36C24818Q0826 Price schedule RFQ 36C24818Q826 (revision 3).xlsx

View the file

Other files

File Type Posted
36C24818Q0826-033.docx DOCX document
36C24818Q0826-030.xlsx XLSX spreadsheet
36C24818Q0826-028.docx DOCX document
36C24818Q0826-032.docx DOCX document
36C24818Q0826-029.docx DOCX document
36C24818Q0826-031.xlsx XLSX spreadsheet
36C24818Q0826-026.docx DOCX document
36C24818Q0826-027.xlsx XLSX spreadsheet
36C24818Q0826-025.docx DOCX document
36C24818Q0826-0004001.docx DOCX document
36C24818Q0826-0004000.docx DOCX document
36C24818Q0826-015.docx DOCX document
36C24818Q0826-014.docx DOCX document
36C24818Q0826-013.docx DOCX document
36C24818Q0826-0003000.docx DOCX document
36C24818Q0826-0003002.docx DOCX document
36C24818Q0826-0003001.docx DOCX document
36C24818Q0826-0003003.xlsx XLSX spreadsheet
36C24818Q0826-011.docx DOCX document
36C24818Q0826-012.docx DOCX document
36C24818Q0826-010.xlsx XLSX spreadsheet
36C24818Q0826-008.docx DOCX document
36C24818Q0826-009.docx DOCX document
36C24818Q0826-006.xls XLS spreadsheet
36C24818Q0826-005.docx DOCX document
36C24818Q0826-004.docx DOCX document
36C24818Q0826-007.docx DOCX document
36C24818Q0826-003.xls XLS spreadsheet
36C24818Q0826-001.docx DOCX document
36C24818Q0826-002.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Environmental Remediation Services
RFQ 36C24818Q0826

Please fill in the Excel document as is

1. Company Name:
2. DUNS #:
3. Socio-economic status:
4. Full Adress:
5. Point of contact info:
The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract.
PLEASE SUBMIT YOUR QUOTE USING THIS TEMPLATE.

Base Year

ESTIMATE WORKSHEET BASE YEARDATESHEET NO.
1OF1
PROJECT NO.LOCATIONPROJECT NAME
N/ABay Pines VA Healthcare SystemEnvironmental Remediation Services
TYPE OF ESTIMATEThe quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract.Period of Performance
Yearly Projections08-01-2018 - 07-30-2019
CLIN IDSYSTEM/SUBSYSTEMQUANTITYUNIT$/UNITTOTALMATERIALSTOTAL
ABCDQUANTITYUNIT$/UNITTOTALCOST
Environmental Remediation Services
0001FILE REVIEW$ - 0
0001aSite Health & Safety Plan1Per Review$ - 0$ - 0
0001bSite Health & Safety Plan for Continued Work4Per Site$ - 0$ - 0
0001cNotice of Discovery of Contamination Package (Initial or TPOC)4Per Site$ - 0$ - 0
0001dPermit Fees (actual fee only, cost to obtain permit is included in applicable pay items)4Per Package$ - 0$ - 0
0002FIELD ACTIVITIES - GENERAL$ - 0
0002aSite Reconnaissance/Field Measurement Visit4Per Visit$ - 0$ - 0
0002bReceptor Survey and Exposure Pathway Identification (includes report)1Per Survey$ - 0$ - 0
0002cProfessional Land Survey subject to FDEP authorization to perform and the SPI displaying the cost not to exceed as supported by quote(s) prior to performance1Per Visit$ - 0$ - 0
0002dContractor Oversight for Non-Price Schedule Activities4Per Day$ - 0$ - 0
0003MOBILIZATION$ - 0
0003aMobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
0003bHeavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
0003cWork Trailer - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
0003dDPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
0003eDrill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
0003fExcavator Mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
0003gLDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
0003hLoader/Backhoe Mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
0003iMini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
0013jDrum Compactor mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
0004MEALS AND LODGING$ - 0
0004aPer Diem - For travel > 1 consecutive day (prorated in quarter day incrementsin accordance with 112.061,F.S.) - Travel Voucher required and quoted rate should be per person per day4Per Person,
Per Day$ - 0$ - 0
0005DRILLING AND BORING$ - 0
0005aSplit Spoon Sampling – 2 foot (during boring) < 50 feet3Per spoon$ - 0$ - 0
0005bSplit Spoon Sampling – 2 foot (during boring) 50 to 100 feet4Per spoon$ - 0$ - 0
0005cSonic Core Sampling - 5 or 10 foot (during boring)4Per core$ - 0$ - 0
0005dHand Auger Boring ≤ 10 foot total depth3Per boring$ - 0$ - 0
0005eDirect Push Technology (DPT) Rig and Equipment5Full day$ - 0$ - 0
0005fDPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)5Full day$ - 0$ - 0
0005gHSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
0005hHSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
0005iSonic Boring, ≤ 6 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
0005jSonic Boring, > 6 to 10 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
0006WELL INSTALLATION$ - 0
0006aWell Installation - 1 inch diameter3Per Foot$ - 0$ - 0
0006bWell Installation - 2 inch diameter (vertical)6Per Foot$ - 0$ - 0
0006cWell Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)6Per Foot$ - 0$ - 0
0006dWell Installation - 4 inch diameter (vertical)3Per Foot$ - 0$ - 0
0006eWell Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)3Per Foot$ - 0$ - 0
0006fWell Installation - 6 inch diameter2Per Foot$ - 0$ - 0
0006gSurface Casing - 6 inch diameter2Per Foot$ - 0$ - 0
0006hAdditional Well Screen > 20 feet - 1 inch diameter3Per Foot$ - 0$ - 0
0006iAdditional Well Screen > 20 feet - 2 inch diameter6Per Foot$ - 0$ - 0
0016jAdditional Well Screen > 20 feet - 4 inch diameter6Per Foot$ - 0$ - 0
