36C24818R0121-00001003.pdf
PDF 289 KB Posted
- Attached to
- Replace Boilers Bldg. 100 (Construction) TIERED EVALUATIONS C. W. Bill Young VA Medical Center
- Solicitation number
- 36C24818R0121
About this file
36C24818R0121 00001 Addendum 1 mechanical plans.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE
PSL
PT
PT
PT
FSV
PRV
PSH
PSL
ZSC
ZSO
FE
FSV
PSH
PSL
PT
ZSC
ZSO
PSL
PSV
PT
TT
Device Label
Device Type
Flow Element, Turbine Pressure Switch
Pressure Transmitter Pressure Transmitter Pressure Transmitter
Safety Valve Regulating Valve Pressure Switch Pressure Switch Position Switch Position Switch
Flow Element, Per Gas Supplier Safety Valve
Pressure Switch Pressure Switch
Pressure Transmitter Position Switch Position Switch
Pressure Switch Safety Valve, "P" 4"x6" Class 150
Pressure Transmitter
Temperature Transmitter
System
Domestic Water Soft Water
Non-Potable Water Soft Water Soft Water
Liquefied Petroleum Gas Liquefied Petroleum Gas Liquefied Petroleum Gas Liquefied Petroleum Gas Liquefied Petroleum Gas Liquefied Petroleum Gas
Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas
Steam Steam Steam
Outside Air
Function
Flow Low Pressure
Pressure Pressure Pressure
Flow, Emergency Shut-Off Pressure
High Pressure Low Pressure
Position Verification Position Verification
Flow, Totalizing Flow, Emergency Shut-Off
High Pressure Alarm Low Pressure Alarm
Pressure Position Verification Position Verification
Low Pressure Pressure Pressure
Temperature
Mounting / Location
Supply to System Softener Skid Discharge Supply to Softener Skid Softener Skid Discharge
Supply to Condensate Surge Tank
Building Supply Main Building Supply Main Building Supply Main Building Supply Main
FSV-4701
FSV-4701
Building Supply Main Building Supply Main Building Supply Main Building Supply Main Building Supply Main
FSV-4802
FSV-4802
Steam Header 100 - 60 PSIG, Pressure Reducing Station
Steam Header
Exterior Wall
Line
Size
4" 4" 4" 4" 3"
1" 1" 1"
6" 6" 6" 6" 6"
10" 6" 10"
Range / Setpoint
26 - 260 GPM
Field Set
0 - 100 PSIG
0 - 100 PSIG
0 - 100 PSIG
Open / Closed
10 PSIG / 350 SCFH
Field Set Field Set Closed Open
2,400 - 76,000 SCFH
Open / Closed
Field Set Field Set
0 - 30 PSIG
Closed Open
Field Set
70 PSIG, 8,210 PPH
0 - 250 PSIG
-20 - 120 F
Point Type
AI
DI
AI
AI
AI
DI
DI
DI
DI
DI
DI
DI
DI
AI
DI
DI
DI
AI
AI
Signal
4 - 20 mA DC 120 V
4 - 20 mA DC 4 - 20 mA DC 4 - 20 mA DC
120 V
120 V 120 V 120 V 120 V
120 V 120 V 120 V
4 - 20 mA DC 120 V 120 V
120 V
4 - 20 mA DC
4 - 20 mA DC
Signal To/From
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
PMCP
CHP-1
CHP-1
CHP-1
Annunciation
Locations
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
Annunciation Type
Status - Flow Low Pressure Alarm
Status - Pressure Status - Pressure Status - Pressure
High Pressure Alarm Low Pressure Alarm
Position Verification - Fully Closed Position Verification - Fully Open
High Pressure Alarm Low Pressure Alarm
Status - Pressure Position Verification - Fully Closed Position Verification - Fully Open
Low Pressure Alarm
Status - Pressure
Status - Temperature
Remarks
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Gas Supply Company Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Notes
Consolidated 1900 Series
Provide w/ TE - 9 9 0
MISCELLANEOUS SYSTEMS - DEVICE SCHEDULE
VA
Nomenclature
SVFPRV
BAS
BMS
CCS
CGP
CHP-1
LCP
PMCP
WSF-PLC
Building Automation System
Burner Management System - (Flame Safeguard Control) Combustion Control System
Combustible Gas Detection Panel CHP-1 Field Panel Miscellaneous Process Points
Local Control Panel Plant Master Control Panel Water Softener PLC
ABBREVIATIONS:
BBC - Boiler Blowdown Controller CST-PLC - Condensate Surge Tank PLC
FE
FE
LCV
LCV
ZT
ZT
DPS
DPS
DPT
FE
LC
LSH
LSL
LSLL
PSL
PSL
TT
Device Label
Device Type
Flow Element Flow Element Control Valve Control Valve
Position Transmitter Position Transmitter
Pressure Switch Pressure Switch
Pressure Transmitter Flow Element
Level Controller Level Switch Level Switch Level Switch
Pressure Switch Pressure Switch
