36C24818R0121-012.pdf
PDF 5 MB Posted
- Attached to
- Replace Boilers Bldg. 100 (Construction) TIERED EVALUATIONS C. W. Bill Young VA Medical Center
- Solicitation number
- 36C24818R0121
About this file
36C24818R0121 VA 516-15-107 - Replace Boilers at Bay Pines VAMC - Approved Construction Drawings_Part1.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG. SHEET
G001 TITLE PAGE 1
G002 INDEX OF DRAWINGS 2
S201 KEYPLAN 3
S202 STRUCTURAL PHASING FOR DEMOLITION & NEW WORK 4
S203 CONDENSATE TANK PLATFORM 5
S204 SECTIONS & DETAILS 6
S205 SECTIONS & DETAILS 7
S206 BOILER STACK FRAMING 8
PL101 OVERALL PLUMBING DEMOLITION / NEW PLAN 9
M001 STEAM TRAP SCHEDULES, LEGEND, AND NOTES 10
M100 SITE MAP - EXTERIOR REPEATER LOCATIONS 11
M101 BUILDING 100 - 1ST FLOOR PLAN - STEAM TRAP LOCATIONS 12
M102 BUILDING 100 - 2ND FLOOR PLAN - STEAM TRAP LOCATIONS 13
M103 ENERGY CENTER - STEAM TRAP LOCATIONS 14
M104 BUILDING 1 - STEAM TRAP LOCATIONS 15
M105 BUILDING 2 - STEAM TRAP LOCATIONS 16
M106 BUILDING 13 - STEAM TRAP LOCATIONS 17
M107 BUILDING 23 - STEAM TRAP LOCATIONS 18
M108 BUILDING 37 - STEAM TRAP LOCATIONS 19
M109 BUILDING 71 - STEAM TRAP LOCATIONS 20
M110 BUILDING 101 - STEAM TRAP LOCATIONS 21
M111 BUILDING 102 - STEAM TRAP LOCATIONS 22
MP001 MECHANICAL LEGEND, SYMBOLS AND ABBREVIATIONS 23
MP201 PHASE 1 - DEMOLITION 24
MP202 PHASE 1 - NEW WORK 25
MP203 PHASE 2 - DEMOLITION 26
MP204 PHASE 2 - NEW WORK 27
MP205 PHASE 3 - DEMOLITION 28
MP206 PHASE 3 - NEW WORK 29
MP207 BOILER PLANT - UNDERFLOOR PIPING 30
MP212 BOILER PLANT - VENTILATION PLAN NEW 31
MP221 DEDUCT ALTERNATE #3 - REUSE EXISTING STACK 32
MP301 BOILER PLANT - SECTIONS - MECHANICAL 33
MP302 BOILER PLANT - 3D VIEW 34
MP303 BOILER PLANT - DEMO 3D VIEWS 35
MP304 BOILER PLANT - NEW 3D VIEWS 36
MP305 BOILER PLANT - ROOF - 3D VIEW 37
MP306 WATER TREATMENT - NEW 3D VIEW 38
MP401 MOBILE BOILER ROOM SITE PLAN 39
INDEX OF DRAWINGS
DESCRIPTION DWG. SHEET
MP501 MECHANICAL DETAILS 40
MP502 MECHANICAL DETAILS 41
MP503 MECHANICAL DETAILS 42
MP504 MECHANICAL DETAILS 43
MP505 SAFETY DEVICE TESTING PROCEDURES 44
MP506 SAFETY DEVICE TESTING PROCEDURES 45
MP507 SAFETY DEVICE TESTING PROCEDURES 46
MP508 SAFETY DEVICE TESTING PROCEDURES 47
MP509 SAFETY DEVICE TESTING PROCEDURES 48
MP601 MECHANICAL SCHEDULES 49
MP602 MECHANICAL SCHEDULES 50
MP603 MECHANICAL SCHEDULES 51
MP701 STEAM SYSTEM SCHEMATIC 52
MP702 CONDENSATE SYSTEM SCHEMATIC 53
MP705 WATER SOFTENER SCHEMATIC 54
MP706 NATURAL GAS SYSTEM SCHEMATIC 55
MP708 TYPICAL 700HP FIRE TUBE BOILER TRIM SCHEMATIC 56
MP709 TYPICAL 700HP FIRE TUBE BOILER FUEL TRAIN SCHEMATIC 57
MP710 CONTROL SYSTEM ARCHITECTURE 58
E001 ELECTRICAL LEGEND, ABBREVIATIONS, AND NOTES 59
ED101 ENERGY CENTER - DEMO 60
EL101 ENERGY CENTER - NEW LIGHTING 61
EP101 ENERGY CENTER - NEW POWER 62
EP102 ENERGY CENTER SOUTH - NEW POWER 63
EP103 ENERGY CENTER ROOF - NEW POWER 64
EP104 ENERGY CENTER - EXISTING TO REMAIN RACEWAY 65
EP120 CAMPUS SITE PLAN - TRAP MONITORING POWER 66
EP121 BUILDING 100 - ENERGY CENTER - TRAP MONITORING 67
EP122 BUILDING 100 - FIRST FLOOR INTERSTITIAL - TRAP MONITORING 68
EP123 BUILDING 100 - SECOND FLOOR INTERSTITIAL - TRAP MONITORING 69
EP124 BUILDINGS 1, 2, & 37 - TRAP MONITORING 70
EP125 BUILDINGS 71 & 101 - TRAP MONITORING 71
EP126 BUILDINGS 102 - TRAP MONITORING 72
EP127 BUILDINGS 13, 23, & 36 AND MAINT. & PUMPHOUSE - TRAP MONITORING 73
EP501 ELECTRICAL DETAILS 74
EP601 ELECTRICAL ONE-LINE DIAGRAM AND LOAD ESTIMATION 75
EP602 MCC-BQ REPLACEMENT AND MCC-Q MODIFICATIONS 76
EP701 ELECTRICAL SCHEDULES 77
EP702 ELECTRICAL SCHEDULES 78
INDEX OF DRAWINGS
DESCRIPTION
18.617.716.715.8
14.9
14.1
13.313
M
N
M.7
M.8
181716
L
S204
S206
S203
S203
NEW MEZZANINE
PLATFORM FOR
CONDENSATE
SURGE TANK.
