36C24818R0121-005.pdf
PDF 4 MB Posted
- Attached to
- Replace Boilers Bldg. 100 (Construction) TIERED EVALUATIONS C. W. Bill Young VA Medical Center
- Solicitation number
- 36C24818R0121
About this file
36C24818R0121 VA 516-15-107 - Replace Boilers at Bay Pines VAMC - Approved Construction Drawings_Part9.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
SAFETY DEVICE TESTING PROCEDURES
MAY 15, 2017 JSN RWD
MP509
1. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF
THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINERS, TRANSMITTERS, CONTROL DEVICES. PRIOR TO COMMENCING INSTALLATION WORK, REFER CONFLICTS
BETWEEN THIS REQUIREMENT AND CONTRACT DRAWINGS TO THE RESIDENT ENGINEER FOR
RESOLUTION. FAILURE OF THE CONTRACTOR TO RESOLVE, OR POINT OUT ANY ISSUES WILL RESULT IN
THE CONTRACTOR CORRECTING AT NO ADDITIONAL COST TO THE GOVERNMENT.
NOTES:
NOTES:
NOTE:
GENERAL NOTES:
NOTE:
NOTES:
NOTES:
NOTE:
NOTE:
CTP-1
CTP-2
15 / 22.5
15 / 22.5
15 / 22.5
10:1
10:1
10:1
30 50 8:1
8:1
8:1
90 50 50 480 / 3 / 60 PROVIDED BY BOILER MANUFACTURER3,500
3,500
3,500
1. NO COMBUSTION AIR PRE-HEAT.
2. GAS SPUDS SHALL BE STAINLESS STEEL.
3. FORCED DRAFT FAN INLET SHALL BE SCREENED.
4.
INVERTER
INVERTER
INVERTER
YES
YES
YES
EMISSIONS PARTS PER MILLION (PPM) ARE BASED ON 3% OXYGEN (O 2).
MARLO MRG-1500-3TWIN ALTERNATINGHOSPITAL (NP)100-WSF-1 250 0 100 75 120 / 1 / 60110 500 64" x 74"
100-B-1
100-B-2
100-B-3
STEAM 24,150- 700
23,433 375 / 383
STEAM -
STEAM -
2,400 84 / 87 7.5
480 / 3 / 60
480 / 3 / 60
480 / 3 / 60
480 / 3 / 60
480 / 3 / 60
1.
2.
ALTITUDE: 100 FEET ABOVE SEA LEVEL
7.5
T-07 1/2" 80140100 3112 361338
60T-08 1/2" 312293
INVERTED BUCKET 100-BDS-1 34 702 5
REGENERATION ONCE PER DAY MAX.
NO
NO
PROVIDED BY BOILER MANUFACTURER
PROVIDED BY BOILER MANUFACTURER
REFER TO LOW NOx BURNER SCHEDULE FOR ADDITIONAL INFORMATION.
CLEAVER BROOKS, CBEX ELITE65,000 25' x 10.5' x 12'
VERTICAL SINGLE STAGE
VERTICAL SINGLE STAGE
7.5
5.0
TEFC2-1/2" x 2-1/2" 5.0 480 / 3 / 60 CONTINUOUS 80.03,500
4880 64 3 5117
INVERTED BUCKET
PENN SEPARATOR , A34100S TO MPS PRV
60S FROM MPS PRV
65,000
65,000
25' x 10.5' x 12'
25' x 10.5' x 12'
375 / 383
375 / 383
CONTINUOUS
REFER TO STEAM NOZZLE LOADS AND MOMENTS DETAIL.3.
3,500
AURORA PUMPS, PVM (X) 33-1
480 / 3 / 60
PROVIDE FLANGED VENT AND DRAIN CONNECTIONS
80.0
24,150
24,150
23,433
23,433
2,400
2,400
84 / 87
84 / 87
CLEAVER BROOKS, CBEX ELITE
CLEAVER BROOKS, CBEX ELITE
63" x 86"
TEFC
PRV-1B MPS REDUCING STATION 1,350 100 621,350 SEE GENERAL NOTES
PRV-1A MPS REDUCING STATION 2,700 100 602,700 SEE GENERAL NOTES
DRUM LOUVER 3000 70"x15" 0.04 TITUS/DLM1
1 2100-SF-1 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
1 PROVIDE UNIT MOUNTED FACTORY DISCONNECT SWITCH.
2 FAN SHALL BE THIRD CERTIFIED FOR HIGH WINDS UP TO 150 MPH.
1 2100-SF-2 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
1 2100-SF-3 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
1 2100-SF-4 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
1 2100-SF-5 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
1 2100-SF-6 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
1 2100-SF-7 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
1 2100-SF-8 GREENHECK. RSFP-200-50BOILER PLANT POWER ROOF VENTILATOR 12,000 0.25 539 4.7 20 5 460 / 3 / 60 BELT - 800
3 PROVIDE WITH PITCHED ROOF CURB, COORDINATE WITH ROOF SLOPE ABOVE SKY-LIGHTS.
4 PROVIDE WITH ROOF CURB.
60T-09 1/2" 3122934880 64 3 5117INVERTED BUCKET -60S FROM MPS PRV
2-1/2" x 2-1/2" AURORA PUMPS, PVM (X) 33-1
PSV-6104 _ PPHBOILER No 1 STEAM STAINLESS STEEL TRIM
PSV-6105 _ PPHBOILER No 1 STEAM STAINLESS STEEL TRIM
PSV-6204 _ PPHBOILER No 2 STEAM STAINLESS STEEL TRIM
PSV-6205 _ PPHBOILER No 2 STEAM STAINLESS STEEL TRIM
PSV-6304 _ PPHBOILER No 3 STEAM STAINLESS STEEL TRIM
PSV-6305 _ PPHBOILER No 3 STEAM STAINLESS STEEL TRIM
PSV-8102 - -_ SCFMBOILER No 1 ATOMIZING AIR STAINLESS STEEL TRIM
PSV-8202 - -_ SCFMBOILER No 2 ATOMIZING AIR STAINLESS STEEL TRIM
PSV-8302 - -_ SCFMBOILER No 3 ATOMIZING AIR STAINLESS STEEL TRIM
PSV-6612 303 4,050 PPHREDUCING STATION STEAM STAINLESS STEEL TRIM
SVB1
SVB2
SVB1
SVB2
SVB1
SVB2
BOILER MUST BE STAMPED 200 PSIG.4.
