About this file

36C24818R0121 100 Spec Final.pdf

View the file

Other files

File Type Posted
36C24818R0121-0006002.pdf PDF
36C24818R0121-0006000.docx DOCX document
36C24818R0121-0006001.docx DOCX document
36C24818R0121-0005002.docx DOCX document
36C24818R0121-0005000.docx DOCX document
36C24818R0121-0005001.pdf PDF
36C24818R0121-0004000.docx DOCX document
36C24818R0121-0004001.docx DOCX document
36C24818R0121-00003000.docx DOCX document
36C24818R0121-00003003.pdf PDF
36C24818R0121-00003001.pdf PDF
36C24818R0121-00003002.docx DOCX document
36C24818R0121-00002001.pdf PDF
36C24818R0121-00002003.pdf PDF
36C24818R0121-00002000.docx DOCX document
36C24818R0121-00002002.pdf PDF
36C24818R0121-00001001.pdf PDF
36C24818R0121-00001004.xlsx XLSX spreadsheet
36C24818R0121-00001002.docx DOCX document
36C24818R0121-00001000.docx DOCX document
36C24818R0121-00001003.pdf PDF
36C24818R0121-007.pdf PDF
36C24818R0121-003.docx DOCX document
36C24818R0121-015.pdf PDF
36C24818R0121-005.pdf PDF
36C24818R0121-014.pdf PDF
36C24818R0121-009.pdf PDF
36C24818R0121-008.pdf PDF
36C24818R0121-004.pdf PDF
36C24818R0121-001.docx DOCX document
36C24818R0121-012.pdf PDF
36C24818R0121-016.doc DOC document
36C24818R0121-006.pdf PDF
36C24818R0121-011.pdf PDF
36C24818R0121-013.pdf PDF
36C24818R0121-010.pdf PDF
36C24818R0121-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Replace Boilers, Bldg. 100 Energy Center

C.W. Bill Young VA Medical Center

Contract VA248-16-C-0145 Project 516-15-107

SPECIFICATIONS

100% Design DOCUMENTS

Prepared for

Department of Veterans Affairs Network Contracting Office 8 10,000 Bay Pines Blvd Bay Pines, FL 33744

Prepared by

3603 NW 98th Street, Suite B Gainesville, Florida 32606

May 15, 2017

Design, Inc.

Replace Boilers – Bldg. 100 Energy Center 100% Design Submittal CW Bill Young VA Medical Center – Bay Pines, FL May 15, 2017

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-15 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 07-15 01 35 26 Safety Requirements 09-16 01 42 19 Reference Standards 05-16 01 45 29 Testing Laboratory Services 06-16 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 09-15 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

Lead Based Paint Abatement Lead Based Paint Report

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16 05 50 00 Metal Fabrications 07-14

DIVISION 09 – FINISHES

09 91 00 Painting 01-16

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 22 05 12 General Motor Requirements for Plumbing Equipment 22 05 23 General-Duty Valves for Plumbing Equipment 22 08 00 Commissioning of Plumbing Systems 22 11 00 Facility Water Distribution 22 31 11 Water Softeners 22 67 21 Water Dealkalizing System

00 01 10-2

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and Steam Generation

02-15

23 05 10 *VHA Boiler Plant Safety Device Testing Manual 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 11-10

23 05 51 Noise and Vibration Control for Boiler Plant 02-15 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 06-13 23 08 11 Demonstrations and Tests for Boiler Plant 02-15 23 09 11 Instrumentation and Control for Boiler Plant 02-15 23 21 11 Boiler Plant Piping Systems 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 37 00 Air Outlets and Inlets 02-15 23 50 11 Boiler Plant Mechanical Equipment 05-11 23 51 00 Breechings, Chimneys, and Stacks 05-11 23 52 39 Fire-Tube Boilers 02-15

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13 26 05 26 Grounding and Bonding for Electrical Systems 12-12 26 05 33 Raceway and Boxes for Electrical Systems 05-14 26 22 00 Low-Voltage Transformers 12-15 26 24 16 Panelboards 05-14 26 24 19 Motor Control Centers 08-14 26 27 26 Wiring Devices 01-16 26 29 11 Motor Controllers 08-14 26 29 21 Enclosed Switches and Circuit Breakers 12-12 26 41 00 Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 08-14

---End---

*Note: This section will be added as a separate attachment to the Specifications.