0016kAdditional Well Screen > 20 feet - 4 inch diameter3Per Foot$ - 0$ - 0
0016lAdditional Well Screen > 20 feet - 6 inch diameter3Per Foot$ - 0$ - 0
0016mAbove Grade Well Completion4Per Well$ - 0$ - 0
0016nInstallation of Well Vault - 2 x 2 x 2 foot2Per Well$ - 0$ - 0
0016oInstallation of Well Vault - 4 x 4 x 2 foot2Per Well$ - 0$ - 0
0006pWell Redevelopment3Per Well$ - 0$ - 0
0007WELL ABANDONMENT$ - 0
0007aGrout and Abandon Well, 1 to 2 inch diameter2Per Foot$ - 0$ - 0
0007bGrout and Abandon Well, > 2 to 4 inch diameter2Per Foot$ - 0$ - 0
0007cGrout and Abandon Well, > 4 to 6 inch diameter2Per Foot$ - 0$ - 0
0007dRemoval of Well Vault - 2 x 2 x 2 foot2Per Vault$ - 0$ - 0
0007eRemoval of Well Vault - 4 x 4 x 2 foot2Per Vault$ - 0$ - 0
0007fRemoval of Well Pad and Manhole2Per Well$ - 0$ - 0
0008SAMPLE COLLECTION AND FIELD TESTING$ - 0
0008aMonitoring Well Sampling with Water Level, ≤ 100 foot depth6Per Well$ - 0$ - 0
0008bDomestic Water Well Sampling1Per Well$ - 0$ - 0
0008cOther Water Sampling10Per Sample$ - 0$ - 0
0008dFree Product Sample Collection20Per Sample$ - 0$ - 0
0008eSoil/Sediment Sample Collection20Per Sample$ - 0$ - 0
0008fWater Level or Free Product Gauging15Per Well$ - 0$ - 0
0008gFree Product Gauging & Bailing15Per Well$ - 0$ - 0
0008hElectronic Data Deliverables (EDD)30Per Sampling Event$ - 0$ - 0
0008iSurvey Latitude/Longitude of Existing Monitor Wells20Per Well$ - 0$ - 0
0008jSurvey Latitude/Longitude of New Monitor Wells20Per Well$ - 0$ - 0
0009LABORATORY ANALYSIS
0010SOIL/SEDIMENT ANALYSIS$ - 0
0010aSoil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)30Per Sample$ - 0$ - 0
0010bSoil, BTEX + MTBE (EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
0010cSoil, Volatile Organic Halocarbons (EPA 8021 or EPA 826030Per Sample$ - 0$ - 0
0010dSoil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
0010eSoil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)30Per Sample$ - 0$ - 0
0010fSoil, Priority Pollutant Volatile Organics (EPA 8260)30Per Sample$ - 0$ - 0
0010gSoil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])30Per Sample$ - 0$ - 0
0010hSoil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)30Per Sample$ - 0$ - 0
0010iSoil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)30Per Sample$ - 0$ - 0
0010jSoil, PCBs [or Aroclors] (EPA 8082)30Per Sample$ - 0$ - 0
0010kSoil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium,30Per Sample$ - 0$ - 0
0010lSoil, Arsenic (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0010mSoil, Cadmium (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0010nSoil, Chromium (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0010oSoil, Lead (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0010pSoil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)30Per Sample$ - 0$ - 0
0010qSoil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA131230Per Sample$ - 0$ - 0
0010rSoil, Organic Carbon, Total (EPA 9060 or Walkey-Black)30Per Sample$ - 0$ - 0
0010sSoil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)30Per Sample$ - 0$ - 0
0010tSoil, Moisture Content (ASTM D2216-10)30Per Sample$ - 0$ - 0
0010uSoil, Texture, (See Gee 7 Bauder [1966])30Per Sample$ - 0$ - 0
0010vSoil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)30Per Sample$ - 0$ - 0
0010xSoil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes
and olefins) (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
0010ySoil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
0010zSoil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)30Per Sample$ - 0$ - 0
0011WATER ANALYSIS$ - 0
0011aaWater, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)30Per Sample$ - 0$ - 0
0011abWater, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant30Per Sample$ - 0$ - 0
0011acWater, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
0011adWater, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
0011aeWater, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)30Per Sample$ - 0$ - 0
0011afWater, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA30Per Sample$ - 0$ - 0
0011ag610 [HPLC], EPA 625, EPA 8270 or EPA 8310)30Per Sample$ - 0$ - 0
0011aiWater, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)30Per Sample$ - 0$ - 0
0011ajWater, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)30Per Sample$ - 0$ - 0
0011akWater, Priority Pollutant Volatile Organics (EPA 8260)30Per Sample$ - 0$ - 0
0011alWater, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])30Per Sample$ - 0$ - 0
0011amWater, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g.,EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)30Per Sample$ - 0$ - 0
0011anWater, Total Recoverable Petroleum Hydrocarbons (FL-PRO)30Per Sample$ - 0$ - 0
0011aoWater, PCBs [or Aroclors] (EPA 608 or EPA 8082)30Per Sample$ - 0$ - 0
0011apWater, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011aqWater, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011arWater, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011asWater, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011atWater, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)30Per Sample$ - 0$ - 0
0011auWater, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)30Per Sample$ - 0$ - 0