100-CST-1 HORIZONTAL 2,000 6' x 14'25
1. TANK INTERIOR SHALL BE EPOXY COATED PER 235011 PARAGRAPH 2.1.H.
2. TOTAL FLOW INCLUDES 97 GPM (PLANT FLOW) + 35 GPM (MANUFACTURE'S RECOMMENDED MIN RECIRC) + 13 GPM (10%).
TRIPLEX SEQUENTIAL: ONE TANK OPERATIONAL, ONE TANK REGENERATION, ONE TANK STAND-BY.
1,500,000 130/6.5 235/15 325/25
MARLO MGTD-350-3TWIN ALTERNATINGBOILER MAKE-UP (NP)100-DEA-1 72 90% - 87.5/15 48" x 72" 100 75 120 / 1 / 60- 500 30" x 30"350,000 175/25 55 -
BOILER B-3 IS DEDUCT ALTERNATE #5.5.
BOILER B-3 IS DEDUCT ALTERNATE #5.5.
100T-21 1/2" 36133880140 112 3 5117INVERTED BUCKET -MOBILE BOILER HPS
SVB1 AND SVB2 PROVIDED BY BOILER MANUFACTURER.
BASIS OF DESIGN
PUMP
DESIG.
TOTAL
FLOW
(GPM)
(2)
HEAD
(FEET H20)
ELECTRICAL
NEMA TYPE
PUMP
TYPE
SUCTION /
DISCHARGE
HP RPM
MOTOR
DUTY
MINIMUM
PUMP
EFFICIENCY
BOILER
No
COMBUSTION
AIR
TEMPERATURE (°F)
HUMIDITY
EXCESS
AIR (%)
(GAS/OIL)
NATURAL GAS
TURNDOWN
TRAIN INLET
PRESSURE
(PSIG)
NOx
(PPM)
CO
(PPM)
FUEL OIL No 2
TURNDOWN
TRAIN INLET
PRESSURE
(PSIG)
NOx
(PPM)
CO
(PPM)
FORCED DRAFT FAN
HP ELECTRICAL
BASIS OF DESIGN
RPM DUTY VSD
BASIS OF DESIGNDESIG
AREA
SERVED TYPE
WATER
HARDNESS
INLET
(PPM)
WATER
HARDNESS
OUTLET
(PPM)
DESIGN
FLOW
RATE/PD
(GPM/PSID)
CONTINUOUS
FLOW
RATE/PD
(GPM/PSID)
PEAK
FLOW
RATE/PD
(GPM/PSID)
VESSEL SIZE
(EACH TANK)
(DIA x H)
VESSEL
PRESSURE
RATING
(PSI)
MAXIMUM
REGENERATION
TIME
(MINUTES)
ELECTRICAL
MAXIMUM
BACKWASH
FLOW
(GPM)
BRINE TANK
CAPACITY
(GAL)
DESIG SERVICE
CAPACITY
POUNDS
PER HOUR
(PPH)
TYPE MBTU's
PER HOUR
EXHAUST GAS
TEMPERATURE
(GAS/OIL)(°F)
DESIGN
PRESSURE
(PSIG)
OPERATING
PRESSURE
(PSIG)
MIN
HEATING
SURFACE
(SQ.FT.)
MIN BOILER
EFFICIENCY
(GAS/OIL)(%)
SKID MOUNTED
AIR
COMPRESSOR
(HP)
ELECTRICAL
DIFF PRESS
(PSIG)
PRESSURE
(PSIG)
DESG GENERAL LOCATION
TRAP
SIZETYPE
OPERMAXOPER
FLOW RATE
(LB/HR)
STEAM TEMP
(°F)
DESIGN
FLOW
SAFETY
FACTORMAX OPER
FLOW MAXOPER
BASIS OF DESIGN BASIS OF DESIGNDESIG
TANK
HEIGHT
(INCHES)
COOLING
WATER
TEMP
(°F)
INLET
(INCHES)
VENT
(INCHES)
VSD
BASIS OF DESIGN
TOTAL
APPROXIMATE
OPERATING
WEIGHT
(LBS)
APPROXIMATE
OVERALL
DIMENSIONS
(LxWxH)
STEAM TRAP SCHEDULE
SCOTCH MARINE FIRETUBE BOILER SCHEDULE
CONDENSATE SURGE TANK AND TRANSFER PUMPS SCHEDULE
BLOWDOWN SEPARATOR SCHEDULE
LOW NOx BURNER SCHEDULE
HORSEPOWER
(HP)
DIMENSIONS
(DIA x H)
DRAIN
(INCHES)
(DEDUCT ALTERNATE #4)WATER SOFTENER SCHEDULE
DESIG
REQUIRED
CAPACITY
(PPH)
LOCATION
MAXIMUM FLOW
WIDE OPEN VALVE
(PPH)
PRESSURE
(PSIG)
IN OUT
REMARKS
STEAM PRESSURE REDUCING VALVE SCHEDULE
No. DUTY
AIR DEVICE SCHEDULE
CFM
DUCT
NECK SIZE
MAX DP
(IN W.G.)
BASIS OF DESIGN
MFR/MODEL NO.
FAN SCHEDULE
ELECTRICAL
DESIG. SERVICE TYPE CFM
ESP
(IN. WC)
APPROX
RPM
BHP
WHEEL
DIA. (IN.) HP
MOTOR
DRIVE
AMCA
CONSTRUCTION
CLASS
APPROXIMATE
WEIGHT
(LBS)
NOTES
BASIS OF DESIGN
MFR/MODEL NO.
DESIG TEMP (°F)LOCATION REMARKS
SET
PRESSURE
(PSIG)
MINIMUM
CAPACITY
SERVICE
PRESSURE SAFETY VALVE SCHEDULE
NOMENCLATURE
VA
TANK
DESIG.
