About this file

This document is an architectural floor plan and Infection Control Risk Assessment (ICRA) plan for Phase 1 of the AE Canteen Kitchen Renovation project at Ralph H. Johnson VA Medical Center in Charleston, South Carolina. The plan, prepared by Atriax, pllc and Quality Consulting Engineers, PLLC, was submitted for final board approval on December 16, 2025, and shows the first floor layout with construction containment measures. The project involves renovation of the canteen kitchen facility within a fully sprinklered building.

The ICRA plan establishes construction protocols including temporary construction barriers, a designated construction entrance, and maintenance of negative pressure (-0.03" W.C. minimum) within the construction area using an inclined manometer gage (0.00" to 0.1" W.C. range). The VA will remove and reinstall an existing door upon project completion. The floor plan identifies multiple functional areas including linen distribution, changing room, uniform/clothing room, canteen freezer, retail office, kitchen facilities, general storage, and food service areas. The document serves as a planning tool for managing infection control during the renovation project to ensure patient safety and facility operations continuity at the VA Medical Center.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RALPH H. JOHNSON VA MEDICAL CENTER

KEY PLAN

PHASING PLAN - KEY

ICRA PLAN NOTES:

1. CONSTRUCTION AREA.

2. TEMPORARY CONSTRUCTION BARRIER.

3. VA TO REMOVE EXISTING DOOR AND STORE. VA TO REINSTALL DOOR UPON

PROJECT COMPLETION.

4. PROVIDE INCLINED MANOMETER GAGE WITH RANGE FROM 0.00" TO 0.1" W.C.

MAINTAIN A MINIMUM OF -0.03" W.C. IN CONSTRUCTION AREA. REFERENCE

FACILITY ICRA PLAN FOR ADDITIONAL INFORMATION

5. CONSTRUCTION ENTRANCE

D ep ar tm en t of V et er an s

A ff ai rs

CHARLESTON, SC

AE CANTEEN KITCHEN

RENOVATION PHASE 2

www.atriaxgroup.com

Atriax, pllc 703 Main Avenue SW PO Box 1629, Hickory, NC 28603

TELEPHONE: 828.315.9962

FAX: 828.315.9964

FULLY SPRINKLERED

Quality Consulting Engineers, PLLC 6277-600 Carolina Commons Dr, #350

Indian Land SC 29707 djones@qualityconsultingengineers.com

803.207.5450

QCE ENGINEERING LICENSE #4298, QCE PROJ #22059

FINAL BD SUBMISSION - 16 DECEMBER 2025

12/16/2025

FLOOR PLAN - ICRA (PH 1)

FIRST FLOOR

A102

SCALE: 1/4" = 1'-0"

PHASE '1' - ICRA FLOOR PLAN1

A102

2. VA TO REMOVE / RELOCATE ALL MOBILE EQUIPMENT TO

KITCHEN AND SERVICE AREAS OUTSIDE OF THE WORK AREA.

CONTRACTOR SHALL COORDINATE DISCONNECTION OF ALL

WATER / POWER / GAS FOR EQUIPMENT TO ALLOW REMOVAL

FROM WORK AREA.

GENERAL NOTES

1. PROVIDE TEMPORARY PARTITIONS AS REQUIRED TO SEPARATE

DEMOLITION & CONSTRUCTION FROM EXISTING OCCUPIED

SPACES. ALL TEMPORARY PARTITIONS TO BE CONSTRUCTED OF

FIRE RESISTIVE MATERIALS, INCLUDING SHEETING.

3. CONTRACTOR TO MAINTAIN MECHANICAL NEGATIVE AIR

REQUIREMENTS IN CONSTRUCTION AREA AT ALL TIMES.

CONTRACTOR TO PROVIDE NEGATIVE AIR EQUIPMENT WITH HEPA

FILTERS AND CARBON FILTERS AS REQUIRED.

4. CONTRACTOR TO PROVIDE WALK OFF MATS AT ALL POINTS OF

EGRESS FROM CONSTRUCTION ZONE AND MUST BE CHANGED AS

NEEDED.

5. ALL TEMPORARY CONSTRUCTION DOORS SHALL HAVE VA

CORES AND DOOR CLOSERS.