0011avWater, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011awWater, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011axWater, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011ayWater, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
0011azWater, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)30Per Sample$ - 0$ - 0
0011baWater, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)30Per Sample$ - 0$ - 0
0011bbWater, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E)30Per Sample$ - 0$ - 0
0011bcWater, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)30Per Sample$ - 0$ - 0
0011bdWater, Nitrate [as N] (EPA 300.0 or EPA 353.2)30Per Sample$ - 0$ - 0
0011beWater, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)30Per Sample$ - 0$ - 0
0011bfWater, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)30Per Sample$ - 0$ - 0
0011bgWater, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)30Per Sample$ - 0$ - 0
0011bhWater, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE30Per Sample$ - 0$ - 0
0011biWater, Residue-filterable [Total Dissolved Solids] (SM 2540 C)30Per Sample$ - 0$ - 0
0011bjWater, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)30Per Sample$ - 0$ - 0
0011bkWater, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)30Per Sample$ - 0$ - 0
0011blWater, Heterotrophic Plate Count (SM 9215 B)30Per Sample$ - 0$ - 0
0011bmWater, Acute Bioassay-96 Day, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)30Per Sample$ - 0$ - 0
0011bnWater, Acute Bioassay-96 Day, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)30Per Sample$ - 0$ - 0
0011boWater, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)30Per Sample$ - 0$ - 0
0011bpWater, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
0011bqWater, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
0011brWater, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)30Per Sample$ - 0$ - 0
0011bsWater, BTEX/MTBE + Naphthalene (EPA 8260)30Per Sample$ - 0$ - 0
0011btWater, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)30Per Sample$ - 0$ - 0
0011buWater, Methane (EPA SOP RSK-175)30Per Sample$ - 0$ - 0
0012SOIL SOURCE REMOVAL RELATED$ - 0
0012aSheet Piling Installation for ≤ 20 feet deep Excavation20Per Sq. Foot$ - 0$ - 0
0012bSheet Piling Rental for ≤ 20 feet deep Excavation20Per Sq. Foot/Day$ - 0$ - 0
0012cSheet Piling Installation for > 20 feet deep Excavation20Per Sq. Foot$ - 0$ - 0
0012dSheet Piling Rental for > 20 feet deep Excavation20Per Sq. Foot/Day$ - 0$ - 0
0012eConventional Soil Excavation and Loading ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012fLDA Excavation and Loading Without Casing ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012gLDA Excavation and Loading With Surface Casing ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012hLDA Excavation and Loading With Driven Casing < 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012iFlowable Fill Concrete and Installation4Per Cubic Yard$ - 0$ - 0
0012jClean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012kClean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012lClean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012mClean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards4Per Cubic Yard$ - 0$ - 0
0012nPea Gravel50Per Ton$ - 0$ - 0
0012o#57 Stone50Per Ton$ - 0$ - 0
0012pDewatering System, up to 12 well points (includes installation)30Per Day$ - 0$ - 0
0012qDewatering System, up to 12 well points (includes installation)4Per Week$ - 0$ - 0
0013PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL$ - 0
0013aRemove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity2Per Tank$ - 0$ - 0
0013bRemove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity3Per Tank$ - 0$ - 0
0013cRemove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity2Per Tank$ - 0$ - 0
0013dRemove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity1Per Tank$ - 0$ - 0
0014DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL$ - 0
0014aRemoval and Loading of Asphalt and/or Concrete - up to 4 inch thickness100Per Square Foot$ - 0$ - 0
0014bLoading, Transport and Disposal/Recycle Clean Overburden100Per Ton$ - 0$ - 0
0014cTransport and Disposal of Clean Concrete100Per Ton$ - 0$ - 0
0014dTransport and Disposal of Mixed Debris100Per Ton$ - 0$ - 0
0014eTransport and Disposal of Petroleum Impacted Soil (includes 50 gallon drum)30Per Drum$ - 0$ - 0
0014fTransport Petroleum Impacted Soil (bulk) ≤ 100 miles100Per Ton$ - 0$ - 0
0014gTransport Petroleum Impacted Soil (bulk) > 100 miles100Per Ton$ - 0$ - 0
0014hDisposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons4Per Ton$ - 0$ - 0
0014iDisposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons4Per Ton$ - 0$ - 0
0014jDisposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons4Per Ton$ - 0$ - 0
0014kDisposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons4Per Ton$ - 0$ - 0
0014lTransport and Disposal of Petroleum Contact Water (includes drum)30Per Drum$ - 0$ - 0
0014mTransport and Disposal of Petroleum Contact Water (bulk)30Per Gallon$ - 0$ - 0
0014nTransport and Disposal of Petroleum Product (includes drum)30Per Drum$ - 0$ - 0
0014oTransport and Disposal of Petroleum Product (bulk)30Per Gallon$ - 0$ - 0