00 01 15 -1

SECTION 00 01 15

The drawings listed below accompanying this specification form a part of the contract.

INDEX OF DRAWINGS

DWG. DESCRIPTION SHEET

G001 TITLE PAGE 1

G002 INDEX OF DRAWINGS 2

S201 KEYPLAN 3

S202 STRUCTURAL PHASING FOR DEMOLITION & NEW WORK 4

S203 CONDENSATE TANK PLATFORM 5

S204 SECTIONS & DETAILS 6

S205 SECTIONS & DETAILS 7

S206 BOILER STACK FRAMING 8

PL101 OVERALL PLUMBING DEMOLITION / NEW PLAN 9

M001 STEAM TRAP SCHEDULES, LEGEND, AND NOTES 10

M100 SITE MAP - EXTERIOR REPEATER LOCATIONS 11

M101 BUILDING 100 - 1ST FLOOR PLAN - STEAM TRAP LOCATIONS 12

M102 BUILDING 100 - 2ND FLOOR PLAN - STEAM TRAP LOCATIONS 13

M103 ENERGY CENTER - STEAM TRAP LOCATIONS 14

M104 BUILDING 1 - STEAM TRAP LOCATIONS 15

M105 BUILDING 2 - STEAM TRAP LOCATIONS 16

M106 BUILDING 13 - STEAM TRAP LOCATIONS 17

M107 BUILDING 23 - STEAM TRAP LOCATIONS 18

M108 BUILDING 37 - STEAM TRAP LOCATIONS 19

M109 BUILDING 71 - STEAM TRAP LOCATIONS 20

M110 BUILDING 101 - STEAM TRAP LOCATIONS 21

M111 BUILDING 102 - STEAM TRAP LOCATIONS 22

MP001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS 23

MP201 PHASE 1 - DEMOLITION 24

MP202 PHASE 1 - NEW WORK 25

00 01 15 -2

INDEX OF DRAWINGS

MP203 PHASE 2 - DEMOLITION 26

MP204 PHASE 2 - NEW WORK 27

MP205 PHASE 3 - DEMOLITION 28

MP206 PHASE 3 - NEW WORK 29

MP207 BOILER PLANT - UNDERFLOOR PIPING 30

MP212 BOILER PLANT - VENTILATION PLAN NEW 31

MP221 DEDUCT ALTERNATE #3 - REUSE EXISTING STACK 32

MP301 BOILER PLANT - SECTIONS - MECHANICAL 33

MP302 BOILER PLANT - 3D VIEW 34

MP303 BOILER PLANT - DEMO 3D VIEWS 35

MP304 BOILER PLANT - NEW 3D VIEWS 36

MP305 BOILER PLANT - ROOF - 3D VIEW 37

MP306 WATER TREATMENT - NEW 3D VIEW 38

MP401 MOBILE BOILER ROOM SITE PLAN 39

MP501 MECHANICAL DETAILS 40

MP502 MECHANICAL DETAILS 41

MP503 MECHANICAL DETAILS 42

MP504 MECHANICAL DETAILS 43

MP505 SAFETY DEVICE TESTING PROCEDURES 44

MP506 SAFETY DEVICE TESTING PROCEDURES 45

MP507 SAFETY DEVICE TESTING PROCEDURES 46

MP508 SAFETY DEVICE TESTING PROCEDURES 47

MP509 SAFETY DEVICE TESTING PROCEDURES 48

MP601 MECHANICAL SCHEDULES 49

MP602 MECHANICAL SCHEDULES 50

MP603 MECHANICAL SCHEDULES 51

MP701 STEAM SYSTEM SCHEMATIC 52

MP702 CONDENSATE SYSTEM SCHEMATIC 53

MP705 WATER SOFTENER SCHEMATIC 54

MP706 NATURAL GAS SYSTEM SCHEMATIC 55

MP708 TYPICAL 700HP FIRE TUBE BOILER TRIM SCHEMATIC 56

00 01 15 -3

INDEX OF DRAWINGS

MP709 TYPICAL 700HP FIRE TUBE BOILER FUEL TRAIN SCHEMATIC 57

MP710 CONTROL SYSTEM ARCHITECTURE 58

E001 ELECTRICAL LEGEND, ABBREVIATIONS, AND NOTES 59

ED101 ENERGY CENTER - DEMO 60

EL101 ENERGY CENTER - NEW LIGHTING 61

EP101 ENERGY CENTER - NEW POWER 62

EP102 ENERGY CENTER SOUTH - NEW POWER 63

EP103 ENERGY CENTER ROOF - NEW POWER 64

EP104 ENERGY CENTER - EXISTING TO REMAIN RACEWAY 65

EP120 CAMPUS SITE PLAN - TRAP MONITORING POWER 66

EP121 BUILDING 100 - ENERGY CENTER - TRAP MONITORING 67

EP122 BUILDING 100 - FIRST FLOOR INTERSTITIAL - TRAP

MONITORING

EP123 BUILDING 100 - SECOND FLOOR INTERSTITIAL - TRAP

