36C24818Q0826-031.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Services; Environmental Remediation Services
- Solicitation number
- 36C24818Q0826
About this file
36C24818Q0826 Task Order One Pricing.xlsx
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page
| Environmental Remediation Services Task Order 1 |
| RFQ 36C24818Q0826 |
Please fill in the Excel document as is
| 1. Company Name: |
| 2. DUNS #: |
| 3. Socio-economic status: |
| 4. Full Adress: |
| 5. Point of contact info: |
| The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. |
| PLEASE SUBMIT YOUR QUOTE USING THIS TEMPLATE. |
Task order 1
ESTIMATE WORKSHEET TASK ORDER 1
| PROJECT NO. | LOCATION | PROJECT NAME | |
| N/A | Bay Pines VA Healthcare System | Environmental Remediation Services Task Order 1 | |
| TYPE OF ESTIMATE | The quantities of supplies or services specified in the Schedule are estimates for Task order One. | Period of Performance | |
| Exhibit Line Item Numbers (ELIN)(s) Projections | 08-21-2018 - 08-20-2019 | ||
| CLIN ID | SYSTEM/SUBSYSTEM | Mental Health |
Department of Veterans Affairs: Department of Veterans Affairs:
Insert quantities for Mental Health Site Building 40 Department of Veterans Affairs: Department of Veterans Affairs:
| Insert quantities for Building 40 site | Total qty task order 1 | UNIT | $/UNIT | TOTAL | MATERIALS | TOTAL | |||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | COST | |||||||||
| Environmental Remediation Services | |||||||||||||||||
| 0 | 0 | 0 | 1 | FILE REVIEW | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 1a | Site Health & Safety Plan | 0 | 0 | 0 | Per Review | $ - 0 | $ - 0 | $ - 0 | ||||||
| 0 | 0 | 0 | 1b | Site Health & Safety Plan for Continued Work | 0 | 0 | 0 | Per Site | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 1c | Notice of Discovery of Contamination Package (Initial or TPOC) | 0 | 0 | 0 | Per Site | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 1d | Permit Fees (actual fee only, cost to obtain permit is included in applicable pay items) | 0 | 0 | 0 | Per Package | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 2 | FIELD ACTIVITIES - GENERAL | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 2a | Site Reconnaissance/Field Measurement Visit | 0 | 0 | 0 | Per Visit | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 2b | Receptor Survey and Exposure Pathway Identification (includes report) | 0 | 0 | 0 | Per Survey | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 2c | Professional Land Survey subject to FDEP authorization to perform and the SPI displaying the cost not to exceed as supported by quote(s) prior to performance | 0 | 0 | 0 | Per Visit | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 2d | Contractor Oversight for Non-Price Schedule Activities | 0 | 0 | 0 | Per Day | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3 | MOBILIZATION | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 3a | Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3b | Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3c | Work Trailer - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3d | DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3e | Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3f | Excavator Mobilization - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3g | LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3h | Loader/Backhoe Mobilization - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 3i | Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 3j | Drum Compactor mobilization - ≤ 100 miles each way | 0 | 0 | 0 | Per Round Trip | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 4 | MEALS AND LODGING | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 4a | Per Diem - For travel > 1 consecutive day (prorated in quarter day incrementsin accordance with 112.061,F.S.) - Travel Voucher required and quoted rate should be per person per day | 0 | 0 | 0 | Per Person, | |||||||||
| Per Day | $ - 0 | $ - 0 | |||||||||||||||
| 0 | 0 | 0 | 5 | DRILLING AND BORING | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 5a | Split Spoon Sampling – 2 foot (during boring) < 50 feet | 0 | 0 | 0 | Per spoon | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5b | Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet | 0 | 0 | 0 | Per spoon | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5c | Sonic Core Sampling - 5 or 10 foot (during boring) | 0 | 0 | 0 | Per core | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5d | Hand Auger Boring ≤ 10 foot total depth | 0 | 0 | 0 | Per boring | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5e | Direct Push Technology (DPT) Rig and Equipment | 0 | 0 | 0 | Full day | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5f | DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate) | 0 | 0 | 0 | Full day | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5g | HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5h | HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5i | Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 5j | Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6 | WELL INSTALLATION | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 6a | Well Installation - 1 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6b | Well Installation - 2 inch diameter (vertical) | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6c | Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling) | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6d | Well Installation - 4 inch diameter (vertical) | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6e | Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling) | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6f | Well Installation - 6 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6g | Surface Casing - 6 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6h | Additional Well Screen > 20 feet - 1 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6i | Additional Well Screen > 20 feet - 2 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6j | Additional Well Screen > 20 feet - 4 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6k | Additional Well Screen > 20 feet - 4 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6l | Additional Well Screen > 20 feet - 6 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6m | Above Grade Well Completion | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6n | Installation of Well Vault - 2 x 2 x 2 foot | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6o | Installation of Well Vault - 4 x 4 x 2 foot | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 6p | Well Redevelopment | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 7 | WELL ABANDONMENT | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 7a | Grout and Abandon Well, 1 to 2 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 7b | Grout and Abandon Well, > 2 to 4 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 7c | Grout and Abandon Well, > 4 to 6 inch diameter | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 7d | Removal of Well Vault - 2 x 2 x 2 foot | 0 | 0 | 0 | Per Vault | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 7e | Removal of Well Vault - 4 x 4 x 2 foot | 0 | 0 | 0 | Per Vault | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 7f | Removal of Well Pad and Manhole | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8 | SAMPLE COLLECTION AND FIELD TESTING | $ - 0 | ||||||||||||
| 0 | 0 | 0 | 8a | Monitoring Well Sampling with Water Level, ≤ 100 foot depth | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8b | Domestic Water Well Sampling | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8c | Other Water Sampling | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8d | Free Product Sample Collection | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8e | Soil/Sediment Sample Collection | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8f | Water Level or Free Product Gauging | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8g | Free Product Gauging & Bailing | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8h | Electronic Data Deliverables (EDD) | 0 | 0 | 0 | Per Sampling Event | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8i | Survey Latitude/Longitude of Existing Monitor Wells | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 8j | Survey Latitude/Longitude of New Monitor Wells | 0 | 0 | 0 | Per Well | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 0 | 9 | LABORATORY ANALYSIS | |||||||||||||
| 0 | 0 | 1 | 0 | SOIL/SEDIMENT ANALYSIS | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 0a | Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0b | Soil, BTEX + MTBE (EPA 8021 or EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0c | Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260 | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0d | Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0e | Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0f | Soil, Priority Pollutant Volatile Organics (EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0g | Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270]) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0h | Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0i | Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0j | Soil, PCBs [or Aroclors] (EPA 8082) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0k | Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0l | Soil, Arsenic (EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0m | Soil, Cadmium (EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0n | Soil, Chromium (EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0o | Soil, Lead (EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0p | Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0q | Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312 | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0r | Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0s | Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0t | Soil, Moisture Content (ASTM D2216-10) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0u | Soil, Texture, (See Gee 7 Bauder [1966]) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0v | Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0x | Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes | |||||||||||||
| and olefins) (EPA 8260Mod, High Resolution GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||||||
| 0 | 0 | 1 | 0y | Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 0z | Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1 | WATER ANALYSIS | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 1aa | Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ab | Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ac | Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ad | Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ae | Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1af | Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ag | 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ai | Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1aj | Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ak | Water, Priority Pollutant Volatile Organics (EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1al | Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625]) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1am | Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g.,EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1an | Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ao | Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ap | Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1aq | Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ar | Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1as | Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1at | Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1au | Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1av | Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1aw | Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ax | Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ay | Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1az | Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1ba | Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bb | Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bc | Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bd | Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1be | Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bf | Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bg | Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bh | Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bi | Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bj | Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bk | Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bl | Water, Heterotrophic Plate Count (SM 9215 B) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bm | Water, Acute Bioassay-96 Day, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bn | Water, Acute Bioassay-96 Day, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bo | Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bp | Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bq | Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1br | Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bs | Water, BTEX/MTBE + Naphthalene (EPA 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bt | Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 1bu | Water, Methane (EPA SOP RSK-175) | 0 | 0 | 0 | Per Sample | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2 | SOIL SOURCE REMOVAL RELATED | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 2a | Sheet Piling Installation for ≤ 20 feet deep Excavation | 0 | 0 | 0 | Per Sq. Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2b | Sheet Piling Rental for ≤ 20 feet deep Excavation | 0 | 0 | 0 | Per Sq. Foot/Day | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2c | Sheet Piling Installation for > 20 feet deep Excavation | 0 | 0 | 0 | Per Sq. Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2d | Sheet Piling Rental for > 20 feet deep Excavation | 0 | 0 | 0 | Per Sq. Foot/Day | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2e | Conventional Soil Excavation and Loading ≤ 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2f | LDA Excavation and Loading Without Casing ≤ 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2g | LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2h | LDA Excavation and Loading With Driven Casing < 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2i | Flowable Fill Concrete and Installation | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2j | Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2k | Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2l | Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2m | Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards | 0 | 0 | 0 | Per Cubic Yard | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2n | Pea Gravel | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2o | #57 Stone | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2p | Dewatering System, up to 12 well points (includes installation) | 0 | 0 | 0 | Per Day | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 2q | Dewatering System, up to 12 well points (includes installation) | 0 | 0 | 0 | Per Week | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 3 | PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 3a | Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity | 0 | 0 | 0 | Per Tank | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 3b | Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity | 0 | 0 | 0 | Per Tank | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 3c | Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity | 0 | 0 | 0 | Per Tank | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 3d | Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity | 0 | 0 | 0 | Per Tank | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4 | DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 4a | Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness | 0 | 0 | 0 | Per Square Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4b | Loading, Transport and Disposal/Recycle Clean Overburden | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4c | Transport and Disposal of Clean Concrete | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4d | Transport and Disposal of Mixed Debris | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4e | Transport and Disposal of Petroleum Impacted Soil (includes 50 gallon drum) | 0 | 0 | 0 | Per Drum | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4f | Transport Petroleum Impacted Soil (bulk) ≤ 100 miles | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4g | Transport Petroleum Impacted Soil (bulk) > 100 miles | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4h | Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4i | Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4j | Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4k | Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons | 0 | 0 | 0 | Per Ton | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4l | Transport and Disposal of Petroleum Contact Water (includes drum) | 0 | 0 | 0 | Per Drum | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4m | Transport and Disposal of Petroleum Contact Water (bulk) | 0 | 0 | 0 | Per Gallon | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4n | Transport and Disposal of Petroleum Product (includes drum) | 0 | 0 | 0 | Per Drum | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4o | Transport and Disposal of Petroleum Product (bulk) | 0 | 0 | 0 | Per Gallon | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 4p | Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container | 0 | 0 | 0 | Per Week | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 5 | RESURFACING | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 5a | Asphalt Paving - 2 inch thickness (includes sub-base) | 0 | 0 | 0 | Per Square Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 5b | Asphalt Paving - additional 1 inch thickness | 0 | 0 | 0 | Per Square Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 5c | Concrete Paving - 4 inch thickness (includes sub-base) | 0 | 0 | 0 | Per Square Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 5d | Crushed Lime Rock Cover - 2 inch thickness | 0 | 0 | 0 | Per Square Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6 | IN-SITU INJECTION | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 6a | Direct Push Boring with In-Situ Injection | 0 | 0 | 0 | Per Foot | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6b | In-Situ Injection Into Existing Well/Treatment Point | 0 | 0 | 0 | Per Injection Point | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6c | Materials to be Injected | 0 | 0 | 0 | Per Gallon | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6d | Groundwater Injection System (not by direct push) | 0 | 0 | 0 | Per Week | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 6e | Groundwater Injection System (not by direct push) | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 7 | REMEDIATION SYSTEM INTEGRATION AND STARTUP | $ - 0 | ||||||||||||