REMOVE / SAWCUT PORTION OF
EXISTING REINFORCED CONCRETE
DECKING & 4' - 7" Ø STACK OPENING
& REPLACE W/ STRUCTURAL
FRAMING GRATING OR PLATE. SEE
S206, PLANS 1, 2, 3, & 4
EXISTING 7' - 0" Ø OPENING & SURROUNDING
CONCRETE TO REMAIN. IN-FILL WITH NEW
STRUCTURAL FRAMING & GRATING OR
PLATE. SEE S206, PLANS 1 & 2.
S204
S204
2B
S204
5B
S205
S204
S204
NEW TRENCH
PILE @ CORNERS
& 10' O.C. MAX.
3'-0" TYP.
C PILING
1' - 10" TYP.
C PILING
L
L
4B
S205
2A
S204
2A
S204
T Y
P . 3
L O
C
TYP. 3 LOC.
7' - 4"
S205
S204
S205
4A
S205
5A
S205
EXST. 4'-7" Ø
STACK OPENING
EXST. CONCRETE
DECK BEYOND
OPENINGS
B
A
C
D
D
F
HJ
B1B2B3
S204
S204
H
A
G
B
C
A
B
A
B
1C
A
A
II
KK
1J
F
H
KK KK
II II
1G1G
J
H
A
B
A
A
Design, Inc.
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 533-4437
COA: FL #29578
AKEA Project No. 128-16
RICHARD G. WHEELER 23064
STRUCTURAL KEYPLAN
MAY 15, 2017 RGW JG
S201
1/4" = 1'-0"
1 OVERALL STRUCTURAL PLAN
SHEET NOTES
ALL PILES SHALL BE DUCTILE IRON PIPE PILES, DRIVEN WITH
A HIGH FREQUENCY IMPACT HAMMER (A PROCESS THAT
PRODUCES LITTLE TO NO VIBRATION). PIPES SHALL BE 4.65
INCHES IN DIAMETER & SHALL BE DRIVEN WITH AN ENLARGED
SHOE TO PRODUCE AN 8 INCH DIAMETER PILE. PILES SHALL
BE DRIVEN TO 35' OR AUGER REFUSAL. AFTER DRIVING, THE
PILES SHALL BE FILLED WITH GROUT AND A REBAR CAGE
SHALL BE PLACED IN THE GROUTED HOLE PER DETAIL 8/S205.
A LOAD TEST SHALL BE PERFORMED TO VERIFY THAT EACH
OF THE DUCTILE IRON PILES HAVE ACHIEVED A MINIMUM
CAPACITY OF 35 TONS.
1.
N
KEY VALUE KEYNOTE TEXT
A EXISTING 5'-6" X 2'-6" X 24" DEEP REINFORCED CONCRETE
CAP W/ 2 CONCRETE PILES
B EXISTING SINGLE PILE W/ 2'-6"± X 2'-6"± X 24" DEEP
THICKENED SLAB
C EXISTING 21'-0" X 8'-0" X 24" DEEP REINFORCED CONCRETE
PILE CAP W/ 4 CONCRETE PILES
D EXISTING FOUNDATION FOR STEEL COLUMNS & ELEVATED
WALKWAY
E NOT USED
F EXISTING TRENCH
G NEW TRENCH
H NEW PILING, SEE NOTE # 1
I NEW CURBS CAST ON EXISTING PADS TO ELEVATE &
SUPPORT NEW BOILERS
J NEW CONCRETE BOILER PAD, 24" THICK
K NEW CURBS CAST W/ NEW PADS TO ELEVATE & SUPPORT
NEW BOILERS
KEYNOTE LEGEND
DEMOLISH EXST. ELEVATED PAD DOWN
TO FINISHED FLOOR LEVEL. AFTER
REMOVAL, ROUGHEN SURFACE & FILL
ALL VOIDS W/ NON-METALLIC NON-
SHRINK HIGH STRENGTH GROUT.
