36C24818R0121 VA 516-15-107 - Replace Boilers at Bay Pines VAMC - Approved Construction Drawings_Part9.pdf

View the file

Other files

File Type Posted
36C24818R0121-0006002.pdf PDF
36C24818R0121-0006000.docx DOCX document
36C24818R0121-0006001.docx DOCX document
36C24818R0121-0005002.docx DOCX document
36C24818R0121-0005000.docx DOCX document
36C24818R0121-0005001.pdf PDF
36C24818R0121-0004000.docx DOCX document
36C24818R0121-0004001.docx DOCX document
36C24818R0121-00003000.docx DOCX document
36C24818R0121-00003003.pdf PDF
36C24818R0121-00003001.pdf PDF
36C24818R0121-00003002.docx DOCX document
36C24818R0121-00002001.pdf PDF
36C24818R0121-00002003.pdf PDF
36C24818R0121-00002000.docx DOCX document
36C24818R0121-00002002.pdf PDF
36C24818R0121-00001001.pdf PDF
36C24818R0121-00001004.xlsx XLSX spreadsheet
36C24818R0121-00001002.docx DOCX document
36C24818R0121-00001000.docx DOCX document
36C24818R0121-00001003.pdf PDF
36C24818R0121-007.pdf PDF
36C24818R0121-003.docx DOCX document
36C24818R0121-015.pdf PDF
36C24818R0121-014.pdf PDF
36C24818R0121-009.pdf PDF
36C24818R0121-008.pdf PDF
36C24818R0121-004.pdf PDF
36C24818R0121-001.docx DOCX document
36C24818R0121-012.pdf PDF
36C24818R0121-016.doc DOC document
36C24818R0121-006.pdf PDF
36C24818R0121-011.pdf PDF
36C24818R0121-002.pdf PDF
36C24818R0121-013.pdf PDF
36C24818R0121-010.pdf PDF
36C24818R0121-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

SAFETY DEVICE TESTING PROCEDURES

MAY 15, 2017 JSN RWD

MP509

1. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF

THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINERS, TRANSMITTERS, CONTROL DEVICES. PRIOR TO COMMENCING INSTALLATION WORK, REFER CONFLICTS

BETWEEN THIS REQUIREMENT AND CONTRACT DRAWINGS TO THE RESIDENT ENGINEER FOR

RESOLUTION. FAILURE OF THE CONTRACTOR TO RESOLVE, OR POINT OUT ANY ISSUES WILL RESULT IN

THE CONTRACTOR CORRECTING AT NO ADDITIONAL COST TO THE GOVERNMENT.

NOTES:

NOTES:

NOTE:

GENERAL NOTES:

NOTE:

NOTES:

NOTES:

NOTE:

NOTE:

CTP-1

CTP-2

15 / 22.5

15 / 22.5

15 / 22.5

10:1

10:1

10:1

30 50 8:1

8:1

8:1

90 50 50 480 / 3 / 60 PROVIDED BY BOILER MANUFACTURER3,500

3,500

3,500

1. NO COMBUSTION AIR PRE-HEAT.

2. GAS SPUDS SHALL BE STAINLESS STEEL.

3. FORCED DRAFT FAN INLET SHALL BE SCREENED.

4.

INVERTER

INVERTER

INVERTER

YES

YES

YES

EMISSIONS PARTS PER MILLION (PPM) ARE BASED ON 3% OXYGEN (O 2).

MARLO MRG-1500-3TWIN ALTERNATINGHOSPITAL (NP)100-WSF-1 250 0 100 75 120 / 1 / 60110 500 64" x 74"

100-B-1

100-B-2

100-B-3

STEAM 24,150- 700

23,433 375 / 383

STEAM -

STEAM -

2,400 84 / 87 7.5

480 / 3 / 60

480 / 3 / 60

480 / 3 / 60

480 / 3 / 60

480 / 3 / 60

1.

2.

ALTITUDE: 100 FEET ABOVE SEA LEVEL

7.5

T-07 1/2" 80140100 3112 361338

60T-08 1/2" 312293

INVERTED BUCKET 100-BDS-1 34 702 5

REGENERATION ONCE PER DAY MAX.

NO

NO

PROVIDED BY BOILER MANUFACTURER

PROVIDED BY BOILER MANUFACTURER

REFER TO LOW NOx BURNER SCHEDULE FOR ADDITIONAL INFORMATION.

CLEAVER BROOKS, CBEX ELITE65,000 25' x 10.5' x 12'

VERTICAL SINGLE STAGE

VERTICAL SINGLE STAGE

7.5

5.0

TEFC2-1/2" x 2-1/2" 5.0 480 / 3 / 60 CONTINUOUS 80.03,500

4880 64 3 5117

INVERTED BUCKET

PENN SEPARATOR , A34100S TO MPS PRV

60S FROM MPS PRV

65,000

65,000

25' x 10.5' x 12'

25' x 10.5' x 12'

375 / 383

375 / 383

CONTINUOUS

REFER TO STEAM NOZZLE LOADS AND MOMENTS DETAIL.3.

3,500

AURORA PUMPS, PVM (X) 33-1

480 / 3 / 60

PROVIDE FLANGED VENT AND DRAIN CONNECTIONS

80.0

24,150

24,150

23,433

23,433

2,400

2,400

84 / 87

84 / 87

CLEAVER BROOKS, CBEX ELITE

CLEAVER BROOKS, CBEX ELITE

63" x 86"

TEFC

PRV-1B MPS REDUCING STATION 1,350 100 621,350 SEE GENERAL NOTES

PRV-1A MPS REDUCING STATION 2,700 100 602,700 SEE GENERAL NOTES

DRUM LOUVER 3000 70"x15" 0.04 TITUS/DLM1

1 2100-SF-1 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

1 PROVIDE UNIT MOUNTED FACTORY DISCONNECT SWITCH.

2 FAN SHALL BE THIRD CERTIFIED FOR HIGH WINDS UP TO 150 MPH.

1 2100-SF-2 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

1 2100-SF-3 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

1 2100-SF-4 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

1 2100-SF-5 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

1 2100-SF-6 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

1 2100-SF-7 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

1 2100-SF-8 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800

3 PROVIDE WITH PITCHED ROOF CURB, COORDINATE WITH ROOF SLOPE ABOVE SKY-LIGHTS.

4 PROVIDE WITH ROOF CURB.

60T-09 1/2" 3122934880 64 3 5117INVERTED BUCKET -60S FROM MPS PRV

2-1/2" x 2-1/2" AURORA PUMPS, PVM (X) 33-1

PSV-6104 _ PPHBOILER No 1 STEAM STAINLESS STEEL TRIM

PSV-6105 _ PPHBOILER No 1 STEAM STAINLESS STEEL TRIM

PSV-6204 _ PPHBOILER No 2 STEAM STAINLESS STEEL TRIM

PSV-6205 _ PPHBOILER No 2 STEAM STAINLESS STEEL TRIM

PSV-6304 _ PPHBOILER No 3 STEAM STAINLESS STEEL TRIM

PSV-6305 _ PPHBOILER No 3 STEAM STAINLESS STEEL TRIM

PSV-8102 - -_ SCFMBOILER No 1 ATOMIZING AIR STAINLESS STEEL TRIM

PSV-8202 - -_ SCFMBOILER No 2 ATOMIZING AIR STAINLESS STEEL TRIM

PSV-8302 - -_ SCFMBOILER No 3 ATOMIZING AIR STAINLESS STEEL TRIM

PSV-6612 303 4,050 PPHREDUCING STATION STEAM STAINLESS STEEL TRIM

SVB1

SVB2

SVB1

SVB2

SVB1

SVB2

BOILER MUST BE STAMPED 200 PSIG.4.