MONITORING

EP124 BUILDINGS 1, 2, & 37 - TRAP MONITORING 70

EP125 BUILDINGS 71 & 101 - TRAP MONITORING 71

EP126 BUILDINGS 102 - TRAP MONITORING 72

EP127 BUILDINGS 13, 23, & 36 AND MAINT. & PUMPHOUSE - TRAP

MONITORING

EP501 ELECTRICAL DETAILS 74

EP601 ELECTRICAL ONE-LINE DIAGRAM AND LOAD ESTIMATION 75

EP602 MCC-BQ REPLACEMENT AND MCC-Q MODIFICATIONS 76

EP701 ELECTRICAL SCHEDULES 77

EP702 ELECTRICAL SCHEDULES 78

---End---

00 01 15 -4

THIS PAGE LEFT INTENTIONALLY BLANK

i

SECTION 01 00 00

GENERAL REQUIREMENTS

11-01-15

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 RESTORATION

1.10 PHYSICAL DATA

1.11 LAYOUT OF WORK

1.12 AS-BUILT DRAWINGS

1.13 USE OF ROADWAYS

1.14 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.15 TEMPORARY TOILETS

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

1.17 TESTS

1.18 INSTRUCTIONS

1.19 CONSTRUCTION SIGN

1.20 SAFETY SIGN

1.21 PHOTOGRAPHIC DOCUMENTATION

1.22 FINAL ELEVATION Digital Images

ii iii

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

11-01-15

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for

Design to Replace Boilers, Bldg. 100 at C. W. Bill Young VAMC, Bay

Pines VAHC, VA Project Number 516-15-107 as required by drawings and specifications.

B. Not Used.

C. Offices of AKEA Design, Inc, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

01 00 00 -2

F. The Complete Steam Trap Monitoring Systems including all associated electrical and communications systems has been award under a different contract and is no longer required under the execution of the boiler replacement contract as specified in the listed drawings and specifications.

1.3 STATEMENT OF BID ITEM(S)

A. BASE BID: Work includes all General, Mechanical, Structural, Electrical, and Communication for new Boilers, Controls, and Steam Trap

Monitoring as shown on contract documents dated May 15, 2017 with all removal of existing systems and installation of new systems as base bid. Work includes all labor, material, equipment and supervision to perform the required construction work on this project. Completion time: 780 Days.

B. DEDUCT ALTERNATE NO. 1: Includes all work in BASE BID, except DEDUCT

New Boiler Stacks and reuse existing boiler stack. Completion time: 720

Days.

C. DEDUCT ALTERNATE NO. 2: Includes all work in BASE BID and DEDUCT

ALTERNATE NO. 1, and DEDUCT ALTERNATE NO. 2, except DEDUCT Boiler Room

Ventilation Systems including all ductwork, air devices, fans, electrical, supports, and framing required. Completion time: 720 Days.

D. DEDUCT ALTERNATE NO. 3: Includes all work in BASE BID and DEDUCT

ALTERNATE NO. 1, and DEDUCT ALTERNATE NO. 2, and DEDUCT ALTERNATE NO.

3, except DEDUCT Water Softener and Chemical Feed System including all piping, electrical, controls, and communications systems required.

Completion time: 660 Days.

E. DEDUCT ALTERNATE NO. 4: Includes all work in BASE BID and DEDUCT

ALTERNATE NO. 1, and DEDUCT ALTERNATE NO. 2, and DEDUCT ALTERNATE NO.