19' - 4"
8' - 7"
19' - 11"
2' - 4"
17' - 1"
3' - 3"3' - 3"
2' - 4" ±
1' - 6" ±
10' - 7"
7' - 5"
3' - 3"
2' - 4 1/2"
22' - 5"
10"±
10"±
2' - 6"
CUT CONCRETE
FLOOR FOR TRENCH
INSTALLATION, TYP.
10' - 7"
7' - 5"
42' - 3 1/2"
3' - 3" 2' - 4 1/2"
22' - 5"
2' - 4 1/2"2' - 4 1/2"
3' - 3"3' - 3"
EXCAVATION
CENTERED ON
EXISTING PAD
LOCATION
10"±
CL
10' - 7"
12' - 1"
10"±
EXCAVATION
CENTERED ON
EXISTING PAD
LOCATION
CL
10' - 6"
7' - 4"
18' - 2"
7' - 1"
21' - 2"
15' - 6"
24' - 1"
NEW TRENCH,
18" WIDE, TYP.
10"±
10"±
CL CL
20' - 9"
5' - 2"
1' - 1"±
1' - 9"±
5' - 2" 1' - 1"1' - 1"
NEW FLOOR CLEAN OUT.
REFER TO DWG PL101
42' - 3"
24' - 1"
7' - 4"
10' - 6"
10"±
CL CL
20' - 9"
1' - 1" 5' - 2" 1' - 1"
1' - 5" 5' - 2"
1' - 5"
10' - 6"
7' - 4"
CLCL
20' - 9"
10"±
5' - 2"1' - 1" 1' - 1"
Design, Inc.
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 533-4437
COA: FL #29578
AKEA Project No. 128-16
RICHARD G. WHEELER 23064
STRUCTURAL PHASING FOR DEMOLITION &
NEW WORK
MAY 15, 2017 RGW JG
S202
1/4" = 1'-0"
1 PHASE 1 DEMOLITION
1/4" = 1'-0"
3 PHASE 2 DEMOLITION
1/4" = 1'-0"
5 PHASE 3 DEMOLITION
N N N
1/4" = 1'-0"
2 PHASE 1 NEW
N
1/4" = 1'-0"
4 PHASE 2 NEW
1/4" = 1'-0"
6 PHASE 3 NEW
N N
SLOPE
1/8" / FT.
SLOPE 1/8" / FT.
SLOPE
1/8" / FT.
SLOPE 1/8" / FT.
SLOPE
1/8" / FT.
SLOPE
1/8" / FT.
SLOPE 1/8" / FT.
SLOPE 1/8" / FT.
-1' - 0"
-1' - 2 3/4"
-1' - 9"-1' - 10"
-1' - 10 1/2"
-1' - 2" -1' - 10"-1' - 11"-2' - 0"
-1' - 8" -1' - 7" -1' - 6" -1' - 5" -1' - 4" -1' - 3"
-1' - 2 3/4" -1' - 2 3/4"
SLOPE
1/8" / FT.
-1' - 0"
-1' - 2 3/4"
-1' - 0"-1' - 0"
-1' - 1 1/4"-1' - 1 1/4" -1' - 0"
-1' - 8 1/4"
1 REMOVE EXISTING 4-1/2" THICK
HOUSEKEEPING PAD ATOP EXISTING
BOILER PAD. AFTER REMOVAL,
ROUGHEN SURFACE & FILL ALL
VOIDS W/ NON-METALLIC NON-
SHRINK HIGH STRENGTH GROUT.
SHEET NOTES
AN EXISTING FLOOR DRAIN PIPE IS
LOCATED BELOW BOTTOM OF
PROPOSED TRENCH IN
APPROXIMATE LOCATIONS SHOWN
(REFER TO DWG PL101).
CONTRACTOR SHALL BE CAREFUL
NOT TO DAMAGE EXISTING PIPE
THAT IS TO BE LEFT IN PLACE. IN
LOCATIONS WHERE NEW TRENCH
PILES ARE TO BE CONSTRUCTED,
CONTRACTOR SHALL DETERMINE
DRAIN PIPE LOCATION PRIOR TO
INSTALLATION OF PILING TO AVOID
INTERFERENCE. SHOULD DRAIN PIPE
INTERFERE WITH PILING, DRAIN PIPE
SHALL BE RELOCATED.
AN EXISTING FLOOR DRAIN PIPE IS
LOCATED AT AN ELEVATION BELOW
THE BOTTOM OF EXISTING
TRENCHES IN APPROXIMATE
LOCATIONS SHOWN (REFER TO DWG
PL101). CONTRACTOR SHALL BE
CAREFUL NOT TO DAMAGE EXISTING
PIPE THAT IS TO BE LEFT IN PLACE.
