36C24818Q0826-003.xls
XLS spreadsheet 124 KB Posted
- Attached to
- Services; Environmental Remediation Services
- Solicitation number
- 36C24818Q0826
About this file
36C24818Q0826 Price Schedule.xls
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Environmental Remediation Services |
| RFQ 36C24818Q0826 |
| Please fill in the Excel document as is |
| 1. Company Name: |
| 2. DUNS #: |
| 3. Socio-economic status: |
| 4. Full Adress: |
| 5. Point of contact info: |
| PLEASE SUBMIT YOUR QUOTE USING THIS TEMPLATE. |
Base year
| ESTIMATE WORKSHEET | DATE | SHEET NO. | |||||||||||
| 1 | OF | 1 | |||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | |||||||||||
| N/A | BPVAHCS and associated Clinics | Environmental Remediation Services | |||||||||||
| TYPE OF ESTIMATE | BUILDING NO./NOS. | ||||||||||||
| Yearly Projections | BPVAHCS | ||||||||||||
| CLIN ID | SYSTEM/SUBSYSTEM | MATERIALS | TOTAL | ||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | COST | |
| Emergency Response - Environmental Remediation Services | |||||||||||||
| 0 | 0 | 0 | 1 | Mobilization (To include all labor, materials, equipment and incidentals) | 2 | Job | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 2 | Site assessment / visit | 4 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 3 | On-site emergency response assessment, within 2 hours. (To include all labor, materials, equipment and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 4 | Well installation (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 5 | Final report to FDEP (Remediation, decommissioning, monitoring, etc.) | 4 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 6 | Correspondence to Florida Department of Environmental Conservation (FDEP) | 8 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 7 | Excavation / Site preparation | 15 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 8 | Utilities Survey (To include all labor, materials, equipment and incidentals) survey | 4 | Job | $ - 0 | $ - 0 | |||||
| 0 | 0 | 0 | 9 | Soil & groundwater remediation (To include all labor, materials, equipment, and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 0 | Soil sampling . (To include all labor, materials, equipment and incidentals) | 100 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 1 | Groundwater sampling . (To include all labor, materials, equipment and incidentals) | 50 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 2 | Engineering / Subject matter expert consultation | 4 | Job | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 3 | Permitting | 4 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 4 | Well decommissioning . (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 5 | Impacted soil removal and disposal (by cubic yard) | 40 | CY | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 6 | Impacted groundwater removal and disposal (55 gallons drum) | 20 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 7 | Laboratory analysis (AEL approved) | 50 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 8 | Tank removal (400 gallons to 1000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 1 | 9 | Tank removal (1500 gallons to 2000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 2 | 0 | Tank removal (4000 gallons to 10,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 2 | 1 | Tank removal (30,000 gallons to 40,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 0 | 0 | 2 | 2 | Site supervisor service | 1 | Daily | $ - 0 | $ - 0 | |||||
| 0 | 0 | 2 | 3 | Professional certified PE or GE | 1 | Daily | $ - 0 | $ - 0 | |||||
| 0 | 0 | 2 | 4 | Project designer | 1 | Daily | $ - 0 | $ - 0 | |||||
| 0 | 0 | 2 | 5 | Project QA/QC | 1 | Daily | $ - 0 | $ - 0 | |||||
| 0 | 0 | 2 | 6 | Administrative services | 1 | Each | $ - 0 | $ - 0 | |||||
| TOTAL | $ - 0 |
&L&8VA FORM HO-18b
DEC 1995
December 1995&C&8VA Form HO-18b&R&8Department of Veterans Affairs
Year 1
| ESTIMATE WORKSHEET | DATE | SHEET NO. | |||||||||||
| 1 | OF | 2 | |||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | |||||||||||
| N/A | BPVAHCS and associated Clinics | Environmental Remediation Services | |||||||||||
| TYPE OF ESTIMATE | BUILDING NO./NOS. | ||||||||||||
| Yearly Projections | BPVAHCS | ||||||||||||
| CLIN ID | SYSTEM/SUBSYSTEM | MATERIALS | TOTAL | ||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | COST | |
| Emergency Response - Environmental Remediation Services | |||||||||||||