3, except DEDUCT new Boiler No. B-1 reuse exiting Boiler B-1 and remove temporary mobile boiler for the phase 3 sequence. Completion time: 600

Days.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

01 00 00 -3

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards:

1. The General Contractor shall provide unarmed guards at the project site after construction hours.

2. The Contractor shall provide the guards and VA police with communication devices as directed.

3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.

D. Key Control:

01 00 00 -4

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

01 00 00 -5

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

01 00 00 -6

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

01 00 00 -7

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to

COR and Contractor, as follows:

1. Phase 1 Demolition:

a. Coordinate with VA to remove all portable items from the west part of the plant.

b. Demolish incinerator stack.

01 00 00 -8

2. Phase 1 Construction:

a. New condensate tank – located on a structural mezzanine built over the existing pit.

b. New water softeners – located on west end of plant near the pit.

c. New mechanical plant ventilation system – located on the roof and in the clerestory areas.

d. New boiler B-3 – located in the empty spot where the old summer boiler used to be.

e. New boiler exhaust stacks. Two (2) stacks in location of old incinerator stack.

f. New continuous blowdown heat exchanger – located in plant as shown.

g. New blowdown separator – located in the existing pit.

h. New trench from pit to boiler B-3, with new fuel oil and blowdown piping.

i. Startup all new equipment.

3. Phase 2 Demolition

a. Demo existing boilers B-3 and B-2 after new boiler plant equipment is active.

4. Phase 2 Construction

a. Extend new trench and piping.

b. Provide new Boiler B-2. Connect to new exhaust stack installed in phase 1.

5. Phase 3 Demolition

a. Demo existing Boiler B-1

b. Demo existing boiler breeching and exhaust stack.

c. Demo existing water softener and chemical feed systems.

d. Demo existing fuel oil, natural gas, and blowdown piping in trench.

e. Demo existing condensate tank.

6. Phase 3 Construction

a. Provide new boiler exhaust stack riser in location of old stack.

b. Extend new trench and piping.

c. Provide new Boiler B-1 and new master control panel.

01 00 00 -9

J. Building(s) No. (s) 100 will be occupied during performance of work.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans

Affairs’ personnel through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

01 00 00 -10

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

N. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris

01 00 00 -11 and standing construction equipment and vehicles. N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

(FAR 52.236-9)

B. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the

01 00 00 -12 environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

C. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.

Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the

Contractor's method of operations and operations planning and the

Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

- Designating areas for equipment maintenance and repair;

- Providing waste receptacles at convenient locations and provide regular collection of wastes;

- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

- Providing adequately maintained sanitary facilities.

1.9 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall

01 00 00 -13 conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.10 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by AKEA Design, Inc.

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make

01 00 00 -14 their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.11 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

1.12 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.13 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary

01 00 00 -15 roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.

1.14 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be

01 00 00 -16 replaced at completion of construction and prior to testing and balancing of system.

5. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.15 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations as approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

01 00 00 -17

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, and electrical welding devices. Electricity for all other uses is available at no cost to the Contractor.

E. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the

Contractor.

01 00 00 -18

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center’s system.

F. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the

Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the

Contractor at Contractor's expense.

1.17 TESTS

A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.

Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions

01 00 00 -19 for a building. Other related components are return air, exhaust air, steam, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.18 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system

01 00 00 -20 being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned

Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.

This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

1.19 CONSTRUCTION SIGN

A. Provide a Construction Sign where directed by the COR. All wood members shall be of framing lumber. Cover sign frame with 0.7 mm (24 gage) galvanized sheet steel nailed securely around edges and on all bearings. Provide three 100 by 100 mm (4 inch by 4 inch) posts (or equivalent round posts) set 1200 mm (four feet) into ground. Set bottom of sign level at 900 mm (three feet) above ground and secure to posts with through bolts. Make posts full height of sign. Brace posts with 50 x 100 mm (two by four inch) material as directed.

B. Paint all surfaces of sign and posts two coats of white gloss paint.

Border and letters shall be of black gloss paint, except project title which shall be blue gloss paint.