Temperature Transmitter
System
Non-Potable Water Soft Water
Non-Potable Water Soft Water
Non-Potable Water Soft Water
Steam Condensate Steam Condensate
Condensate Surge Tank Condensate Surge Tank Condensate Surge Tank Condensate Surge Tank Condensate Surge Tank Condensate Surge Tank Condensate Surge Tank Condensate Surge Tank
Steam Condensate
Function
Flow, Totalizing Flow, Totalizing
Level Level
Position Feedback Position Feedback
Differential Pressure Differential Pressure
Level Flow, Totalizing
Level High Level Alarm Low Level Alarm
Low-Low Level Alarm, Shutdown Low Pressure Low Pressure Temperature
Mounting / Location
Supply to Condensate Surge Tank CST-1 Supply to Condensate Surge Tank CST-1 Supply to Condensate Surge Tank CST-1 Supply to Condensate Surge Tank CST-1
LCV-1703
LCV-1704
Condensate Transfer Pump CTP-1 Condensate Transfer Pump CTP-2
Condensate Surge Tank CST-1 Pumped Return from Campus Condensate Surge Tank CST-1 Condensate Surge Tank CST-1 Condensate Surge Tank CST-1 Condensate Surge Tank CST-1
Condensate Transfer Pump CTP-1 Condensate Transfer Pump CTP-2
Condensate Surge Tank CST-1
Line
Size
3" 3" 3" 3"
4"
Range / Setpoint
0 - 130 GPM
0 - 130 GPM
0 - 130 GPM
0 - 130 GPM
0 - 100 % 0 - 100 %
Field Set Field Set Field Set
110 GPM
Field Set Field Set Field Set Field Set Field Set Field Set 32 - 212 F
Point Type
AI
AI
AI
AI
DI
DI
AI
AI
AI/AO
DI
DI
DI
DI
DI
AI
Signal
4 - 20 mA DC 4 - 20 mA DC
ZT-1703
ZT-1704
4 - 20 mA DC 4 - 20 mA DC
120 V 120 V
4 - 20 mA DC 4 - 20 mA DC 4 - 20 mA DC
120 V 120 V 120 V 120 V 120 V
4 - 20 mA DC
Signal To/From
CST-PLC
CST-PLC
CST-PLC / LC-6707
CST-PLC / LC-6707
CST-PLC
CST-PLC
CST-PLC
CST-PLC
CST-PLC / ZT-170x
CST-PLC
CST-PLC
CST-PLC
CST-PLC
CST-PLC
CST-PLC
Annunciation
Location
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
BAS
Annunciation Type
Status - Flow Status - Flow
Position Indication % Position Indication %
Pump Status - Low Pressure Alarm Pump Status - Low Pressure Alarm
Status - Level Status - Flow
High Level Alarm Low Level Alarm
Low-Low Level Alarm, Pump Shutdown Low Pressure Low Pressure
Status - Temperature
Remarks
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Notes
Provide w/ Provide w/
Fail Open Fail Open
Provide w/
Provide w/
FT
FT
FT
TE
CONDENSATE SURGE TANK - DEVICE SCHEDULE
VA
Nomenclature
HWACT
LWACT
NOTES:
1 Set below 2/3 of tank height and at least 4" below overflow.
2 Set above 1/3 of tank height.
3 Setpoint at least 4" below top of tank.
Device Label
TCV
TT
Device Type
Control Valve Temperature Transmitter
System
Soft Water Blowdown
Function
Temperature Temperature
Mounting / Location
Supply to Blowdown Separator BDS-1 Drain from Blowdown Separator BDS-1
Line
Size
2" 5"
Range / Setpoint
Open / Closed 32 - 212 F
Point Type
DI
AI
Signal
120 V 4 - 20 mA DC
Signal To/From
CHP-1 / TT-3605
CHP-1
Annunciation
Location
BAS
Annunciation Type
Status - Temperature
Remarks
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Notes
Fail Open Provide w/ TE - 3 6 0
BLOWDOWN SYSTEMS - DEVICE SCHEDULE
BMS
CCS
CGP
CHP-1
FO-PLC
LCP
PMCP
WSF-PLC
Burner Management System - (Flame Safeguard Control) Combustion Control System
Combustible Gas Detection Panel CHP-1 Field Panel Miscellaneous Process Points Fuel Oil System PLC
Local Control Panel Plant Master Control Panel Water Softener PLC
ABBREVIATIONS:
BBC - Boiler Blowdown Controller
CCS-PLC - Condensate Surge Tank PLC
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvil le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #29578
AKEA Pro j ec t No . 128 - 16
JACK S NEALE 42678
MECHANICAL SCHEDULES
MAY 15, 2017 JSN RWD
MP602
1 - Addendum 1 05/24/18
Boiler No 1 Device Label
BSB
BSB
BSC
BSC
DPT
FE
LCV
LSH
LSL
LSLL
LSLL
ZT
CC
CE
FCV
FSV
FSV
FSV
PRV
PRV
PSH
PSL
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
FCV
FE
FSV
FSV
FSV
PRV
PSH
PSL
PT
PT
ZSC
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
ZT
FCV
FE
FSV
FSV
PSH
PSL
PT
ZSC
ZSC
ZSC
ZSO
ZSO
ZT
FE
PSHH
PSHH
PSV
PSV
PT
PT
TT
AE
BE
DPT
DPT
EX
FCV
FS
FS
IS
ST
TT
ZS
ZSC
ZSO
ZT
PSL
PSV
HS
VFD
BAS
BMS