0014pDelivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container4Per Week$ - 0$ - 0
0015RESURFACING$ - 0
0015aAsphalt Paving - 2 inch thickness (includes sub-base)150Per Square Foot$ - 0$ - 0
0015bAsphalt Paving - additional 1 inch thickness100Per Square Foot$ - 0$ - 0
0015cConcrete Paving - 4 inch thickness (includes sub-base)50Per Square Foot$ - 0$ - 0
0015dCrushed Lime Rock Cover - 2 inch thickness150Per Square Foot$ - 0$ - 0
0016IN-SITU INJECTION$ - 0
0016aDirect Push Boring with In-Situ Injection10Per Foot$ - 0$ - 0
0016bIn-Situ Injection Into Existing Well/Treatment Point4Per Injection Point$ - 0$ - 0
0016cMaterials to be Injected10Per Gallon$ - 0$ - 0
0016dGroundwater Injection System (not by direct push)4Per Week$ - 0$ - 0
0016eGroundwater Injection System (not by direct push)4Per Month$ - 0$ - 0
0017REMEDIATION SYSTEM INTEGRATION AND STARTUP$ - 0
0017aSystem Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points2Per Startup$ - 0$ - 0
0017bSystem Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points2Per Startup$ - 0$ - 0
0018REMEDIAL ACTION - PACKAGED WORK SCOPES

(Including Remediation System Equipment)

0019SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES
(Including Remediation System Equipment)$ - 0
0019aGroundwater Treatment System Package - Medium30Per Day$ - 0$ - 0
0019bGroundwater Treatment System Package - Medium4Per Week$ - 0$ - 0
0019cAir Sparge System Package - Medium30Per Day$ - 0$ - 0
0019dAir Sparge System Package - Medium2Per Week$ - 0$ - 0
0019eMPE System Package - Medium30Per Day$ - 0$ - 0
0019fMPE System Package - Medium4Per Week$ - 0$ - 0
0019gSVE System Package - Medium30Per Day$ - 0$ - 0
0019hSVE System Package - Medium2Per Week$ - 0$ - 0
0020MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES
(Excluding Remediation System Equipment)$ - 0
0020aSystem O&M Package - Small4Per Month$ - 0$ - 0
0020bSystem O&M Package - Medium4Per Month$ - 0$ - 0
0021REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M)$ - 0
0021aGroundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021bGroundwater Treatment System - Stand Alone Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
0021cGroundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021dGroundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
0021eAir Sparge System - Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021fAir Sparge System - Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
0021gAir Sparge System - Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021hAir Sparge System - Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
0021iMPE System - Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021jMPE System - Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
0021kMPE System - Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021lMPE System - Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
0021mGroundwater Treatment - Add On - Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021nGroundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
0021oGroundwater Treatment - Add On - Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
0021pGroundwater Treatment - Add On - Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
0022REPORTS (Excluding Professional Engineering and Professional Geology Services)$ - 0
0022aSoil Source Removal Report4Per Report$ - 0$ - 0
0022bGeneral Site Assessment Report4Per Report$ - 0$ - 0
0022cNatural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual4Per Report$ - 0$ - 0
0022dConstruction Drawings and Specs Report4Per Report$ - 0$ - 0
0022eAs-Built Drawings (P.E. Sealed red lined modifications)4Per Drawing$ - 0$ - 0
0022fLetter/NPDES Report4Per Report$ - 0$ - 0
0022gRemedial Action General Report4Per Report$ - 0$ - 0
0022hRemedial Action Interim Report4Per Report$ - 0$ - 0
0022iFree Product Recovery Report4Per Report$ - 0$ - 0
0022jWell Abandonment/Site Restoration Report4Per Report$ - 0$ - 0
0023PERSONNEL (Excluding Professional Engineer and Professional Geologist)$ - 0
0023aProgram Manager (Key)40Per Day$ - 0$ - 0
0023bEngineer (Key)40Per Day$ - 0$ - 0
0023cGeologist/Geoscientist (Key)80Per Day$ - 0$ - 0
0023dScientist/Technical Specialist (Key)80Per Day$ - 0$ - 0
0023eField Technician (Key)80Per Day$ - 0$ - 0
0023fDraftsperson80Per Day$ - 0$ - 0
0023gAdministrative80Per Day$ - 0$ - 0
0023hLaborers and Security Guards80Per Day$ - 0$ - 0
0024PROFESSIONAL ENGINEERING AND PROFESSIONAL GEOLOGY SERVICES$ - 0
0024aProfessional Engineer (Key)80Per Day$ - 0$ - 0
0024bProfessional Geologist (Key)80Per Day$ - 0$ - 0
0024cP.G. Field Oversight of Drilling and Boring and Soil-Boring Logging (Use Dayly rate on site specific basis)80Per Day$ - 0$ - 0
0024dP.G. Field Oversight of Well Installation (Use Dayly rate on site specific basis)80Per Day$ - 0$ - 0
0024eP.E. Project Oversight for Remediation System Integration and Startup - Small System80Per System$ - 0$ - 0
0024fP.E. Project Oversight for Remediation System Integration and Startup - Medium System2Per System$ - 0$ - 0
0024gP.E. Review, Evaluation, and Certification of Construction Drawings4Per Set of Drawings
$ - 0$ - 0
0024hP.E. Review, Evaluation, and Certification of Annual PARM Report4Per Report$ - 0$ - 0
$ - 0

Year 1

ESTIMATE WORKSHEET YEAR ONEDATESHEET NO.
