This is a transmittal package for HVAC and boiler plant insulation submittals at the Carl Vinson VA Medical Center in Dublin, Georgia, under contract W912HP-16-C-0018. The document includes Form 4025-R submission requesting approval for two items: DAP Alex Fast Dry Caulk (Item 25) and Polyisocyanurate Pipe Insulation (Item 26).

The DAP caulk is being submitted as a replacement for previously rejected Speedline caulk that contained formaldehyde. The polyisocyanurate pipe insulation requires a variance as it differs from the specified cellular glass closed cell insulation for chilled water pipe in the boiler room. The technical specifications show the DAP caulk is an acrylic latex plus silicone product that is paintable within 20 minutes, waterproof, and mold/mildew resistant. The HiTherm HT-300 polyisocyanurate insulation has a service temperature range of -297°F to +300°F and is specifically designed for commercial chilled water and industrial applications. The contractor notes the polyisocyanurate insulation was previously approved for chilled water piping during a preparatory meeting, though it differs from the original specifications.

View the file

Other files

File Type Posted
Additional clarification questions.docx DOCX document
23 07 11-2 Transmittal Package HVAC Insulation.pdf PDF
36C24725Q0203 0003.docx DOCX document
36C24725Q0203 0002.docx DOCX document
Cogen Plant Spec Combined 051616_COR Approval with boiler tests.pdf PDF
23 64 00-1 transmittal Package water cooled chillers.pdf PDF
Chiller Plant Design.pdf PDF
Site Visit December16th.pdf PDF
36C24725Q0203 0001.docx DOCX document
36C24725Q0203.docx DOCX document
36C24725Q0203_1.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

DATE TRANSMITTAL NO.

TO: FROM: CONTRACT NO. CHECK ONE:

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL ___________

SPECIFICATION SEC. NO. (Cover only one section with each transmittal) PROJECT TITLE AND LOCATION 01-Main Register THIS TRANSMITTAL IS FOR: (Check one)

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See

Note 3) a.

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

b.

SUBMITTAL

TYPE CODE

(See Note 8) c.

NO.

OF

COPIES

d.

CONTRACT REFERENCE

DOCUMENT

SPEC.

PARA. NO.

e.

DRAWING

SHEET NO.

f.

CONTRACTOR

REVIEW

CODE

g.

VARIATION

Enter "Y" if requesting a variation

(See Note 6) h.

USACE

ACTION

CODE

(Note 9) i.

REMARKS I certify that the above submitted items have been reviewed in detail and are correct and in the strict conformance with the contract drawings and specifications except as otherwise stated.

NAME AND SIGNATURE OF CONTRACTOR

SECTION II - APPROVAL ACTION

ENCLOSURES RETURNED (List by item No.) NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE

ENG FORM 4025-R, MAR 2012 REPLACES EDITION OF MAR 95, WHICH IS OBSOLETE.

03/02/2018 23 07 11-3

23 07 11 HVAC and Boiler Plant Insulation

W912HP-16-C-0018 NA

SFO - VA Geographic District ROs 69A Hagood Avenue Charleston, SC 29403-5107

GREENLAND ENTERPRISES, INC.

2713 MAGRUDER BLVD STE A

HAMPTON, VA 23666-1572

FY16 VAMC Dublin GA Boiler Plant Rebuild Dublin, GA

X

X

Item 25 is submitted in place of rejected Speedline caulk.

Variance is requested for:

Item 26 is proposed to be used for boiler room chilled water pipe.

Specs Section 23 07 11, PIPE INSULATION SCHEDULE on pag 861 indicates Cellular Glass Closed cell for within chiller room.

25 DAP Alex Fast Dry Caulk SD-03 0 1.4 A

26 Polyisocyanurate Pipe Insulation 0 1.4 A Y