100-CST-1 HORIZONTAL 2,000 6' x 14'25

1. TANK INTERIOR SHALL BE EPOXY COATED PER 235011 PARAGRAPH 2.1.H.

2. TOTAL FLOW INCLUDES 97 GPM (PLANT FLOW) + 35 GPM (MANUFACTURE'S RECOMMENDED MIN RECIRC) + 13 GPM (10%).

TRIPLEX SEQUENTIAL: ONE TANK OPERATIONAL, ONE TANK REGENERATION, ONE TANK STAND-BY.

1,500,000 130/6.5 235/15 325/25

MARLO MGTD-350-3TWIN ALTERNATINGBOILER MAKE-UP (NP)100-DEA-1 72 90% - 87.5/15 48" x 72" 100 75 120 / 1 / 60- 500 30" x 30"350,000 175/25 55 -

BOILER B-3 IS DEDUCT ALTERNATE #5.5.

BOILER B-3 IS DEDUCT ALTERNATE #5.5.

100T-21 1/2" 36133880140 112 3 5117INVERTED BUCKET -MOBILE BOILER HPS

SVB1 AND SVB2 PROVIDED BY BOILER MANUFACTURER.

BASIS OF DESIGN

PUMP

DESIG.

TOTAL

FLOW

(GPM)

(2)

HEAD

(FEET H20)

ELECTRICAL

NEMA TYPE

PUMP

TYPE

SUCTION /

DISCHARGE

HP RPM

MOTOR

DUTY

MINIMUM

PUMP

EFFICIENCY

BOILER

No

COMBUSTION

AIR

TEMPERATURE (°F)

HUMIDITY

EXCESS

AIR (%)

(GAS/OIL)

NATURAL GAS

TURNDOWN

TRAIN INLET

PRESSURE

(PSIG)

NOx

(PPM)

CO

(PPM)

FUEL OIL No 2

TURNDOWN

TRAIN INLET

PRESSURE

(PSIG)

NOx

(PPM)

CO

(PPM)

FORCED DRAFT FAN

HP ELECTRICAL

BASIS OF DESIGN

RPM DUTY VSD

BASIS OF DESIGNDESIG

AREA

SERVED TYPE

WATER

HARDNESS

INLET

(PPM)

WATER

HARDNESS

OUTLET

(PPM)

DESIGN

FLOW

RATE/PD

(GPM/PSID)

CONTINUOUS

FLOW

RATE/PD

(GPM/PSID)

PEAK

FLOW

RATE/PD

(GPM/PSID)

VESSEL SIZE

(EACH TANK)

(DIA x H)

VESSEL

PRESSURE

RATING

(PSI)

MAXIMUM

REGENERATION

TIME

(MINUTES)

ELECTRICAL

MAXIMUM

BACKWASH

FLOW

(GPM)

BRINE TANK

CAPACITY

(GAL)

DESIG SERVICE

CAPACITY

POUNDS

PER HOUR

(PPH)

TYPE MBTU's

PER HOUR

EXHAUST GAS

TEMPERATURE

(GAS/OIL)(°F)

DESIGN

PRESSURE

(PSIG)

OPERATING

PRESSURE

(PSIG)

MIN

HEATING

SURFACE

(SQ.FT.)

MIN BOILER

EFFICIENCY

(GAS/OIL)(%)

SKID MOUNTED

AIR

COMPRESSOR

(HP)

ELECTRICAL

DIFF PRESS

(PSIG)

PRESSURE

(PSIG)

DESG GENERAL LOCATION

TRAP

SIZETYPE

OPERMAXOPER

FLOW RATE

(LB/HR)

STEAM TEMP

(°F)

DESIGN

FLOW

SAFETY

FACTORMAX OPER

FLOW MAXOPER

BASIS OF DESIGN BASIS OF DESIGNDESIG

TANK

HEIGHT

(INCHES)

COOLING

WATER

TEMP

(°F)

INLET

(INCHES)

VENT

(INCHES)

VSD

BASIS OF DESIGN

TOTAL

APPROXIMATE

OPERATING

WEIGHT

(LBS)

APPROXIMATE

OVERALL

DIMENSIONS

(LxWxH)

STEAM TRAP SCHEDULE

SCOTCH MARINE FIRETUBE BOILER SCHEDULE

CONDENSATE SURGE TANK AND TRANSFER PUMPS SCHEDULE

BLOWDOWN SEPARATOR SCHEDULE

LOW NOx BURNER SCHEDULE

HORSEPOWER

(HP)

DIMENSIONS

(DIA x H)

DRAIN

(INCHES)

(DEDUCT ALTERNATE #4)WATER SOFTENER SCHEDULE

DESIG

REQUIRED

CAPACITY

(PPH)

LOCATION

MAXIMUM FLOW

WIDE OPEN VALVE

(PPH)

PRESSURE

(PSIG)

IN OUT

REMARKS

STEAM PRESSURE REDUCING VALVE SCHEDULE

No. DUTY

AIR DEVICE SCHEDULE

CFM

DUCT

NECK SIZE

MAX DP

(IN W.G.)

BASIS OF DESIGN

MFR/MODEL NO.

FAN SCHEDULE

ELECTRICAL

DESIG. SERVICE TYPE CFM

ESP

(IN. WC)

APPROX

RPM

BHP

WHEEL

DIA. (IN.) HP

MOTOR

DRIVE

AMCA

CONSTRUCTION

CLASS

APPROXIMATE

WEIGHT

(LBS)

NOTES

BASIS OF DESIGN

MFR/MODEL NO.

DESIG TEMP (°F)LOCATION REMARKS

SET

PRESSURE

(PSIG)

MINIMUM

CAPACITY

SERVICE

PRESSURE SAFETY VALVE SCHEDULE

NOMENCLATURE

VA

TANK

DESIG.