1OF2
PROJECT NO.LOCATIONPROJECT NAME
N/ABay Pines VA Healthcare SystemEnvironmental Remediation Services
TYPE OF ESTIMATEThe quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract.Period of Performance
Yearly Projections08-01-2019 - 07-30-2020
CLIN IDSYSTEM/SUBSYSTEMQUANTITYUNIT$/UNITTOTALMATERIALSTOTAL
ABCDQUANTITYUNIT$/UNITTOTALCOST
Environmental Remediation Services
1001FILE REVIEW$ - 0
1001aSite Health & Safety Plan1Per Review$ - 0$ - 0
1001bSite Health & Safety Plan for Continued Work4Per Site$ - 0$ - 0
1001cNotice of Discovery of Contamination Package (Initial or TPOC)4Per Site$ - 0$ - 0
1001dPermit Fees (actual fee only, cost to obtain permit is included in applicable pay items)4Per Package$ - 0$ - 0
1002FIELD ACTIVITIES - GENERAL$ - 0
1002aSite Reconnaissance/Field Measurement Visit4Per Visit$ - 0$ - 0
1002bReceptor Survey and Exposure Pathway Identification (includes report)1Per Survey$ - 0$ - 0
1002cProfessional Land Survey subject to FDEP authorization to perform and the SPI displaying the cost not to exceed as supported by quote(s) prior to performance1Per Visit$ - 0$ - 0
1002dContractor Oversight for Non-Price Schedule Activities4Per Day$ - 0$ - 0
1003MOBILIZATION$ - 0
1003aMobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
1003bHeavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
1003cWork Trailer - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
1003dDPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
1003eDrill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
1003fExcavator Mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
1003gLDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
1003hLoader/Backhoe Mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
1003iMini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way2Per Round Trip$ - 0$ - 0
1013jDrum Compactor mobilization - ≤ 100 miles each way1Per Round Trip$ - 0$ - 0
1004MEALS AND LODGING$ - 0
1004aPer Diem - For travel > 1 consecutive day (prorated in quarter day incrementsin accordance with 112.061,F.S.) - Travel Voucher required and quoted rate should be per person per day4Per Person,
Per Day$ - 0$ - 0
1005DRILLING AND BORING$ - 0
1005aSplit Spoon Sampling – 2 foot (during boring) < 50 feet3Per spoon$ - 0$ - 0
1005bSplit Spoon Sampling – 2 foot (during boring) 50 to 100 feet4Per spoon$ - 0$ - 0
1005cSonic Core Sampling - 5 or 10 foot (during boring)4Per core$ - 0$ - 0
1005dHand Auger Boring ≤ 10 foot total depth3Per boring$ - 0$ - 0
1005eDirect Push Technology (DPT) Rig and Equipment5Full day$ - 0$ - 0
1005fDPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)5Full day$ - 0$ - 0
1005gHSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
1005hHSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
1005iSonic Boring, ≤ 6 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
1005jSonic Boring, > 6 to 10 inch diameter, < 50 foot total depth6Per Foot$ - 0$ - 0
1006WELL INSTALLATION$ - 0
1006aWell Installation - 1 inch diameter3Per Foot$ - 0$ - 0
1006bWell Installation - 2 inch diameter (vertical)6Per Foot$ - 0$ - 0
1006cWell Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)6Per Foot$ - 0$ - 0
1006dWell Installation - 4 inch diameter (vertical)3Per Foot$ - 0$ - 0
1006eWell Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)3Per Foot$ - 0$ - 0
1006fWell Installation - 6 inch diameter2Per Foot$ - 0$ - 0
1006gSurface Casing - 6 inch diameter2Per Foot$ - 0$ - 0
1006hAdditional Well Screen > 20 feet - 1 inch diameter3Per Foot$ - 0$ - 0
1006iAdditional Well Screen > 20 feet - 2 inch diameter6Per Foot$ - 0$ - 0
1016jAdditional Well Screen > 20 feet - 4 inch diameter6Per Foot$ - 0$ - 0
1016kAdditional Well Screen > 20 feet - 4 inch diameter3Per Foot$ - 0$ - 0
1016lAdditional Well Screen > 20 feet - 6 inch diameter3Per Foot$ - 0$ - 0
1016mAbove Grade Well Completion4Per Well$ - 0$ - 0
1016nInstallation of Well Vault - 2 x 2 x 2 foot2Per Well$ - 0$ - 0
1016oInstallation of Well Vault - 4 x 4 x 2 foot2Per Well$ - 0$ - 0
1006pWell Redevelopment3Per Well$ - 0$ - 0
1007WELL ABANDONMENT$ - 0
1007aGrout and Abandon Well, 1 to 2 inch diameter2Per Foot$ - 0$ - 0
1007bGrout and Abandon Well, > 2 to 4 inch diameter2Per Foot$ - 0$ - 0
1007cGrout and Abandon Well, > 4 to 6 inch diameter2Per Foot$ - 0$ - 0
1007dRemoval of Well Vault - 2 x 2 x 2 foot2Per Vault$ - 0$ - 0
1007eRemoval of Well Vault - 4 x 4 x 2 foot2Per Vault$ - 0$ - 0
1007fRemoval of Well Pad and Manhole2Per Well$ - 0$ - 0
1008SAMPLE COLLECTION AND FIELD TESTING$ - 0
1008aMonitoring Well Sampling with Water Level, ≤ 100 foot depth6Per Well$ - 0$ - 0
1008bDomestic Water Well Sampling1Per Well$ - 0$ - 0
1008cOther Water Sampling10Per Sample$ - 0$ - 0