CCS
CGP
CHP-1
DA-PLC
LCP
PMCP
WSF-PLC
x
Building Automation System
Burner Management System - (Flame Safeguard Control) Combustion Control System
Combustible Gas Detection Panel CHP-1 Field Panel Miscellaneous Process Points Deaerator and Condensate Surge Tank PLC
Local Control Panel Plant Master Control Panel Water Softener PLC
1A x
Boiler No 2 Device Label
BSB
BSB
BSC
BSC
DPT
FE
LCV
LSH
LSL
LSLL
LSLL
ZT
CC
CE
FCV
FSV
FSV
FSV
PRV
PRV
PSH
PSL
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
FCV
FE
FSV
FSV
FSV
PRV
PSH
PSL
PT
PT
ZSC
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
ZT
FCV
FE
FSV
FSV
PSH
PSL
PT
ZSC
ZSC
ZSC
ZSO
ZSO
ZT
FE
PSHH
PSHH
PSV
PSV
PT
PT
TT
AE
BE
DPT
DPT
EX
FCV
FS
FS
IS
ST
TT
ZS
ZSC
ZSO
ZT
PSL
PSV
HS
VFD
x
1A x
Boiler No 3 Device Label
BSB
BSB
BSC
BSC
DPT
FE
LCV
LSH
LSL
LSLL
LSLL
ZT
CC
CE
FCV
FSV
FSV
FSV
PRV
PRV
PSH
PSL
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
FCV
FE
FSV
FSV
FSV
PRV
PSH
PSL
PT
PT
ZSC
ZSC
ZSC
ZSC
ZSO
ZSO
ZSO
ZT
FCV
FE
FSV
FSV
PSH
PSL
PT
ZSC
ZSC
ZSC
ZSO
ZSO
ZT
FE
PSHH
PSHH
PSV
PSV
PT
PT
TT
AE
BE
DPT
DPT
EX
FCV
FS
FS
IS
ST
TT
ZS
ZSC
ZSO
ZT
PSL
PSV
HS
VFD
x
1A x
Device Type
Shunt Switch Shunt Switch Shunt Switch Shunt Switch
Pressure Transmitter Flow Element, V-Cone
Control Valve Level Switch Level Switch Level Switch Level Switch
Position Transmitter
Conductivity Controller Conductivity Element
Control Valve, Ball Type
Safety Valve Safety Valve Safety Valve
Regulating Valve Regulating Valve Pressure Switch Pressure Switch
Position Switch Position Switch Position Switch Position Switch Position Switch Position Switch
Control Valve Flow Element, Thermal Mass
Safety Valve Safety Valve Safety Valve
Regulating Valve Pressure Switch Pressure Switch
Pressure Transmitter Pressure Transmitter
Position Switch
Position Switch Position Switch Position Switch Position Switch Position Switch Position Switch
Position Transmitter
Control Valve Flow Element, Positive Displacement
Safety Valve Safety Valve
Pressure Switch Pressure Switch
Pressure Transmitter Position Switch
Position Switch Position Switch Position Switch Position Switch
Position Transmitter
Flow Element, V-Cone Pressure Switch Pressure Switch
Safety Valve Safety Valve
Pressure Transmitter Pressure Transmitter
Temperature Transmitter
Oxygen Monitor
Flame Scanner Pressure Transmitter Pressure Transmitter Voltage Transformer
Control Valve Flow Switch Flow Switch
Current Switch
Speed Transmitter Temperature Transmitter
Position Switch Position Switch
Position Switch Position Transmitter
Pressure Switch Safety Valve
Hand Switch
Speed Multifunction
System
Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater Boiler Feedwater
Blowdown Blowdown Blowdown
Gas Igniter Gas Igniter Gas Igniter Gas Igniter
Liquefied Petroleum Gas Gas Igniter
Gas Igniter - NG
Gas Igniter Gas Igniter Gas Igniter Gas Igniter Gas Igniter Gas Igniter
Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas
Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas
Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil
Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil
Steam Steam Steam Steam Steam Steam Steam Steam
Combustion
Combustion Combustion Combustion Combustion Combustion Combustion Combustion Combustion
Combustion Combustion Combustion Combustion
Combustion Combustion
Atomizing Air Atomizing Air
BMS / CCS
Combustion
Function
Manual Re-Set Manual Re-Set (Auxiliary)
Safety By-Pass Safety By-Pass (Auxiliary)
Level Flow Level
High Level Low Level
Low-Low Level Low-Low Level (Auxiliary)
Position Feedback
Conductivity Conductivity
Flow
Flow Flow Flow
Pressure Pressure
High Pressure Low Pressure
Position Verification Position Verification Position Verification Position Verification Position Verification Position Verification
Flow Flow, Totalizing
Flow Flow Flow
Pressure High Pressure Low Pressure
Pressure Pressure
Position Verification
Position Verification Position Verification Position Verification Position Verification Position Verification Position Verification Position Feedback