TANK

TYPE

TANK

CAPACITY AT

OVERFLOW

(GAL)

TANK

DIMENSIONS

(DIA x L)

DESIGN

OPERATING

PRESSURE

(PSIG)

GRAIN

CAPACITY

PER TANK

(GRAINS)

BASIS OF DESIGNDESIG

AREA

SERVED TYPE

ALKALINITY

INLET

(PPM)

DESIGN

FLOW

RATE/PD

(GPM/PSID)

CONTINUOUS

FLOW

RATE/PD

(GPM/PSID)

PEAK

FLOW

RATE/PD

(GPM/PSID)

VESSEL SIZE

(EACH TANK)

(DIA x H)

VESSEL

PRESSURE

RATING

(PSI)

MAXIMUM

REGENERATION

TIME

(MINUTES)

ELECTRICAL

MAXIMUM

BACKWASH

FLOW

(GPM)

BRINE TANK

CAPACITY

(GAL)

DIMENSIONS

(DIA x H)

DEALKALIZER SCHEDULE (DEDUCT ALTERNATE #4)

GRAIN

CAPACITY

PER TANK

(GRAINS)

CAUSTIC TANK

CAPACITY

(GAL)

DIMENSIONS

(DIA x H)

ALKALINITY

REDUCTION

(DEDUCT ALTERNATE #3)

(DEDUCT ALTERNATE #3)

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

MECHANICAL SCHEDULES

MAY 15, 2017 JSN RWD

MP601

FE

PSL

PT

PT

PT

FSV

PRV

PSH

PSL

ZSC

ZSO

FE

FSV

PSH

PSL

PT

ZSC

ZSO

PSL

PSV

PT

QE

QE

QE

QE

QE

QE

QE

QE

TT

Device Label

Device Type

Flow Element, Turbine

Pressure Switch

Pressure Transmitter

Pressure Transmitter

Pressure Transmitter

Safety Valve

Regulating Valve

Pressure Switch

Pressure Switch

Position Switch

Position Switch

Flow Element, Per Gas Supplier

Safety Valve

Pressure Switch

Pressure Switch

Pressure Transmitter

Position Switch

Position Switch

Pressure Switch

Safety Valve, "P" 4"x6" Class 150

Pressure Transmitter

Combustible Gas Sensor

Combustible Gas Sensor

Carbon Monoxide Sensor

Carbon Monoxide Sensor

Carbon Monoxide Sensor

Carbon Monoxide Sensor

Carbon Monoxide Sensor

Carbon Monoxide Sensor

Temperature Transmitter

System

Domestic Water

Soft Water

Non-Potable Water

Soft Water

Soft Water

Liquefied Petroleum Gas

Liquefied Petroleum Gas

Liquefied Petroleum Gas

Liquefied Petroleum Gas

Liquefied Petroleum Gas

Liquefied Petroleum Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Steam

Steam

Steam

Indoor Air Quality

Indoor Air Quality

Indoor Air Quality

Indoor Air Quality

Indoor Air Quality

Indoor Air Quality

Indoor Air Quality

Indoor Air Quality

Outside Air

Function

Flow

Low Pressure

Pressure

Pressure

Pressure

Flow, Emergency Shut-Off

Pressure

High Pressure

Low Pressure

Position Verification

Position Verification

Flow, Totalizing

Flow, Emergency Shut-Off

High Pressure Alarm

Low Pressure Alarm

Pressure

Position Verification

Position Verification

Low Pressure

Pressure

Pressure

Combustible Gas Level

Combustible Gas Level

Carbon Monoxide Level

Carbon Monoxide Level

Carbon Monoxide Level

Carbon Monoxide Level

Carbon Monoxide Level

Carbon Monoxide Level

Temperature

Mounting / Location

Supply to System

Softener Skid Discharge

Supply to Softener Skid

Softener Skid Discharge

Supply to Condensate Surge Tank

Building Supply Main

Building Supply Main

Building Supply Main

Building Supply Main

FSV-4701

FSV-4701

Building Supply Main

Building Supply Main

Building Supply Main

Building Supply Main

Building Supply Main

FSV-4802

FSV-4802

Steam Header

100 - 60 PSIG, Pressure Reducing Station

Steam Header

Upper Level Mezzanine

Breathing Level, Front of Boiler

Exterior Wall

Line

Size

4"

4"

4"

4"

3"

1"

1"

1"

6"

6"

6"

6"

6"

10"

6"

10"

Range / Setpoint

26 - 260 GPM

Field Set

0 - 100 PSIG

0 - 100 PSIG

0 - 100 PSIG

Open / Closed

10 PSIG / 350 SCFH

Field Set

Field Set

Closed

Open

2,400 - 76,000 SCFH

Open / Closed

Field Set

Field Set

0 - 30 PSIG

Closed

Open

Field Set

70 PSIG, 8,210 PPH

0 - 250 PSIG

0 - 100 % LEL / 10% LEL

0 - 100 % PPM / 25-50 PPM

-20 - 120 F

Point Type

AI

DI

AI

AI

AI

DI

DI

DI

DI

DI

DI

DI

DI

AI

DI

DI

DI

AI

AI

AI

AI

AI

AI

AI

AI

AI

AI

Signal

4 - 20 mA DC

120 V

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

120 V

120 V

120 V

120 V

120 V

120 V

120 V

120 V

4 - 20 mA DC

120 V

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

9 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

Signal To/From

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

PMCP

CHP-1

CHP-1

CHP-1

CHP-1

CHP-1

CHP-1

CHP-1

CHP-1

CHP-1

CHP-1

CHP-1

Annunciation

Locations

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

Annunciation Type

Status - Flow

Low Pressure Alarm

Status - Pressure

Status - Pressure

Status - Pressure

High Pressure Alarm

Low Pressure Alarm

Position Verification - Fully Closed

Position Verification - Fully Open

High Pressure Alarm

Low Pressure Alarm

Status - Pressure

Position Verification - Fully Closed

Position Verification - Fully Open

Low Pressure Alarm

Status - Pressure

Status - Level

Status - Level

Status - Level

Status - Level

Status - Level

Status - Level

Status - Level

Status - Level

Status - Temperature

Remarks

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Gas Supply Company Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Notes

Consolidated 1900 Series

Alarm / Refer to Plans

Alarm / Refer to Plans

Alarm / Refer to Plans

Alarm / Refer to Plans

Alarm / Refer to Plans

Alarm / Refer to Plans

Alarm / Refer to Plans

Alarm / Refer to Plans

Provide w/ TE - 9 9 0

MISCELLANEOUS SYSTEMS - DEVICE SCHEDULE

VA

Nomenclature

SVFPRV

0 - 100 % LEL / 10% LEL

0 - 100 % PPM / 25-50 PPM

0 - 100 % PPM / 25-50 PPM

0 - 100 % PPM / 25-50 PPM

0 - 100 % PPM / 25-50 PPM

0 - 100 % PPM / 25-50 PPM

Upper Level Mezzanine

Breathing Level, Front of Boiler

Breathing Level, Front of Boiler

Breathing Level, Front of Boiler

Breathing Level, Control Rm 106

Breathing Level, Shop Area Rm 101

BAS

BMS

CCS

CGP

CHP-1

LCP

PMCP

WSF-PLC

Building Automation System

Burner Management System - (Flame Safeguard Control)