IN LOCATIONS WHERE NEW PILES
OR BOILER PADS ARE TO BE
CONSTRUCTED, CONTRACTOR
SHALL DETERMINE DRAIN PIPE
LOCATIONS TO AVOID DAMAGE DUE
TO EXCAVATION OR INSTALLATION
OF PILING.
SAW-CUT FLOOR TO ACCOMMODATE
FLOOR CLEAN OUT RELOCATION.
COMPACT SOIL & PATCH FLOOR
WITH CONCRETE TO MATCH
EXISTING. REFER TO DWG PL101.
-1' - 2"
-1' - 1"
-1' - 2"
-1' - 1"
-1' - 0"
13.313
M.8 6' - 8"
S203
S203
7'
/2
W8X10
W8X10
W 8X
W 8X
C 4X
4.
C 4X
4.
W 8X
W
8X
W 8X
W
8X
W8X10W8X10
HSS 4 x 4 x ¼"
COLUMNS, TYP.
5 LOCATIONS
W 8X
W 8X
C4X4.5 C4X4.5
W8X10W8X10
3' - 0 1/2"
4'
/4
C4X4.5
C 4X
4.
3' - 0 1/2"
4'
/4
FIELD VERIFY
2' - 0"
ATTACH C4X4.5 TO EXISTING
CONCRETE WALL W/ 3/8" Ø X
4" LONG WEDGE ANCHOR -
TYP. 2 PER LENGTH OF
CHANNEL (6 THIS SIDE).
ATTACH C4X4.5 TO EXISTING
CONCRETE WALL W/ 3/8" Ø X 4" LONG
WEDGE ANCHOR - TYP. 2 PER
LENGTH OF CHANNEL (6 THIS SIDE).
T Y
P
1'
TYP.
1' - 0"
OPEN
S203
S203
12' - 9"
C 4X
4.
C 4X
4.
C 4X
4.
C 4X
4.
C 4X
4.
C 4X
4.
C 4X
4.
C4X4.5
EXST.
STAIR
LANDING
C4X4.5 C4X4.5
B E
T W
E E
N W
8X
B E
A M
S , T
Y P
13.313
M.8
S203
S203
3' - 0" 3' - 0"
12' - 9"
6' - 6" (78")
CL TO BOLTSCL
7'
/2
/2
C L T
O
B
O L
T S
C L
6' Ø TANK
STAND BASE
6' - 9" (81")
2'
0"
±4'
/4
4'
/4
3'
T A
N K
L E
N G
T H
4'
4'
S T
A N
D B
A S
E
8'
STAND BASE
5'
6' - 6"
3'
/2
18' - 0"
2' - 0 1/2" ±
EXST.
STAIR
LANDING
3' - 0"
102102
DEMOLISH EXST.
HAND RAILING
THIS AREA
102102
13.313
W8X10
HSS 4 X 4 X ¼"
6" X 6" X 1/4"
BASE PLATE.
ANCHOR TO
EXST. PIT FLOOR.
EXST. PIT
WALL
C4X4.5
1-½" Ø HANDRAILING
W/ STD. 4" KICK
PLATE, TYP.
21"
42"
CONDENSATE
SURGE TANK
ELEVATED TANK SUPPORT
FRAME BY OTHERS
S203
1/4"
TYP.
C4X4.5
EXST. WALL
3/8" Ø
WEDGE
ANCHOR
COPE CHANNEL
FLANGES, TYP.
CL
CL
C4X4.5
214214
1/4" x 6" x 6" PLATE
1/4"
TYP. ALL
AROUND
HSS 4 x 4 x 1/4
1 1/2"
81" OUTSIDE FRAME WIDTH
78" TO ANCHOR BOLTS
SURGE TANK BASE
W8X10
7/8" Ø BOLT, ATTACH BASE
FRAME TO W8X10
CL
CL CL
1 1/8"
4"
1/4"
TYP. ALL
AROUNDTYP.
1"
3/8" Ø X 3" LONG
WEDGE ANCHORS,
TYP. 2 PER COLUMN
1/4" x 8" x 8" PLATE
EXST.
CONCR.
SLAB
W8X10
L3 X 3 X 1/4 - 3" LONG
ANGLE CLIP EA. SIDE
OF W8X10 WEB.
3/8" Ø X 4" LONG
WEDGE ANCHOR,
TYP. 1 PER
ANGLE CLIP
EXIST. WALL
1/4
TYP.214
Design, Inc.
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 533-4437
COA: FL #29578
AKEA Project No. 128-16
RICHARD G. WHEELER 23064
CONDENSATE TANK PLATFORM
MAY 15, 2017 RGW JG
S203
3/4" = 1'-0"
1 STRUCTURAL PLATFORM FRAMING PLAN
1/2" = 1'-0"
NEW MEZZANINE PLATFORM FOR
CONDENSATE SURGE TANK
1/2" = 1'-0"
3 MEZZANINE PLATFORM CROSS SECTION
KEY VALUE KEYNOTE TEXT
101 CUT AWAY PORTION OF EXISTING 6.5" SLAB AS
REQUIRED TO FACILITATE INSTALLATION OF NEW
COLUMN BASE PLATE.