Flow Flow Flow Flow
High Pressure Low Pressure
Pressure Position Verification
Position Verification Position Verification Position Verification Position Verification Position Feedback
Flow High-High Pressure
High-High Pressure (Auxiliary) Pressure Pressure Pressure Pressure
Temperature
Oxygen Content
Flame Monitoring Differential Pressure Differential Pressure
Burner Ignition Flow
Flow, Low Air Flow, Purge Air Current Sensor
Speed Temperature
Position Verification Position Verification
Position Verification Position Feedback
Low Pressure Pressure
Emergency Cut-Off
VFD Monitoring
Mounting / Location
Float Type Water Column Conductivity Probe Type Water Column
Float Type Water Column Conductivity Probe Type Water Column
Float Type Water Column Supply to Boiler Supply to Boiler
Conductivity Probe Type Water Column Conductivity Probe Type Water Column
Float Type Water Column Conductivity Probe Type Water Column
LCV-3x07
Supply from Boiler to CBHX-1 Supply from Boiler to CBHX-1 Supply from Boiler to CBHX-1
Supply to Burner Supply to Burner
Vent Supply to Burner Supply to Burner Supply to Burner Supply to Burner
FSV-4x01 FSV-4x02 FSV-4x03 FSV-4x01 FSV-4x02 FSV-4x03
Supply to Burner Supply to Burner Supply to Burner Supply to Burner
Vent Supply to Burner Supply to Burner Supply to Burner Supply to Burner Supply to Burner
FCV-4x08
FSV-4x10 FSV-4x11 FSV-4x12 FSV-4x10 FSV-4x11 FSV-4x12 FCV-4x08
Supply to Burner Supply to Burner Supply to Burner Supply to Burner Supply to Burner Supply to Burner Supply to Burner
FCV-5x01
FSV-5x03 FSV-5x04 FSV-5x03 FSV-5x04 FCV-5x01
Supply from Boiler Boiler Boiler Boiler Boiler Boiler
Supply from Boiler, FE-6x01 Supply from Boiler, FE-6x01
Breeching
Burner Combustion Air Supply
Breeching Burner
Fresh Air Fan Damper Combustion Air Supply
Across Boiler Boiler FD Fan
Boiler FD Fan Breeching
Burner Oil Gun Flue Gas Recirculation
FCV-7x08 FCV-7x08
Boiler Mounted Compressor Boiler Mounted Compressor
Boiler
Boiler FD Fan
Line Size
2" 2"
1" 1" 1"
3/4" 3/4"
3/4" 1/2" 3/4" 3/4"
3" 4" 3" 3" 3" 3" 3" 3" 3"
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
6"
Range / Setpoint
Open / Closed Open / Closed Open / Closed Open / Closed
Field Set
2,300 - 23,000 PPH
0 - 23,000 PPH
Field Set Field Set
1" Below LWA 1" Below LWCO
0 - 100 %
Field Set
Open / Closed
Open / Closed Open / Closed Open / Closed
2 PSIG / 300 SCFH
8 PSIG / 120 SCFH
Field Set 80% of Regulated Pressure
Closed Closed Closed Open Open Open
0 - 25,000 SCFH
2,500 - 25,000 SCFH
Open / Closed Open / Closed Open / Closed
5 PSIG / 25,000 SCFH
6 PSIG
4 PSIG
0 - 25 PSIG
0 - 25 PSIG
Closed
Closed Closed Closed Open Open Open
0 - 100 %
0 - 180 GPH
18 - 180 GPH
Open / Closed Open / Closed
110% of Regulated Pressure 90% of Regulated Pressure
0 - 250 PSIG
Closed
Closed Closed Open Open
0 - 100 %
2,100 - 21,000 PPH
120 PSIG
125 PSIG
135 PSIG
140 PSIG
0 - 250 PSIG
0 - 250 PSIG
32 - 392 F
0 - 10 %
Per Manufacturer Per Manufacturer Per Manufacturer Per Manufacturer
Field Set Field Set Field Set
Field Set 32 - 752 F
Open / Closed Closed
Open 0 - 100 %
80% of Pressure at Low Fire Per Manufacturer
Open / Closed
Field Set
Point Type
DI
DI
DI
DI
AI
AI
DI
DI
DI
DI
AI
AI/AO
AI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
AI
DI
DI
DI
DI
DI
AI
AI
DI
DI
DI
DI
DI
DI
DI
AI
AI
DI
DI
DI
DI
AI
DI
DI
DI
DI
DI
AI
AI
DI
DI
AI
AI
AI
AI
DI
AI
AI
DI
DI
DI
DI
AI
AI
DI
DI
DI
AI
DI
DI
AI
Signal
120 V 120 V 120 V 120 V
4 - 20 mA DC 4 - 20 mA DC
ZT-3x07 120 V 120 V 120 V 120 V
4 - 20 mA DC
4 - 20 mA DC 4 - 20 mA DC
120 V
120 V 120 V 120 V
120 V 120 V
120 V 120 V 120 V 120 V 120 V 120 V
ZT-4x08 4 - 20 mA DC
120 V 120 V 120 V
120 V 120 V
4 - 20 mA DC 4 - 20 mA DC
120 V
120 V 120 V 120 V 120 V 120 V 120 V
4 - 20 mA DC
ZT-5x01 4 - 20 mA DC
120 V 120 V 120 V 120 V
4 - 20 mA DC 120 V
120 V 120 V 120 V 120 V
4 - 20 mA DC
4 - 20 mA DC 120 V 120 V
4 - 20 mA DC 4 - 20 mA DC 4 - 20 mA DC
4 - 20 mA DC
0 - 5 V DC
4 - 20 mA DC 4 - 20 mA DC
120 V ZT-7x08
120 V 120 V 120 V
4 - 20 mA DC 4 - 20 mA DC
120 V 120 V
120 V 4 - 20 mA DC
120 V
120 V