Combustion Control System

Combustible Gas Detection Panel

CHP-1 Field Panel Miscellaneous Process Points

Local Control Panel

Plant Master Control Panel

Water Softener PLC

ABBREVIATIONS:

BBC - Boiler Blowdown Controller

CST-PLC - Condensate Surge Tank PLC

FE

FE

LCV

LCV

ZT

ZT

DPS

DPS

DPT

FE

LC

LSH

LSL

LSLL

PSL

PSL

TT

Device Label

Device Type

Flow Element

Flow Element

Control Valve

Control Valve

Position Transmitter

Position Transmitter

Pressure Switch

Pressure Switch

Pressure Transmitter

Flow Element

Level Controller

Level Switch

Level Switch

Level Switch

Pressure Switch

Pressure Switch

Temperature Transmitter

System

Non-Potable Water

Soft Water

Non-Potable Water

Soft Water

Non-Potable Water

Soft Water

Steam Condensate

Steam Condensate

Condensate Surge Tank

Condensate Surge Tank

Condensate Surge Tank

Condensate Surge Tank

Condensate Surge Tank

Condensate Surge Tank

Condensate Surge Tank

Condensate Surge Tank

Steam Condensate

Function

Flow, Totalizing

Flow, Totalizing

Level

Level

Position Feedback

Position Feedback

Differential Pressure

Differential Pressure

Level

Flow, Totalizing

Level

High Level Alarm

Low Level Alarm

Low-Low Level Alarm, Shutdown

Low Pressure

Low Pressure

Temperature

Mounting / Location

Supply to Condensate Surge Tank CST-1

Supply to Condensate Surge Tank CST-1

Supply to Condensate Surge Tank CST-1

Supply to Condensate Surge Tank CST-1

LCV-1703

LCV-1704

Condensate Transfer Pump CTP-1

Condensate Transfer Pump CTP-2

Condensate Surge Tank CST-1

Pumped Return from Campus

Condensate Surge Tank CST-1

Condensate Surge Tank CST-1

Condensate Surge Tank CST-1

Condensate Surge Tank CST-1

Condensate Transfer Pump CTP-1

Condensate Transfer Pump CTP-2

Condensate Surge Tank CST-1

Line

Size

3"

3"

3"

3"

4"

Range / Setpoint

0 - 130 GPM

0 - 130 GPM

0 - 130 GPM

0 - 130 GPM

0 - 100 %

0 - 100 %

Field Set

Field Set

Field Set

110 GPM

Field Set

Field Set

Field Set

Field Set

Field Set

Field Set

32 - 212 F

Point Type

AI

AI

AI

AI

DI

DI

AI

AI

AI/AO

DI

DI

DI

DI

DI

AI

Signal

4 - 20 mA DC

4 - 20 mA DC

ZT-1703

ZT-1704

4 - 20 mA DC

4 - 20 mA DC

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

120 V

120 V

120 V

120 V

120 V

4 - 20 mA DC

Signal To/From

CST-PLC

CST-PLC

CST-PLC / LC-6707

CST-PLC / LC-6707

CST-PLC

CST-PLC

CST-PLC

CST-PLC

CST-PLC / ZT-170x

CST-PLC

CST-PLC

CST-PLC

CST-PLC

CST-PLC

CST-PLC

Annunciation

Location

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

BAS

Annunciation Type

Status - Flow

Status - Flow

Position Indication %

Position Indication %

Pump Status - Low Pressure Alarm

Pump Status - Low Pressure Alarm

Status - Level

Status - Flow

High Level Alarm

Low Level Alarm

Low-Low Level Alarm, Pump Shutdown

Low Pressure

Low Pressure

Status - Temperature

Remarks

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Notes

Provide w/

Provide w/

Fail Open

Fail Open

Provide w/

Provide w/

FT

FT

FT

TE

CONDENSATE SURGE TANK - DEVICE SCHEDULE

VA

Nomenclature

HWACT

LWACT

NOTES:

1 Set below 2/3 of tank height and at least 4" below overflow.

2 Set above 1/3 of tank height.

3 Setpoint at least 4" below top of tank.

Device Label

TCV

TT

Device Type

Control Valve

Temperature Transmitter

System

Soft Water

Blowdown

Function

Temperature

Temperature

Mounting / Location

Supply to Blowdown Separator BDS-1

Drain from Blowdown Separator BDS-1

Line

Size

2"

5"

Range / Setpoint

Open / Closed

32 - 212 F

Point Type

DI

AI

Signal

120 V

4 - 20 mA DC

Signal To/From

CHP-1 / TT-3605

CHP-1

Annunciation

Location

BAS

Annunciation Type

Status - Temperature

Remarks

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Notes

Fail Open

Provide w/ TE - 3 6 0

BLOWDOWN SYSTEMS - DEVICE SCHEDULE

BMS

CCS

CGP

CHP-1

FO-PLC

LCP

PMCP

WSF-PLC

Burner Management System - (Flame Safeguard Control)

Combustion Control System

Combustible Gas Detection Panel

CHP-1 Field Panel Miscellaneous Process Points

Fuel Oil System PLC

Local Control Panel

Plant Master Control Panel

Water Softener PLC

ABBREVIATIONS:

BBC - Boiler Blowdown Controller

CCS-PLC - Condensate Surge Tank PLC

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

MECHANICAL SCHEDULES

MAY 15, 2017 JSN RWD

MP602

Boiler No 1

Device Label

BSB

BSB

BSC

BSC

DPT

FE

LCV

LSH

LSL

LSLL

LSLL

ZT

CC

CE

FCV

FSV

FSV

FSV

PRV

PRV

PSH

PSL

ZSC

ZSC

ZSC

ZSO

ZSO

ZSO

FCV

FE

FSV

FSV

FSV

PRV

PSH

PSL

PT

PT

ZSC

ZSC

ZSC

ZSC

ZSO

ZSO

ZSO

ZT

FCV

FE

FSV

FSV

PSH

PSL

PT

ZSC

ZSC

ZSC

ZSO

ZSO

ZT

FE

PSHH

PSHH

PSV

PSV

PT

PT

TT

AE

AO

BE

DPT

DPT

EX

FCV

FS

FS

IS

ST

TT

ZS

ZSC

ZSO

ZT

PSL

PSV

HS

VFD

BAS

BMS

CCS

CGP

CHP-1

DA-PLC

LCP

PMCP

WSF-PLC

x

Building Automation System

Burner Management System - (Flame Safeguard Control)