TANK
TYPE
TANK
CAPACITY AT
OVERFLOW
(GAL)
TANK
DIMENSIONS
(DIA x L)
DESIGN
OPERATING
PRESSURE
(PSIG)
GRAIN
CAPACITY
PER TANK
(GRAINS)
BASIS OF DESIGNDESIG
AREA
SERVED TYPE
ALKALINITY
INLET
(PPM)
DESIGN
FLOW
RATE/PD
(GPM/PSID)
CONTINUOUS
FLOW
RATE/PD
(GPM/PSID)
PEAK
FLOW
RATE/PD
(GPM/PSID)
VESSEL SIZE
(EACH TANK)
(DIA x H)
VESSEL
PRESSURE
RATING
(PSI)
MAXIMUM
REGENERATION
TIME
(MINUTES)
ELECTRICAL
MAXIMUM
BACKWASH
FLOW
(GPM)
BRINE TANK
CAPACITY
(GAL)
DIMENSIONS
(DIA x H)
DEALKALIZER SCHEDULE (DEDUCT ALTERNATE #4)
GRAIN
CAPACITY
PER TANK
(GRAINS)
CAUSTIC TANK
CAPACITY
(GAL)
DIMENSIONS
(DIA x H)
ALKALINITY
REDUCTION
(DEDUCT ALTERNATE #3)
(DEDUCT ALTERNATE #3)
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
MECHANICAL SCHEDULES
MAY 15, 2017 JSN RWD
MP601
FE
PSL
PT
PT
PT
FSV
PRV
PSH
PSL
ZSC
ZSO
FE
FSV
PSH
PSL
PT
ZSC
ZSO
PSL
PSV
PT
QE
QE
QE
QE
QE
QE
QE
QE
TT
Device Label
Device Type
Flow Element, Turbine
Pressure Switch
Pressure Transmitter
Pressure Transmitter
Pressure Transmitter
Safety Valve
Regulating Valve
Pressure Switch
Pressure Switch
Position Switch
Position Switch
Flow Element, Per Gas Supplier
Safety Valve
Pressure Switch
Pressure Switch
Pressure Transmitter
Position Switch
Position Switch
Pressure Switch
Safety Valve, "P" 4"x6" Class 150
Pressure Transmitter
Combustible Gas Sensor
Combustible Gas Sensor
Carbon Monoxide Sensor
Carbon Monoxide Sensor
Carbon Monoxide Sensor
Carbon Monoxide Sensor
Carbon Monoxide Sensor
Carbon Monoxide Sensor
Temperature Transmitter
System
Domestic Water
Soft Water
Non-Potable Water
Soft Water
Soft Water
Liquefied Petroleum Gas
Liquefied Petroleum Gas
Liquefied Petroleum Gas
Liquefied Petroleum Gas
Liquefied Petroleum Gas
Liquefied Petroleum Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Steam
Steam
Steam
Indoor Air Quality
Indoor Air Quality
Indoor Air Quality
Indoor Air Quality
Indoor Air Quality
Indoor Air Quality
Indoor Air Quality
Indoor Air Quality
Outside Air
Function
Flow
Low Pressure
Pressure
Pressure
Pressure
Flow, Emergency Shut-Off
Pressure
High Pressure
Low Pressure
Position Verification
Position Verification
Flow, Totalizing
Flow, Emergency Shut-Off
High Pressure Alarm
Low Pressure Alarm
Pressure
Position Verification
Position Verification
Low Pressure
Pressure
Pressure
Combustible Gas Level
Combustible Gas Level
Carbon Monoxide Level
Carbon Monoxide Level
Carbon Monoxide Level
Carbon Monoxide Level
Carbon Monoxide Level
Carbon Monoxide Level
Temperature
Mounting / Location
Supply to System
Softener Skid Discharge
Supply to Softener Skid
Softener Skid Discharge
Supply to Condensate Surge Tank
Building Supply Main
Building Supply Main
Building Supply Main
Building Supply Main
FSV-4701
FSV-4701
Building Supply Main
Building Supply Main
Building Supply Main
Building Supply Main
Building Supply Main
FSV-4802
FSV-4802
Steam Header
100 - 60 PSIG, Pressure Reducing Station
Steam Header
Upper Level Mezzanine
Breathing Level, Front of Boiler
Exterior Wall
Line
Size
4"
4"
4"
4"
3"
1"
1"
1"
6"
6"
6"
6"
6"
10"
6"
10"
Range / Setpoint
26 - 260 GPM
Field Set
0 - 100 PSIG
0 - 100 PSIG
0 - 100 PSIG
Open / Closed
10 PSIG / 350 SCFH
Field Set
Field Set
Closed
Open
2,400 - 76,000 SCFH
Open / Closed
Field Set
Field Set
0 - 30 PSIG
Closed
Open
Field Set
70 PSIG, 8,210 PPH
0 - 250 PSIG
0 - 100 % LEL / 10% LEL
0 - 100 % PPM / 25-50 PPM
-20 - 120 F
Point Type
AI
DI
AI
AI
AI
DI
DI
DI
DI
DI
DI
DI
DI
AI
DI
DI
DI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
Signal
4 - 20 mA DC
120 V
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
4 - 20 mA DC
120 V
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
9 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
Signal To/From
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
CHP-1
CHP-1
CHP-1
CHP-1
CHP-1
CHP-1
CHP-1
CHP-1
CHP-1
CHP-1
CHP-1
Annunciation
Locations
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
Annunciation Type
Status - Flow
Low Pressure Alarm
Status - Pressure
Status - Pressure
Status - Pressure
High Pressure Alarm
Low Pressure Alarm
Position Verification - Fully Closed
Position Verification - Fully Open
High Pressure Alarm
Low Pressure Alarm
Status - Pressure
Position Verification - Fully Closed
Position Verification - Fully Open
Low Pressure Alarm
Status - Pressure
Status - Level
Status - Level
Status - Level
Status - Level
Status - Level
Status - Level
Status - Level
Status - Level
Status - Temperature
Remarks
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Gas Supply Company Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Notes
Consolidated 1900 Series
Alarm / Refer to Plans
Alarm / Refer to Plans
Alarm / Refer to Plans
Alarm / Refer to Plans
Alarm / Refer to Plans
Alarm / Refer to Plans
Alarm / Refer to Plans
Alarm / Refer to Plans
Provide w/ TE - 9 9 0
MISCELLANEOUS SYSTEMS - DEVICE SCHEDULE
VA
Nomenclature
SVFPRV
0 - 100 % LEL / 10% LEL
0 - 100 % PPM / 25-50 PPM
0 - 100 % PPM / 25-50 PPM
0 - 100 % PPM / 25-50 PPM
0 - 100 % PPM / 25-50 PPM
0 - 100 % PPM / 25-50 PPM
Upper Level Mezzanine
Breathing Level, Front of Boiler
Breathing Level, Front of Boiler