| 1 | 0 | 0 | 1 | Mobilization (To include all labor, materials, equipment and incidentals) | 2 | Job | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 2 | Site assessment / visit | 4 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 3 | On-site emergency response assessment, within 2 hours. (To include all labor, materials, equipment and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 4 | Well installation (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 5 | Final report to FDEP (Remediation, decommissioning, monitoring, etc.) | 4 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 6 | Correspondence to Florida Department of Environmental Conservation (FDEP) | 8 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 7 | Excavation / Site preparation | 15 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 8 | Utilities Survey (To include all labor, materials, equipment and incidentals) survey | 4 | Job | $ - 0 | $ - 0 | |||||
| 1 | 0 | 0 | 9 | Soil & groundwater remediation (To include all labor, materials, equipment, and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 0 | Soil sampling . (To include all labor, materials, equipment and incidentals) | 100 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 1 | Groundwater sampling . (To include all labor, materials, equipment and incidentals) | 50 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 2 | Engineering / Subject matter expert consultation | 4 | Job | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 3 | Permitting | 4 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 4 | Well decommissioning . (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 5 | Impacted soil removal and disposal (by cubic yard) | 40 | CY | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 6 | Impacted groundwater removal and disposal (55 gallons drum) | 20 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 7 | Laboratory analysis (AEL approved) | 50 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 8 | Tank removal (400 gallons to 1000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 1 | 9 | Tank removal (1500 gallons to 2000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 2 | 0 | Tank removal (4000 gallons to 10,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 2 | 1 | Tank removal (30,000 gallons to 40,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 1 | 0 | 2 | 2 | Site supervisor service | 1 | Daily | $ - 0 | $ - 0 | |||||
| 1 | 0 | 2 | 3 | Professional certified PE or GE | 1 | Daily | $ - 0 | $ - 0 | |||||
| 1 | 0 | 2 | 4 | Project designer | 1 | Daily | $ - 0 | $ - 0 | |||||
| 1 | 0 | 2 | 5 | Project QA/QC | 1 | Daily | $ - 0 | $ - 0 | |||||
| 1 | 0 | 2 | 6 | Administrative services | 1 | Each | $ - 0 | $ - 0 | |||||
| TOTAL | $ - 0 |
&L&8VA FORM HO-18b
DEC 1995
December 1995&C&8VA Form HO-18b&R&8Department of Veterans Affairs
Year 2
| ESTIMATE WORKSHEET | DATE | SHEET NO. | |||||||||||
| 1 | OF | 3 | |||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | |||||||||||
| N/A | BPVAHCS and associated Clinics | Environmental Remediation Services | |||||||||||
| TYPE OF ESTIMATE | BUILDING NO./NOS. | ||||||||||||
| Yearly Projections | BPVAHCS | ||||||||||||
| CLIN ID | SYSTEM/SUBSYSTEM | MATERIALS | TOTAL | ||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | COST | |
| Emergency Response - Environmental Remediation Services | |||||||||||||
| 2 | 0 | 0 | 1 | Mobilization (To include all labor, materials, equipment and incidentals) | 2 | Job | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 2 | Site assessment / visit | 4 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 3 | On-site emergency response assessment, within 2 hours. (To include all labor, materials, equipment and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 4 | Well installation (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 5 | Final report to FDEP (Remediation, decommissioning, monitoring, etc.) | 4 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 6 | Correspondence to Florida Department of Environmental Conservation (FDEP) | 8 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 7 | Excavation / Site preparation | 15 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 8 | Utilities Survey (To include all labor, materials, equipment and incidentals) survey | 4 | Job | $ - 0 | $ - 0 | |||||