0 - 120 V
Signal To/From
BMS / CCS
BMS / CCS
BMS / CCS
BMS / CCS
CCS
BMS
BMS / CCS
BMS / CCS
BMS / CCS
BMS / CCS
CCS
BBC
BBC
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BMS
BMS
BMS
PMCP
PMCP
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS
BMS
BMS
BMS
PMCP
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS / CCS
BMS
CCS
CCS
CCS
CCS
BMS
CCS
CCS
BMS / CCS
BMS
BMS
CCS
CCS
BMS / CCS
BMS / CCS
BMS / CCS
BMS
BMS / CCS
BAS
Annunciation Location
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
BMS
BMS
BAS
BAS
BMS
BMS
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS
BMS
BAS
BMS
BMS
BMS
BMS
BMS
CCS
CCS
BMS
BMS
CCS
CCS
CCS
CCS
BMS
CCS
CCS
CCS
BMS
BMS
CCS
CCS
BMS
BMS
BMS
BMS
BMS
BAS
Annunciation Type
Status Status
Blowdown Override Blowdown Override
Status - Drum Water Level Status - Flow
High Level Bell Low Level Bell
Low-Low Level Cut-Off Alarm Low-Low Level Cut-Off Alarm (Auxiliary)
Position Indication %
High Pressure Alarm Low Pressure Alarm
Position Verification - Fully Closed Position Verification - Fully Closed Position Verification - Fully Closed Position Verification - Fully Open Position Verification - Fully Open Position Verification - Fully Open
Status - Flow
High Pressure Alarm Low Pressure Alarm
Status - Pressure Status - Pressure
Position Verification - Fully Closed
Position Verification - Fully Closed Position Verification - Fully Closed Position Verification - Fully Closed Position Verification - Fully Open Position Verification - Fully Open Position Verification - Fully Open
Position Indication %
Status - Flow
High Pressure Alarm Low Pressure Alarm
Status - Pressure Position Verification - Fully Closed
Position Verification - Fully Closed Position Verification - Fully Closed Position Verification - Fully Open Position Verification - Fully Open
Position Indication %
Status - Flow High-High Pressure Cut-Off
High-High Pressure Cut-Off (Auxiliary)
Status - Pressure Status - Pressure
Status - Temperature
Status - % Oxygen
Status - Burner Flame Failure Status - FD Fan Failure
Status - Rate
Status - Low Air Flow Status - Purge Air Flow
Status - Current
Status - Speed Status - Temperature
Position Indication - Present Position Verification - Fully Closed
Position Verification - Fully Open Position Indication %
Low Pressure Alarm
Emergency Cut-Off
Status
Remarks
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Contractor Furnished / Contractor Installed
Contractor Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
Manufacturer Furnished / Contractor Installed
Refer to Sequence of Operation for Specific Points
Notes
Manual Reset Manual Reset
Provide w/
Fail Last Position
Fail Open
Fail Closed Fail Closed Fail Open Fail Closed Fail Closed
Fail Closed Provide w/
Fail Closed Fail Closed
Fail Open Fail Closed
Fail Closed Provide w/
Fail Closed Fail Closed
Provide w/ Automatic Reset Manual Reset
Provide w/
Provide w/ Provide w/
Fail Last Position
FT
FT
FT
FT
AT
SE
TE
x x x x x x x
BOILER - DEVICE SCHEDULE
VA
Nomenclature
HWAB
LWA
LWCO
ALWCO
APFGSOV
APFGSOV
APFGSVV
LPFGPCS
AFGSOV
AFGSOV
AFGSVV
HFGPCS
LFGPCS
POC-AFGSOV
POC-AFGSOV
AFOSOV
AFOSOV
HFOPCS
LFOPCS
POC-AFOSOV
POC-AFOSOV
RBSPLS
NRBSPLS
SVB1
SVB2
LFGOLI
FSMFO
FSNSIS
CAPS
PAPS
FDMIS
FDDWOPS
LAMPS
BMS BMS
Setpoint No Higher Than 120% of Regulated Pressure Setpoint No Higher Than 80% of Regulated Pressure
Wired in Series with ZSC 4x11 Wired in Series with ZSC 4x10
LPFGPCS PSL - 4 1 0 8 PSL - 4 2 0 8 PSL - 4 3 0 8 Pressure Switch Gas Igniter - LPG Low Pressure Supply to Burner 1/2" 80% of Regulated Pressure DI 120 V BMS BMS Low Pressure Alarm Manufacturer Furnished / Contractor Installed
LFPS ZSC - 4 1 0 9 ZSC - 4 2 0 9 ZSC - 4 3 0 9 Position Switch Natural Gas Position Verification FCV-4x08 --- Closed DI 120 V BMS BMS Low Fire Position Manufacturer Furnished / Contractor Installed
LFPS ZSC - 5 1 0 2 ZSC - 5 2 0 2 ZSC - 5 3 0 3 Position Switch Fuel Oil Position Verification FCV-5x01 --- Closed DI 120 V BMS BMS Low Fire Position Manufacturer Furnished / Contractor Installed
FDMIS
FDMIS