102 EXST. W10 BEAM & STEEL GRATE BALCONY TO BE
DEMOLISHED IN PHASE 3.
201 NEW HAND RAILING TO BE INSTALLED IN PHASE 3.
202 NEW HAND RAILING THIS SIDE. SEE SECTION 3/S203
214 WELDED BAR GRATING, GW SERIES, 1" X 1/8" BAR
BEARING SIZE; 1 3/16" CENTER TO CENTER BAR
SPACINGS, TYP. - WELD TO NEW STRUCTURAL STEEL
CHANNEL FRAMING AND ANGLE CLIPS.
1 1/2" = 1'-0"
6 STRUCTURAL PLATFORM CONNECTION DETAIL
9' - 0"
FIELD VERIFY
N
NOTE: COORDINATE MEZZANINE DIMENSIONS W/
SELECTED CONDENSATE SURGE TANK.
1 1/2" = 1'-0"
4 DETAIL - MEZZANINE PLATFORM ATTACHMENT
N
10"
3' - 3"
3 #5 HORIZ.,
BOTH SIDES
3 #5 TOP;
4 #5 BOTTOM
0' - 10" 1' - 6" 0' - 10"
8"
12"
MIN.
#5 @ 12"
O.C. TYP.
2" COVER
TYP.
NEW PILING @
10' O.C. MAX.
1' - 7 1/2"
CL
209209
2" COVER,
TYP.
10" 1' - 6"
2' - 4 1/2" VARIES
24"
10"
CL
12"
MIN.
8"
209 210
1' - 6" ± *
12"
MIN.
8"
3 #5
104104
FIELD VERIFY BEFORE CUTTING
#5 @ 12
210 210
1' - 6"
12"
MIN.
2' - 4 1/2"
205204
8"
10"
210 209
1/4" x 2 3/4" H.H.
BOLT @ 18" O.C.
CONT. "O"
RING VINYL
SEALS
#10-24 x 5/8" S.S.
SCREW @ 24" O.C.
1 1/4"
NOTE: AS AN ALTERNATIVE, CONTRACTOR
MAY OPT TO INSTALL SUPPORT
FRAME AFTER NEW CONCRETE HAS
CURED. REFER TO DETAIL 1B/S204.
FACTORY SUPPLIED CAST-IN-PLACE STEEL
FRAME SPECIFICALLY DESIGNED & SUPPLIED
FOR USE AS TRENCH COVER SUPPORT.
NEW PILING
3' - 0"
10' - 7"
BOILER & SUPPORT FRAMING
TO SPAN EXST. TRENCH
NEW 4" CURB ON
EXISTING PAD, SEE
SECTION 4/S205
10"
4"4"
10"
104 206
207 4 #5 W/
STD. HOOK
3' - 0"
4"
NEW 4" CURB,
SEE SECTION
5/S205
10" 1' - 6"
2' - 4 1/2" 2' - 0"
CL
209 210
12"
MIN.
8"
3"
2"
3/8" X 2-1/2"
WEDGE ANCHOR
@ 18" O.C. TYP.
L3 X 2 X 1/4
EXST. CONCR.
1/4"
2"
Design, Inc.
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 533-4437
COA: FL #29578
AKEA Project No. 128-16
RICHARD G. WHEELER 23064
SECTIONS & DETAILS
MAY 15, 2017 RGW JG
S204
1 1/2" = 1'-0"
1 TYPICAL NEW TRENCH SECTION
1" = 1'-0"
2 TRENCH @ PILE CAP INTERFACE
1" = 1'-0"
2B TRENCHING @ EXISTING PILE CAP & BOILER PAD INTERFACES
1" = 1"
1A DETAIL - CAST-IN-PLACE TRENCH COVER SUPPORT
1" = 1'-0"
3 NEW BOILER PAD & CURBING TO SUPPORT BOILER
1" = 1'-0"
2A TRENCH @ EXISTING BOILER PAD INTERFACE
1" = 1"
1B DETAIL TRENCH COVER SUPPORT FRAME @ EXISTING CONCRETE
1.
2.
EXISTING PILE CAPS ARE NOT VISIBLE FROM
SURFACE. CONTRACTOR SHALL EXPOSE
PRIOR TO TRENCH CONSTRUCTION.
CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS BEFORE CUTTING
EXISTING SLAB.
KEY VALUE KEYNOTE TEXT
103 EXISTING REINFORCED 10" FLOOR SLAB TO REMAIN.
104 EXISTING 24" THICK BOILER PAD W/ 4 PILES TO
REMAIN.
106 EXISTING 24" THICK PILE CAP TO REMAIN.
107 EXISTING 24" DEEP, 30" WIDE TRENCH TO REMAIN.
108 SAW CUT & REMOVE EXISTING 10" FLOOR SLAB.
203 DRILL HOLE & EPOXY GROUT, TYP.
204 #5 DOWEL, MID DEPTH & 4" EMBEDMENT EACH SIDE,
@ 18" O.C., TYP.