1008dFree Product Sample Collection20Per Sample$ - 0$ - 0
1008eSoil/Sediment Sample Collection20Per Sample$ - 0$ - 0
1008fWater Level or Free Product Gauging15Per Well$ - 0$ - 0
1008gFree Product Gauging & Bailing15Per Well$ - 0$ - 0
1008hElectronic Data Deliverables (EDD)30Per Sampling Event$ - 0$ - 0
1008iSurvey Latitude/Longitude of Existing Monitor Wells20Per Well$ - 0$ - 0
1008jSurvey Latitude/Longitude of New Monitor Wells20Per Well$ - 0$ - 0
1009LABORATORY ANALYSIS
1010SOIL/SEDIMENT ANALYSIS$ - 0
1010aSoil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)30Per Sample$ - 0$ - 0
1010bSoil, BTEX + MTBE (EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
1010cSoil, Volatile Organic Halocarbons (EPA 8021 or EPA 826030Per Sample$ - 0$ - 0
1010dSoil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
1010eSoil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)30Per Sample$ - 0$ - 0
1010fSoil, Priority Pollutant Volatile Organics (EPA 8260)30Per Sample$ - 0$ - 0
1010gSoil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])30Per Sample$ - 0$ - 0
1010hSoil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)30Per Sample$ - 0$ - 0
1010iSoil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)30Per Sample$ - 0$ - 0
1010jSoil, PCBs [or Aroclors] (EPA 8082)30Per Sample$ - 0$ - 0
1010kSoil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium,30Per Sample$ - 0$ - 0
1010lSoil, Arsenic (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1010mSoil, Cadmium (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1010nSoil, Chromium (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1010oSoil, Lead (EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1010pSoil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)30Per Sample$ - 0$ - 0
1010qSoil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA131230Per Sample$ - 0$ - 0
1010rSoil, Organic Carbon, Total (EPA 9060 or Walkey-Black)30Per Sample$ - 0$ - 0
1010sSoil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)30Per Sample$ - 0$ - 0
1010tSoil, Moisture Content (ASTM D2216-10)30Per Sample$ - 0$ - 0
1010uSoil, Texture, (See Gee 7 Bauder [1966])30Per Sample$ - 0$ - 0
1010vSoil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)30Per Sample$ - 0$ - 0
1010xSoil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes
and olefins) (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
1010ySoil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
1010zSoil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)30Per Sample$ - 0$ - 0
1011WATER ANALYSIS$ - 0
1011aaWater, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)30Per Sample$ - 0$ - 0
1011abWater, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant30Per Sample$ - 0$ - 0
1011acWater, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
1011adWater, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)30Per Sample$ - 0$ - 0
1011aeWater, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)30Per Sample$ - 0$ - 0
1011afWater, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA30Per Sample$ - 0$ - 0
1011ag610 [HPLC], EPA 625, EPA 8270 or EPA 8310)30Per Sample$ - 0$ - 0
1011aiWater, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)30Per Sample$ - 0$ - 0
1011ajWater, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)30Per Sample$ - 0$ - 0
1011akWater, Priority Pollutant Volatile Organics (EPA 8260)30Per Sample$ - 0$ - 0
1011alWater, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])30Per Sample$ - 0$ - 0
1011amWater, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g.,EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)30Per Sample$ - 0$ - 0
1011anWater, Total Recoverable Petroleum Hydrocarbons (FL-PRO)30Per Sample$ - 0$ - 0
1011aoWater, PCBs [or Aroclors] (EPA 608 or EPA 8082)30Per Sample$ - 0$ - 0
1011apWater, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011aqWater, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011arWater, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011asWater, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011atWater, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)30Per Sample$ - 0$ - 0
1011auWater, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)30Per Sample$ - 0$ - 0
1011avWater, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011awWater, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011axWater, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011ayWater, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)30Per Sample$ - 0$ - 0
1011azWater, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)30Per Sample$ - 0$ - 0
1011baWater, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)30Per Sample$ - 0$ - 0
