This document is an amendment to a Request for Quote (RFQ) for Natural Gas Line Leak and Detection Service at the Department of Veterans Affairs (VA) Medical Centers in Tuskegee and Montgomery, Alabama. The solicitation (36C24726Q0105) seeks a contractor to perform comprehensive leak detection and inspection services on above-ground, exposed natural gas piping across both campuses, with testing to be conducted in May. Key requirements include inspecting all visible exterior joints, meters, and capped stub-ups, using industry-standard leak detection methods, and providing digital inspection reports to the Contracting Officer's Representative (COR) immediately after site inspection.

The amendment includes detailed responses to 24 contractor questions covering technical specifications, operational requirements, and logistical details. Important clarifications include: invoicing can be done annually, satellite imagery is not preferred, only leak testing (not pressure testing) is required, digital reports are acceptable, and testing can be performed on any non-holiday days in May. Site visit is scheduled for November 25, 2025, with locations in Montgomery (8:00a-12:00p CST) and Tuskegee (1:00p-3:30p CST). The RFQ expires on December 3, 2025, at 11:00am CST, with questions closing on November 28, 2025, at 11:00am CST.

View the file

Other files

File Type Posted
Gas Line - Tuskegee Campus.pdf PDF
Gas Line - Montgomery Campus.pdf PDF
Inspection Sheets Montgomery.pdf PDF
S02 RFQ Site Visit in SOW 36C24726Q0105 0001 Amendment.docx DOCX document
S02 RFQ 36C24726Q0105_1.docx DOCX document
36C24726Q0105.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

12-02-2025

619-26-2-5243-0008

None

Department of Veterans Affairs CAVHCS- West & East Campus 2400 Hospital Road Tuskegee AL 36083

Department of Veterans Affairs Tuscaloosa VA Medical Center 3701 Loop Road East Tuscaloosa AL 35404-5088 To all Offerors/Bidders

36C24726Q0105

X

The purpose of this amendment is as follows:

1. To answer questions on this solicitation. See below

All terms and conditions remain the same.

Questions:

Natural Gas Leak service & Detection:

1. Do you plan on the monthly invoicing? Or can you invoice one time for the whole year for the annual inspection?

Answer:

They can invoice one time for the annual inspection.

How many miles of line are there and do you know how many services?

Answer:

There is no specific on how many miles there is or how many services is needed but the bidders are only inspecting what is coming out of the ground to the buildings. Bidders will be able to see what is asked of them when they do the site visit.

2. Can we utilize satellite imagery to provide a quote and does understand and accept, "No consideration will be given to claims based on a lack of knowledge of the existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable. “ If the VA Engineering supervisors does not wish to accept satellite imagery, please provide an answer as to why, given this is a standard industry practice. No mention of satellite imagery is in the above referenced statement. We are just stating if you do not know what you are bidding on and we accept the bid, you are stuck without change orders.

3. Is the SOW provided in document S02+RFQ+36C24726Q0105 complete? Contractor requests all technical attachments, drawings, or prior contractor documentation associated with RFQ, to ensure our bid accurately reflects all expectations, requirements, and deliverables. These were not included in the original SOW. Follow all standard codes. We will submit our previous gas line maps for reference but a site visit should be conducted to verify stub to meter line locations. The maps will not show these locations.

4. To properly prepare our procedures, please confirm the following testing parameters or indicate the VA’s required standards:

a. Are both leak testing and pressure testing required. The SOW briefly mentions pressure, but then no further explanation is provided? Just leak testing. Pressure testing not required.

b. If so, required test pressures, test duration, and allowable pressure drop (if pressure testing is included)? N/A

c. What is the preferred leak detection method (e.g., live-line detector survey, soap solution, ultrasonic devices, infrared, etc.)? Whatever the standard acceptable practice for leak detection is.

d. Are there any VA-specific calibration, equipment, or reporting standards? See attached picture as an example.

5. What are the exact limits of the inspection scope:

a. Is the testing limited strictly to piping from the Spire/Alabama Gas metering stations to the listed buildings? All visible joints and meters on campus.

b. Are all visible exterior joints only to be inspected? Yes.

c. Are the capped stub-ups at Tuskegee buildings 13, 14, and 15 to be tested? Yes.

d. Is the piping associated with the synthetic natural gas equipment station behind the cottages to be fully included? Yes.

6. The RFQ states that an inspection report must be delivered to the COR prior to departing the site. To standardize our reporting, please confirm whether the VA requires:

a. A specific report format or template? See example attached.

0. Photographs of all joints inspected? Just failed joints, leaking joints. See example attached.

0. GPS coordinates or site drawings showing inspection points? Doesn’t show inspection points. Verify locations at site visit.

b. A deficiency severity classification (minor/major/critical)? See example form.

c. A required format for immediate deficiency notifications? See example form.

d. Digital vs. hard copy submission? Digital versions. See example attached.

7. The RFQ notes that testing is to be performed in May. We request confirmation of:

a. The available date range in May for each campus? Any days but holidays.

b. Whether the campuses must be tested sequentially or may be tested concurrently? No requirement. Up to the vendor.

8. Are there any specific methodologies required for performing the Leak Detection work, such as Method 21, OGI, etc.? Any approved industry standard can be used.

System Extent & Technical Scope

9. Could VA confirm the total linear footage of natural gas piping to be surveyed at the Montgomery and Tuskegee campuses? We don’t have that number, we are only asking for the joints to be tested

10. Based on the SOW description (“all visible joints outside each building”), can VA confirm that the scope includes only above-ground, exposed, visible piping and joints, with no interior piping included? Yes

11. Would VA consider including underground piping as an optional or additive item (e.g., for mobile emission survey drives)? No

12. Are updated maps, system diagrams, or as-built drawings for the gas distribution system available? Nothing additional

13. Are there any known historical leak locations or areas of concern that the contractor should prioritize? no

14. Could VA confirm the pipe materials (steel, PE, copper, etc.) and approximate installation age ranges at each campus? Confirm steel and age unknown.

15. If a leak is identified, what response protocol does VA require? Should the contractor:

a. classify only,

b. classify and repair, or

c. identify and report only? Identify and report

16. Which leak classification standard should be used (e.g., 49 CFR Part 192 or a VA-specific standard)? Any approved industry standard can be used.

17. Is follow-up verification required after repairs performed by VA or another contractor? no

18. What is the required report format (GIS files, PDF report, marked-up maps, GPS points, or a combination)? See previous examples

2. Operational Requirements & Access

2.1 Hours of Work, Notifications, and Restrictions

19. Outside the standard Monday–Friday, 8:00 AM–4:30 PM work window, are there any campus-specific access restrictions that may affect work (e.g., clinical areas, behavioral health, surgery zones, ambulance corridors)? All outside, so no.

20. Is the “Testing to be performed in May” requirement fixed, or is VA open to a flexible work window based on site conditions or access constraints? Any days but holidays.

2.2 Security, Badging, and Escorts

21. What badging requirements apply to contractor personnel? Contractor shall contact the Contracting Officer’s Representative (COR) upon contract award, to receive instructions on how to obtain a VA Identification Badge during the performance of this contract (e.g., background check, fingerprinting, TB test, PIV card, etc.)

22. Are escorts required for:

· the entire project,

· only restricted/clinical zones,

· or not required for outdoor pipeline areas? Not required.

23. How far in advance must badge or escort requests be submitted? Contractor shall contact the Contracting Officer’s Representative (COR) upon contract award, to receive instructions on how to obtain a VA Identification Badge during the performance of this contract

2.3 Site Logistics

24. Will VA provide staging or laydown areas for contractor vehicles and equipment? We have them but should not be needed.