| 0 | 0 | 1 | 7a | System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points | 0 | 0 | 0 | Per Startup | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 7b | System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points | 0 | 0 | 0 | Per Startup | $ - 0 | $ - 0 | |||||||
| 0 | 0 | 1 | 8 | REMEDIAL ACTION - PACKAGED WORK SCOPES |
(Including Remediation System Equipment)
| 0 | 0 | 1 | 9 | SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES | ||||||||
| (Including Remediation System Equipment) | $ - 0 | |||||||||||
| 0 | 0 | 1 | 9a | Groundwater Treatment System Package - Medium | 0 | 0 | 0 | Per Day | $ - 0 | $ - 0 | ||
| 0 | 0 | 1 | 9b | Groundwater Treatment System Package - Medium | 0 | 0 | 0 | Per Week | $ - 0 | $ - 0 | ||
| 0 | 0 | 1 | 9c | Air Sparge System Package - Medium | 0 | 0 | 0 | Per Day | $ - 0 | $ - 0 | ||
| 0 | 0 | 1 | 9d | Air Sparge System Package - Medium | 0 | 0 | 0 | Per Week | $ - 0 | $ - 0 | ||
| 0 | 0 | 1 | 9e | MPE System Package - Medium | 0 | 0 | 0 | Per Day | $ - 0 | $ - 0 | ||
| 0 | 0 | 1 | 9f | MPE System Package - Medium | 0 | 0 | 0 | Per Week | $ - 0 | $ - 0 | ||
| 0 | 0 | 1 | 9g | SVE System Package - Medium | 0 | 0 | 0 | Per Day | $ - 0 | $ - 0 | ||
| 0 | 0 | 1 | 9h | SVE System Package - Medium | 0 | 0 | 0 | Per Week | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 0 | MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES | ||||||||
| (Excluding Remediation System Equipment) | $ - 0 | |||||||||||
| 0 | 0 | 2 | 0a | System O&M Package - Small | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 0b | System O&M Package - Medium | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1 | REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M) | $ - 0 | |||||||
| 0 | 0 | 2 | 1a | Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1b | Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1c | Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1d | Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1e | Air Sparge System - Small - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1f | Air Sparge System - Small - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1g | Air Sparge System - Medium - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1h | Air Sparge System - Medium - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1i | MPE System - Small - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1j | MPE System - Small - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1k | MPE System - Medium - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1l | MPE System - Medium - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1m | Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1n | Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1o | Groundwater Treatment - Add On - Small - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 1p | Groundwater Treatment - Add On - Medium - Long Term > 6 mos. | 0 | 0 | 0 | Per Month | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2 | REPORTS (Excluding Professional Engineering and Professional Geology Services) | $ - 0 | |||||||
| 0 | 0 | 2 | 2a | Soil Source Removal Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2b | General Site Assessment Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2c | Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2d | Construction Drawings and Specs Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2e | As-Built Drawings (P.E. Sealed red lined modifications) | 0 | 0 | 0 | Per Drawing | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2f | Letter/NPDES Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2g | Remedial Action General Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2h | Remedial Action Interim Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2i | Free Product Recovery Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 2j | Well Abandonment/Site Restoration Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3 | PERSONNEL (Excluding Professional Engineer and Professional Geologist) | $ - 0 | $ - 0 | ||||||
| 0 | 0 | 2 | 3a | Program Manager (Key) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3b | Engineer (Key) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3c | Geologist/Geoscientist (Key) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3d | Scientist/Technical Specialist (Key) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3e | Field Technician (Key) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3f | Draftsperson | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3g | Administrative | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 3h | Laborers and Security Guards | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 4 | PROFESSIONAL ENGINEERING AND PROFESSIONAL GEOLOGY SERVICES | $ - 0 | |||||||
| 0 | 0 | 2 | 4a | Professional Engineer (Key) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 4b | Professional Geologist (Key) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 4c | P.G. Field Oversight of Drilling and Boring and Soil-Boring Logging (Use Dayly rate on site specific basis) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 4d | P.G. Field Oversight of Well Installation (Use Daily rate on site specific basis) | 0 | 0 | 0 | Per 8 hour day | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 4e | P.E. Project Oversight for Remediation System Integration and Startup - Small System | 0 | 0 | 0 | Per System | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 4f | P.E. Project Oversight for Remediation System Integration and Startup - Medium System | 0 | 0 | 0 | Per System | $ - 0 | $ - 0 | ||
| 0 | 0 | 2 | 4g | P.E. Review, Evaluation, and Certification of Construction Drawings | 0 | 0 | 0 | Per Set of Drawings | ||||
| $ - 0 | $ - 0 | |||||||||||
| 0 | 0 | 2 | 4h | P.E. Review, Evaluation, and Certification of Annual PARM Report | 0 | 0 | 0 | Per Report | $ - 0 | $ - 0 | ||
| $ - 0 |
File details come from the government source that posted it.