Combustion Control System

Combustible Gas Detection Panel

CHP-1 Field Panel Miscellaneous Process Points

Deaerator and Condensate Surge Tank PLC

Local Control Panel

Plant Master Control Panel

Water Softener PLC

1A x

Boiler No 2

Device Label

BSB

BSB

BSC

BSC

DPT

FE

LCV

LSH

LSL

LSLL

LSLL

ZT

CC

CE

FCV

FSV

FSV

FSV

PRV

PRV

PSH

PSL

ZSC

ZSC

ZSC

ZSO

ZSO

ZSO

FCV

FE

FSV

FSV

FSV

PRV

PSH

PSL

PT

PT

ZSC

ZSC

ZSC

ZSC

ZSO

ZSO

ZSO

ZT

FCV

FE

FSV

FSV

PSH

PSL

PT

ZSC

ZSC

ZSC

ZSO

ZSO

ZT

FE

PSHH

PSHH

PSV

PSV

PT

PT

TT

AE

AO

BE

DPT

DPT

EX

FCV

FS

FS

IS

ST

TT

ZS

ZSC

ZSO

ZT

PSL

PSV

HS

VFD

x

1A x

Boiler No 3

Device Label

BSB

BSB

BSC

BSC

DPT

FE

LCV

LSH

LSL

LSLL

LSLL

ZT

CC

CE

FCV

FSV

FSV

FSV

PRV

PRV

PSH

PSL

ZSC

ZSC

ZSC

ZSO

ZSO

ZSO

FCV

FE

FSV

FSV

FSV

PRV

PSH

PSL

PT

PT

ZSC

ZSC

ZSC

ZSC

ZSO

ZSO

ZSO

ZT

FCV

FE

FSV

FSV

PSH

PSL

PT

ZSC

ZSC

ZSC

ZSO

ZSO

ZT

FE

PSHH

PSHH

PSV

PSV

PT

PT

TT

AE

AO

BE

DPT

DPT

EX

FCV

FS

FS

IS

ST

TT

ZS

ZSC

ZSO

ZT

PSL

PSV

HS

VFD

x

1A x

Device Type

Shunt Switch

Shunt Switch

Shunt Switch

Shunt Switch

Pressure Transmitter

Flow Element, V-Cone

Control Valve

Level Switch

Level Switch

Level Switch

Level Switch

Position Transmitter

Conductivity Controller

Conductivity Element

Control Valve, Ball Type

Safety Valve

Safety Valve

Safety Valve

Regulating Valve

Regulating Valve

Pressure Switch

Pressure Switch

Position Switch

Position Switch

Position Switch

Position Switch

Position Switch

Position Switch

Control Valve

Flow Element, Thermal Mass

Safety Valve

Safety Valve

Safety Valve

Regulating Valve

Pressure Switch

Pressure Switch

Pressure Transmitter

Pressure Transmitter

Position Switch

Position Switch

Position Switch

Position Switch

Position Switch

Position Switch

Position Switch

Position Transmitter

Control Valve

Flow Element, Positive Displacement

Safety Valve

Safety Valve

Pressure Switch

Pressure Switch

Pressure Transmitter

Position Switch

Position Switch

Position Switch

Position Switch

Position Switch

Position Transmitter

Flow Element, V-Cone

Pressure Switch

Pressure Switch

Safety Valve

Safety Valve

Pressure Transmitter

Pressure Transmitter

Temperature Transmitter

Oxygen Monitor

Opacity Meter

Flame Scanner

Pressure Transmitter

Pressure Transmitter

Voltage Transformer

Control Valve

Flow Switch

Flow Switch

Current Switch

Speed Transmitter

Temperature Transmitter

Position Switch

Position Switch

Position Switch

Position Transmitter

Pressure Switch

Safety Valve

Hand Switch

Speed Multifunction

System

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Boiler Feedwater

Blowdown

Blowdown

Blowdown

Gas Igniter

Gas Igniter

Gas Igniter

Gas Igniter

Liquefied Petroleum Gas

Gas Igniter

Gas Igniter - NG

Gas Igniter

Gas Igniter

Gas Igniter

Gas Igniter

Gas Igniter

Gas Igniter

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Natural Gas

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Fuel Oil

Steam

Steam

Steam

Steam

Steam

Steam

Steam

Steam

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Combustion

Atomizing Air

Atomizing Air

BMS / CCS

Combustion

Function

Manual Re-Set

Manual Re-Set (Auxiliary)

Safety By-Pass

Safety By-Pass (Auxiliary)

Level

Flow

Level

High Level

Low Level

Low-Low Level

Low-Low Level (Auxiliary)

Position Feedback

Conductivity

Conductivity

Flow

Flow

Flow

Flow

Pressure

Pressure

High Pressure

Low Pressure

Position Verification

Position Verification

Position Verification

Position Verification

Position Verification

Position Verification

Flow

Flow, Totalizing

Flow

Flow

Flow

Pressure

High Pressure

Low Pressure

Pressure

Pressure

Position Verification

Position Verification

Position Verification

Position Verification

Position Verification

Position Verification

Position Verification

Position Feedback

Flow

Flow

Flow

Flow

High Pressure

Low Pressure

Pressure

Position Verification

Position Verification

Position Verification

Position Verification

Position Verification

Position Feedback

Flow

High-High Pressure

High-High Pressure (Auxiliary)

Pressure

Pressure

Pressure

Pressure

Temperature

Oxygen Content

Opacity

Flame Monitoring

Differential Pressure

Differential Pressure

Burner Ignition

Flow

Flow, Low Air

Flow, Purge Air

Current Sensor

Speed

Temperature

Position Verification

Position Verification

Position Verification

Position Feedback

Low Pressure

Pressure

Emergency Cut-Off

VFD Monitoring

Mounting / Location

Float Type Water Column

Conductivity Probe Type Water Column

Float Type Water Column

Conductivity Probe Type Water Column

Float Type Water Column

Supply to Boiler

Supply to Boiler

Conductivity Probe Type Water Column

Conductivity Probe Type Water Column

Float Type Water Column

Conductivity Probe Type Water Column

LCV-3x07

Supply from Boiler to CBHX-1

Supply from Boiler to CBHX-1

Supply from Boiler to CBHX-1

Supply to Burner

Supply to Burner

Vent

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

FSV-4x01

FSV-4x02

FSV-4x03

FSV-4x01

FSV-4x02

FSV-4x03

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

Vent

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

FCV-4x08

FSV-4x10

FSV-4x11

FSV-4x12

FSV-4x10

FSV-4x11

FSV-4x12

FCV-4x08

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

Supply to Burner

FCV-5x01

FSV-5x03

FSV-5x04

FSV-5x03

FSV-5x04

FCV-5x01

Supply from Boiler

Boiler

Boiler

Boiler

Boiler

Boiler

Supply from Boiler, FE-6x01

Supply from Boiler, FE-6x01

Breeching

Breeching

Burner

Combustion Air Supply

Breeching

Burner

Fresh Air Fan Damper

Combustion Air Supply

Across Boiler

Boiler FD Fan

Boiler FD Fan

Breeching

Burner Oil Gun

Flue Gas Recirculation

FCV-7x08

FCV-7x08

Boiler Mounted Compressor

Boiler Mounted Compressor

Boiler

Boiler FD Fan

Line

Size

2"

2"

1"

1"

1"

3/4"

3/4"

3/4"

1/2"

3/4"

3/4"

3"