Breathing Level, Front of Boiler
Breathing Level, Control Rm 106
Breathing Level, Shop Area Rm 101
BAS
BMS
CCS
CGP
CHP-1
LCP
PMCP
WSF-PLC
Building Automation System
Burner Management System - (Flame Safeguard Control)
Combustion Control System
Combustible Gas Detection Panel
CHP-1 Field Panel Miscellaneous Process Points
Local Control Panel
Plant Master Control Panel
Water Softener PLC
ABBREVIATIONS:
BBC - Boiler Blowdown Controller
CST-PLC - Condensate Surge Tank PLC
FE
FE
LCV
LCV
ZT
ZT
DPS
DPS
DPT
FE
LC
LSH
LSL
LSLL
PSL
PSL
TT
Device Label
Device Type
Flow Element
Flow Element
Control Valve
Control Valve
Position Transmitter
Position Transmitter
Pressure Switch
Pressure Switch
Pressure Transmitter
Flow Element
Level Controller
Level Switch
Level Switch
Level Switch
Pressure Switch
Pressure Switch
Temperature Transmitter
System
Non-Potable Water
Soft Water
Non-Potable Water
Soft Water
Non-Potable Water
Soft Water
Steam Condensate
Steam Condensate
Condensate Surge Tank
Condensate Surge Tank
Condensate Surge Tank
Condensate Surge Tank
Condensate Surge Tank
Condensate Surge Tank
Condensate Surge Tank
Condensate Surge Tank
Steam Condensate
Function
Flow, Totalizing
Flow, Totalizing
Level
Level
Position Feedback
Position Feedback
Differential Pressure
Differential Pressure
Level
Flow, Totalizing
Level
High Level Alarm
Low Level Alarm
Low-Low Level Alarm, Shutdown
Low Pressure
Low Pressure
Temperature
Mounting / Location
Supply to Condensate Surge Tank CST-1
Supply to Condensate Surge Tank CST-1
Supply to Condensate Surge Tank CST-1
Supply to Condensate Surge Tank CST-1
LCV-1703
LCV-1704
Condensate Transfer Pump CTP-1
Condensate Transfer Pump CTP-2
Condensate Surge Tank CST-1
Pumped Return from Campus
Condensate Surge Tank CST-1
Condensate Surge Tank CST-1
Condensate Surge Tank CST-1
Condensate Surge Tank CST-1
Condensate Transfer Pump CTP-1
Condensate Transfer Pump CTP-2
Condensate Surge Tank CST-1
Line
Size
3"
3"
3"
3"
4"
Range / Setpoint
0 - 130 GPM
0 - 130 GPM
0 - 130 GPM
0 - 130 GPM
0 - 100 %
0 - 100 %
Field Set
Field Set
Field Set
110 GPM
Field Set
Field Set
Field Set
Field Set
Field Set
Field Set
32 - 212 F
Point Type
AI
AI
AI
AI
DI
DI
AI
AI
AI/AO
DI
DI
DI
DI
DI
AI
Signal
4 - 20 mA DC
4 - 20 mA DC
ZT-1703
ZT-1704
4 - 20 mA DC
4 - 20 mA DC
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
120 V
120 V
120 V
120 V
120 V
4 - 20 mA DC
Signal To/From
CST-PLC
CST-PLC
CST-PLC / LC-6707
CST-PLC / LC-6707
CST-PLC
CST-PLC
CST-PLC
CST-PLC
CST-PLC / ZT-170x
CST-PLC
CST-PLC
CST-PLC
CST-PLC
CST-PLC
CST-PLC
Annunciation
Location
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
Annunciation Type
Status - Flow
Status - Flow
Position Indication %
Position Indication %
Pump Status - Low Pressure Alarm
Pump Status - Low Pressure Alarm
Status - Level
Status - Flow
High Level Alarm
Low Level Alarm
Low-Low Level Alarm, Pump Shutdown
Low Pressure
Low Pressure
Status - Temperature
Remarks
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Notes
Provide w/
Provide w/
Fail Open
Fail Open
Provide w/
Provide w/
FT
FT
FT
TE
CONDENSATE SURGE TANK - DEVICE SCHEDULE
VA
Nomenclature
HWACT
LWACT
NOTES:
1 Set below 2/3 of tank height and at least 4" below overflow.
2 Set above 1/3 of tank height.
3 Setpoint at least 4" below top of tank.
Device Label
TCV
TT
Device Type
Control Valve
Temperature Transmitter
System
Soft Water
Blowdown
Function
Temperature
Temperature
Mounting / Location
Supply to Blowdown Separator BDS-1
Drain from Blowdown Separator BDS-1
Line
Size
2"
5"
Range / Setpoint
Open / Closed
32 - 212 F
Point Type
DI
AI
Signal
120 V
4 - 20 mA DC
Signal To/From
CHP-1 / TT-3605
CHP-1
Annunciation
Location
BAS
Annunciation Type
Status - Temperature
Remarks
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Notes
Fail Open
Provide w/ TE - 3 6 0
BLOWDOWN SYSTEMS - DEVICE SCHEDULE
BMS
CCS
CGP
CHP-1
FO-PLC
LCP
PMCP
WSF-PLC
Burner Management System - (Flame Safeguard Control)
Combustion Control System
Combustible Gas Detection Panel
CHP-1 Field Panel Miscellaneous Process Points
Fuel Oil System PLC
Local Control Panel
Plant Master Control Panel
Water Softener PLC
ABBREVIATIONS:
BBC - Boiler Blowdown Controller
CCS-PLC - Condensate Surge Tank PLC
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
MECHANICAL SCHEDULES
MAY 15, 2017 JSN RWD
MP602
Boiler No 1
Device Label
BSB
BSB
BSC
BSC
DPT
FE
LCV
LSH
LSL
LSLL
LSLL
ZT
CC
CE
FCV
FSV
FSV
FSV
PRV
PRV
PSH
PSL
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
FCV
FE
FSV
FSV
FSV
PRV
PSH
PSL
PT
PT
ZSC
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
ZT
FCV
FE
FSV
FSV
PSH
PSL
PT
ZSC
ZSC
ZSC
ZSO
ZSO
ZT
FE
PSHH
PSHH
PSV
PSV
PT
PT
TT
AE
AO
BE
DPT
DPT
EX
FCV
FS
FS
IS
ST
TT
ZS
ZSC
ZSO
ZT
PSL
PSV
HS
VFD
BAS
BMS
CCS
CGP
CHP-1
DA-PLC
LCP
PMCP
WSF-PLC
x
Building Automation System
Burner Management System - (Flame Safeguard Control)
Combustion Control System
Combustible Gas Detection Panel
CHP-1 Field Panel Miscellaneous Process Points
Deaerator and Condensate Surge Tank PLC
Local Control Panel
Plant Master Control Panel
Water Softener PLC
1A x
Boiler No 2