IS - 7 1 1 1B IS - 7 2 1 1B IS - 7 3 1 1B
IS - 7 1 1 1C IS - 7 2 1 1C IS - 7 3 1 1C
Current Switch Combustion Current Switch Combustion
Current Sensor Current Sensor
Boiler FD Fan Boiler FD Fan
Field Set DI 120 V BMS BMS Field Set DI 120 V BMS BMS
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
LFPS
LFPS
ZSC - 7 1 0 9 ZSC - 7 2 0 9 ZSC - 7 3 0 9
ZSC - 7 1 1 0 ZSC - 7 2 1 0 ZSC - 7 3 1 0
Position Switch Combustion Position Verification Position Switch Combustion Position Verification
FCV 7x08 Flue Gas Recirculation Damper
Closed Closed
DI 120 V BMS
DI 120 V BMS
BMS
BMS
Low Fire Position Low Fire Position
Manufacturer Furnished / Contractor Installed Manufacturer Furnished / Contractor Installed
FGRD1 ZSC - 7 1 1 1 ZSC - 7 2 1 1 ZSC - 7 3 1 1 Position Switch Combustion Position Verification Flue Gas Recirculation Damper --- Damper 80% Open DI 120 V BMSBMS Position Verification - 80% Open Manufacturer Furnished / Contractor Installed 2
LAMDPS
DPS - 8 1 0 1 DPS - 8 2 0 1 DPS - 8 3 0 1 Differential Pressure Switch Atomizing Air Fuel Oil Differential Pressure Atomizing Air --- 80% of Differential DI 120 V BMS BMS Low Differential Pressure Alarm Contractor Furnished / Contractor Installed IS - 8 1 0 3A IS - 8 2 0 3A IS - 8 3 0 3A Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set DI 120 V BMS BMS
DI 120 V BMS BMS
DI 120 V BMS BMS
Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed Contractor Furnished / Contractor Installed
Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set Current Switch Atomizing Air Current Sensor Air Compressor Motor --- Field Set
IS - 8 1 0 3B IS - 8 2 0 3B IS - 8 3 0 3B
IS - 8 1 0 3C IS - 8 2 0 3C IS - 8 3 0 3C
NOTES:
1 Wiring for POC - AFGSOV shall be easily accessible. Wiring is accessed during switch testing.
2 FGR damper switch as required by manufacturer. If manufacturer states in writing to the facility that the position of the damper does not matter to achieve proper purge, then no switch is required.
3 Ensure oil valves are mounted in such a way that there is easy access to the proof of closure switch wiring.
ABBREVIATIONS:
BBC - Boiler Blowdown Controller
FCV - 7 1 0 9 FCV - 7 2 0 9 FCV - 7 3 0 9 Draft Control Damper Draft Control Draft Control Breeching --- Per Manufacturer AO 120 V BMS BMS --- ---
Status
BMS BMS
BMS BMS
4 - 20 mA DC 4 - 20 mA DCDI
DI
Open / Closed Open / Closed---
Draft Control Damper
BBC
Interlock
Draft Control Draft Control Draft Control
Position Switch Draft Controller
ZSC - 7 1 1 2
DC - 7 1 0 0
ZSC - 7 2 1 2
DC - 7 2 0 0
ZSC - 7 3 1 2
DC - 7 3 0 0
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvil le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #29578
AKEA Pro j ec t No . 128 - 16
JACK S NEALE 42678
MECHANICAL SCHEDULES
MAY 15, 2017 JSN RWD
MP603
F
L
F
F
L
F
F
VFD
PI PI
TI
PI
PI
S S
PI
PI
TI
PI
PI
PI
PI
PIPI
S
SS
S S
S
L
L
L
L
L
L
GENERAL NOTES:
DRAWING NOTES:
PSL
5x06 FCV
5x01
ZT
5x01
ZSC
5x01
ZI
5x01
FC FC
PSV
8x02
PSL
8x01
EX
7x07
BE
7x03
ZS
7x15
HS
9x01
AE
7x01
AT
7x01
AI
7x01 O2
DPT
7x06
DPT
7x05
FS
7x10
FS
7x09
DPT
7x04
ZSC
7x08
IS
7x11A
SE
7x12
ST
7x12
SI
7x12
FCV
7x08
ZT
7x08
ZI
7x08
ZSO
7x08
PSL
4x07
FO
FCFC
FC FC
FO
PRV
4x13
PRV
4x04
PRV
4x05
ZSC
4x08
FCV
4x08
ZT
4x08
ZI
4x08
TE
7x13
TT
7x13
TI
7x13
PSH
5x05 PT
5x07
PI
5x07
FE
5x02
FT
5x02
FI
5x02
FSV
5x03
ZSC
5x03
ZSO
5x03
FSV
5x04
ZSC
5x04
ZSO
5x04
PSH
4x06
FSV
4x03
ZSC
4x03
ZSO
4x03
FSV
4x01
ZSC
4x01
ZSO
4x01
FSV
4x02
ZSC
4x02
ZSO
4x02
PSH
4x14
PT
4x17
PI
4x17
PT
4x16
PI
4x16
FE
4x09
FT
4x09
FI
4x09
FSV
4x10
ZSC
4x10
ZSO
4x10
FSV
4x11
ZSC
4x11
ZSO
4x11
FSV
4x12
ZSC
4x12
ZSO
4x12
PI
PI
PI PI
PI
PI
PSL
4x15
ZSC
7x09
IS
7x11B
IS
7x11C
ZSC
7x10
ZSC
7x11IS
8x03A
IS
8x03B
IS
8x03C
DPS
8x01
ZSC
5x02
ZSC
4x09
PSL
4x08
FCV
7x20
CY
7x20
IS
7x20
MS
ZSC
7x12
FCV
7x09
DC
7x00
ALL BURNER PIPING, INCLUDING THE GAS TRAIN, GAS IGNITER TRAIN, FUEL
OIL TRAIN AND COMPRESSED AIR (ATOMIZING) TRAIN, SHALL CONFORM TO
NFPA 85, AS MODIFIED BY THE PROJECT SPECIFICATIONS AND THE THIRD
EDITION OF THE VHA BOILER PLANT SAFETY DEVICE TESTING MANUAL.