4"

3"

3"

3"

3"

3"

3"

3"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

6"

Range / Setpoint

Open / Closed

Open / Closed

Open / Closed

Open / Closed

Field Set

2,300 - 23,000 PPH

0 - 23,000 PPH

Field Set

Field Set

1" Below LWA

1" Below LWCO

0 - 100 %

Field Set

Open / Closed

Open / Closed

Open / Closed

Open / Closed

2 PSIG / 300 SCFH

8 PSIG / 120 SCFH

Field Set

80% of Regulated Pressure

Closed

Closed

Closed

Open

Open

Open

0 - 25,000 SCFH

2,500 - 25,000 SCFH

Open / Closed

Open / Closed

Open / Closed

5 PSIG / 25,000 SCFH

6 PSIG

4 PSIG

0 - 25 PSIG

0 - 25 PSIG

Closed

Closed

Closed

Closed

Open

Open

Open

0 - 100 %

0 - 180 GPH

18 - 180 GPH

Open / Closed

Open / Closed

110% of Regulated Pressure

90% of Regulated Pressure

0 - 250 PSIG

Closed

Closed

Closed

Open

Open

0 - 100 %

2,100 - 21,000 PPH

120 PSIG

125 PSIG

135 PSIG

140 PSIG

0 - 250 PSIG

0 - 250 PSIG

32 - 392 F

0 - 10 %

0 - 100 %

Per Manufacturer

Per Manufacturer

Per Manufacturer

Per Manufacturer

Field Set

Field Set

Field Set

Field Set

32 - 752 F

Open / Closed

Closed

Open

0 - 100 %

80% of Pressure at Low Fire

Per Manufacturer

Open / Closed

Field Set

Point Type

DI

DI

DI

DI

AI

AI

DI

DI

DI

DI

AI

AI/AO

AI

DI

DI

DI

DI

DI

DI

DI

DI

DI

DI

DI

DI

AI

DI

DI

DI

DI

DI

AI

AI

DI

DI

DI

DI

DI

DI

DI

AI

AI

DI

DI

DI

DI

AI

DI

DI

DI

DI

DI

AI

AI

DI

DI

AI

AI

AI

AI

AI

DI

AI

AI

DI

DI

DI

DI

AI

AI

DI

DI

DI

AI

DI

DI

AI

Signal

120 V

120 V

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

ZT-3x07

120 V

120 V

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

120 V

120 V

120 V

120 V

120 V

120 V

120 V

120 V

120 V

120 V

120 V

120 V

ZT-4x08

4 - 20 mA DC

120 V

120 V

120 V

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

120 V

120 V

120 V

120 V

120 V

120 V

120 V

4 - 20 mA DC

ZT-5x01

4 - 20 mA DC

120 V

120 V

120 V

120 V

4 - 20 mA DC

120 V

120 V

120 V

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

4 - 20 mA DC

0 - 5 V DC

4 - 20 mA DC

4 - 20 mA DC

120 V

ZT-7x08

120 V

120 V

120 V

4 - 20 mA DC

4 - 20 mA DC

120 V

120 V

120 V

4 - 20 mA DC

120 V

120 V

0 - 120 V

Signal To/From

BMS / CCS

BMS / CCS

BMS / CCS

BMS / CCS

CCS

BMS

BMS / CCS

BMS / CCS

BMS / CCS

BMS / CCS

CCS

BBC

BBC

BMS

BMS

BMS

BMS

BMS

BMS

BMS

BMS

BMS

BMS

BMS

CCS

BMS

BMS

BMS

BMS

BMS

PMCP

PMCP

BMS

BMS

BMS

BMS

BMS

BMS

BMS

CCS

CCS

BMS

BMS

BMS

BMS

PMCP

BMS

BMS

BMS

BMS

BMS

CCS

CCS

BMS / CCS

BMS

CCS

CCS

CCS

CCS

PMCP

BMS

CCS

CCS

BMS / CCS

BMS

BMS

CCS

CCS

BMS / CCS

BMS / CCS

BMS / CCS

BMS

BMS / CCS

BAS

Annunciation

Location

BMS

BMS

BMS

BMS

CCS

BMS

BMS

BMS

BMS

BMS

CCS

BMS

BMS

BMS

BMS

BMS

BMS

BMS

BMS

CCS

BMS

BMS

BAS

BAS

BMS

BMS

BMS

BMS

BMS

BMS

BMS

CCS

CCS

BMS

BMS

BAS

BMS

BMS

BMS

BMS

BMS

CCS

CCS

BMS

BMS

CCS

CCS

CCS

CCS

BAS

BMS

CCS

CCS

CCS

BMS

BMS

CCS

CCS

BMS

BMS

BMS

BMS

BMS

BAS

Annunciation Type

Status

Status

Blowdown Override

Blowdown Override

Status - Drum Water Level

Status - Flow

High Level Bell

Low Level Bell

Low-Low Level Cut-Off Alarm

Low-Low Level Cut-Off Alarm (Auxiliary)

Position Indication %

High Pressure Alarm

Low Pressure Alarm

Position Verification - Fully Closed

Position Verification - Fully Closed

Position Verification - Fully Closed

Position Verification - Fully Open

Position Verification - Fully Open

Position Verification - Fully Open

Status - Flow

High Pressure Alarm

Low Pressure Alarm

Status - Pressure

Status - Pressure

Position Verification - Fully Closed

Position Verification - Fully Closed

Position Verification - Fully Closed

Position Verification - Fully Closed

Position Verification - Fully Open

Position Verification - Fully Open

Position Verification - Fully Open

Position Indication %

Status - Flow

High Pressure Alarm

Low Pressure Alarm

Status - Pressure

Position Verification - Fully Closed

Position Verification - Fully Closed

Position Verification - Fully Closed

Position Verification - Fully Open

Position Verification - Fully Open

Position Indication %

Status - Flow

High-High Pressure Cut-Off

High-High Pressure Cut-Off (Auxiliary)