01 00 00 -21

C. Maintain sign and remove it when directed by the COR.

1.20 SAFETY SIGN

A. Provide a Safety Sign where directed by COR. Face of sign shall be 19 mm (3/4 inch) thick exterior grade plywood. Provide two 100 mm by 100 mm (four by four inch) posts extending full height of sign and 900 mm

(three feet) into ground. Set bottom of sign level at 1200 mm (four feet) above ground.

B. Paint all surfaces of Safety Sign and posts with one prime coat and two coats of white gloss paint. Letters and design shall be painted with gloss paint of colors noted.

C. Maintain sign and remove it when directed by COR.

D. Standard Detail Drawing Number SD10000-02(Found on VA TIL) of safety sign showing required legend and other characteristics of sign is required.

E. Post the number of accident free days on a daily basis.

Estimated Cost No. of Photographs

Up to $250,000 50 to 100

" " $500,000 100 to 150

" " $1,000,000 150 to 200

" " $2,000,000 200 to 250

" " $5,000,000 250 to 300

" " $10,000,000 300 to 400

More than

$10,000,000 400 to 500

1.21 PHOTOGRAPHIC DOCUMENTATION

A. During the construction period through completion, provide photographic documentation of construction progress and at selected milestones including electronic indexing, navigation, storage and remote access to the documentation, as per these specifications. The commercial

01 00 00 -22 photographer or the subcontractor used for this work shall meet the following qualifications:

1. Demonstrable minimum experience of three (3) years in operation providing documentation and advanced indexing/navigation systems including a representative portfolio of construction projects of similar type, size, duration and complexity as the Project.

2. Demonstrable ability to service projects throughout North America, which shall be demonstrated by a representative portfolio of active projects of similar type, size, duration and complexity as the

Project.

B. Photographic documentation elements:

1. Each digital image shall be taken with a professional grade camera with minimum size of 6 megapixels (MP) capable of producing

200x250mm (8 x 10 inch) prints with a minimum of 2272 x 1704 pixels and 400x500mm (16 x 20 inch) prints with a minimum 2592 x 1944 pixels.

2. Indexing and navigation system shall utilize actual AUTOCAD construction drawings, making such drawings interactive on an on-line interface. For all documentation referenced herein, indexing and navigation must be organized by both time (date-stamped) and location throughout the project.

3. Documentation shall combine indexing and navigation system with inspection-grade digital photography designed to capture actual conditions throughout construction and at critical milestones.

Documentation shall be accessible on-line through use of an internet connection. Documentation shall allow for secure multiple-user access, simultaneously, on-line.

4. Construction progress for all trades shall be tracked at pre-determined intervals, but not less than once every thirty (30) calendar days (“Progressions”). Progression documentation shall track both the exterior and interior construction of the building.

Exterior Progressions shall track 360 degrees around the site and each building. 7. As-built conditions of mechanical, electrical, plumbing and all other systems shall be documented. Overlapping

01 00 00 -23 photographic techniques shall be used to insure maximum coverage.

Indexing and navigation accomplished through interactive drawings.

5. Miscellaneous events that occur during any Contractor site visit, or events captured by the Department of Veterans Affairs independently, shall be dated, labeled and inserted into a Section in the navigation structure entitled “Slideshows,” allowing this information to be stored in the same “place” as the formal scope.

6. Customizable project-specific digital photographic documentation of other details or milestones. Indexing and navigation accomplished through interactive plans.

7. Detailed Exact-Built of all Slabs for all project slab pours just prior to placing concrete or as directed by the COR.

8. Detailed Interior exact built overlapping photos of the entire building to include documentation of all mechanical, electrical and plumbing systems as directed by COR.

9. In event a greater or lesser number of images than specified above are required by the COR, adjustment in contract price will be made in accordance with clause entitled "CHANGES" (FAR 52.243-4 and VAAR

852.236-88).

C. Images shall be taken by a commercial photographer and must show distinctly, at as large a scale as possible, all parts of work embraced in the picture.

D. Coordination of photo shoots is accomplished through COR. Contractor shall also attend construction team meetings as necessary. Contractor’s operations team shall provide regular updates regarding the status of the documentation, including photo shoots concluded, the availability of new Progressions or Exact-Builts viewable on-line and anticipated future shoot dates.

E. Contractor shall provide all on-line domain/web…