Device Label
BSB
BSB
BSC
BSC
DPT
FE
LCV
LSH
LSL
LSLL
LSLL
ZT
CC
CE
FCV
FSV
FSV
FSV
PRV
PRV
PSH
PSL
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
FCV
FE
FSV
FSV
FSV
PRV
PSH
PSL
PT
PT
ZSC
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
ZT
FCV
FE
FSV
FSV
PSH
PSL
PT
ZSC
ZSC
ZSC
ZSO
ZSO
ZT
FE
PSHH
PSHH
PSV
PSV
PT
PT
TT
AE
AO
BE
DPT
DPT
EX
FCV
FS
FS
IS
ST
TT
ZS
ZSC
ZSO
ZT
PSL
PSV
HS
VFD
x
1A x
Boiler No 3
Device Label
BSB
BSB
BSC
BSC
DPT
FE
LCV
LSH
LSL
LSLL
LSLL
ZT
CC
CE
FCV
FSV
FSV
FSV
PRV
PRV
PSH
PSL
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
FCV
FE
FSV
FSV
FSV
PRV
PSH
PSL
PT
PT
ZSC
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
ZT
FCV
FE
FSV
FSV
PSH
PSL
PT
ZSC
ZSC
ZSC
ZSO
ZSO
ZT
FE
PSHH
PSHH
PSV
PSV
PT
PT
TT
AE
AO
BE
DPT
DPT
EX
FCV
FS
FS
IS
ST
TT
ZS
ZSC
ZSO
ZT
PSL
PSV
HS
VFD
x
1A x
Device Type
Shunt Switch
Shunt Switch
Shunt Switch
Shunt Switch
Pressure Transmitter
Flow Element, V-Cone
Control Valve
Level Switch
Level Switch
Level Switch
Level Switch
Position Transmitter
Conductivity Controller
Conductivity Element
Control Valve, Ball Type
Safety Valve
Safety Valve
Safety Valve
Regulating Valve
Regulating Valve
Pressure Switch
Pressure Switch
Position Switch
Position Switch
Position Switch
Position Switch
Position Switch
Position Switch
Control Valve
Flow Element, Thermal Mass
Safety Valve
Safety Valve
Safety Valve
Regulating Valve
Pressure Switch
Pressure Switch
Pressure Transmitter
Pressure Transmitter
Position Switch
Position Switch
Position Switch
Position Switch
Position Switch
Position Switch
Position Switch
Position Transmitter
Control Valve
Flow Element, Positive Displacement
Safety Valve
Safety Valve
Pressure Switch
Pressure Switch
Pressure Transmitter
Position Switch
Position Switch
Position Switch
Position Switch
Position Switch
Position Transmitter
Flow Element, V-Cone
Pressure Switch
Pressure Switch
Safety Valve
Safety Valve
Pressure Transmitter
Pressure Transmitter
Temperature Transmitter
Oxygen Monitor
Opacity Meter
Flame Scanner
Pressure Transmitter
Pressure Transmitter
Voltage Transformer
Control Valve
Flow Switch
Flow Switch
Current Switch
Speed Transmitter
Temperature Transmitter
Position Switch
Position Switch
Position Switch
Position Transmitter
Pressure Switch
Safety Valve
Hand Switch
Speed Multifunction
System
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Boiler Feedwater
Blowdown
Blowdown
Blowdown
Gas Igniter
Gas Igniter
Gas Igniter
Gas Igniter
Liquefied Petroleum Gas
Gas Igniter
Gas Igniter - NG
Gas Igniter
Gas Igniter
Gas Igniter
Gas Igniter
Gas Igniter
Gas Igniter
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Natural Gas
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Fuel Oil
Steam
Steam
Steam
Steam
Steam
Steam
Steam
Steam
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Combustion
Atomizing Air
Atomizing Air
BMS / CCS
Combustion
Function
Manual Re-Set
Manual Re-Set (Auxiliary)
Safety By-Pass
Safety By-Pass (Auxiliary)
Level
Flow
Level
High Level
Low Level
Low-Low Level
Low-Low Level (Auxiliary)
Position Feedback
Conductivity
Conductivity
Flow
Flow
Flow
Flow
Pressure
Pressure
High Pressure
Low Pressure
Position Verification
Position Verification
Position Verification
Position Verification
Position Verification
Position Verification
Flow
Flow, Totalizing
Flow
Flow
Flow
Pressure
High Pressure
Low Pressure
Pressure
Pressure
Position Verification
Position Verification
Position Verification
Position Verification
Position Verification
Position Verification
Position Verification
Position Feedback
Flow
Flow
Flow
Flow
High Pressure
Low Pressure
Pressure
Position Verification
Position Verification
Position Verification
Position Verification
Position Verification
Position Feedback
Flow
High-High Pressure
High-High Pressure (Auxiliary)
Pressure
Pressure
Pressure
Pressure
Temperature
Oxygen Content
Opacity
Flame Monitoring
Differential Pressure
Differential Pressure
Burner Ignition
Flow
Flow, Low Air
Flow, Purge Air
Current Sensor
Speed
Temperature
Position Verification
Position Verification
Position Verification
Position Feedback
Low Pressure
Pressure
Emergency Cut-Off
VFD Monitoring
Mounting / Location
Float Type Water Column
Conductivity Probe Type Water Column
Float Type Water Column
Conductivity Probe Type Water Column
Float Type Water Column
Supply to Boiler
Supply to Boiler
Conductivity Probe Type Water Column
Conductivity Probe Type Water Column
Float Type Water Column
Conductivity Probe Type Water Column
LCV-3x07
Supply from Boiler to CBHX-1
Supply from Boiler to CBHX-1
Supply from Boiler to CBHX-1
Supply to Burner
Supply to Burner
Vent
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
FSV-4x01
FSV-4x02
FSV-4x03
FSV-4x01
FSV-4x02
FSV-4x03
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
Vent
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
FCV-4x08
FSV-4x10
FSV-4x11
FSV-4x12
FSV-4x10
FSV-4x11
FSV-4x12
FCV-4x08
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
Supply to Burner
FCV-5x01
FSV-5x03
FSV-5x04
FSV-5x03
FSV-5x04
FCV-5x01
Supply from Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Supply from Boiler, FE-6x01