1.
5" NG(5)
FROM
NATURAL GAS
SYSTEM
MP706, E9
INSTALL PER MANUFACTURERS RECOMMENDATION
AS REQUIRED BY FIELD CONDITIONS (TYP)
1/2" LPG(2)
FROM LIQUEFIED
PETROLEUM GAS
(PROPANE) SYSTEM
MP706, B9
VTR VTR VTR VTR
2" V 3" V 11/2" V 11/2" V
3/4" G(I)
1" V
3/4" V
1" V
3/4" V
1/2" LPG(2)
1/2" LPG
3/4" G(I)
3" NG3" NG(5)4" NG(5) 3" NG3" NG
3/4" G(I)3/4" G(I)
3/8" V
(TEST PORT)
3/8" V
(TEST PORT)
3/8" V
(TEST PORT)
LOCKABLE BALL
VALVE (LOCKABLE IN
OPEN POSITION
ONLY)(TYP)
LOCKABLE BALL
VALVE (LOCKABLE IN
OPEN POSITION
ONLY)(TYP)
1"1"
3/8" V
2" V
3/4" V
3/4" FOS
FROM EXISTING
FUEL OIL SYSTEM
1/2" FOR
TO EXISTING
FUEL OIL SYSTEM
1/2" AIR BLEED
(PURGE)
3/4" FOS 3/4" FOS 3/4" FOS
3/4" FUEL OIL
PURGE
PIPE TO
FLOOR
BOILER MOUNTED
AIR COMPRESSOR
BURNER
BREECHING
BREECHING
3/4" FOS
700 HP
FIRETUBE
BOILER
B-1, B-2, B-3
2. CONTROL POINT NUMBER "x" SHALL BE REPLACED WITH APPROPRIATE
BOILER NUMBER:
BOILER No 1 BOILER No 2 BOILER No 3
- x1xx
- x2xx
- x3xx
TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR.1
"BURNER" DESIGNATION IS DEFINED AS "TO BE FURNISHED BY THE BURNER
MANUFACTURER AND INSTALLED BY THE CONTRACTOR".
3.
"OTHERS" DESIGNATION IS DEFINED AS "TO BE PROVIDED AND INSTALLED
BY THE CONTRACTOR".
4.
TO BE FURNISHED BY THE BOILER/BURNER MANUFACTURER AND
INSTALLED BY THE CONTRACTOR.
O
TH
ER
S
BU
RN
ER
O
TH
ER
S
BU
RN
ER
1 1 1 1
O
TH
ER
S
BU
RN
ER
OTHERS
BURNER
OTHERS
BURNER
OTHERS
BURNER
O
TH
ER
S
BU
RN
ER
OTHERS
BURNER
OTHERS
BURNER
BOILER
MOUNTED
FD FAN
MOTOR
FGR
MANUAL
BIASING
DAMPER
10 PIPE DIA MIN 5 PIPE DIA MIN
TY
P)
TY
P)
TY
P)
TY
P)
48" MAX
L
L
3/4"
1/2" ED
(TEST PORT)
OTHERS
BURNER
L
L
L
3/8" V
(TEST PORT)
L
TEST PORT LOCKED CLOSED
TP
L
LOCKED OPEN
L 3
NC
BLEED
VALVE
L
TP
TP
VALVE LOCKABLE ONLY IN OPEN POSITION.
L
ALL SAFETY DEVICES MUST COMPLY WITH VA / VHA REQUIREMENTS.5.
OUTSIDE AIR
OA DAMPER
SUPPLY FAN
BOILER ROOM
MAKE UP AIR FANS
(DEDUCT ALTERNATE #2)
MECHANICAL
LINKAGE
FLEXIBLE HOSE
(BRAIDED STEEL)
BOILER OUTLET DAMPER
INTERLOCK SWITCH
BOILER OUTLET DRAFT
CONTROLLER
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvil le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #29578
AKEA Pro j ec t No . 128 - 16
JACK S NEALE 42678
TYPICAL 700HP FIRE TUBE BOILER FUEL TRAIN
SCHEMATIC
MAY 15, 2017 JSN RWD
MP709
NOTES:
(1) PROVIDE BAS FEEDBACK FOR ALL ALARM STATE LEVELS SUCH AS: NO GAS DETECTED, LOW LEVEL ALARM, HIGH LEVEL ALARM, ETC.