6. CONTRACTOR TO REVIEW HAZARDOUS MATERIALS SURVEY

REPORT (PREPARED BY TERRACON CONSULTANTS, INC., DATED

NOV 25, 2025) FOR INFORMATION REGARDING ASBESTOS

CONTAINING MATERIALS, AND LEAD BASED PAINT LOCATIONS.

FLOOR PLAN HAZARDOUS MATERIALS NOTES

1. PRIOR TO PERFORMING ANY MECHANICAL DEMOLITION WORK

AS INDICATED ON SHEET MD101, ABATE ASBESTOS CONTAINING

GRAY / WHITE AND TAN HVAC MASTIC. REFER TO HAZARDOUS

MATERAL SURVEY REPORT (PREPARED BY TERRACON

CONSULTANTS, INC., DATED NOV 25, 2025) FOR FURTHER

INFORMATION.

2. PRIOR TO PERFORMING ANY PLUMBING DEMOLITION WORK,

ABATE ASBESTOS CONTAINING THERMAL SYSTEM INSULATION

(TSI). REFER TO HAZARDOUS MATERIAL SURVEY REPORT

(PREPARED BY TERRACON CONSULTANTS, INC., DATED NOV 25,

2025) FOR FURTHER INFORMATION.

AutoCAD SHX Text

GENERAL DINING AREA

AutoCAD SHX Text C102

AutoCAD SHX Text

COR1C2

AutoCAD SHX Text C102A

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text C119

AutoCAD SHX Text

PEST

AutoCAD SHX Text C101

AutoCAD SHX Text

FOOD SERVICE AREA

AutoCAD SHX Text

LINEN DISTRIBUTION

AutoCAD SHX Text C107

AutoCAD SHX Text

FAC

AutoCAD SHX Text

CANTEEN FREEZER

AutoCAD SHX Text C116

AutoCAD SHX Text

COR1C1

AutoCAD SHX Text

UNIFORM/CLOTHING ROOM

AutoCAD SHX Text

REFRIG.

AutoCAD SHX Text C115A

AutoCAD SHX Text

SUP.

AutoCAD SHX Text

DIST

AutoCAD SHX Text C122

AutoCAD SHX Text

LINEN

AutoCAD SHX Text C123A

AutoCAD SHX Text

CHANGING

AutoCAD SHX Text

ROOM

AutoCAD SHX Text C101F

AutoCAD SHX Text C107D

AutoCAD SHX Text

BREAK

AutoCAD SHX Text

ROOM

AutoCAD SHX Text C114A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

ACCESS

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

INTO

AutoCAD SHX Text

PIPE

AutoCAD SHX Text

BASMT

AutoCAD SHX Text C115

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text C101B

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

DINING

AutoCAD SHX Text C115B

AutoCAD SHX Text

DRY

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text C101G

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

DRY

AutoCAD SHX Text C117

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

WALK-IN

AutoCAD SHX Text C117A

AutoCAD SHX Text

AREA

AutoCAD SHX Text

EXIST GRILL/HOOD

AutoCAD SHX Text C115C

AutoCAD SHX Text

ELEC RM

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text

NW

AutoCAD SHX Text

SW

AutoCAD SHX Text

NE

AutoCAD SHX Text

SE

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text

PHASE 1

AutoCAD SHX Text

PHASE 2

AutoCAD SHX Text Architect/Engineer

AutoCAD SHX Text Seal

AutoCAD SHX Text

17 JAN 2026

AutoCAD SHX Text 534-25-102

AutoCAD SHX Text Approved: Service Director

AutoCAD SHX Text Approved: Division Chief

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Of

AutoCAD SHX Text Dwg.

AutoCAD SHX Text Location

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Date

AutoCAD SHX Text Revisions Date

AutoCAD SHX Text Architect/Engineer

AutoCAD SHX Text Seal

AutoCAD SHX Text Architect/Engineer Address

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text K

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text

TGB

AutoCAD SHX Text

PRS

AutoCAD SHX Text

AutoCAD SHX Text

REVISION / CORRECTION 1/17/26

AutoCAD SHX Text

AutoCAD SHX Text

REVISION / CORRECTION 6/04/26

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
A102 icra ph1

File details come from the government source that posted it. Updated .