Supply from Boiler, FE-6x01
Breeching
Breeching
Burner
Combustion Air Supply
Breeching
Burner
Fresh Air Fan Damper
Combustion Air Supply
Across Boiler
Boiler FD Fan
Boiler FD Fan
Breeching
Burner Oil Gun
Flue Gas Recirculation
FCV-7x08
FCV-7x08
Boiler Mounted Compressor
Boiler Mounted Compressor
Boiler
Boiler FD Fan
Line
Size
2"
2"
1"
1"
1"
3/4"
3/4"
3/4"
1/2"
3/4"
3/4"
3"
4"
3"
3"
3"
3"
3"
3"
3"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
6"
Range / Setpoint
Open / Closed
Open / Closed
Open / Closed
Open / Closed
Field Set
2,300 - 23,000 PPH
0 - 23,000 PPH
Field Set
Field Set
1" Below LWA
1" Below LWCO
0 - 100 %
Field Set
Open / Closed
Open / Closed
Open / Closed
Open / Closed
2 PSIG / 300 SCFH
8 PSIG / 120 SCFH
Field Set
80% of Regulated Pressure
Closed
Closed
Closed
Open
Open
Open
0 - 25,000 SCFH
2,500 - 25,000 SCFH
Open / Closed
Open / Closed
Open / Closed
5 PSIG / 25,000 SCFH
6 PSIG
4 PSIG
0 - 25 PSIG
0 - 25 PSIG
Closed
Closed
Closed
Closed
Open
Open
Open
0 - 100 %
0 - 180 GPH
18 - 180 GPH
Open / Closed
Open / Closed
110% of Regulated Pressure
90% of Regulated Pressure
0 - 250 PSIG
Closed
Closed
Closed
Open
Open
0 - 100 %
2,100 - 21,000 PPH
120 PSIG
125 PSIG
135 PSIG
140 PSIG
0 - 250 PSIG
0 - 250 PSIG
32 - 392 F
0 - 10 %
0 - 100 %
Per Manufacturer
Per Manufacturer
Per Manufacturer
Per Manufacturer
Field Set
Field Set
Field Set
Field Set
32 - 752 F
Open / Closed
Closed
Open
0 - 100 %
80% of Pressure at Low Fire
Per Manufacturer
Open / Closed
Field Set
Point Type
DI
DI
DI
DI
AI
AI
DI
DI
DI
DI
AI
AI/AO
AI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
AI
DI
DI
DI
DI
DI
AI
AI
DI
DI
DI
DI
DI
DI
DI
AI
AI
DI
DI
DI
DI
AI
DI
DI
DI
DI
DI
AI
AI
DI
DI
AI
AI
AI
AI
AI
DI
AI
AI
DI
DI
DI
DI
AI
AI
DI
DI
DI
AI
DI
DI
AI
Signal
120 V
120 V
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
ZT-3x07
120 V
120 V
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
120 V
ZT-4x08
4 - 20 mA DC
120 V
120 V
120 V
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
120 V
120 V
120 V
120 V
120 V
120 V
120 V
4 - 20 mA DC
ZT-5x01
4 - 20 mA DC
120 V
120 V
120 V
120 V
4 - 20 mA DC
120 V
120 V
120 V
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
4 - 20 mA DC
0 - 5 V DC
4 - 20 mA DC
4 - 20 mA DC
120 V
ZT-7x08
120 V
120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
120 V
120 V
120 V
4 - 20 mA DC
120 V
120 V
0 - 120 V
Signal To/From
BMS / CCS
BMS / CCS
BMS / CCS
BMS / CCS
CCS
BMS
BMS / CCS
BMS / CCS
BMS / CCS
BMS / CCS
CCS
BBC
BBC
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BMS
BMS
BMS
PMCP
PMCP
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS
BMS
BMS
BMS
PMCP
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS / CCS
BMS
CCS
CCS
CCS
CCS
PMCP
BMS
CCS
CCS
BMS / CCS
BMS
BMS
CCS
CCS
BMS / CCS
BMS / CCS
BMS / CCS
BMS
BMS / CCS
BAS
Annunciation
Location
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BAS
BAS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS
BMS
BAS
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS
BMS
CCS
CCS
CCS
CCS
BAS
BMS
CCS
CCS
CCS
BMS
BMS
CCS
CCS
BMS
BMS
BMS
BMS
BMS
BAS
Annunciation Type
Status
Status
Blowdown Override
Blowdown Override
Status - Drum Water Level
Status - Flow
High Level Bell
Low Level Bell
Low-Low Level Cut-Off Alarm
Low-Low Level Cut-Off Alarm (Auxiliary)
Position Indication %
High Pressure Alarm
Low Pressure Alarm
Position Verification - Fully Closed
Position Verification - Fully Closed
Position Verification - Fully Closed
Position Verification - Fully Open
Position Verification - Fully Open
Position Verification - Fully Open
Status - Flow
High Pressure Alarm
Low Pressure Alarm
Status - Pressure
Status - Pressure
Position Verification - Fully Closed
Position Verification - Fully Closed
Position Verification - Fully Closed
Position Verification - Fully Closed
Position Verification - Fully Open
Position Verification - Fully Open
Position Verification - Fully Open
Position Indication %
Status - Flow
High Pressure Alarm
Low Pressure Alarm
Status - Pressure
Position Verification - Fully Closed
Position Verification - Fully Closed
Position Verification - Fully Closed
Position Verification - Fully Open
Position Verification - Fully Open
Position Indication %
Status - Flow
High-High Pressure Cut-Off
High-High Pressure Cut-Off (Auxiliary)
Status - Pressure
Status - Pressure
Status - Temperature
Status - % Oxygen
Status - % Opacity
Status - Burner Flame Failure
Status - FD Fan Failure
Status - Rate
Status - Low Air Flow
Status - Purge Air Flow
Status - Current
Status - Speed
Status - Temperature
Position Indication - Present
Position Verification - Fully Closed
Position Verification - Fully Open
Position Indication %
Low Pressure Alarm
Emergency Cut-Off
Status
Remarks
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Refer to Sequence of Operation for Specific Points
Notes
Manual Reset
Manual Reset
Provide w/
Fail Last Position
Fail Open
Fail Closed
Fail Closed
Fail Open
Fail Closed
Fail Closed
Fail Closed
Provide w/
Fail Closed
Fail Closed
Fail Open
Fail Closed
Fail Closed
Provide w/