| 2 | 0 | 0 | 9 | Soil & groundwater remediation (To include all labor, materials, equipment, and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 0 | Soil sampling . (To include all labor, materials, equipment and incidentals) | 100 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 1 | Groundwater sampling . (To include all labor, materials, equipment and incidentals) | 50 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 2 | Engineering / Subject matter expert consultation | 4 | Job | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 3 | Permitting | 4 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 4 | Well decommissioning . (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 5 | Impacted soil removal and disposal (by cubic yard) | 40 | CY | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 6 | Impacted groundwater removal and disposal (55 gallons drum) | 20 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 7 | Laboratory analysis (AEL approved) | 50 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 8 | Tank removal (400 gallons to 1000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 1 | 9 | Tank removal (1500 gallons to 2000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 2 | 0 | Tank removal (4000 gallons to 10,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 2 | 1 | Tank removal (30,000 gallons to 40,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 2 | 0 | 2 | 2 | Site supervisor service | 1 | Daily | $ - 0 | $ - 0 | |||||
| 2 | 0 | 2 | 3 | Professional certified PE or GE | 1 | Daily | $ - 0 | $ - 0 | |||||
| 2 | 0 | 2 | 4 | Project designer | 1 | Daily | $ - 0 | $ - 0 | |||||
| 2 | 0 | 2 | 5 | Project QA/QC | 1 | Daily | $ - 0 | $ - 0 | |||||
| 2 | 0 | 2 | 6 | Administrative services | 1 | Each | $ - 0 | $ - 0 | |||||
| TOTAL | $ - 0 |
&L&8VA FORM HO-18b
DEC 1995
December 1995&C&8VA Form HO-18b&R&8Department of Veterans Affairs
Year 3
| ESTIMATE WORKSHEET | DATE | SHEET NO. | |||||||||||
| 1 | OF | 4 | |||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | |||||||||||
| N/A | BPVAHCS and associated Clinics | Environmental Remediation Services | |||||||||||
| TYPE OF ESTIMATE | BUILDING NO./NOS. | ||||||||||||
| Yearly Projections | BPVAHCS | ||||||||||||
| CLIN ID | SYSTEM/SUBSYSTEM | MATERIALS | TOTAL | ||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | COST | |
| Emergency Response - Environmental Remediation Services | |||||||||||||
| 3 | 0 | 0 | 1 | Mobilization (To include all labor, materials, equipment and incidentals) | 2 | Job | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 2 | Site assessment / visit | 4 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 3 | On-site emergency response assessment, within 2 hours. (To include all labor, materials, equipment and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 4 | Well installation (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 5 | Final report to FDEP (Remediation, decommissioning, monitoring, etc.) | 4 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 6 | Correspondence to Florida Department of Environmental Conservation (FDEP) | 8 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 7 | Excavation / Site preparation | 15 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 8 | Utilities Survey (To include all labor, materials, equipment and incidentals) survey | 4 | Job | $ - 0 | $ - 0 | |||||
| 3 | 0 | 0 | 9 | Soil & groundwater remediation (To include all labor, materials, equipment, and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 0 | Soil sampling . (To include all labor, materials, equipment and incidentals) | 100 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 1 | Groundwater sampling . (To include all labor, materials, equipment and incidentals) | 50 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 2 | Engineering / Subject matter expert consultation | 4 | Job | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 3 | Permitting | 4 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 4 | Well decommissioning . (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 5 | Impacted soil removal and disposal (by cubic yard) | 40 | CY | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 6 | Impacted groundwater removal and disposal (55 gallons drum) | 20 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 7 | Laboratory analysis (AEL approved) | 50 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 8 | Tank removal (400 gallons to 1000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 1 | 9 | Tank removal (1500 gallons to 2000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 2 | 0 | Tank removal (4000 gallons to 10,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 2 | 1 | Tank removal (30,000 gallons to 40,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 3 | 0 | 2 | 2 | Site supervisor service | 1 | Daily | $ - 0 | $ - 0 | |||||
