRONT PANEL MOUNTED AND/OR DATA COLLECTION SYSTEM (DCS)
XXX
XXX
INSTRUMENTATION DESCRIPTION (SEE INSTRUMENTATION DESCRIPTION TABLE)
INSTRUMENT LOOP NUMBER
RESET
I
I/P ELECTRIC TO PNEUMATIC CONVERTER
GENERAL EQUIPMENT INTERLOCK
DRAWING NUMBER WHERE SHOWN
DETAIL NUMBER
MP101
POUNDS PER HOURLBS/HR
NORMALLY CLOSEDNC
LENGTHL
PARTS PER MILLIONPPM
PRESSURE SAFETY VALVEPSV
POUNDS PER HOURPPH
SQUARE FOOT (FEET)SQFT
STAINLESS STEELSS
BREECHING HANGER BRACKET ASSEMBLYHBA
BREECHING FIXED SUPPORT ASSEMBLYFSA
OXYGENO2CW COLD WATER (POTABLE)
SYMBOL DESCRIPTION
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
HPS
HPR
MPS
MPR
LPS
LPR
PC
CHS
CHR
MW
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
D
V
X
CHILLED WATER SUPPLY
CHILLED WATER RETURN
MAKE-UP WATER
DRAIN LINE
VENT LINE
EXISTING PIPE TO BE REMOVED
SYMBOL DESCRIPTION
FEED WATER PUMP SUCTION
FEED WATER PUMP DISCHARGE
CONDENSATE TRANSFER PUMP DISCHAGE
FWPD
FWPS
CTPD
CTPS
BBD
CBD
CF
NG
CONDENSATE TRANSFER PUMP SUCTION
BOTTOM BLOWDOWN
CONTINUOUS BLOWDOWN
CHEMICAL FEED
NATURAL GAS MAIN FUEL
FOS FUEL OIL SUPPLY
FOR FUEL OIL RETURN
CW COLD WATER (CITY WATER)
SW SOFTENED WATER
RH
ROLLER-TYPE HANGER
SH
VARIABLE SPRING-TYPE HANGER (TYPE 51)*
* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY STANDARD PRACTICE SP-58.
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
PIPE UP
PIPE DOWN
QUICK-COUPLE HOSE CONNECTOR
LOCKABLE BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE (LEVEL GLASS GAGE VALVE)
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
HOSE CONNECTOR
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
FLANGE
BLIND FLANGE
VENT THRU ROOF
BALL VALVE
L
NP NON POTABLE
NON-PATIENTNP
GLOBE VALVE
EXTERNAL STATIC PRESSUREESP
VENT CAP
THREE-WAY VALVE
OFL OVERFLOW
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
MECHANICAL LEGEND, SYMBOLS AND
ABBREVIATIONS
MAY 15, 2017 JSN RWD
MP001
17.716.715.814.914.113.313
M
N
M.7
M.8
18171615
L
DEMOLISH ABANDONED
STEAM PIPING, VENT &
FLUE CONNECTION
DEMOLISH ABANDONED STEAM & CHILLED
WATER PIPING
RELOCATE EXISTING
FLUE O2 MONITOR
DEMO ABANDONED
4" HPS
DEMO ABANDONED
LAUNDRY 6" HPS
DEMOLISH ABANDONED
42"Ø INCINERATOR FLUE
FROM BOILER PLANT TO
ABOVE ROOF.
100-B-3
EXISTING
"ø
A B
N D
2" A
B N
D
H P
S 6"
H P
S
2 3
DEMOLISH ABANDONED STEAM LINE
THAT EXTENDS 3'-0" INTO SWITCHGEAR
ROOM
DEMOLISH ABANDONED CHILLED
WATER LINES
DEMO ABANDONED
2" HPS
DEMO ABANDONED
2" HPS
DEMO ABANDONED
6" VTR
100-B-2
EXISTING
100-B-1
EXISTING
6"HPS (100)
HPS
6"HPS (100)
HPS
6" HPS (100)
4"HPS (100)
4"HPS (100)
HPS
4"HPS (100)
HPS
2"HPS (100)
H P
S
10"CHR
10"CHS
10"CHR (TOP)
10"CHS (BOTTOM) EXISTING DEAERATOR
DEMO ABANDONED
LAUNDRY 3" PC
DEMO ABANDONED
LAUNDRY 2" HPR
2" HPR
2" HPR
2" HPR
3" PC 3" PC
DEMO ABANDONED 2" HPR
FROM LAUNDRY
DEMO ABANDONED 3" PC
FROM LAUNDRY (LOCATED
IN TRENCH)
DEMO ABANDONED 3" PC
FROM LAUNDRY AND CAP
DEMO ABANDONED 3" PC
FROM LAUNDRY (LOCATED
IN TRENCH)
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
PHASE 1 - DEMOLITION
MAY 15, 2017 JSN RWD
MP201
1/4" = 1'-0"
PHASE 1 - DEMOLITION
KEY NOTES
KEY NOTES
REMOVE NATURAL GAS STUB-UP AND CAP
PIPE BELOW FLOOR. PROVIDE WELDED
END CAP ON EXISTING PIPES TO REMAIN
AS NEEDED.