Fail Closed
Fail Closed
Provide w/
Automatic Reset
Manual Reset
Provide w/
Provide w/
Provide w/
Fail Last Position
FT
FT
FT
FT
AT
SE
TE
x x x x x x x
BOILER - DEVICE SCHEDULE
VA
Nomenclature
HWAB
LWA
LWCO
ALWCO
APFGSOV
APFGSOV
APFGSVV
LPFGPCS
AFGSOV
AFGSOV
AFGSVV
HFGPCS
LFGPCS
POC-AFGSOV
POC-AFGSOV
AFOSOV
AFOSOV
HFOPCS
LFOPCS
POC-AFOSOV
POC-AFOSOV
RBSPLS
NRBSPLS
SVB1
SVB2
LFGOLI
FSMFO
FSNSIS
CAPS
PAPS
FDMIS
FDDWOPS
LAMPS
BMS BMS
Setpoint No Higher Than 120% of Regulated Pressure
Setpoint No Higher Than 80% of Regulated Pressure
Wired in Series with ZSC 4x11
Wired in Series with ZSC 4x10
LPFGPCS PSL - 4 1 0 8 PSL - 4 2 0 8 PSL - 4 3 0 8 Pressure Switch Gas Igniter - LPG Low Pressure Supply to Burner 1/2" 80% of Regulated Pressure DI 120 V BMS BMS Low Pressure Alarm Manufacturer Furnished / Contractor Installed
LFPS ZSC - 4 1 0 9 ZSC - 4 2 0 9 ZSC - 4 3 0 9 Position Switch Natural Gas Position Verification FCV-4x08 --- Closed DI 120 V BMS BMS Low Fire Position Manufacturer Furnished / Contractor Installed
LFPS ZSC - 5 1 0 2 ZSC - 5 2 0 2 ZSC - 5 3 0 3 Position Switch Fuel Oil Position Verification FCV-5x01 --- Closed DI 120 V BMS BMS Low Fire Position Manufacturer Furnished / Contractor Installed
FDMIS
FDMIS
IS - 7 1 1 1B IS - 7 2 1 1B IS - 7 3 1 1B
IS - 7 1 1 1C IS - 7 2 1 1C IS - 7 3 1 1C
Current Switch Combustion
Current Switch Combustion
Current Sensor
Current Sensor
Boiler FD Fan
Boiler FD Fan
Field Set DI 120 V BMS BMS
Field Set DI 120 V BMS BMS
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
LFPS
LFPS
ZSC - 7 1 0 9 ZSC - 7 2 0 9 ZSC - 7 3 0 9
ZSC - 7 1 1 0 ZSC - 7 2 1 0 ZSC - 7 3 1 0
Position Switch Combustion Position Verification
Position Switch Combustion Position Verification
FCV 7x08
Flue Gas Recirculation Damper
Closed
Closed
DI 120 V BMS
DI 120 V BMS
BMS
BMS
Low Fire Position
Low Fire Position
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
FGRD1 ZSC - 7 1 1 1 ZSC - 7 2 1 1 ZSC - 7 3 1 1 Position Switch Combustion Position Verification Flue Gas Recirculation Damper --- Damper 80% Open DI 120 V BMSBMS Position Verification - 80% Open Manufacturer Furnished / Contractor Installed 2
LAMDPS
DPS - 8 1 0 1 DPS - 8 2 0 1 DPS - 8 3 0 1 Differential Pressure Switch Atomizing Air Fuel Oil Differential Pressure Atomizing Air --- 80% of Differential DI 120 V BMS BMS Low Differential Pressure Alarm Contractor Furnished / Contractor Installed
IS - 8 1 0 3A IS - 8 2 0 3A IS - 8 3 0 3A Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set DI 120 V BMS BMS
DI 120 V BMS BMS
DI 120 V BMS BMS
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set
Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set
IS - 8 1 0 3B IS - 8 2 0 3B IS - 8 3 0 3B
IS - 8 1 0 3C IS - 8 2 0 3C IS - 8 3 0 3C
NOTES:
1 Wiring for POC - AFGSOV shall be easily accessible. Wiring is accessed during switch testing.
2 FGR damper switch as required by manufacturer. If manufacturer states in writing to the facility that the position of the damper does not matter to achieve proper purge, then no switch is required.
3 Ensure oil valves are mounted in such a way that there is easy access to the proof of closure switch wiring.
ABBREVIATIONS:
BBC - Boiler Blowdown Controller
FCV - 7 1 0 9 FCV - 7 2 0 9 FCV - 7 3 0 9 Draft Control Damper Draft Control Draft Control Breeching --- Per Manufacturer AO 120 V BMS BMS --- ---
Status
BMS BMS
BMS BMS
4 - 20 mA DC
4 - 20 mA DCDI
DI
Open / Closed
Open / Closed---
Draft Control Damper
BBC
Interlock
Draft Control
Draft Control
Draft Control
Position Switch
Draft Controller
ZSC - 7 1 1 2
DC - 7 1 0 0
ZSC - 7 2 1 2
DC - 7 2 0 0
ZSC - 7 3 1 2
DC - 7 3 0 0
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
MECHANICAL SCHEDULES
MAY 15, 2017 JSN RWD
MP603
PI
PI PIPI PI PI PI PI PI PI PI PI
PI PI
DRAWING NOTES:
T-01
3/4" ED
M A
X
STEAM SILENCER S-1
(EXHAUST SYSTEM FOR
BOILER BURNER TESTING
AND ADJUSTING)
4" HPS(100)
3/4" ED
1"
T-02
3/4" ED3/4" ED
PIPE TO FLOOR DRAIN
3/4" ED 3/4" ED
3/4" ED3/4" ED
VTR
16" V
3" HPS(100)
TO BUILDING
6" HPS(100)
TO HEAT
CONVERTERS
8" HPS(100)
12" HPS(100)
STEAM HEADER
TO EXISTING
DEAERATOR DA-1
M
IN
T
Y P
VTR
3/4" HPR 3/4" HPR
TO EXISTING
DEAERATOR DA-1
EXISTING 12"
HPS(100)
STEAM HEADER
8"
6"
TO ABANDONED
PROCESS ROOM
FROM OLD
BOILER B-3
TO BUILDING 1
TO MENTAL
HEALTH BUILDING
6" HPS(100) 6" HPS(100)
1-1/2"
6" HPS(100)
4" HPS(100)
6" HPS(100) 3" HPS(100)
TO BUILDING 100
MPS SYSTEM
WHISTLE
VALVE
3/4" HPS(100)
TO EXISTING
DEAERATOR DA-1
TO EXISTING
DEAERATOR DA-1
TO EXISTING
DEAERATOR DA-1
3/4" HPR
6" HPS(100)
TO EXISTING MPS PRESSURE
REDUCING STATION
TO EXISTING
DEAERATOR DA-1
DEMO
EXISTING NALCO
PORTAFEED CHEMICAL
TREATMENT SYSTEM
EXISTING NALCO
PORTAFEED CHEMICAL
TREATMENT SYSTEM
EXISTING
DEAERATOR
8" HPS(100)
6" HPS(100)
6" HPS(100)
3" HPS(100)
6" HPS(100)
4" HPS(100)
6" HPS(100)
PSL
PT
PI
L
FE
FT
FI
PRV
1B
PRV
1A
PSV
66126" HPS(100)
FACTORY INSTALLED
BY-PASS (TYP)
BOILER PLANT
FINISHED FLOOR
6" HPS(100)
FROM NEW
BOILER B-2
MP708, B9
6" 5S
WHISTLE
8" HPS(100)
BF
6" HPS(100)
1-1/2"
6" HPS(100)
1-1/2"
4" HPS(100)
1-1/2"
BF
4" HPS(100)
1-1/2"