205 NEW TRENCH; SEE SECTION 1/S204 FOR
REINFORCING
206 NEW 4 PILE BOILER PAD, 24" THICK W/ #7 @ 12" TOP
& BOTTOM, EACH DIRECTION.
207 1/2" PREMOLDED EXPANSION JOINT.
208 1/4" DIAMOND PLATE STEEL TRENCH COVER.
209 CAST-IN-PLACE TRENCH COVER SUPPORT. REFER
TO DETAIL 1A/S204
210 TRENCH COVER SUPPORT AT EXISTING CONCRETE.
REFER TO DETAIL 1B/S204
218 REFER TO S202 FOR DEPTH.
SHEET NOTES
10" 18"
8"
12"
MIN.
4' - 2" 18"
8"
12"
MIN.
1' - 3 1/4" 6 3/4" 10" 12" 12"
204205 204 205
1' - 9 1/4" 5' - 2" 1' - 0 3/4"
CL CL
203203203 203203
BOILER SUPPORT
FRAMING BY
OTHERS, TYP.
2' - 4 1/2"
2' - 4 1/2"
103 103
209 210 209210
218 218
12"
10" 18"
8"
12"
MIN.
203203
2' - 4 1/2"
11"
209 210
12"
203203
11"
1' - 10"
7' - 5"
1' - 10"3' - 8"10"
7" 4' - 2" 7"
4 #5 W/STD HOOK
NEW PILING
103 103 1' - 1" 5' - 2" 1' - 1"
CL CL
CL CL
1' - 10"
7' - 5"
1' - 10"3' - 8"
7" 4' - 2"
4 #5 W/STD HOOK
NEW PILING
7"
1' - 1" 5' - 2" 1' - 1"
212212
CL CL
CL CL
10" 1' - 6" 1' - 6" 10"
8"
7' - 4"
7" 4' - 2"
12"
MIN.
12"
MIN.
8"
12' - 1"
2' - 4" 1' - 10" 3' - 8" 1' - 10" 2' - 4"
4 #5 W/STD HOOK
NEW PILING
7"
12" 12"
212212
103 103
1' - 1" 5' - 2" 1' - 1"
CL C
L
CL CL
208 208
209209 209209
218 218
12"
4"
6"
2 #5 CONT.
#5 @ 12" O.C., BARS BENT AS
INDICATED.
3/4" CHAMFER, TYP.
1 1/2" COVER, TYP.
8"
CLEAN EXISTING CONCRETE
SURFACE, ROUGHEN & APPLY
ADHESIVE BETWEEN EXISTING &
NEW CONCRETE (PRIOR TO
CONCRETE PLACEMENT)
12"
2#5 CONT.
#5 @ 12" W/STD
HOOKS EACH END
3/4" CHAMFER, TYP.
#7 @ 12" O.C. TOP & BOTTOM, EA. WAY.1 1/2" COVER, TYP.
4"
#3 SPIRAL CAGE
4 #5 BARS, TIE INTO
BOTTOM OF TRENCH &
BOILER PADS W/ #5
DOWELS W/ STD HOOKS. 1 1/2"
COVER
8" Ø PILE
1" = 1'-0"
4 SECTION - NEW TRENCHES & CURBS @ EXISTING STRUCTURAL PAD
Design, Inc.
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 533-4437
COA: FL #29578
AKEA Project No. 128-16
RICHARD G. WHEELER 23064
SECTIONS & DETAILS
MAY 15, 2017 RGW JG
S205
1" = 1'-0" 4A
SECTION - NEW TRENCHES & CURBS
@ EXISTING STRUCTURAL PAD
1" = 1'-0" 4B
SECTION - NEW CURBS ON
EXISTING STRUCTURAL PAD
1" = 1'-0"
5 SECTION - NEW BOILER PAD & CURBS @ EXISTING TRENCH
1" = 1'-0"
5A SECTION - NEW BOILER PAD & CURBS @ EXISTING SLAB
1" = 1'-0"
5B SECTION - NEW BOILER PAD, TRENCHES, & CURBS @ EXISTING SLAB
NEW BOILER #3
3" = 1'-0"
6 DETAIL - NEW CURB TO EXISTING CONCRETE
3" = 1'-0"
7 DETAIL - NEW CURB CAST W/ NEW BOILER PAD
KEY VALUE KEYNOTE TEXT
103 EXISTING REINFORCED 10" FLOOR SLAB TO REMAIN.
104 EXISTING 24" THICK BOILER PAD W/ 4 PILES TO
REMAIN.
105 EXISTING 4-1/2" ELEVATED HOUSEKEEPING PAD
(ATOP BOILER PAD) TO BE DEMOLISHED.