1011bbWater, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E)30Per Sample$ - 0$ - 0
1011bcWater, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)30Per Sample$ - 0$ - 0
1011bdWater, Nitrate [as N] (EPA 300.0 or EPA 353.2)30Per Sample$ - 0$ - 0
1011beWater, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)30Per Sample$ - 0$ - 0
1011bfWater, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)30Per Sample$ - 0$ - 0
1011bgWater, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)30Per Sample$ - 0$ - 0
1011bhWater, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE30Per Sample$ - 0$ - 0
1011biWater, Residue-filterable [Total Dissolved Solids] (SM 2540 C)30Per Sample$ - 0$ - 0
1011bjWater, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)30Per Sample$ - 0$ - 0
1011bkWater, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)30Per Sample$ - 0$ - 0
1011blWater, Heterotrophic Plate Count (SM 9215 B)30Per Sample$ - 0$ - 0
1011bmWater, Acute Bioassay-96 Day, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)30Per Sample$ - 0$ - 0
1011bnWater, Acute Bioassay-96 Day, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)30Per Sample$ - 0$ - 0
1011boWater, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)30Per Sample$ - 0$ - 0
1011bpWater, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
1011bqWater, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)30Per Sample$ - 0$ - 0
1011brWater, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)30Per Sample$ - 0$ - 0
1011bsWater, BTEX/MTBE + Naphthalene (EPA 8260)30Per Sample$ - 0$ - 0
1011btWater, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)30Per Sample$ - 0$ - 0
1011buWater, Methane (EPA SOP RSK-175)30Per Sample$ - 0$ - 0
1012SOIL SOURCE REMOVAL RELATED$ - 0
1012aSheet Piling Installation for ≤ 20 feet deep Excavation20Per Sq. Foot$ - 0$ - 0
1012bSheet Piling Rental for ≤ 20 feet deep Excavation20Per Sq. Foot/Day$ - 0$ - 0
1012cSheet Piling Installation for > 20 feet deep Excavation20Per Sq. Foot$ - 0$ - 0
1012dSheet Piling Rental for > 20 feet deep Excavation20Per Sq. Foot/Day$ - 0$ - 0
1012eConventional Soil Excavation and Loading ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012fLDA Excavation and Loading Without Casing ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012gLDA Excavation and Loading With Surface Casing ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012hLDA Excavation and Loading With Driven Casing < 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012iFlowable Fill Concrete and Installation4Per Cubic Yard$ - 0$ - 0
1012jClean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012kClean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012lClean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012mClean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards4Per Cubic Yard$ - 0$ - 0
1012nPea Gravel50Per Ton$ - 0$ - 0
1012o#57 Stone50Per Ton$ - 0$ - 0
1012pDewatering System, up to 12 well points (includes installation)30Per Day$ - 0$ - 0
1012qDewatering System, up to 12 well points (includes installation)4Per Week$ - 0$ - 0
1013PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL$ - 0
1013aRemove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity2Per Tank$ - 0$ - 0
1013bRemove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity3Per Tank$ - 0$ - 0
1013cRemove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity2Per Tank$ - 0$ - 0
1013dRemove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity1Per Tank$ - 0$ - 0
1014DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL$ - 0
1014aRemoval and Loading of Asphalt and/or Concrete - up to 4 inch thickness100Per Square Foot$ - 0$ - 0
1014bLoading, Transport and Disposal/Recycle Clean Overburden100Per Ton$ - 0$ - 0
1014cTransport and Disposal of Clean Concrete100Per Ton$ - 0$ - 0
1014dTransport and Disposal of Mixed Debris100Per Ton$ - 0$ - 0
1014eTransport and Disposal of Petroleum Impacted Soil (includes 50 gallon drum)30Per Drum$ - 0$ - 0
1014fTransport Petroleum Impacted Soil (bulk) ≤ 100 miles100Per Ton$ - 0$ - 0
1014gTransport Petroleum Impacted Soil (bulk) > 100 miles100Per Ton$ - 0$ - 0
1014hDisposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons4Per Ton$ - 0$ - 0
1014iDisposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons4Per Ton$ - 0$ - 0
1014jDisposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons4Per Ton$ - 0$ - 0
1014kDisposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons4Per Ton$ - 0$ - 0
1014lTransport and Disposal of Petroleum Contact Water (includes drum)30Per Drum$ - 0$ - 0
1014mTransport and Disposal of Petroleum Contact Water (bulk)30Per Gallon$ - 0$ - 0