CUT CHILLED WATER LINES
UNDERGROUND OUTSIDE OF PIT AND
GROUT REMAINING ABANDONED PIPES.
PATCH HOLES IN WALL.
CUT STEAM, PUMPED CONDENSATE AND
HPR LINES UNDERGROUND OUTSIDE OF
PIT AND GROUT REMAINING ABANDONED
PIPE. PATCH HOLES IN WALL.
REMOVE ABANDONED STEAM LINE AND
PATCH WALLS.
WELD CAP ON REMAINING CHILLED WATER
PIPES.
COORDINATE WITH THE VA TO REMOVE/
RELOCATE ALL PORTABLE ITEMS FROM
THE PHASE I CONSTRUCTION AREA.
CUT PIPE UNDERGROUND OUTSIDE OF
PLANT. GROUT PIPE TO REMAIN.
N
M.7
M.8
18171615
L
MP301
ELEVATED PLATFORM. SEE
STRUCTURAL.
BRINE
TANK
DEALKALIZER
SKID
WATER
SOFTENERS
"Ø
ID
"Ø
ID
30"Ø ID
30"Ø ID
BACKFLOW
PREVENTER
EXISTING 10" CW
3" P
C
RELOCATE EXISTING
FLUE O2 SENSOR
SH
SH
SH
SH
SH
RH
RH
SH SH SH
FSA
FSA
FSA
FSA
FSA
HBA
HBA
HBA
HBA
HBA
HBA
HBA
HBA
HBA
HBA
HB
HBA
FSA
FSA
FSA
FSA
FSA
30"Ø ID UP
30"Ø ID UP
FSA
HBA
2-1/2" FWPD
2" FWPD
3/4" DRAIN BOTTOM
OF STACK TO EXISTING
FLOOR DRAIN
100-B-3
EXISTING
100-B-2
EXISTING
100-B-1
EXISTING
100-B-3
NEW
100-CST-1
BDS-1
BRINE
TANK
DEALKALIZER
CAUSTIC TANK
BRINE
PUMP SKID
8"HPS (100)
8"HPS (100)
2" FWPD
2" FWPD
6"HPS (100)
4"CW
4"
SH
SH
SHSHSHSHSHSHSHSH
SH
SH
6" NG
6" NG
5"
N G
6" HPS
6" H
PS
3" SW
3" SW
3" CW
2" CW
3" CW
3" S
W
3" S
W
3" S
W
3" S
W
3/4" LPC
1 1/2" SW
1 1/2" CW
3" SW
3" SW
3" S
W
3" SW
1 1/2" SW
3" CW
4" HPC
2 1/2" HPC
5"
1/
2" H
PC
3" L
PC
3/4" LPC
EXISTING 6" SW
4" SW
4" SW
4" SW
10" CW
C W
10" CW10" CW
10" CW
BACKFLOW
PREVENTER
2" NP
2" C
W
3" CTPD
4"V UP
SH
SH
SH
6" HPS
4" SW
2" FWPD
2" FWPD
3" FWPD
2-1/2" FWPD3" FWPD
3" FWPD
BOILER CONTROL
PANEL
CONCRETE PAD
VFD
2" FWPD
2" FWPD
3" FWPD
3/4" SW
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
PHASE 1 - NEW WORK
MAY 15, 2017 JSN RWD
MP202
1/4" = 1'-0"
PHASE 1 - NEW WORK
KEY NOTES
KEY NOTES
CONDUIT JUNCTION BOXES (TYP. OF 6). SEE
ELECTRICAL FOR CONDUIT ROUTING. MUST
MAINTAIN CLEAR FROM BOX TO FINISHED FLOOR.
BASE BID: NEW WATER SOFTENERS,
DEALKALIZER, BRINE PUMP, BACKFLOW
PREVENTER, BRINE TANK, AND CAUSTIC TANK.
DEDUCT ALTERNATE #4: REUSE EXISTING
WATER SOFTENER AND CHEMICAL TREATMENT.
EXISTING FUEL OIL PUMP SET.
BREECHING EXPANSION JOINT.
(2) 2" FWPD, 2"NP, 3" PC, 8" HPS AND 6" NG
CONNECTIONS FOR MOBILE BOILER WITH BLIND
FLANGE 12'-0" ABOVE GRADE. PROVIDE
STAINLESS STEEL ESCUTCHEN PLATE OVER
WALL PENETRATION.