2 SCALE: NONE
BOILER GAS DETECTION SYSTEM CONTROL DIAGRAM
BOILER GAS DETECTION
PANEL
STROBE & HORN
BAS
COMMUNICATION
CO SENSOR
BOILER 1
COMBUSTIBLE
GAS SENSOR
CO SENSOR
BOILER 2
CO SENSOR
BOILER 3
CO SENSOR
NW CORNER OF
BOILER ROOM
CO SENSOR
RM 101
COMBUSTIBLE
GAS SENSOR
LOCATION:
INSIDE PLANT,
BETWEEN
BOILER 2 AND 3
STROBE, HORN,
AND WARNING
SIGN (TYPICAL)
LOCATION:
INSIDE PLANT,
BETWEEN
BOILER 2 AND 3
LOCATION:
INSIDE PLANT, NEXT
TO PERSONNEL DOOR
INTO CONTROL ROOM
LOCATION:
OUTSIDE PERSONNEL
DOOR, NORTH SIDE
ADJACENT TO
COLUMN LINE 14.9
LOCATION:
OUTSIDE MAIN
OVERHEAD DOOR
ON EAST SIDE
CO SENSOR
RM 106
TAG POINT DESCRIPTION SE
TP
O
IN
T
VA
LU
E
H
IG
H L
IM
IT
LO
W
L
IM
IT
WORKSTATION
UNITS
USER INFORMATION
POINT TYPE
AN
AL
O G
D
IG
IT
AL
IN
TE
G R
AT
ED
ALARM
AL
AR
M D
EL
AY
(M
IN
CONDITION
INTEGRATION
SDP
XSDP
XSDP
CARBON MONOXIDE ALARM STATE (1)
SDP
XCOMBUSTIBLE GAS LEVEL - UPPER LEVEL MEZZANINE PPM
XCARBON MONOXIDE GAS LEVEL - IN FRONT OF BOILER 1 PPM
COMBUSTIBLE GAS ALARM STATE (1)
SDP XPPM
SDP XPPM
SDP XCOMBUSTIBLE GAS LEVEL - UPPER LEVEL MEZZAZINE PPM
CARBON MONOXIDE GAS LEVEL - IN FRONT OF BOILER 2
CARBON MONOXIDE GAS LEVEL - IN FRONT OF BOILER 3
SDP XPPMCARBON MONOXIDE GAS LEVEL - IN CONTROL RM 106
SDP XPPMCARBON MONOXIDE GAS LEVEL - IN SHOP AREA RM 101
SDP XPPMCARBON MONOXIDE GAS LEVEL - NW CORNER OF RM
1 SCALE: NONE
CONTROL SYSTEM ARCHITECTURE
SYMBOLS
HARDWIRED
MODBUS IP
BURNER MANAGEMENT SYSTEM - (FLAME SAFEGUARD CONTROL)BMS
COMBUSTION CONTROL SYSTEMCCS
BMS
CCS
BOILER No 1
CONTROL PANEL
HARDWIRE TO
BOILER DEVICES
HARDWIRE TO
PACKAGED
DEAERATOR DEVICES
BMS
CCS
BOILER No 2
CONTROL PANEL
HARDWIRE TO
BOILER DEVICESBMS
CCS
BOILER No 3
CONTROL PANEL
HARDWIRE TO
BOILER DEVICES
PRINTER
BOILER PLANT
WORKSTATION
NETWORK
SWITCH
BOILER
PLANT DATA
STORAGE
SERVER
PRINTER
BMS
WORKSTATION
BMS SERVER
DISPLAY SCREENS
TO EX. CAMPUS LAN ( GE WONDERWARE )
CONTROL ROOM
DA-PLC
CHP-1
FIELD PANEL
MISC POINTS - PLC
NETWORK
SWITCH
PLANT MASTER
CONTROL PANEL
COMBUSTIBLE
GAS DETECTION
PANEL FUEL OIL SYSTEM
FO-PLC
WATER
SOFTENER
CONTROL PANEL
WSF-PLC
CONDENSATE
SURGE TANK
EXISTING FUEL
OIL PUMP
CONTROLLER
DA-PLC
EXISTING
DEAERATOR
CONTROLLER
DEALK-PLC
BRINE PUMP
DEALKALIZER
CONTROLLER
BRINE PUMP
CONTROLLER
BOILER #1 BBC -
BOILER
BLOWDOWN
CONTROLLER
BOILER #2 BBC -
BOILER
BLOWDOWN
CONTROLLER
BOILER #3 BBC -
BOILER
BLOWDOWN
CONTROLLER
Design, Inc.
Tel 352.376.5500 Fax 352.375.3479
Tioga Town Center
Gainesville, Florida 32669
Affiliated Engineers SE, Inc.
CA-5140
12921 SW 1st Road Ste 205
Affiliated Engineers
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3 6 0 3 N W 9 8 t h S t r e e t , S u i t e B Gainesvil le, FL 32606 P h o n e : ( 3 5 2 ) 4 7 4 - 6 1 2 4 F a x : ( 3 5 2 ) 5 3 3 - 4 4 3 7
COA: FL #29578
AKEA Pro j ec t No . 128 - 16
JACK S NEALE 42678
CONTROL SYSTEM ARCHITECTURE
MAY 15, 2017 JSN RWD
MP710
| MP602 |
| MP603 |
| MP709 |
| MP710 |
File details come from the government source that posted it.