Status - Pressure

Status - Pressure

Status - Temperature

Status - % Oxygen

Status - % Opacity

Status - Burner Flame Failure

Status - FD Fan Failure

Status - Rate

Status - Low Air Flow

Status - Purge Air Flow

Status - Current

Status - Speed

Status - Temperature

Position Indication - Present

Position Verification - Fully Closed

Position Verification - Fully Open

Position Indication %

Low Pressure Alarm

Emergency Cut-Off

Status

Remarks

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

Refer to Sequence of Operation for Specific Points

Notes

Manual Reset

Manual Reset

Provide w/

Fail Last Position

Fail Open

Fail Closed

Fail Closed

Fail Open

Fail Closed

Fail Closed

Fail Closed

Provide w/

Fail Closed

Fail Closed

Fail Open

Fail Closed

Fail Closed

Provide w/

Fail Closed

Fail Closed

Provide w/

Automatic Reset

Manual Reset

Provide w/

Provide w/

Provide w/

Fail Last Position

FT

FT

FT

FT

AT

SE

TE

x x x x x x x

BOILER - DEVICE SCHEDULE

VA

Nomenclature

HWAB

LWA

LWCO

ALWCO

APFGSOV

APFGSOV

APFGSVV

LPFGPCS

AFGSOV

AFGSOV

AFGSVV

HFGPCS

LFGPCS

POC-AFGSOV

POC-AFGSOV

AFOSOV

AFOSOV

HFOPCS

LFOPCS

POC-AFOSOV

POC-AFOSOV

RBSPLS

NRBSPLS

SVB1

SVB2

LFGOLI

FSMFO

FSNSIS

CAPS

PAPS

FDMIS

FDDWOPS

LAMPS

BMS BMS

Setpoint No Higher Than 120% of Regulated Pressure

Setpoint No Higher Than 80% of Regulated Pressure

Wired in Series with ZSC 4x11

Wired in Series with ZSC 4x10

LPFGPCS PSL - 4 1 0 8 PSL - 4 2 0 8 PSL - 4 3 0 8 Pressure Switch Gas Igniter - LPG Low Pressure Supply to Burner 1/2" 80% of Regulated Pressure DI 120 V BMS BMS Low Pressure Alarm Manufacturer Furnished / Contractor Installed

LFPS ZSC - 4 1 0 9 ZSC - 4 2 0 9 ZSC - 4 3 0 9 Position Switch Natural Gas Position Verification FCV-4x08 --- Closed DI 120 V BMS BMS Low Fire Position Manufacturer Furnished / Contractor Installed

LFPS ZSC - 5 1 0 2 ZSC - 5 2 0 2 ZSC - 5 3 0 3 Position Switch Fuel Oil Position Verification FCV-5x01 --- Closed DI 120 V BMS BMS Low Fire Position Manufacturer Furnished / Contractor Installed

FDMIS

FDMIS

IS - 7 1 1 1B IS - 7 2 1 1B IS - 7 3 1 1B

IS - 7 1 1 1C IS - 7 2 1 1C IS - 7 3 1 1C

Current Switch Combustion

Current Switch Combustion

Current Sensor

Current Sensor

Boiler FD Fan

Boiler FD Fan

Field Set DI 120 V BMS BMS

Field Set DI 120 V BMS BMS

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

LFPS

LFPS

ZSC - 7 1 0 9 ZSC - 7 2 0 9 ZSC - 7 3 0 9

ZSC - 7 1 1 0 ZSC - 7 2 1 0 ZSC - 7 3 1 0

Position Switch Combustion Position Verification

Position Switch Combustion Position Verification

FCV 7x08

Flue Gas Recirculation Damper

Closed

Closed

DI 120 V BMS

DI 120 V BMS

BMS

BMS

Low Fire Position

Low Fire Position

Manufacturer Furnished / Contractor Installed

Manufacturer Furnished / Contractor Installed

FGRD1 ZSC - 7 1 1 1 ZSC - 7 2 1 1 ZSC - 7 3 1 1 Position Switch Combustion Position Verification Flue Gas Recirculation Damper --- Damper 80% Open DI 120 V BMSBMS Position Verification - 80% Open Manufacturer Furnished / Contractor Installed 2

LAMDPS

DPS - 8 1 0 1 DPS - 8 2 0 1 DPS - 8 3 0 1 Differential Pressure Switch Atomizing Air Fuel Oil Differential Pressure Atomizing Air --- 80% of Differential DI 120 V BMS BMS Low Differential Pressure Alarm Contractor Furnished / Contractor Installed

IS - 8 1 0 3A IS - 8 2 0 3A IS - 8 3 0 3A Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set DI 120 V BMS BMS

DI 120 V BMS BMS

DI 120 V BMS BMS

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Contractor Furnished / Contractor Installed

Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set

Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set

IS - 8 1 0 3B IS - 8 2 0 3B IS - 8 3 0 3B

IS - 8 1 0 3C IS - 8 2 0 3C IS - 8 3 0 3C

NOTES:

1 Wiring for POC - AFGSOV shall be easily accessible. Wiring is accessed during switch testing.

2 FGR damper switch as required by manufacturer. If manufacturer states in writing to the facility that the position of the damper does not matter to achieve proper purge, then no switch is required.

3 Ensure oil valves are mounted in such a way that there is easy access to the proof of closure switch wiring.

ABBREVIATIONS:

BBC - Boiler Blowdown Controller

FCV - 7 1 0 9 FCV - 7 2 0 9 FCV - 7 3 0 9 Draft Control Damper Draft Control Draft Control Breeching --- Per Manufacturer AO 120 V BMS BMS --- ---

Status

BMS BMS

BMS BMS

4 - 20 mA DC

4 - 20 mA DCDI

DI

Open / Closed

Open / Closed---

Draft Control Damper

BBC

Interlock

Draft Control

Draft Control

Draft Control

Position Switch

Draft Controller

ZSC - 7 1 1 2

DC - 7 1 0 0

ZSC - 7 2 1 2

DC - 7 2 0 0

ZSC - 7 3 1 2

DC - 7 3 0 0

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

MECHANICAL SCHEDULES

MAY 15, 2017 JSN RWD

MP603

PI

PI PIPI PI PI PI PI PI PI PI PI

PI PI

DRAWING NOTES:

T-01

3/4" ED

M A

X

STEAM SILENCER S-1

(EXHAUST SYSTEM FOR

BOILER BURNER TESTING

AND ADJUSTING)

4" HPS(100)

3/4" ED

1"

T-02

3/4" ED3/4" ED

PIPE TO FLOOR DRAIN

3/4" ED 3/4" ED

3/4" ED3/4" ED

VTR

16" V

3" HPS(100)

TO BUILDING

6" HPS(100)

TO HEAT

CONVERTERS

8" HPS(100)

12" HPS(100)

STEAM HEADER

TO EXISTING

DEAERATOR DA-1

M

IN

T

Y P

VTR

3/4" HPR 3/4" HPR

TO EXISTING

DEAERATOR DA-1

EXISTING 12"

HPS(100)

STEAM HEADER

8"

6"

TO ABANDONED

PROCESS ROOM

FROM OLD

BOILER B-3

TO BUILDING 1

TO MENTAL

HEALTH BUILDING

6" HPS(100) 6" HPS(100)

1-1/2"

6" HPS(100)

4" HPS(100)

6" HPS(100) 3" HPS(100)

TO BUILDING 100

MPS SYSTEM

WHISTLE

VALVE

3/4" HPS(100)

TO EXISTING

DEAERATOR DA-1

TO EXISTING

DEAERATOR DA-1

TO EXISTING

DEAERATOR DA-1

3/4" HPR

6" HPS(100)

TO EXISTING MPS PRESSURE

REDUCING STATION

TO EXISTING

DEAERATOR DA-1

DEMO

EXISTING NALCO

PORTAFEED CHEMICAL

TREATMENT SYSTEM

EXISTING NALCO

PORTAFEED CHEMICAL

TREATMENT SYSTEM

EXISTING

DEAERATOR

8" HPS(100)

