36C24818R0121-00003002.docx

DOCX document 13 KB Posted

Attached to
Replace Boilers Bldg. 100 (Construction) TIERED EVALUATIONS C. W. Bill Young VA Medical Center
Solicitation number
36C24818R0121
Issued by

About this file

36C24818R0121 00003 Price Schedule order of priority is as follows.docx

View the file

Other files

File Type Posted
36C24818R0121-0006002.pdf PDF
36C24818R0121-0006000.docx DOCX document
36C24818R0121-0006001.docx DOCX document
36C24818R0121-0005002.docx DOCX document
36C24818R0121-0005000.docx DOCX document
36C24818R0121-0005001.pdf PDF
36C24818R0121-0004000.docx DOCX document
36C24818R0121-0004001.docx DOCX document
36C24818R0121-00003000.docx DOCX document
36C24818R0121-00003003.pdf PDF
36C24818R0121-00003001.pdf PDF
36C24818R0121-00002001.pdf PDF
36C24818R0121-00002003.pdf PDF
36C24818R0121-00002000.docx DOCX document
36C24818R0121-00002002.pdf PDF
36C24818R0121-00001001.pdf PDF
36C24818R0121-00001004.xlsx XLSX spreadsheet
36C24818R0121-00001002.docx DOCX document
36C24818R0121-00001000.docx DOCX document
36C24818R0121-00001003.pdf PDF
36C24818R0121-007.pdf PDF
36C24818R0121-003.docx DOCX document
36C24818R0121-015.pdf PDF
36C24818R0121-005.pdf PDF
36C24818R0121-014.pdf PDF
36C24818R0121-009.pdf PDF
36C24818R0121-008.pdf PDF
36C24818R0121-004.pdf PDF
36C24818R0121-001.docx DOCX document
36C24818R0121-012.pdf PDF
36C24818R0121-016.doc DOC document
36C24818R0121-006.pdf PDF
36C24818R0121-011.pdf PDF
36C24818R0121-002.pdf PDF
36C24818R0121-013.pdf PDF
36C24818R0121-010.pdf PDF
36C24818R0121-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule order of priority is as follows: A single award will be made on Item No. 0001, but in the event the offer exceeds the funds available, a single award will be made on Item No. 0002 or Item No. 0003, 0004, 0005 in that order, based on available funding. Offerors shall propose a price on each item listed.

0001 516-15-107 Replace Boilers Building 100 Energy Center, C.W Bill Young Medical Center, located at 10000 Bay Pines Blvd., Bay Pines, Florida. Completion time: 780 Days.

0002 DEDUCT ALTERNATE NO. 1: Includes all work in BASE BID, except DEDUCT New Boiler Stacks and reuse existing boiler stack. Completion time: 720 Days.

0003 DEDUCT ALTERNATE NO. 2: Includes all work in BASE BID and DEDUCT ALTERNATE NO. 1, and DEDUCT Boiler Room Ventilation Systems including all ductwork, air devices, fans, electrical, supports, and framing required. Completion time: 720 Days.

0004 DEDUCT ALTERNATE NO. 3: Includes all work in BASE BID and DEDUCT ALTERNATE NO. 1, and DEDUCT ALTERNATE NO. 2, except DEDUCT Water Softener and Chemical Feed System including all piping, electrical, controls, and communications systems required. Completion time: 660 Days.

0005 DEDUCT ALTERNATE NO.4: Includes all work in BASE BID and DEDUCT ALTERNATE NO. 1, and DEDUCT ALTERNATE NO. 2, and DEDUCT ALTERNATE NO. 3, except DEDUCT new Boiler No. B-1 reuse exiting Boiler B-1 and remove temporary mobile boiler for the phase 3 sequence. Completion time: 600 Days.

File details come from the government source that posted it.