(2) 4" VENTS, (1) 3" VENT THRU ROOF. PROVIDE
VENT DRIP PAN ELBOWS. SIZED BY BOILER
MANUFACTURER.
NO 90° ELBOWS ALLOWED IN BOILER SAFETY
RELIEF VALVE VENT PIPING. MAXIMUM BENDS
ALLOWED: (2) 45° ELBOWS.
EXTRA LAYER OF INSULATION REQUIRED ON B-2
BREECHING WHERE IT IS LESS THAN 3' FEET
FROM ACCESS PLATFORM. REFER TO 230711
PARAGRAPH 3.4.
N
M.7
M.8
18171615
L
30"ø
N G
P C
H P
R
H P
S
DEMOLISH ABANDONED
FUEL OIL, BLOW DOWN
& ASSOCIATED PIPING
DEMOLISH 4" NATURAL
GAS LINE
100-B-3
EXISTING
100-B-2
EXISTING
100-B-1
EXISTING
100-DA-1
EXISTING
100-B-3
NEW
EXISTING DEAERATOR
5" VENT
4" VENT
4"
2" FWPD
1"
2"
6"
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
PHASE 2 - DEMOLITION
MAY 15, 2017 JSN RWD
MP203
1/4" = 1'-0"
PHASE 2 - DEMOLITION
KEY NOTES
NATURAL GAS, FUEL OIL, AND BLOWDOWN
PIPING MUST BE DEMOLISHED TO BELOW
FINISHED FLOOR. PROVIDE
SCREWED/WELDED END CAPS FOR
REMAINING PIPE IN TRENCH AS NECCESARY.
N
M.7
M.8
18171615
L
H
PS
H
PS
HPS
1 1
"Ø
ID
"Ø
ID
30"Ø ID 30"Ø ID
30"Ø ID
SH
SH
SH
SH
FSA
FSA
FSA HBA
HBAHBAHBAHBA
SH
SH
HPS
6" VTR
N G
NG
100-B-3
EXISTING
100-B-2
NEW
100-B-1
EXISTING
100-B-3
NEW
100-CST-1
6"NG
6"HPS
5"NG
4"HPS
3"MPS
4"HPS
6"HPS
SH
SH SH SH
SH
SH
4"V UP
3 4
2-1/2" FWPD
2" BBD
BOILER CONTROL
PANEL
CONCRETE PAD
VFD
1 1/2" SW
1 1/2" SW
3/4" SW
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
PHASE 2 - NEW WORK
MAY 15, 2017 JSN RWD
MP204
1/4" = 1'-0"
PHASE 2 - NEW WORK
KEY NOTES
1 CONDUIT JUNCTION BOXES (TYP. OF 6). SEE
ELECTRICAL FOR CONDUIT ROUTING. MUST
MAINTAIN CLEAR FROM BOX TO FINISHED
FLOOR.
BREECHING EXPANSION JOINT.
(2) 4" VENTS, (1) 3" VENT THRU ROOF. PROVIDE
VENT DRIP PAN ELBOWS. SIZED BY BOILER
MANUFACTURER.
NO 90° ELBOWS ALLOWED IN BOILER SAFETY
RELIEF VALVE VENT PIPING. MAXIMUM BENDS
ALLOWED: (2) 45° ELBOWS.
N
M.7
M.8
18171615
L
"ø
44"ø 36"ø 30"ø
30"ø
48"ø
HPS
H P
S
HPS
M P
S
HPS
N G
4"
100-B-3
EXISTING
100-B-2
NEW
100-B-1
EXISTING
100-DA-1
EXISTING
100-B-3
NEW
100-CST-1
2"MW
2"HPR
1"PC
5"V
4"V
6"HPS 6"HPS
5"V
4"V
4"NG
2"HPR
1"PC
2"MW
2" FWPD
1"CA
1"
1"
6"HPS
3"MPS
4"HPS
1 1
EXISTING FUEL OIL
PUMPS AND DAY TANK.
2" FWPD
2-1/2" FWPD
2" FWPD
16.715.8
N
N.5
DEMO EXISTING
BOILER CONTROL
PANEL
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
PHASE 3 - DEMOLITION
MAY 15, 2017 JSN RWD
MP205
1/4" = 1'-0"
PHASE 3 - DEMOLITION
KEY NOTES
KEY NOTES
NATURAL GAS, FUEL OIL AND BLOWDOWN
PIPING TO BE DEMOLISHED IN THE TRENCH
BACK TO THE PIT AND THE MAIN FUEL OIL
PIPE. DEMO NOT SHOWN.
BASE BID: DEMO EXISTING WATER
SOFTENER
ALTERNATE #3: EXISTING TO REMAIN
1/8" = 1'-0"
PHASE 3 - DEMO EXISTING BOILER CONTROL PANEL