107 EXISTING 24" DEEP, 30" WIDE TRENCH TO REMAIN.
108 SAW CUT & REMOVE EXISTING 10" FLOOR SLAB.
203 DRILL HOLE & EPOXY GROUT, TYP.
204 #5 DOWEL, MID DEPTH & 4" EMBEDMENT EACH SIDE,
@ 18" O.C., TYP.
205 NEW TRENCH; SEE SECTION 1/S204 FOR
REINFORCING
206 NEW 4 PILE BOILER PAD, 24" THICK W/ #7 @ 12" TOP &
BOTTOM, EACH DIRECTION.
207 1/2" PREMOLDED EXPANSION JOINT.
208 1/4" DIAMOND PLATE STEEL TRENCH COVER.
209 CAST-IN-PLACE TRENCH COVER SUPPORT. REFER
TO DETAIL 1A/S204
210 TRENCH COVER SUPPORT AT EXISTING CONCRETE.
REFER TO DETAIL 1B/S204
211 ELEVATED CURB, ATTACH TO EXISTING CONCRETE.
SEE DETAIL 6/S205
212 ELEVATED CURB, CAST WITH NEW BOILER PAD. SEE
DETAIL 7/S205
213 NEW BOILER SUPPORT FRAMING BY OTHERS.
218 REFER TO S202 FOR DEPTH.
NEW BOILER #2 NEW BOILER #1
6" = 1'-0"
8 DETAIL - TYPICAL NEW PILE REINFORCEMENT
NEW C6X8.2, TYP.
PHASE 3
EXISTING CONCRETE
DECK TO REMAIN.
EXISTING
CONCRETE
DECK TO
REMAIN.
EXISTING 7'-0" Ø
OPENING TO REMAIN.
PHASE 1
3" MIN.
TYP.
3" MIN.
TYP.
217217
NEW 30" Ø STACK PIPE,
(W/ INSULATION - 34"
O.D. SHOWN) TYP. 3
LOCATIONS
NEW 30" Ø STACK PIPE,
(W/ INSULATION - 34"
O.D. SHOWN) TYP. 3
LOCATIONS
EXISTING CONCRETE
DECK TO REMAIN.
EXISTING 7'-0" Ø OPENING
TO REMAIN. EXISTING
ROOF CURB & COVER TO
BE REMOVED.
EXISTING
CONCRETE
DECK TO
REMAIN.
NEW C6X8.2, TYP.
PHASE 3PHASE 1
217217
219 219
* 6" ** 4 3/4"
EXST.
CONCR.
DECK
* 3" ** 2 1/4"
L3 X 3 X 1/4 - 3" LONG ANGLE CLIP.
WELD TO DECKING. ATTACH TO
EXST. CONCR. W/ 1/4" Ø X 2" LONG
WEDGE ANCHORS.
1/4" GALVANIZED METAL
PLATE, WELDED TO NEW
CHANNEL FRAMING.
1/4" GALVANIZED METAL
PLATE, WELDED TO NEW
CHANNEL FRAMING.
NEW 45" X 45" ROOF CURB,
TYPICAL EACH STACK.
REFER TO DETAIL 8/S206
PHASE 3
* 6" ** 4 3/4"
EXST.
CONCR.
DECK
* 3" ** 2 1/4"
L3 X 3 X 1/4 - 3" LONG ANGLE
CLIP. WELD TO CHANNEL
FRAMING. ATTACH TO
EXST. CONCR. W/ 1/4" Ø X
2" LONG WEDGE ANCHORS.
C6
CHANNEL
ROUND METAL HOOD
SECURED TO FLUE
WITH STAINLESS
STEEL BAND CLAMP
EPDM FLASHING STRIP
EPDM BASE SHEET
EPDM CAP SHEET
EPDM COMPATIBLE SEALANT
BOILER FLUE
1/4" GALVANIZED STEEL
ROOF DECK PLATE
MIN.
2"
POLYISOCYANURATE
BOARD, DEPTH
VARIES W/ SLOPE.
TREATED WOOD
NAILER, DEPTH
AS REQ'D.
GENERAL NOTES: POLYISO BOARD VARIES IN THICKNESS TO CREATE RIDGES &
VALLEYS TO SLOPE TO DRAINS. PREFABRICATED TAPERED PANELS
SHALL BE UTILIZED TO CREATE SLOPE AND ALL LAYOUTS SHALL BE
CLEARLY DEFINED IN SHOP DRAWINGS & COORDINATED WITH ALL
PENETRATIONS RELATIVE TO DEPTH OF INSULATION.
36 1/2"
30°
37 1/2" 6 1/2"
10" 10"
7 1/2"
1' - 8"
2 1/2"
EXIST. 4' - 7" Ø
STACK OPENING
EXIST. 7' - 0" Ø
STACK OPENING
EXST. CONCR. DECK
SAWCUT / REMOVE PORTION OF EXISTING
REINFORCED CONCRETE DECKING TO
FACILITATE NEW STACKS.
8 1/4"
* 6" ** 4 3/4"
EXST.
CONCR.
DECK
* 3" ** 2 1/4"
214 216
NEW C6X8.2
1/4" Ø X 2" LONG
WEDGE ANCHOR
Design, Inc.