6" HPS(100)

6" HPS(100)

3" HPS(100)

6" HPS(100)

4" HPS(100)

6" HPS(100)

PSL

PT

PI

L

FE

FT

FI

PRV

1B

PRV

1A

PSV

66126" HPS(100)

FACTORY INSTALLED

BY-PASS (TYP)

BOILER PLANT

FINISHED FLOOR

6" HPS(100)

FROM NEW

BOILER B-2

MP708, B9

6" 5S

WHISTLE

8" HPS(100)

BF

6" HPS(100)

1-1/2"

6" HPS(100)

1-1/2"

4" HPS(100)

1-1/2"

BF

4" HPS(100)

1-1/2"

1 REPLACE VALVES AND DEMO PIPE. PROVIDE BLIND FLANGE.

2 REPLACE VALVES.

2 2 1 2 2 2 2 2 2 2

D E

M O

A

LL

P

IP

E F

R O

M H

E A

D E

R T

O R

O O

M

D E

M O

P

IP

E

N E

W P

IP

E

N E

W P

IP

E

N E

W P

IP

E

6" HPS(100)

6" HPS(100)

MP708, B9

MP708, B9

FROM NEW

BOILER B-1

FROM NEW

BOILER B-3

DEMO PIPE DEMO PIPE

6" HPS(100)

3/4" HPR

5 PIPE DIA MIN10 PIPE DIA MIN

INSTALL PER MANUFACTURERS RECOMMENDATION

AS REQUIRED BY FIELD CONDITIONS (TYP)

3" HPS(100)

3/4" ED

PIPE TO

FLOOR DRAIN

T-07

3/4" HPR

4" HPS(60)

6" HPS(60)

2" HPS(100)

3" HPS(100)

6" HPS(60)

3" HPS(100)

6" HPS(60)

2"

11/4"

21/2"

20 PIPE DIA MIN10 PIPE DIA MIN

(TYP FOR ALL PRESSURE REDUCING STATIONS)

6" HPS(60)

3/4" HPR

6" V

VTR72

M

IN

(T Y

P

T-08

T-09

3/4" HPR

PIPE TO

FLOOR DRAIN

NC

3/4" ED

PIPE TO

FLOOR DRAIN

3 EXISTING NALCO PORTAFEED SYSTEM, PROVIDE NEW STAINLESS STEEL

RETRACTABLE INJECTION QUILL, PROVIDE NEW STAINLESS STEEL PIPING,

AND PROVIDE NEW PUMP.

N E

W P

IP

E

8" HPS(100)

6" HPS(100)

6" HPS(100)

6" HPS(100)

FROM MOBILE

BOILER

8" HPS(100)

TO EXISTING

DEAERATOR

3/4" HPR

T-21

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1

88 88 44 44

00 00

BBBB

AAAA

CCCC

DDDD

EEEE

FFFF

th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot

"6

11 11 00 00

"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot

22 22 00 00

"6

"6

00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot

44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot

44 44 00 00

00 00 44 44

88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot

VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231

1111 2222 3333 4444 5555 6666 88887777 9999

FFFF

EEEE

DDDD

CCCC

BBBB

AAAA

99997777 8888666655554444333322221111

FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.

APPROVED FOR CONSTRUCTION

Office of Construction and Facilities Management

Department of Veterans Affairs

BLDG 100 ENERGY CENTER

516-15-107

BAY PINES, FLORIDA

100% DESIGN

DESIGN TO REPLACE BOILERS,

3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7

COA: FL #2 9 57 8

AKE A P r o j e c t No . 1 2 8 - 1 6

JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678

STEAM SYSTEM SCHEMATIC

MAY 15, 2017 JSN RWD

MP701

M

M

M

TI

PI PI

PIPI

TI

TI

PI

TI

PI

LCV

ZT

ZI

LCV

ZT

ZI

TE

TT

TI

LAH

LAL

EMA

DPS

PI

PI

PSL

DPS

PI

PI

PSL

FO

FO

I

FE

FE

FE

LC

LSH

LI

LI

LI

LSL

LSLL

DPT

NORMAL MAKE-UP

FROM WATER

SOFTENERS WSF-1

MP705, E1

EMERGENCY

MAKE-UP FROM

NONPOTABLE

WATER SYSTEM

MP705, D9

3" SW

3" NP

VTR

4" V

3" SW

CONDENSATE

SURGE TANK

CST-1

NORMAL WATER LEVEL

TOP OF TANK

OVERFLOW LINE

HIGH LEVEL ALARM

EMERGENCY MAKE-UP

11/2"

11/2"

11/2"

LOW LEVEL ALARM

PIPE TO

FLOOR DRAIN

11/2"

11/2"

RECIRC

ORIFICE

(TYP)

TO SANITARY

4" ED(OF)

4" CTPS

BOTTOM OF TANK

FIRE HOSE

CONNECTION

FROM EXISTING

PC LINE

3" PC

11/2" ED

4" TANK

BY-PASS

EXTEND OVERFLOW

PIPE DOWN TO 12"

ABOVE TANK BOTTOM

PIPE TO

FLOOR DRAIN

CTP-2

TO EXISTING

DEAERATOR DA-1

3" CTPD

MP705, D9

EMERGENCY MAKE-UP

FROM NONPOTABLE

WATER SYSTEM

MP705, D1

3" NP

EMERGENCY MAKE-UP

FROM WATER

SOFTENERS WSF-1

3" SW

EXHAUST HEAD

4" CTPS

PIPE TO

FLOOR DRAIN

CONDENSATE

TRANSFER

PUMP CTP-1

3" CTPD 3" CTPD

3" CTPD

3"

4"

12"x16"

MANWAY

3"

4"

FLASH

STEAM

FROM CBHX

3"

MP704, A9

M

IN

T

Y P

3"3"

2" HPR

FROM EXISTING

STEAM LINE DRIP

TRAPS

2" HPR

L

L

VALVE LOCKABLE IN

OPEN POSITION ONLY

VALVE LOCKABLE IN

OPEN POSITION ONLY

NC

3" CTPD

TO EXISTING

BOILER FEED

PUMP SUCTION

3" CTPD

NC

2-1/2" PC

3" PC

2" PC

2-1/2" PC

FROM EXISTING

PC LINE

FROM EXISTING

PC LINE

FROM EXISTING

PC LINE

FROM EXISTING

PC LINE

4" PC 4" PC

4" PC

(DEAERATOR TANK BYPASS)

NC

NC

NC NC

NC NC

FLOW METER

FLOW METER

FLOW METER

Design, Inc.

Tel 352.376.5500 Fax 352.375.3479

Tioga Town Center

Gainesville, Florida 32669

Affiliated Engineers SE, Inc.

CA-5140

12921 SW 1st Road Ste 205

Affiliated Engineers

ENGINEER-OF-RECORDENGINEER-OF-RECORDE…