1 REPLACE VALVES AND DEMO PIPE. PROVIDE BLIND FLANGE.
2 REPLACE VALVES.
2 2 1 2 2 2 2 2 2 2
D E
M O
A
LL
P
IP
E F
R O
M H
E A
D E
R T
O R
O O
M
D E
M O
P
IP
E
N E
W P
IP
E
N E
W P
IP
E
N E
W P
IP
E
6" HPS(100)
6" HPS(100)
MP708, B9
MP708, B9
FROM NEW
BOILER B-1
FROM NEW
BOILER B-3
DEMO PIPE DEMO PIPE
6" HPS(100)
3/4" HPR
5 PIPE DIA MIN10 PIPE DIA MIN
INSTALL PER MANUFACTURERS RECOMMENDATION
AS REQUIRED BY FIELD CONDITIONS (TYP)
3" HPS(100)
3/4" ED
PIPE TO
FLOOR DRAIN
T-07
3/4" HPR
4" HPS(60)
6" HPS(60)
2" HPS(100)
3" HPS(100)
6" HPS(60)
3" HPS(100)
6" HPS(60)
2"
11/4"
21/2"
20 PIPE DIA MIN10 PIPE DIA MIN
(TYP FOR ALL PRESSURE REDUCING STATIONS)
6" HPS(60)
3/4" HPR
6" V
VTR72
M
IN
(T Y
P
T-08
T-09
3/4" HPR
PIPE TO
FLOOR DRAIN
NC
3/4" ED
PIPE TO
FLOOR DRAIN
3 EXISTING NALCO PORTAFEED SYSTEM, PROVIDE NEW STAINLESS STEEL
RETRACTABLE INJECTION QUILL, PROVIDE NEW STAINLESS STEEL PIPING,
AND PROVIDE NEW PUMP.
N E
W P
IP
E
8" HPS(100)
6" HPS(100)
6" HPS(100)
6" HPS(100)
FROM MOBILE
BOILER
8" HPS(100)
TO EXISTING
DEAERATOR
3/4" HPR
T-21
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORDENGINEER-OF-RECORD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot on e ei gh th in ch on e fo ot 1
88 88 44 44
00 00
BBBB
AAAA
CCCC
DDDD
EEEE
FFFF
th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot th re e in ch es on e fo ot
"6
11 11 00 00
"6 on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot on e in ch on e fo ot
22 22 00 00
"6
"6
00 00 22 22 th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot th re e qu ar te rs in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot on e ha lf in ch on e fo ot
44 44 00 00 th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot th re e ei gh th s in ch on e fo ot
44 44 00 00
00 00 44 44
88 88 on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot on e qu ar te r in ch on e fo ot
VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231VA FORM 08-6231
1111 2222 3333 4444 5555 6666 88887777 9999
FFFF
EEEE
DDDD
CCCC
BBBB
AAAA
99997777 8888666655554444333322221111
FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvi l le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #2 9 57 8
AKE A P r o j e c t No . 1 2 8 - 1 6
JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678JACK S NEALE 42678
STEAM SYSTEM SCHEMATIC
MAY 15, 2017 JSN RWD
MP701
M
M
M
TI
PI PI
PIPI
TI
TI
PI
TI
PI
LCV
ZT
ZI
LCV
ZT
ZI
TE
TT
TI
LAH
LAL
EMA
DPS
PI
PI
PSL
DPS
PI
PI
PSL
FO
FO
I
FE
FE
FE
LC
LSH
LI
LI
LI
LSL
LSLL
DPT
NORMAL MAKE-UP
FROM WATER
SOFTENERS WSF-1
MP705, E1
EMERGENCY
MAKE-UP FROM
NONPOTABLE
WATER SYSTEM
MP705, D9
3" SW
3" NP
VTR
4" V
3" SW
CONDENSATE
SURGE TANK
CST-1
NORMAL WATER LEVEL
TOP OF TANK
OVERFLOW LINE
HIGH LEVEL ALARM
EMERGENCY MAKE-UP
11/2"
11/2"
11/2"
LOW LEVEL ALARM
PIPE TO
FLOOR DRAIN
11/2"
11/2"
RECIRC
ORIFICE
(TYP)
TO SANITARY
4" ED(OF)
4" CTPS
BOTTOM OF TANK
FIRE HOSE
CONNECTION
FROM EXISTING
PC LINE
3" PC
11/2" ED
4" TANK
BY-PASS
EXTEND OVERFLOW
PIPE DOWN TO 12"
ABOVE TANK BOTTOM
PIPE TO
FLOOR DRAIN
CTP-2
TO EXISTING
DEAERATOR DA-1
3" CTPD
MP705, D9
EMERGENCY MAKE-UP
FROM NONPOTABLE
WATER SYSTEM
MP705, D1
3" NP
EMERGENCY MAKE-UP
FROM WATER
SOFTENERS WSF-1
3" SW
EXHAUST HEAD
4" CTPS
PIPE TO
FLOOR DRAIN
CONDENSATE
TRANSFER
PUMP CTP-1
3" CTPD 3" CTPD
3" CTPD
3"
4"
12"x16"
MANWAY
3"
4"
FLASH
STEAM
FROM CBHX
3"
MP704, A9
M
IN
T
Y P
3"3"
2" HPR
FROM EXISTING
STEAM LINE DRIP
TRAPS
2" HPR
L
L
VALVE LOCKABLE IN
OPEN POSITION ONLY
VALVE LOCKABLE IN
OPEN POSITION ONLY
NC
3" CTPD
TO EXISTING
BOILER FEED
PUMP SUCTION
3" CTPD
NC
2-1/2" PC
3" PC
2" PC
2-1/2" PC
FROM EXISTING
PC LINE
FROM EXISTING
PC LINE
FROM EXISTING
PC LINE
FROM EXISTING
PC LINE
4" PC 4" PC
4" PC
(DEAERATOR TANK BYPASS)
NC
NC
NC NC
NC NC
FLOW METER
FLOW METER
FLOW METER
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORDENGINEER-OF-RECORDE…