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 533-4437
COA: FL #29578
AKEA Project No. 128-16
RICHARD G. WHEELER 23064
BOILER STACK FRAMING & DETAILS
MAY 15, 2017 RGW JG
S206
1/2" = 1'-0"
2 TYPICAL INTERIOR STACK FRAMING PLAN (SEE 3/S206 FOR ROOF)
1/2" = 1'-0"
3 STACK FRAMING PLAN - ROOF LEVEL
N
3" = 1'-0"
DETAIL - STRUCTURAL FRAMING - DECKING &
ANGLE CLIP TO EXISTING CONCRETE DECK
1/2" = 1'-0"
4 STACK IN STAIRWELL - ROOF FINISHING PLAN
N
KEY VALUE KEYNOTE TEXT
214 WELDED BAR GRATING, GW SERIES, 1" X 1/8" BAR BEARING SIZE; 1 3/16" CENTER TO
CENTER BAR SPACINGS, TYP. - WELD TO NEW STRUCTURAL STEEL CHANNEL FRAMING
AND ANGLE CLIPS.
215 ATTACH L3 X 3 X 1/4 X 3" LONG ANGLE CLIPS TO EXISTING CONCRETE W/ 1/4" X 2" LONG
WEDGE ANCHORS. WELD GRATING & METAL PLATE TO CLIPS. SEE DETAIL 6/S206
216 1/4" GALVANIZED METAL PLATE, WELDED TO NEW STRUCTURAL STEEL CHANNEL
FRAMING AND ANGLE CLIPS. CUT TO WITHIN 1/2" BETWEEN STACKS & PLATING.
217 SEE 5/S206 FOR TYPICAL C6X8.2 TO EXISTING CONCRETE ATTACHMENT DETAIL.
219 ATTACH NEW C6X8.2 TO EXISTING CONCRETE. REFER TO DETAIL 7/S206
3" = 1'-0"
DETAIL - STRUCTURAL FRAMING - DECKING &
END OF CHANNEL TO EXISTING CONCRETE DECK
N
3" = 1'-0"
8 DETAIL - NEW ROOF CURB
1/2" = 1'-0"
1 TYPICAL STAIRWELL SLAB DEMOLITION PLAN
N
3" = 1'-0"
DETAIL - DECKING & CHANNEL
FRAMING TO EXISTING CONCRETE DECK
INTERIOR FLOORS
ROOF DECK
NOTE: FOR DETAILS 5, 6, & 7
CUT TO WITHIN 3" BETWEEN STACKS & GRATING.
18.617.716.715.814.914.113.313
M
N
M.7
M.8
181716
L
4" HUB DRAIN TO
BE REMOVED
F.C.O. TO BE RELOCATED
4" VENT
UP
4" HUB DRAIN
TO REMAIN
4" HUB DRAIN TO
BE REMOVED 4" F.D. TO
REMAIN
4" F.D. TO BE
REMOVED
4" F.D. TO BE
REMOVED
EXISTING
TRENCH, TYP.
4" F.D. TO
REMAIN
F.C.O. TO
REMAIN
4" F.D. TO
REMAIN
4" F.D. TO
REMAIN
4" F.D. TO
REMAIN
F.C.O. TO
REMAIN
SAW CUT FLOOR TO ACCOMMODATE F.C.O. RELOCATION.
PATCH FLOOR TO MATCH EXISTING AND SEAL RELOCATED F.C.O.
NEW 4" C.I.
SANITARY
PIPING
1 2
1 2
1 2
2' - 6"
4" F.D. TO
REMAIN
3 33
Design, Inc.
ENGINEER-OF-RECORD Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th i nc h o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs i nc h o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FL. P.E. NO.
APPROVED FOR CONSTRUCTION
Office of
Construction and Facilities Management
Department of Veterans Affairs
BLDG 100 ENERGY CENTER
516-15-107
BAY PINES, FLORIDA
100% DESIGN
DESIGN TO REPLACE BOILERS,
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 533-4437
COA: FL #29578
AKEA Project No. 128-16
STEPHEN T. STEFFE 70349
OVERALL PLUMBING DEMOLITION / NEW PLAN
MAY 15, 2017 STS JG
PL101
1/4" = 1'-0"
1 OVERALL PLUMBING DEMOLITION / NEW PLAN
CAP AND PLUG SANITARY DRAIN PIPE BELOW FLOOR
AT FLOOR DRAIN OR HUB DRAIN TO BE REMOVED.
CAP AND PLUG SANITARY DRAIN PIPE BELOW FLOOR
AT THE LOWEST LEVEL POSSIBLE TO AVOID
INTERFERENCE OF NEW TRENCH OR CONCRETE PAD.
3 FLOOR AREA TO BE DEMOLISHED TO
ACCOMMODATE NEW TRENCHES & BOILER PADS,
TYP. SEE STRUCTURAL.
4 PILE CAP / STRUCTURAL FOUNDATION
BELOW SLAB, TYP.