About this file

36C24818R0121 00002 36C24818R0121 RFIs2_AKEA Design Response.pdf

View the file

Other files

File Type Posted
36C24818R0121-0006002.pdf PDF
36C24818R0121-0006000.docx DOCX document
36C24818R0121-0006001.docx DOCX document
36C24818R0121-0005002.docx DOCX document
36C24818R0121-0005000.docx DOCX document
36C24818R0121-0005001.pdf PDF
36C24818R0121-0004000.docx DOCX document
36C24818R0121-0004001.docx DOCX document
36C24818R0121-00003000.docx DOCX document
36C24818R0121-00003003.pdf PDF
36C24818R0121-00003001.pdf PDF
36C24818R0121-00003002.docx DOCX document
36C24818R0121-00002003.pdf PDF
36C24818R0121-00002000.docx DOCX document
36C24818R0121-00002002.pdf PDF
36C24818R0121-00001001.pdf PDF
36C24818R0121-00001004.xlsx XLSX spreadsheet
36C24818R0121-00001002.docx DOCX document
36C24818R0121-00001000.docx DOCX document
36C24818R0121-00001003.pdf PDF
36C24818R0121-007.pdf PDF
36C24818R0121-003.docx DOCX document
36C24818R0121-015.pdf PDF
36C24818R0121-005.pdf PDF
36C24818R0121-014.pdf PDF
36C24818R0121-009.pdf PDF
36C24818R0121-008.pdf PDF
36C24818R0121-004.pdf PDF
36C24818R0121-001.docx DOCX document
36C24818R0121-012.pdf PDF
36C24818R0121-016.doc DOC document
36C24818R0121-006.pdf PDF
36C24818R0121-011.pdf PDF
36C24818R0121-002.pdf PDF
36C24818R0121-013.pdf PDF
36C24818R0121-010.pdf PDF
36C24818R0121-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAW Contracting, Inc.

2625 Production Rd, Ste A

Virginia Beach, VA 23454 www.sawcontracting.com

2625 Production Rd, Ste A, Virginia Beach, VA 23454

REQUEST FOR INFORMATION

Subject: Prebid RFIs No.

PROJECT: Replacement of Energy Plant Boilers Building 100 DATE: 5/17/18

TO: Department of Veterans Affairs Contract #: 36C24818R0121

STARTED:

ATTN: Thomas Lucas REQUIRED:

REQUEST:

Please provide a ductile iron pile specification and geotechnical report. The pile manufacturer requests this information for them to evaluate driving conditions.

Request By: SAW Contracting, Inc.

Signed:_____________________________________ Date: 05/17/2018

RESPONSE:

Answered By:

Signed:______________________________________ Date:______________________________________

RHensley Typewritten Text Attached please find the geotechnical investigation report that was used as the basis for design. Ductile iron pipe shall be strong enough to be driven without warp or deflection. Pile driving contractor shall determine ductile iron pipe properties.

RHensley Typewritten Text 5-24-2018

RHensley Typewritten Text

RHensley Typewritten Text Richard Wheeler, PE

RHensley Typewritten Text

2018-05-25T14:19:31-0400
Richard G. Wheeler

File details come from the government source that posted it.