1014nTransport and Disposal of Petroleum Product (includes drum)30Per Drum$ - 0$ - 0
1014oTransport and Disposal of Petroleum Product (bulk)30Per Gallon$ - 0$ - 0
1014pDelivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container4Per Week$ - 0$ - 0
1015RESURFACING$ - 0
1015aAsphalt Paving - 2 inch thickness (includes sub-base)150Per Square Foot$ - 0$ - 0
1015bAsphalt Paving - additional 1 inch thickness100Per Square Foot$ - 0$ - 0
1015cConcrete Paving - 4 inch thickness (includes sub-base)50Per Square Foot$ - 0$ - 0
1015dCrushed Lime Rock Cover - 2 inch thickness150Per Square Foot$ - 0$ - 0
1016IN-SITU INJECTION$ - 0
1016aDirect Push Boring with In-Situ Injection10Per Foot$ - 0$ - 0
1016bIn-Situ Injection Into Existing Well/Treatment Point4Per Injection Point$ - 0$ - 0
1016cMaterials to be Injected10Per Gallon$ - 0$ - 0
1016dGroundwater Injection System (not by direct push)4Per Week$ - 0$ - 0
1016eGroundwater Injection System (not by direct push)4Per Month$ - 0$ - 0
1017REMEDIATION SYSTEM INTEGRATION AND STARTUP$ - 0
1017aSystem Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points2Per Startup$ - 0$ - 0
1017bSystem Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points2Per Startup$ - 0$ - 0
1018REMEDIAL ACTION - PACKAGED WORK SCOPES

(Including Remediation System Equipment)

1019SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES
(Including Remediation System Equipment)$ - 0
1019aGroundwater Treatment System Package - Medium30Per Day$ - 0$ - 0
1019bGroundwater Treatment System Package - Medium4Per Week$ - 0$ - 0
1019cAir Sparge System Package - Medium30Per Day$ - 0$ - 0
1019dAir Sparge System Package - Medium2Per Week$ - 0$ - 0
1019eMPE System Package - Medium30Per Day$ - 0$ - 0
1019fMPE System Package - Medium4Per Week$ - 0$ - 0
1019gSVE System Package - Medium30Per Day$ - 0$ - 0
1019hSVE System Package - Medium2Per Week$ - 0$ - 0
1020MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES
(Excluding Remediation System Equipment)$ - 0
1020aSystem O&M Package - Small4Per Month$ - 0$ - 0
1020bSystem O&M Package - Medium4Per Month$ - 0$ - 0
1021REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M)$ - 0
1021aGroundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021bGroundwater Treatment System - Stand Alone Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
1021cGroundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021dGroundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
1021eAir Sparge System - Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021fAir Sparge System - Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
1021gAir Sparge System - Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021hAir Sparge System - Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
1021iMPE System - Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021jMPE System - Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
1021kMPE System - Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021lMPE System - Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
1021mGroundwater Treatment - Add On - Small - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021nGroundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.3Per Month$ - 0$ - 0
1021oGroundwater Treatment - Add On - Small - Long Term > 6 mos.3Per Month$ - 0$ - 0
1021pGroundwater Treatment - Add On - Medium - Long Term > 6 mos.3Per Month$ - 0$ - 0
1022REPORTS (Excluding Professional Engineering and Professional Geology Services)$ - 0
1022aSoil Source Removal Report4Per Report$ - 0$ - 0
1022bGeneral Site Assessment Report4Per Report$ - 0$ - 0
1022cNatural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual4Per Report$ - 0$ - 0
1022dConstruction Drawings and Specs Report4Per Report$ - 0$ - 0
1022eAs-Built Drawings (P.E. Sealed red lined modifications)4Per Drawing$ - 0$ - 0
1022fLetter/NPDES Report4Per Report$ - 0$ - 0
1022gRemedial Action General Report4Per Report$ - 0$ - 0
1022hRemedial Action Interim Report4Per Report$ - 0$ - 0
1022iFree Product Recovery Report4Per Report$ - 0$ - 0
1022jWell Abandonment/Site Restoration Report4Per Report$ - 0$ - 0
1023PERSONNEL (Excluding Professional Engineer and Professional Geologist)$ - 0
1023aProgram Manager (Key)40Per Day$ - 0$ - 0
1023bEngineer (Key)40Per Day$ - 0$ - 0
1023cGeologist/Geoscientist (Key)80Per Day$ - 0$ - 0
1023dScientist/Technical Specialist (Key)80Per Day$ - 0$ - 0
1023eField Technician (Key)80Per Day$ - 0$ - 0
1023fDraftsperson80Per Day$ - 0$ - 0
1023gAdministrative80Per Day$ - 0$ - 0
1023hLaborers and Security Guards80Per Day$ - 0$ - 0
1024PROFESSIONAL ENGINEERING AND PROFESSIONAL GEOLOGY SERVICES$ - 0
1024aProfessional Engineer (Key)80Per Day$ - 0$ - 0
1024bProfessional Geologist (Key)80Per Day$ - 0$ - 0