| 3 | 0 | 2 | 3 | Professional certified PE or GE | 1 | Daily | $ - 0 | $ - 0 | |||||
| 3 | 0 | 2 | 4 | Project designer | 1 | Daily | $ - 0 | $ - 0 | |||||
| 3 | 0 | 2 | 5 | Project QA/QC | 1 | Daily | $ - 0 | $ - 0 | |||||
| 3 | 0 | 2 | 6 | Administrative services | 1 | Each | $ - 0 | $ - 0 | |||||
| TOTAL | $ - 0 |
&L&8VA FORM HO-18b
DEC 1995
December 1995&C&8VA Form HO-18b&R&8Department of Veterans Affairs
Year 4
| ESTIMATE WORKSHEET | DATE | SHEET NO. | |||||||||||
| 1 | OF | 5 | |||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | |||||||||||
| N/A | BPVAHCS and associated Clinics | Environmental Remediation Services | |||||||||||
| TYPE OF ESTIMATE | BUILDING NO./NOS. | ||||||||||||
| Yearly Projections | BPVAHCS | ||||||||||||
| CLIN ID | SYSTEM/SUBSYSTEM | MATERIALS | TOTAL | ||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | COST | |
| Emergency Response - Environmental Remediation Services | |||||||||||||
| 4 | 0 | 0 | 1 | Mobilization (To include all labor, materials, equipment and incidentals) | 2 | Job | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 2 | Site assessment / visit | 4 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 3 | On-site emergency response assessment, within 2 hours. (To include all labor, materials, equipment and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 4 | Well installation (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 5 | Final report to FDEP (Remediation, decommissioning, monitoring, etc.) | 4 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 6 | Correspondence to Florida Department of Environmental Conservation (FDEP) | 8 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 7 | Excavation / Site preparation | 15 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 8 | Utilities Survey (To include all labor, materials, equipment and incidentals) survey | 4 | Job | $ - 0 | $ - 0 | |||||
| 4 | 0 | 0 | 9 | Soil & groundwater remediation (To include all labor, materials, equipment, and incidentals) | 4 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 0 | Soil sampling . (To include all labor, materials, equipment and incidentals) | 100 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 1 | Groundwater sampling . (To include all labor, materials, equipment and incidentals) | 50 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 2 | Engineering / Subject matter expert consultation | 4 | Job | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 3 | Permitting | 4 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 4 | Well decommissioning . (To include all labor, materials, equipment and incidentals) | 6 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 5 | Impacted soil removal and disposal (by cubic yard) | 40 | CY | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 6 | Impacted groundwater removal and disposal (55 gallons drum) | 20 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 7 | Laboratory analysis (AEL approved) | 50 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 8 | Tank removal (400 gallons to 1000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 1 | 9 | Tank removal (1500 gallons to 2000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 2 | 0 | Tank removal (4000 gallons to 10,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 2 | 1 | Tank removal (30,000 gallons to 40,000 gallons) To include all labor, materials, equipment, and incidentals. | 1 | Each | $ - 0 | $ - 0 | |||||
| 4 | 0 | 2 | 2 | Site supervisor service | 1 | Daily | $ - 0 | $ - 0 | |||||
| 4 | 0 | 2 | 3 | Professional certified PE or GE | 1 | Daily | $ - 0 | $ - 0 | |||||
| 4 | 0 | 2 | 4 | Project designer | 1 | Daily | $ - 0 | $ - 0 | |||||
| 4 | 0 | 2 | 5 | Project QA/QC | 1 | Daily | $ - 0 | $ - 0 | |||||
| 4 | 0 | 2 | 6 | Administrative services | 1 | Each | $ - 0 | $ - 0 | |||||
| TOTAL | $ - 0 |
&L&8VA FORM HO-18b
DEC 1995
December 1995&C&8VA Form HO-18b&R&8Department of Veterans Affairs
Total
| ESTIMATE WORKSHEET SUMMARY | DATE | SHEET NO. | |||
| 6 | |||||
| PROJECT TITLE: | LOCATION | PROJECT NAME | |||
| N/A | BPVAHCS and associated Clinics | Environmental Remediation Services | |||
| YEAR OF CONTRACT | YEARLY COST OF CONTRACT | ||||
| BASE YEAR | 0.00 | ||||
| OPTION YEAR 1 | 0.00 | ||||
| OPTION YEAR 2 | 0.00 | ||||
| OPTION YEAR 3 | 0.00 | ||||
| OPTION YEAR 4 | 0.00 | ||||
| TOTAL | 0.00 |